Escolar Documentos
Profissional Documentos
Cultura Documentos
COLLECTOR KOLLAM
Complaint
Thereafter, Branch Manager was not ready to sanction the PMEGP loan. She
ignored me and made outrageous demands. First, she demanded for the Civil
Report and there was no action taken by The Branch Manager. She was delaying
the loan for Civil Report verification in such a way that would cause loss and
damages for me. Since only ten days are remaining for the financial year if she
continues to delay I may not receive the loan sanction on time.
But I attended and completed E.D.P training for 10 days. I will obtain the
E.D.P Training certificate only after showing the sanction letter from the Indian
Bank, Chadayamangalam Branch. But the Branch Manager is not willing to give
the sanction letter.
The Branch Manager is making objection and delays for unknown reasons. I
am willing to satisfy any other condition set by the Bank.
I kindly request you to intervene for an immediate action and give the
necessary direction to KVIC, Indian Bank Chadayamangalam Branch and Zonal
Manager Indian Bank to pass my PMEGP loan on or before 10 days else I would
lose the benefit of the loan.
Yours faithfully,