Você está na página 1de 68

S/4HANA: Integrated Procure to Pay

Demo ID: 11973


Last Update: 31 January 2017
S/4HANA: INTEGRATED PROCURE TO PAY

S/4HANA: Integrated Procure to Pay


1. TECHNICAL REQUIREMENTS ................................................................................................................. 3
1.1. Demo Environment & Users ................................................................................................................. 3
2. MRP ............................................................................................................................................................ 5
3. PROCUREMENT ...................................................................................................................................... 17
4. PURCHASING ANALYSIS ...................................................................................................................... 33
5. ACCOUNTS PAYABLES ......................................................................................................................... 43
6. PAYABLES DASHBOARD ...................................................................................................................... 61
S/4HANA: INTEGRATED PROCURE TO PAY

1. TECHNICAL REQUIREMENTS
1.1. Demo Environment & Users
Information

  Under the country flag you can find the demo package (several guided and/or self running versions).
  In the zip files, you can watch and download several video versions (with and without audio, use
space bar to start/stop them)

  LIVE ONLINE DEMO


  Due to the complexity of MRP – requiring a bottleneck situation – you need to investigate how
to pursue this demo. Both options definitely need some ERP backend skills:
  A) In the backend ECN system you can check transaction MD04 for material NAV-
001012 and influence the supply / demand situation (delete old Puchase and Sales
orders, create new Sales order etc)
  B) the best way is
  to create your own material (MM01 - copy from material NAV-001012 for plant
1000, Storage 0001, Sales Org. 1000, Distr. Channel 10 with all Sales, MRP,
Accounting tabs). With your own material name you can give the demo a different
Industry flavor (Retail, Consumer, Manfactruing etc.)
  create 2 Vendor Info records for your material and vendors 1000 1nd 1001
  maintain the source list for your material reflecting the 2 different suppliers
  finally create a Sales order for your material and customer 66688 with delivery
date today
  The roles required for the demo are MRP Controller, Purchasing Manager and Finance
Accounts Payables.
  The Lumira files can typically be accessed via the Fiori tiles. If you face a problem here (screen
size, charts cannot be displayed), you might want to open the Lumira files directly vial the link
below.

Showroom Information
Showroom SAP Simple Finance 1.0 Q 2015 (Public) which can be accessed via the SAP Demo Cloud portal:
www.sapdemocloud.com (restricted – registration required until end of Sapphire 2015).

Fiori Access

Steps for accessing the demo in the S/4HANA Digital Core ALL Edition 2016 V2 (Public) showroom:
Direct Access URL (can be used for access from inside the showroom)
Demo URL: https://s42-fin-emea.sapdemocloud.com
Username: MATHEWP
Password: welcome

Steps for accessing the demo in the Green Phoenix Showroom:


System Access Details (from the WTS within the showroom)
Demo URL: https://cimgn.wdf.sap.corp:8118/sap/bc/ui5_ui5/ui2/ushell/shells/abap/FioriLaunchpad.html
Username: MATHEWP
Password: welcome

Lumira Access
Lumira files storage (accessible only within the showroom): \\cldvmxwi00041\files$\S4HANA\Lumira

User Details (Fiori & Lumira)


S/4HANA: INTEGRATED PROCURE TO PAY

Login: MATHEWP
Pwd: welcome
S/4HANA: INTEGRATED PROCURE TO PAY

2. MRP
What to do and what to say What you should see

My first role in this demo is that of


an MRP controller.Our customer
Smart Solutions has ordered 50
navigation devices from us
and the material is supposed to be
shipped today. So, I click on the
'Monitor Material Shortages' app to
take look at my material
shortages.

1. Click on Monitor Material


Shortage

To make it easier to identify my


material 'NAV-001012', I adapt the
view by clicking on the
'Personalize' icon.

2. Click on Personalize
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

3. Personalize the view by


deselecting the entry 'Vendor'.
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

4. Scroll down the list, add the


entries 'Available
Stock','Procurement Type, and
'Safety Stock'.
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

5. Click Available Stock.


S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

6. Click Procurement Type.


S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

7. Click Safety Stock.


S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

8. Click OK to confirm selection

9. Scroll to bottom to select GPS


Navigational System.
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

I select my material 'NAV-001012'


by ticking the respective checkbox.

