TARGET CONSTRUCTION SAUDI ARABIA [W.L.

L]
PROJECT: CLOSED DRAIN SYSTEM IN ABQIQ PLANT PROJECT
BI-10-00934

Construction Two Week Look Ahead from October 13, 2018 up to October 26, 2018

MR MR
Rev Description P.O NO. with Latest Rev. PO VENDOR NOC Letter No. PO QTY MR QTY
No.
.

KSA-MP-0220 IDEALINK
008 C INSTRUMENT CABLE Lot Lot
Rev 1 DEKORON & CABLE AND SAUDI CABLE COMPANY

011 E PRESSURE RELIEF VALVE (PZV) KSA-MP-0229 YUSAF BIN AHMED KANOO COMPANY 12 Nos 30 Nos.
Rev 0

026 D MCCP'S / MOTOR STARTER/OVERLOAD PROTECTION KSA-MP-0702 Waha Electric Supply Company of Saudi Arabia (WESCOSA) 97 Nos 97 Nos

029 B LV PANEL BOARD KSA-MP-0578 GEDAC ELECTIC Lot Lot

034 B REBARS 0934-SMC-PO-2015/005 Rev.00 AL-FAIZAL Lot Lot

049 D GAUGE (PRESSURE / TEMPERATURE / FLOW) KSA-MP-0284 Aschroft Al Al Rushaid 620 Nos 620 Nos

050 B DENSITY METER KSA-MP-0438 Saudi Fall Company Emerson Process Mamagment 12 Nos 12 Nos

062 B DRY TYPE TRANSFORMERS 15 KVA & 30 KVA KSA-MP-0579 AQESA 7 Nos 7 Nos

066 B local control station (LCS) panel board KSA-MP-0580 GAS ARABIAN Lot
Rev 0 (FEAM) Lot

Saudi Aramco: Company General Use


TARGET CONSTRUCTION SAUDI ARABIA [W.L.L]
PROJECT: CLOSED DRAIN SYSTEM IN ABQIQ PLANT PROJECT Date: 11-Oct-07
Rev : 0

PIPE SUPPORT INSTALAATION AND BACKFILLING PLAN FOR BI-10-00934 Closed Drain System in Abqiq plant

14-Oct-17
15-Oct-17
16-Oct-17
17-Oct-17
18-Oct-17
19-Oct-17
20-Oct-17
21-Oct-17
22-Oct-17
23-Oct-17
24-Oct-17
25-Oct-17
26-Oct-17
27-Oct-17

28-Oct-17

29-Oct-17

30-Oct-17
Activity
ITEM Plant area Activity QTY Planned
Duration

Mon

Mon

Mon
Wed

Wed
Thu

Thu
Sun

Sun

Sun
Tue

Tue
Sat

Sat

Sat
Fri

Fri
1 Abqaiq Plant Construction 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 106 Installation of Pipe support 9 4 2 2 2 3
2 106 Pipe support backfilling 9 2 4 5
3 251 Pipe support backfilling 3 2 2 1
4 271 Installation of Pipe support 15 4 4 4 4 3
5 271 Pipe support backfilling 51 12 5 5 5 2 2 6 6 4 4 4 4 4
6 282 Installation of Pipe support 18 4 5 5 4 4
7 282 Pipe support backfilling 32 5 8 8 8 4 4
8 64A Pipe support backfilling 14 5 5 3 2 2 2
9 D15 Pipe support backfilling 16 4 4 4 4 4
10 D87 Installation of Pipe support 8 3 3 3 2
11 D87 Pipe support backfilling 8 2 4 4

INCR.Support Installation Count 2 2 2 3 0 0 0 9 9 8 7 3 3 0 2 0 0


INCR.Support backfilling Count 0 5 6 10 12 12 0 8 8 6 6 12 12 0 12 12 12

Cumm.Support installation Count 2 4 6 9 9 9 9 18 27 35 42 45 48 48 50 50 50


Cumm.Support backfilling Count 0 5 11 21 33 45 45 53 61 67 73 85 97 97 109 121 133

Total Pipe support to be installed 50

Total Pipe support to be backfilled 133

Saudi Aramco: Company General Use