Você está na página 1de 30

UNIVERSITAS GADJAH MADA

FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN


LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 2.50 - 3.50 m


Location : Tarakan Date : 21 Maret 2016
Boring no.: B - 18 (STA 1+570) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 29.63 24.00

3 Mass of dry soil + piknometer M2 gram 46.73 41.00

4 Mass of dry soil + water + piknometer M3 gram 89.78 84.39

5 Mass of water + piknometer M4 gram 79.19 73.80

6 Temperature toC 27.50

7 A = M2 - M1 17.10 17.00

8 B = M3 - M4 10.59 10.59

9 C=A-B 6.51 6.41

10 Specific Gravity, G1 = A/C 2.63 2.65

11 Average specific gravity, G1 2.64

12 Gwater at toC 0.9963

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.64

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 3.00 - 3.50 m


Location : Tarakan Date : 21 Maret 2016
Boring no.: B - 2 (STA 0+320) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 28.47 30.72

3 Mass of dry soil + piknometer M2 gram 45.46 47.71

4 Mass of dry soil + water + piknometer M3 gram 88.91 91.25

5 Mass of water + piknometer M4 gram 78.39 80.77

6 Temperature toC 27.50

7 A = M2 - M1 16.99 16.99

8 B = M3 - M4 10.52 10.48

9 C=A-B 6.47 6.51

10 Specific Gravity, G1 = A/C 2.63 2.61

11 Average specific gravity, G1 2.62

12 Gwater at toC 0.9963

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.62

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 4.00 - 4.50 m


Location : Tarakan Date : 07 Maret 2016
Boring no.: B - 6 (STA 1+000) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 28.20 33.17

3 Mass of dry soil + piknometer M2 gram 40.40 45.38

4 Mass of dry soil + water + piknometer M3 gram 85.62 90.13

5 Mass of water + piknometer M4 gram 78.15 82.69

6 Temperature toC 28.00

7 A = M2 - M1 12.20 12.21

8 B = M3 - M4 7.47 7.44

9 C=A-B 4.73 4.77

10 Specific Gravity, G1 = A/C 2.58 2.56

11 Average specific gravity, G1 2.57

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.57

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 2.50 - 3.00 m


Location : Tarakan Date : 07 Maret 2016
Boring no.: B - 13 (STA 2+350) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 31.25 31.49

3 Mass of dry soil + piknometer M2 gram 43.24 43.48

4 Mass of dry soil + water + piknometer M3 gram 88.48 88.94

5 Mass of water + piknometer M4 gram 81.15 81.67

6 Temperature toC 28.00

7 A = M2 - M1 11.99 11.99

8 B = M3 - M4 7.33 7.27

9 C=A-B 4.66 4.72

10 Specific Gravity, G1 = A/C 2.57 2.54

11 Average specific gravity, G1 2.56

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.56

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 3.50 - 4.00 m


Location : Tarakan Date : 29 Februari 2016
Boring no.: B - 7 (STA 1+500) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 28.20 33.17

3 Mass of dry soil + piknometer M2 gram 48.20 53.17

4 Mass of dry soil + water + piknometer M3 gram 90.77 95.28

5 Mass of water + piknometer M4 gram 78.15 82.69

6 Temperature toC 27.50

7 A = M2 - M1 20.00 20.00

8 B = M3 - M4 12.62 12.59

9 C=A-B 7.38 7.41

10 Specific Gravity, G1 = A/C 2.71 2.70

11 Average specific gravity, G1 2.70

12 Gwater at toC 0.9963

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.70

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 3.00 - 3.50 m


Location : Tarakan Date : 29 Februari 2016
Boring no.: B - 5 (STA 0+700) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 31.25 31.49

3 Mass of dry soil + piknometer M2 gram 48.56 48.79

4 Mass of dry soil + water + piknometer M3 gram 91.98 92.48

5 Mass of water + piknometer M4 gram 81.15 81.67

6 Temperature toC 28.00

7 A = M2 - M1 17.31 17.30

8 B = M3 - M4 10.83 10.81

9 C=A-B 6.48 6.49

10 Specific Gravity, G1 = A/C 2.67 2.67

11 Average specific gravity, G1 2.67

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.67

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 3.00 - 3.50 m


Location : Tarakan Date : 29 Februari 2016
Boring no.: B - 9 (STA 1+570) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 28.47 30.71

