1. How many compaction test for 1000m3 shall be performed?

2. ABET-ACCREDITATION BOARD FOR ENGINEERING AND TECHNOLOGY


True or Flase

3. QSAS-Qatar Sustainability Assessment System

4. Concordant Cable for pre-stressed is? Excess deflection

5. Moisture content of wood?


a. 2-4%
b. 4-8%
c. 10%
d. None of the above (14-18%)

6. What is dry density for normal concrete? 2400kg/m3

7. Modulus of Elasticity of a mass of rock compared to rock substance


Equivalent to…..

8. What is the excavation if in embankment there is 100,000m3 wherein with swell factor of 20%
and shrinkage factor is 15% (there are more formulas given such as loose volume, compaction
volume)
a. 115,000 m3
b. 117,xxx m3
c. 120,000 m3

9. Geosynthetic means…..
a. Reinforcement for soil and barrier for movement of soil
b. Reinforcement for soil and filter the soil
c. Reinforcement for soil and hold the movement of water in soil
d. Reinforcement for soil only

10. Factors affecting the workability of concrete?


a. Size of aggregate
b. Plasticity of the paste itself
c. Surface of aggregate
d. All of the above

11. RQD equivalent to 100% means


a. Fissured rock
b. Dense sand
c. Very dense sand
d. Very dense clay

12. Simple beam supported at which points the stress due to (i) flexure (ii). Shear equal to zero
a. At support and in the neutral center
b. At midspan and in the lower neutral center
c. At midspan and in the upper neutral center
d. At support and in the midspan neutral cente

13. Tank of dimension 4x16x2.5 flow of 35m3/m2/day what is the capacity.


2240 m3/day sol. (4*16*35)

14. A station of 00+0.00 with elevation of 174ft the required filling for culvert
a. 3.0 ft
b. 3.7 ft
c. 4.0 ft
d. 4.5 ft

15. Plywood is used for formwork


a. Tensile strength same in both direction
b. Tensile strength in short direction is greater than long direction
c. Tensile strength in long direction is greater than short direction

16. During extensive construction of retaining wall using gypsum which is not the characteristic:
a. Low cost
b. Can be easily formed in different shapes
c. Can be recyclable

17. In infrastructure what is the deepest layer for utilities


Drainage

18. For the Work package which is false statement


a. There is a start and end
b. There is resources
c. There is medium duration in each activity
d. There is breakdown estimate from top to bottom

19. In project time line which is the latest one occur:


a. Rough estimate
b. Square meter estimate
c. Bid estimate
d. …………….
20. You borrowed 1 million for 5 year with an interest of APR=9% how much ..
F= P(1+i)^n………………………………F= 1,000,000 (1+.09)^5=1,538,624

21. In which factor the design will be considered to become successful if a long concrete pile will be
constructed in a rock foundation…
a. Strength of rock
b. Strength of concrete
c. Buckling of pile
d. ………..