10. Click on check box to select


my material 'NAV-001012'

11. Click .

12. Click .
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

Now, the system shows me the


shortage list for the GPS device
'NAV-001012'.
The sales order from Smart
Solutions with its material shortage
of 177 pieces is highlighted.
At the bottom, the system
proposes different options to solve
this issue.
To getter a better impression of
the situation, I click on the
'Graphics' icon.

Now, the system shows me the


stock/requirements list which
contains two shortages.
In the first line, I can see that I
currently have 198 navigation
devices on stock.
As a safety stock of 50 pieces for
this material has been defined in
the system, only 148 devices are
currently available.

The second line shows the sales


order from Smart Solutions with
today's date.
As I need 325 devices to fulfil this
order, I have a material shortage
of 177 pieces.
This is indicated by a red button in
the same line.
As the sales order from Smart
Solutions needs to be handled
immediately, I will take care of the
second material shortage at some
later point in time.
Now, I click on the red button next
to the sales order from Smart
Solutions to manage the material
shortage.

13. Click .
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

14. Click .

15. Click Calender to select


Delivery Date.

16. Select 4/Sep/2015.


S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

17. Select Create Requisition.

Now, the system automatically


creates a purchase requisition for
which I need to enter a delivery
date.
I select August 04, 2015, the
required quantity is already pre-
filled by the system, and I confirm
this by clicking on 'OK'.

18. Click .

I see that my material shortage on


August 04 is solved. I click on the
'List' icon to go back to the table
view of the 'Shortages' list.

19. Click to go back to


Shortage List.
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

20. Click here to scroll to view


details.

I see that my material shortage


on Sep 04 is solved. I click on the
'List' icon to go back to the table
view of the 'Shortages' list.

21. Click to navigate Home.


S/4HANA: INTEGRATED PROCURE TO PAY

3. Procurement
What to do and what to say What you should see

1. Click Approve Purchase


Requisitions.

The systems now displays files


which belong to my purchase
requisition 10043112-10.
These are files that help me make
my decision and can e.g. contain
product specifications or pictures.
After I have taken a look at the
available information, I click on
'Approve' to approve my purchase
requisition.

On the left-hand side, I see a list of


all the purchase requisitions.
On the other side, the system
displays further information on the
purchase requisition that I just
created as an MRP controller.
As I can tell from the number next
to the 'Paper Clip' icon, additional
files have been attached to this
purchase requisition.
I click on the 'Paper Clip' icon to
display them.

2. Click .

As a comment field is mandatory, I


enter 'Urgent for Mathew P' and
click on 'Submit'. Now, the system
displays a summary of the
purchase requisition that I just
approved.

3. The Note field is filled out.


S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

4. Click .

5. Click to navigate to SAP


Fiori Launchpad.

Next, I click on the 'Order from


Requisitions' app to create a
purchase order from my purchase
requisition.

6. Click on Order from


Requisitions
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

As you can see at the top, there is


quite a number of purchase
requisitions available already.
As I am interested in a purchase
requisition for which the supplier
assignment has already taken
place, I click on 'Assigned PRs'.

7. Click Assigned PRs .

8. Unselect All Checkboxes.

Now, the system shows me all


assigned purchase requisitions.
The respective icon at the top has
turned red. My purchase
requisition with the number
'10043112-10' is the second one
seen from the top.

The respective supplier for my


purchase requisition is C.E.B.
Berlin.

9. Click check box to select PR


item
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

To simulate a PO from this


purchase requisition,
I select the respective entry and
click on 'Simulate POs'.

10. Click .

The system displays a message


telling me that a purchase order
has been created.
To look at it, I click on 'Created
POs' at the top.

11. Click Simulated POs .

12. Click .
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

13. Click Created POs .

Take note of the Purchase Order


number as you will need it for later
reference. In this case it's
PO 4500018515.

14. Click to navigate to SAP


Fiori Launchpad.

In the meantime, I have received


the GPS devices that I ordered
from C.E.B. Berlin.
For this reason, I click on the 'Post
Goods Entry to Stock' app to
create a goods receipt document.

15. Click on Post Goods Entry to


Stock
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

16. Clicking the opens a drop-


down list.