3 Mass of dry soil + piknometer M2 gram 43.47 45.72

4 Mass of dry soil + water + piknometer M3 gram 87.67 90.02

5 Mass of water + piknometer M4 gram 78.39 80.77

6 Temperature toC 27.50

7 A = M2 - M1 15.00 15.01

8 B = M3 - M4 9.28 9.25

9 C=A-B 5.72 5.76

10 Specific Gravity, G1 = A/C 2.62 2.61

11 Average specific gravity, G1 2.61

12 Gwater at toC 0.9963

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.61

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 3.00 - 3.50 m


Location : Tarakan Date : 29 Februari 2016
Boring no.: B - 1 (STA 0+320) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 29.63 24.00

3 Mass of dry soil + piknometer M2 gram 46.73 41.10

4 Mass of dry soil + water + piknometer M3 gram 89.81 84.37

5 Mass of water + piknometer M4 gram 79.19 73.80

6 Temperature toC 28.00

7 A = M2 - M1 17.10 17.10

8 B = M3 - M4 10.62 10.57

9 C=A-B 6.48 6.53

10 Specific Gravity, G1 = A/C 2.64 2.62

11 Average specific gravity, G1 2.63

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.63

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 2.00 - 2.50 m


Location : Tarakan Date : 29 Februari 2016
Boring no.: B - 6 (STA 1+000) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 31.44 25.86

3 Mass of dry soil + piknometer M2 gram 43.35 37.77

4 Mass of dry soil + water + piknometer M3 gram 88.37 83.07

5 Mass of water + piknometer M4 gram 81.15 75.85

6 Temperature toC 28.00

7 A = M2 - M1 11.91 11.91

8 B = M3 - M4 7.22 7.22

9 C=A-B 4.69 4.69

10 Specific Gravity, G1 = A/C 2.54 2.54

11 Average specific gravity, G1 2.54

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.54

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 3.50 - 4.00 m


Location : Tarakan Date : 29 Februari 2016
Boring no.: B - 3 (STA 0+510) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 31.86 26.56

3 Mass of dry soil + piknometer M2 gram 47.87 42.57

4 Mass of dry soil + water + piknometer M3 gram 91.30 86.73

5 Mass of water + piknometer M4 gram 81.31 76.77

6 Temperature toC 28.00

7 A = M2 - M1 16.01 16.01

8 B = M3 - M4 9.99 9.96

9 C=A-B 6.02 6.05

10 Specific Gravity, G1 = A/C 2.66 2.65

11 Average specific gravity, G1 2.65

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.65

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 4.00 - 4.50 m


Location : Tarakan Date : 29 Februari 2016
Boring no.: B - 1 (STA 0+320) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 27.92 27.87

3 Mass of dry soil + piknometer M2 gram 43.93 43.87

4 Mass of dry soil + water + piknometer M3 gram 87.78 88.20

5 Mass of water + piknometer M4 gram 77.89 78.31

6 Temperature toC 28.00

7 A = M2 - M1 16.01 16.00

8 B = M3 - M4 9.89 9.89

9 C=A-B 6.12 6.11

10 Specific Gravity, G1 = A/C 2.62 2.62

11 Average specific gravity, G1 2.62

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.62

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 4.00 - 4.50 m


Location : Tarakan Date : 29 Februari 2016
Boring no.: B - 4 (STA 0+650) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 27.92 27.87

3 Mass of dry soil + piknometer M2 gram 40.96 40.91

4 Mass of dry soil + water + piknometer M3 gram 84.83 85.24

5 Mass of water + piknometer M4 gram 77.89 78.31

6 Temperature toC 28.00

7 A = M2 - M1 13.04 13.04

8 B = M3 - M4 6.94 6.93

9 C=A-B 6.10 6.11

10 Specific Gravity, G1 = A/C 2.14 2.13

11 Average specific gravity, G1 2.14

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.14

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 3.00 - 3.50 m


Location : Tarakan Date : 07 Maret 2016
Boring no.: B - 19 (STA 1+780) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 31.43 25.86

