Escolar Documentos
Profissional Documentos
Cultura Documentos
Email: zahid.liaqat69@gmail.com
Mobile: +92304-4128143
OBJECTIVE
To achieve challenging position in the technical environment, where I can make a significant
contribution towards organization excellence.
Professional Experience 5 Year
ASHRAF FEBRICATION AND ENGINEERING
APRI 24, 2017 ~ to date. As a QA/QC Inspector
RAVI-TECH MANUFACTURING PVT LTD
January 06, 2016 ~ April 18 2017. As a QC Inspector
HI-TECH MANUFACTURING PVT LTD.
September 04, 2013 ~ December 29, 2015 as a QC Inspector
Academic Qualification
DAE (chemical) PBTE PUNJAB PAKISTAN
MATRICULATION STANDARD. (Science group) BISE BWP PUNJAB PAKISTAN
ASNT-NDT Level-II( PT, MT,) From ( TWI Institue ) Certificate Number NDT/190985/00138)
6hrHeat Stress Training conducted by IIRSM.
Workshop experience:
Fabrication of 30 M.Ton LPG bowser:
Position: QC inspector
Employer: HI-TECH MANUFACTURING PVT LTD.
Client: Cress LPG PVT LTD (TPI UNI Team)
Position: QC inspector
Employer: HI-TECH MANUFACTURING PVT LTD.
Client: Allied ceramic TPI (TUV)
Position: QC Inspector
Employer: HI-TECH MANUFACTURING PVT LTD.
Client: Pyramid LPG PVT LTD
Position: QC Inspector
Employer: RAVI-TECH MANUFACTURING PVT LTD.
Client: Max Energy LPG PVT LTD
Position: QC inspector
Employer: RAVI-TECH MANUFACTURING PVT LTD
Client: Lite Fuel LPG PVT LTD
Position: QC inspector
Employer: RAVI-TECH MANUFACTURING PVT LTD
Client: BABA FAREED LPG PVT LTD
Position: QC inspector
Employer: RAVI-TECH MANUFACTURING PVT LTD
Client: ICI PAKISTAN
Position: QC inspector
Employer: RAVI-TECH MANUFACTURING PVT LTD
Client: MIDDLE EAST ENGINEERING PVT LTD
Position: QC Inspector
Employer: HI-TECH MANUFACTURING PVT LTD.
Client: CRESS LPG
Position: QC Inspector
Employer: ASHRAF FEBRICATION AND ENGINEERING
Client: NDC (National Development Complex)
Position: QC Inspector
Employer: ASHRAF FEBRICATION AND ENGINEERING
Client: Fast Cable
FABRICATION OF PENSTOCK PIPE AND DAM OUTLET PIPE FOR 102 MW HYDRO POWER
PROJECT GULPUR PAKISTAN
Client : ANDRITZ HYDRO (GERMANY)
Employer: ASHRAF FEBRICATION
AND ENGINEERING
Position: QA/QC welding Inspector
SITE EXPERIENCE
FABRICATION AND INSALLATION OF STORAGE TANK AT ICI KHEWRA PAKISTAN
Position : QC Inspector
Employer : RAVI-TECH MANUFACTURING PVT LTD
Client : ICI KHEWRA
FABRICATION AND INSALLATION OF STEEL THIN SHELL 102 MW HYDRO POWER PROJECT
GULPUR PAKISTAN
Position: QC Inspector
Employer: ASHRAF FEBRICATION AND ENGINEERING
Client : DAELIM- LOTTE J/V
In Hours Training
PT level II
Phase array ultrasonic testing (PAUT)
RT,MPI,UT
COMPUTER LITERACY
MS Office
Responsibilities:
Preparing WPSs (Welding Procedure Specifications)
Preparing WPQs (Welder Performance Qualifications)
Carrying out Visual Welding inspections
Taking Welders Tests for performance qualifications (WPQ)
Ensuring Qualified welders are performing welding on job, in qualified welding position.
Ensuring welding is being done as per approved WPS and PQR.
Checking welder stamps near the finished welding joints.
Keeping record of baking of low hydrogen electrodes- E 7018.
Keeping record of drying of low hydrogen electrodes- E 7018.
Check the temperature of electrodes E 7018 in desiccators.
Preparing ITP (Inspection and Test Plan) or QIP (Quality Inspection Plan / Traveler.
Checking marking for cutting of materials.
Ensuring “material hard punching transferring” on cut parts.
Checking Layout of materials.
Fit ups checking.
Giving “Go Ahead” for NDT (RT, UT, MT and PT) after visual inspection of welding.
Checking overtly of individual shells and completed Vessel.
Performing Dimensional Check.
Checking material identification of each part of vessel etc.
Checking Hydrostatic Test.
Raising NCR (Non conformance report) if there is out of tolerance or non compliance of
materials.
Arranging RT & UT Teams.
Preparing NDT reports (RT, MT & PT,).
Performing PT (Penetrating Testing) & MPI (magnetic particle testing).
Preparation of Dossier/IDM.
Incoming Material:
Incoming material identification and inspection as per PR (purchase requisition), PO (purchase order).
To ensure conformance of incoming material according to ASME II PART A, Part C ASME B 16.5 ,
ASME 16.9 and ASME 16.11
FABRICATION INSPECTION
Checking marking for cutting of materials
Ensuring “material hard punching transferring” on cut parts
Checking Layout of materials
Fit ups checking
Giving “Go Ahead” for NDT (RT, UT, MT and PT) after visual inspection of welding
Checking Ovalty of individual shells and completed Vessel
Performing Dimensional Check
Checking material identification of each part of vessel etc
Checking Hydrostatic Test
Checking Pneumatic test of pads
Checking Pad leak test
Checking Water fill Test of storage tanks
Raising NCR (Non conformance report) if there is out of tolerance or non compliance of
materials
FINAL DOCUMENTATION
Preparation of Dossier/IDM
Reviewing IDM
Handing over copy of IDM to Client
CALIBRATION
To check calibration of measuring and test equipments.
To prepare Calibration equipment log.
KEY SKILLS
Proactive with superior oral and written communication and interpersonal skills
Capable of working in a multitasked, fast paced and changing environment.
Well developed leadership, organizational, analytical and problem-solving skills.
Highly trustworthy, discreet and ethical.
Safety oriented
Possess a positive attitude
Be a self-starter and self-motivated
Have the ability to work well with team members & in tough environments.
English ( good), Urdu (Excellent), Punjabi (very Good)
PERSONAL INFORMATION
Nationality Pakistani
City Rahim Yar Khan ,Punjab , Pakistan
Date of birth July 18, 1992
Hobbies Cricket, Reading
Marital status Single
Languages English, Urdu, Punjabi
Reference Available On Demand