17. Clicking the entry


selects it.

The goods receipt document


contains information such as the
document and posting date, the
name of the delivered material,
its quantity, its storage location, as
well as the respective vendor.
After checking that everything has
been delivered as ordered,
I click on 'Item OK' to indicate this.

18. Click .
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

19. Click .

20.

is double-clicked.
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

21. Click to close.

22. Click to navigate to SAP


Fiori Launchpad.
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

Now, I would like to post the


invoice that I received from C.E.B.
Berlin for delivering the GPS
devices.
To do so, I click on the 'Post
Supplier Invoice' app.

23. Click on Post Supplier


Invoice

24. Click on As invoice date, I


enter today's date, i.e. August 04 ,
2015
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

25. Click 4, September 2015.

26. The Material Number field is


filled out.

I enter the overall amount of


8.294,30 EUR which consists of
the tax amount of 1.324,30 € and
the gross price of 6.970 €. The tax
amount of 19% has already been
calculated by the system.

As I have received all devices as


ordered, I confirm this by ticking
the checkbox next to the purchase
order number.

27. Select the check box next to


the purchase order number
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

28. Click to do the actual


posting of the supplier invoice.

29. Click to confirm.

30. Click .
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

31. The Amount field is filled out.

32. Click .

33.

is double-clicked.
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

34. Click to close.

35. Click to navigate to SAP


Fiori Launchpad.
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

36. Click Track Purchase Order.

On the left-hand side, the system


displays a list of all my purchase
orders.
On the right-hand side, I see
detailed information on my
purchase order, such as delivery
date and amount.
At the top, I can see all the steps
that my purchase order has gone
through, so far.
In the detailed view on the right, I
click on the delivery date of my
purchase order to display further
information.

37. The Search field is filled out.

38. Click C.E.B. BERLIN.


S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

39. Click .

Here, I can see the pricing


conditions of my purchase order
At the bottom, the system displays
the respective documents for
goods receipt and invoicing.

40. Click here to scroll.

41. Click to navigate to SAP


Fiori Launchpad.
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see


S/4HANA: INTEGRATED PROCURE TO PAY

4. Purchasing Analysis
What to do and what to say What you should see

First of all, I have to establish a


connection to the SAP HANA
database.
The Lumira files only contain the
data structure, while the data itself
is stored in the database.
After entering my user and
password, I click on 'Connect'.

I am still in the role of a


Purchasing Manager, but now I
would like to do some purchasing
analysis to see the implications of
my purchase order regarding the
overall situation of my company.
For this, I take a look at my SAP
Lumira Purchasing Dashboard
which combines SAP Fiori and
SAP Lumira . From the SAP Fiori
Launchpad, I click on the
'Purchasing Dashboard' app to
open it up.

1. Click on Purchasing
Dashboard

My Purchasing Dashboard
consists of several helpful reports
which are visualized with SAP
Lumira.
The underlying SAP HANA
database provides me with real-
time access to my purchasing data
from the last twenty years.
Due to this massive amount of
data, my reports all look quite
cluttered. Let's see what happens
if I display only purchasing data
with regard to my supplier 'C.E.B.
Berlin'.
.

2. The field is filled out.


S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

Now, all my reports only show


purchasing data for C.E.B. Berlin.

In the last twenty years, there


have been almost 700 purchase
orders for C.E.B. Berlin with an
overall purchasing amount of
almost 7 million €.

The selected filter is shown in the


upper left corner of the screen.
Now, I would like to take a look at
the number of purchase orders by
year and month.

In the respective report, I click on


the 'Full Screen' icon to maximize
the report

3. Click .

4. Click 0000001000.
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

5. Click on Full screen .

Here, I can see when and how


many purchase orders were
created for this supplier.

6. Click on .

7. Click on Full screen .


S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

8. Click .

Now, I would like to see a


comparison of the number of
purchase orders and purchase
order amounts by vendor.
In the 'POs and PO Amount by
Vendor' report, I click on the 'Full
Screen' icon to maximize the
report.

9. Click on Full screen .

10. Click .
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

11. The Year/Month field is filled


out.