3 Mass of dry soil + piknometer M2 gram 47.45 41.88

4 Mass of dry soil + water + piknometer M3 gram 91.13 85.83

5 Mass of water + piknometer M4 gram 81.15 75.85

6 Temperature toC 28.00

7 A = M2 - M1 16.02 16.02

8 B = M3 - M4 9.98 9.98

9 C=A-B 6.04 6.04

10 Specific Gravity, G1 = A/C 2.65 2.65

11 Average specific gravity, G1 2.65

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.65

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 2.00 - 2.50 m


Location : Tarakan Date : 07 Maret 2016
Boring no.: B - 3 (STA 0+510) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 31.86 26.56

3 Mass of dry soil + piknometer M2 gram 49.61 44.30

4 Mass of dry soil + water + piknometer M3 gram 92.35 87.76

5 Mass of water + piknometer M4 gram 81.31 76.77

6 Temperature toC 28.00

7 A = M2 - M1 17.75 17.74

8 B = M3 - M4 11.04 10.99

9 C=A-B 6.71 6.75

10 Specific Gravity, G1 = A/C 2.65 2.63

11 Average specific gravity, G1 2.64

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.64

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 3.50 - 4.00 m


Location : Tarakan Date : 07 Maret 2016
Boring no.: B - 14 (STA 0+900) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 28.46 30.71

3 Mass of dry soil + piknometer M2 gram 40.45 42.71

4 Mass of dry soil + water + piknometer M3 gram 85.69 88.03

5 Mass of water + piknometer M4 gram 78.39 80.77

6 Temperature toC 28.00

7 A = M2 - M1 11.99 12.00

8 B = M3 - M4 7.30 7.26

9 C=A-B 4.69 4.74

10 Specific Gravity, G1 = A/C 2.56 2.53

11 Average specific gravity, G1 2.54

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.54

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 3.00 - 3.50 m


Location : Tarakan Date : 07 Maret 2016
Boring no.: B - 12 (STA 2+000) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 29.63 24.00

3 Mass of dry soil + piknometer M2 gram 41.72 36.09

4 Mass of dry soil + water + piknometer M3 gram 86.41 81.08

5 Mass of water + piknometer M4 gram 79.19 73.80

6 Temperature toC 28.00

7 A = M2 - M1 12.09 12.09

8 B = M3 - M4 7.22 7.28

9 C=A-B 4.87 4.81

10 Specific Gravity, G1 = A/C 2.48 2.51

11 Average specific gravity, G1 2.50

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.50

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 1.00 - 1.50 m


Location : Tarakan Date : 16 Maret 2016
Boring no.: B - 9 (STA 1+570) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 28.20 33.17

3 Mass of dry soil + piknometer M2 gram 46.21 51.18

4 Mass of dry soil + water + piknometer M3 gram 89.31 93.84

5 Mass of water + piknometer M4 gram 78.15 82.69

6 Temperature toC 28.00

7 A = M2 - M1 18.01 18.01

8 B = M3 - M4 11.16 11.15

9 C=A-B 6.85 6.86

10 Specific Gravity, G1 = A/C 2.63 2.63

11 Average specific gravity, G1 2.63

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.63

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 3.00 - 3.50 m


Location : Tarakan Date : 16 Maret 2016
Boring no.: B - 16 (STA 0+650) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 31.25 31.49

3 Mass of dry soil + piknometer M2 gram 48.28 48.26

4 Mass of dry soil + water + piknometer M3 gram 91.73 92.09

5 Mass of water + piknometer M4 gram 81.15 81.67

6 Temperature toC 28.00

7 A = M2 - M1 17.03 16.77

8 B = M3 - M4 10.58 10.42

9 C=A-B 6.45 6.35

10 Specific Gravity, G1 = A/C 2.64 2.64

11 Average specific gravity, G1 2.64

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.64

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 4.00 - 4.50 m


Location : Tarakan Date : 16 Maret 2016
Boring no.: Quarry Bawah Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 28.46 30.71

