Você está na página 1de 2

AKOYA OXYGEN 916 VILLAS

CLUSTER V (BASSWOOD), CLUSTER U (MIMOSA) & CLUSTER 6P1 (AMAZONIA EXT)

NON-CONFORMANCE REPORT # Contract No./NCR - Serial No. 002


P106. 24, 25&32: Akoya Oxygen Basswood, Project No. P106.24/25/32
Mimosa and Amazonia, Extension, Al Yufrah 2, Date 30.08.2018
Project Name
Dubai, United Arab Emirates.
Issued to Arabtec Construction LLC
Contract
Subject COSHH Materials unsafe storage
Drawing/Spec Ref
Description

Repeated violation, COSHH materials exposed to direct sun without any protection.
Follow the site HSE plan and MSDS for protecting COSHH materials.

This is for your information, urgent action and record.

Attachments: Photos
Consultant: Received by Contractor
Name: Wafiq Nashashibi Name: Mohammed Abu Khafaja
Signature: Date: 30.08.2018 Signature: Date:
Distribution: Contractor (Original) Consultant QS Others
Contractor’s Response:
Corrective action proposed (provide target date):

Measures taken to prevent recurrence:

Contractor’s Authorized Rep: Received by Consultant:


Name: Name:
Signature: Date: Signature: Date:
Approval to Proceed with the Proposed Corrective Action:
Approved to proceed Approved to proceed with comments as noted Not Approved
Comments:

Attachments:
Consultant: Received by Contractor
Name: Name:
Signature: Date: Signature: Date:
Distribution: Consultant QS Contractor(Original) Others
NCR Closeout:
Corrective action implemented Yes No
Comments:

Consultant:
Name:
Signature: Date:
Distribution: Consultant QS Contractor Others

Form ME-F1-70
AKOYA OXYGEN 916 VILLAS
CLUSTER V (BASSWOOD), CLUSTER U (MIMOSA) & CLUSTER 6P1 (AMAZONIA EXT)

Form ME-F1-70