VISION DOCUMENT

PUBLIC WORKS DEPARTMENT


DIST WARDHA

 Current status of road length in various


categories of road.
 Proposed Development and extention in
road length in various
categories during 2001-2021.

Vision document package 1


 Road Development Plan, Target,
Achievement
 Expected expenditure for completing the
mission, with reference
to village connectivity.

OBJECTIVE

• Every village should be on the road map to assure 100% village


connectivity by all weather road.
• Every village populated more than 1500 population should be
connected by at least Four separate roads.

Vision document package 1


• Every village population between 1000 to 1500 should be connected by
Three separate road.
• Every village population between 500 to 1000 should be connected by Two
separate road.
• District place to other District place should be connected by Four
lane road.
• Taluka to District place shlould be connected by 1.5 lane road.
• To assure connectivity in all weather bridges, C.D. works culvert to
be constructed.
• To avoid interruptions in rainy season on all the bridges should be
high level.
• To avoid the traffic conjunction in city area every taluka & District
place should be facilated bypass or Ring road.

Vision document package 1


TARGETED ROAD LENGTH IN DISTRICT UNDER ROAD DEVELOPMENT PLAN 2001-2021.

SR.NO. CATEGORY OF ROAD TARGETED LENGTH UPTO 2021


1. MAJOR STATE HIGHWAY 108.00 KM.
2. STATE HIGHWAY 815.39 KM.
3. MAJOR DISTRICT ROAD 867.82 KM.
4. OTHER DISTRICT ROAD 1182.75 KM.
5. VILLAGE ROAD 2311.40 KM.
TOTAL 5393.76 KM.

Vision document package 1


• Additional proposed length in Major State Highway Category
under road Development Plan 2001-2021
- 2.60 Km.

Cost to Cover above road length -


260 Lakhs
Source of Funds - CRF - 260

Lakhs
• Additional proposed length in State Highway Category under
R.D.P.2001-2021- 53.50 Km.

Cost to Cover above road length -


5515.00 Lakhs

Source of Fund B.O.T. - 2805.00

Lakh

Vision document package 1


C.R.F. - 2635.00

Lakh
NABARD - 75.00 Lakh

• Additional Proposed length in Major District Road Category


- 214.90 Km.

Cost to Cover above road length -


10134.00 Lakh

Source of Funds CRF -


9725 Lakh

NABARD - 412 Lakh

• Additional Proposed length in Other District Road Category


- 196.25 KM.

Vision document package 1


Cost to Cover above road length -
67.39 Lakh
Source of Funds PMGSY -
2702.00 Lakh
District Plan - 2943.00

Lakh
Trible Plan - 1094.00

Lakh
• Additional Proposed length in Village Road Category
- 1491.15 KM.
Cost to Cover above road length -
71561 Lakh

Vision document package 1


Source of Funds PMGSY -
18886.00 Lakh
District Plan - 46561.00

Lakh
Trible Plan - 6114.00

Lakh
---------------------------------------------------------------------------------------
------------------------------------------
Summary -
Total Length to be executed in all Category of Road
- 1955.80 Km.
Cost to Cover above extended length
- 94212.00 Lakh

Vision document package 1


---------------------------------------------------------------------------------------
------------------------------------------

 TOTLA POPULATION OF WARDHA DISTRICT - 1236736

 TOTAL NO. OF VILLAGES IN DISTRICT - 967

 TOTAL NO. OF VILLAGES CONNECTED BY ROAD - 965

 TOTAL NO. OF VILLAGES REMAIN UNCONNECTED - 2

Vision document package 1


 EXPECTED PERIOD ACHIEVING 100% CONNECTIVITY -

MARCH 2012

Vision document package 1