3 Mass of dry soil + piknometer M2 gram 50.46 52.71

4 Mass of dry soil + water + piknometer M3 gram 92.08 94.42

5 Mass of water + piknometer M4 gram 78.39 80.77

6 Temperature toC 28.00

7 A = M2 - M1 22.00 22.00

8 B = M3 - M4 13.69 13.65

9 C=A-B 8.31 8.35

10 Specific Gravity, G1 = A/C 2.65 2.63

11 Average specific gravity, G1 2.64

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.64

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 2.50 - 3.00 m


Location : Tarakan Date : 16 Maret 2016
Boring no.: Quarry Atas Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 29.63 24.00

3 Mass of dry soil + piknometer M2 gram 51.74 46.12

4 Mass of dry soil + water + piknometer M3 gram 92.90 87.54

5 Mass of water + piknometer M4 gram 79.19 73.80

6 Temperature toC 28.00

7 A = M2 - M1 22.11 22.12

8 B = M3 - M4 13.71 13.74

9 C=A-B 8.40 8.38

10 Specific Gravity, G1 = A/C 2.63 2.64

11 Average specific gravity, G1 2.64

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.64

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 2.00 - 2.50 m


Location : Tarakan Date : 14 Maret 2016
Boring no.: B - 10 (STA 1+780) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 31.43 25.86

3 Mass of dry soil + piknometer M2 gram 51.45 45.89

4 Mass of dry soil + water + piknometer M3 gram 93.63 88.33

5 Mass of water + piknometer M4 gram 81.15 75.85

6 Temperature toC 28.00

7 A = M2 - M1 20.02 20.03

8 B = M3 - M4 12.48 12.48

9 C=A-B 7.54 7.55

10 Specific Gravity, G1 = A/C 2.66 2.65

11 Average specific gravity, G1 2.65

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.65

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 4.00 - 4.50 m


Location : Tarakan Date : 14 Maret 2016
Boring no.: B - 10 (STA 1+780) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 31.86 26.56

3 Mass of dry soil + piknometer M2 gram 43.66 38.37

4 Mass of dry soil + water + piknometer M3 gram 88.59 84.01

5 Mass of water + piknometer M4 gram 81.31 76.77

6 Temperature toC 28.00

7 A = M2 - M1 11.80 11.81

8 B = M3 - M4 7.28 7.24

9 C=A-B 4.52 4.57

10 Specific Gravity, G1 = A/C 2.61 2.58

11 Average specific gravity, G1 2.60

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.60

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 2.50 - 3.00 m


Location : Tarakan Date : 14 Maret 2016
Boring no.: B - 11 (STA 2+000) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 27.91 27.88

3 Mass of dry soil + piknometer M2 gram 38.91 38.88

4 Mass of dry soil + water + piknometer M3 gram 84.69 85.09

5 Mass of water + piknometer M4 gram 77.89 78.31

6 Temperature toC 28.00

7 A = M2 - M1 11.00 11.00

8 B = M3 - M4 6.80 6.78

9 C=A-B 4.20 4.22

10 Specific Gravity, G1 = A/C 2.62 2.61

11 Average specific gravity, G1 2.61

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.61

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 4.50 - 5.00 m


Location : Tarakan Date : 14 Maret 2016
Boring no.: B - 11 (STA 2+000) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 27.55 28.90

3 Mass of dry soil + piknometer M2 gram 38.55 39.90

4 Mass of dry soil + water + piknometer M3 gram 84.17 85.59

5 Mass of water + piknometer M4 gram 77.41 78.80

6 Temperature toC 28.00

7 A = M2 - M1 11.00 11.00

8 B = M3 - M4 6.76 6.79

9 C=A-B 4.24 4.21

10 Specific Gravity, G1 = A/C 2.59 2.61

11 Average specific gravity, G1 2.60

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.60

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 3.00 - 3.50 m


Location : Tarakan Date : 21 Maret 2016
Boring no.: B - 17 (STA 0+700) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 29.94 30.68

3 Mass of dry soil + piknometer M2 gram 45.64 46.38

4 Mass of dry soil + water + piknometer M3 gram 89.79 90.11

5 Mass of water + piknometer M4 gram 80.08 80.41

6 Temperature toC 28.00

7 A = M2 - M1 15.70 15.70

8 B = M3 - M4 9.71 9.70

9 C=A-B 5.99 6.00

10 Specific Gravity, G1 = A/C 2.62 2.62

11 Average specific gravity, G1 2.62

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.62

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 2.50 - 2.00 m


Location : Tarakan Date : 21 Maret 2016
Boring no.: B - 20 (STA 2+350) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 28.52 31.48