12. Click .
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

Now, I would like to drill down from


the overall picture to the level of
the purchase order that I just
created. For this reason,
I set filters for April 2015, C.E.B.
Berlin, and the purchase order
number. On the right-hand side, I
set the respective filters one after
the other by clicking on them.
I can see that my reports react
immediately to these changes.

13. Click the checkbox to select


201508

Now drill down the change for the


month 09,2015

14. The Year/Month field is filled


out.
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

15. Click Search .

16. Click the checkbox to select


201509
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

17. The Purchasing Document


field is filled out.

18. Click Search .


S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

19. Click 4500018515.

The filters that I have set are


displayed in the top left corner of
the screen.
Now, the reports focus exclusively
on my current purchase order for
supplier C.E.B. Berlin.
What I can also see now is that my
supplier C.E.B. Berlin belongs to
my purchase organization 'Best
Run Germany'.

20. Click to navigate to Fiori


Launchpad.
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see


S/4HANA: INTEGRATED PROCURE TO PAY

5. Accounts Payables
What to do and what to say What you should see

Now, I am in the role of an


Finance Accounts Payable. I click
on the 'Manage Vendor Line Items'
app to launch it.

1. Click on Manage Vendor Line

2. The Vendor field is filled out.

3. The Company Code field is


filled out.

4. Click .
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

Now, the system displays a table


containing the line items for C.E.B.
Berlin, i.e. vendor '1000'. I click on
'Personalize' to adjust the columns
of the table.

5. Click .

The system shows a long list of


column names that I can choose
from.
I scroll further down to select the
entry 'Due on'.
I add this information to my table
view by clicking on 'OK'.

6. Click here to scroll.


S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

7. Select the "due on" check box


S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

8. Click .

Now, I can see that the column


'Due on' has been added to my
table view.

9. Click Due on.


S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

I click on 'Due on' to change the


sorting of this column.
I click on 'Sort Descending' to
display the most recent line items
at the top.

10. Click Sort descending .

Now, the display of the line items


has changed accordingly.
At the very top of the table, I can
now see the line item belonging to
my recently created purchase
order.
Now, I decide to take a look at the
respective G/L document.
To open it, I double-click on the
document number of my line item.

11. Double Click on Document


Number 5100000026

I find myself in the entry view of


the G/L document for my purchase
order. Here, I can see to which
G/L acounts the respective credit
and debit amounts are posted.
As I would like to have an
overview of all the documents that
belong to my purchase order, I
click on 'Related Documents' at
the top.

12. Click RELATED DOCUMENT.


S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

The system displays a list of all the


documents relating to my
purchase order. Here, I see e.g.
the number of the invoicing
document, the number of the
accounting document,
the number of the purchase order
and the files for the approval of the
purchase requisition. I click on
'Home' to return to SAP Fiori
Launchpad.

13. Click to navigate to Fiori


Launchpad.

Now, I would like to take look at


the balances for vendor C.E.B.
Berlin. In the SAP Fiori
Launchpad, I click on the 'Display
Vendor Balances' app.

14. Click on Display Vendor


Balances .

I enter my vendor '1000' and


company code '1000', and fiscal
year '2015.
Then, I click on the 'Search' icon to
start the search for the vendor
balances of C.E.B. Berlin in 2015.

15. The Vendor field is filled out.

16. The Company Code field is


filled out.

17. Click .
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

The system shows a list of debit


and credit postings and cumulative
balances along with imputed
interest

18. Send an account statement to


C.E.B. Berlin by Clicking
.

I click on the 'Correspondence'


field to open a pop-up menu with
predefined correspondence types.
From the drop-down list, I select
the entry 'Account statement' by
clicking on it

19. Click
Correspondence dropdown .
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

20. Click
.

21. Click Vendor.


S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

In the field 'Postings from', I click


on the Calendar icon to open up
the calender view. I select January
1, 2015 by clicking on the
respective date in the calendar
view.

22. Click calender . To select


the date as " 01/01/2015"

23. Click .
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

24. Click .

Now, I can choose between


different options: I can generate a
preview of the document,
I can send an e-mail or fax to the
vendor, or I can print it out. I click
on 'Preview'.

25. Click .

26. Click Here to Scroll.


S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

27. Click to return to the SAP


Fiori Launchpad.