3 Mass of dry soil + piknometer M2 gram 46.52 49.48

4 Mass of dry soil + water + piknometer M3 gram 89.29 92.70

5 Mass of water + piknometer M4 gram 78.10 81.49

6 Temperature toC 28.00

7 A = M2 - M1 18.00 18.00

8 B = M3 - M4 11.19 11.21

9 C=A-B 6.81 6.79

10 Specific Gravity, G1 = A/C 2.64 2.65

11 Average specific gravity, G1 2.65

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.65

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 0.50 - 1.00 m


Location : Tarakan Date : 14 Maret 2016
Boring no.: B - 13 (STA 2+350) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 27.08 30.97

3 Mass of dry soil + piknometer M2 gram 45.05 48.94

4 Mass of dry soil + water + piknometer M3 gram 88.44 91.89

5 Mass of water + piknometer M4 gram 77.24 80.69

6 Temperature toC 28.00

7 A = M2 - M1 17.97 17.97

8 B = M3 - M4 11.20 11.20

9 C=A-B 6.77 6.77

10 Specific Gravity, G1 = A/C 2.65 2.65

11 Average specific gravity, G1 2.65

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.65

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 3.50 - 4.00 m


Location : Tarakan Date : 14 Maret 2016
Boring no.: B - 15 (STA 0+520) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 26.58 26.14

3 Mass of dry soil + piknometer M2 gram 43.58 43.14

4 Mass of dry soil + water + piknometer M3 gram 86.92 86.67

5 Mass of water + piknometer M4 gram 76.45 76.12

6 Temperature toC 28.00

7 A = M2 - M1 17.00 17.00

8 B = M3 - M4 10.47 10.55

9 C=A-B 6.53 6.45

10 Specific Gravity, G1 = A/C 2.60 2.64

11 Average specific gravity, G1 2.62

12 Gwater at toC 0.9962

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.62

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 2.50 - 3.00 m


Location : Tarakan Date : 22 Maret 2016
Boring no.: B - 8 (STA 1+500) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 28.20 33.17

3 Mass of dry soil + piknometer M2 gram 45.18 50.14

4 Mass of dry soil + water + piknometer M3 gram 88.67 93.17

5 Mass of water + piknometer M4 gram 78.15 82.69

6 Temperature toC 27.50

7 A = M2 - M1 16.98 16.97

8 B = M3 - M4 10.52 10.48

9 C=A-B 6.46 6.49

10 Specific Gravity, G1 = A/C 2.63 2.61

11 Average specific gravity, G1 2.62

12 Gwater at toC 0.9963

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.62

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY
UNIVERSITAS GADJAH MADA
FAKULTAS TEKNIK - JURUSAN TEKNIK SIPIL & LINGKUNGAN
LABORATORIUM MEKANIKA TANAH - GEOTEKNIK

SPECIFIC GRAVITY

Project : Perbaikan Landasan Bandara Depth : 2.50 - 3.00 m


Location : Tarakan Date : 22 Maret 2016
Boring no.: B - 4 (STA 0+650) Made by : Riswantini
Checked by : Dr. Fikri Faris

1 Piknometer no. 1 2

2 Mass of piknometer M1 gram 31.25 31.50

3 Mass of dry soil + piknometer M2 gram 48.26 48.51

4 Mass of dry soil + water + piknometer M3 gram 91.65 92.14

5 Mass of water + piknometer M4 gram 81.15 81.67

6 Temperature toC 27.50

7 A = M2 - M1 17.01 17.01

8 B = M3 - M4 10.50 10.47

9 C=A-B 6.51 6.54

10 Specific Gravity, G1 = A/C 2.61 2.60

11 Average specific gravity, G1 2.61

12 Gwater at toC 0.9963

13 G for 27,5 oC = G = (G1 x Gwater at toC)/(Gwater at 27.5oC) 2.61

SOIL MECHANICS LABORATORY - CIVIL AND ENVIRONMENTAL ENGINEERING DEPT. - GADJAH MADA UNIVERSITY