28. Click on Create Manual


Payment

29. The Vendor field is filled out.


S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

30. Click 1000.

31. Click House Bank .

32. Click 1000.


S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

33. Select Tax Code .

34. The Search field is filled out.

35. Click .
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

36. Click VA.

37. The field is filled


out.

Now, I see that the system has


automatically taken over all the
details for the bank that I have
selected in the previous screen.

I click on 'Calculate Tax' to update


the field 'Amount' and then I click
on 'Create' to create the actual
payment.

38. Click Calculate Tax.


S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

39. Click .

The system displays a messsage


telling me that the document for
the manual payment has been
created successully.

To take a look at the document in


PDF format, I click on 'Open PDF'.

40. Click Open PDF.

Now, I take a look at the details of


the manual payment and close the
tab with the PDF document to
return to the success message

41. Click Close .


S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

I click on 'Show Details' to display


further details on the success
message.

42. Click .

As you can see the payment has


been scheduled for a payment run
which takes place today. Now, I
click on the 'Home' icon to return
to the SAP Fiori Launchpad.

43. Click .

44. Click to return to Fiori


Launchpad.
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

Now, I want to display further


information regarding the payment
and the scheduled payment run. In
SAP Fiori Launchpad, I click on
the 'Schedule Payment Proposal'
app.

45. Click on Schedule Payment


Proposals

To search for the payment, I click


into the field 'Created By' and
enter 'jonesd' as a search term.
The system displays a list of
matching search hits.
I select the entry for 'MATHEWP'
by clicking on it. Then I click on the
'Search' icon to start searching.

46. The Created By field is filled


out.

47. Click .

48. Click .
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

As the payment has already been


processed, there is a message
telling me that no payment
proposal can be found. However,
there is one processed payment in
the 'Payment Processed' tab. I
open the tab by clicking on it.

49. Click .
S/4HANA: INTEGRATED PROCURE TO PAY

6. Payables Dashboard
What to do and what to say What you should see

I am still in the role of an Finance


Accounts Payable. Now, I would
like to do some analysis on my
accounts payable situation. For
this reason, I click on the
'Accounts Payables Dashboard'
app in the Fiori Launchpad.

1. Click on Accounts payables


Dashboards

2. The Company Code field is


filled out.
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

3. Click Search .
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

4. Click on check box to filter


company code "1000"

Next, I want to take a look at the


payable amounts in company code
currency by net due days. I click
on the 'Full Screen' icon of the
respective report to maximize it.

5. Click on .

The report visualizes the payables


amount in combination with the net
due days. I can e.g. see that the
largest part of the payables
amount is due 45 days after the
invoice. I click on the 'Close' icon
to close the report and return to
my Payables Dashboard.

6. Click .
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

Next, I want to take a look at the


payables amount by posting
period and arrears aging range. I
click on the 'Full Screen' icon of
the respective report to maximize
it.

7. Click on full screen.

The report visualizes the payables


amount by posting period and
arrears aging range.

8. Click on the 'Close' to close


the report and return to my
Payables Dashboard.

The next report that I would like to


take a look at is 'Accounts Payable
by Vendor Country'. I click on the
'Full Screen' icon to maximize the
report.

9. Click on fullscreen .
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

This graphic illustrates at one


glance in which countrys my
company has the highest
proportion of the payables amount.
I can see immediately the country
with the highest accounts payable
is the U.S. as this country is
shown in dark green color.
I click on 'Cancel' to close the
report and return to my Purchasing
Dashboard.

10. Click .

Now, I would like to drill down from


the overall picture to the level of
the payables amount of today's
purchase orders.
For this reason, I set filters for
Vendor '1000' and company code
'1000'. On the right-hand side, I
set the respective filters one after
the other by clicking on them.

I can see that my reports react


immediately to these changes.

11. The Vendor field is filled out.

12. Click Search .

13. Select 0000001000.


S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

14. The PostingMonth field is


filled out.

15. Click .

16. Click 09.


S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

17. Click on Fullscreen .

18. Click .

19. Click to return to Fiori


Launchpad.
S/4HANA: INTEGRATED PROCURE TO PAY

What to do and what to say What you should see

Você também pode gostar