1 General
1.01 Project management X X X X
1.02 Construction and site management X
1.03 HSE management X
1.04 HAZOP including SIL management X
1.05 Quality assurance / Quality control X X X X Siemens/NEM for supplied equipment
1.06 Construction all risk insurance including third party X
1.07 Indoor installation X
1.08 Outdoor installation X
2.4 Control
8 Fuel systems
8.01 Unloading/receiving equipment C-B-D X X
8.02 Liquid fuel tanks C-B-D X X
8.03 Liquid fuel forwarding pump C-B-D X X
8.04 Liquid fuel conditioning system C-B-D X X
8.05 Gas receiving equipment C-B-D X X
8.08 Gas pressure boosting system C-B-D X X
8.09 Propane bottle system for starting on Liquid fuel X X
9.02 Water treatment system, incl. cooling tower make-up water treatment system C-B-D X X
9.03 Water treatment system demineralization C-B-D X X
9.04 Process drainage system C-B-D X X
9.05 Process drains treatment system C-B-D X X
9.06 Domestic waste water collection and drainage system C-B-D X X
9.07 Sanitary water treatment skid C-B-D X X
9.08 Rain water collection and drainage system C-B-D X X
9.09 Return condensate system C-B-D X X
13 Ancillary systems
13.01 Control Room Ventilation and (HVAC) System Gas Turbine Ctrl. Module C-B-D X X
13.02 Control Room Ventilation and (HVAC) System BoP C-B-D X X
13.03 Fire extinguishing system outside GT enclosure C-B-D X X
13.04 Lift equipment including cranes, hoists, lifting beams C-B-D X X
13.05 Workshop, stores and laboratory equipment C-B-D X X
13.06 Communication & information system, camera monitoring system C-B-D X X
13.07 Phone and internet connection C-B-D X X
13.08 Control room (located in electrical module) C-B-D X X
14 Piping
14.06 Demineralized water distribution system piping C-B-D X X
14.07 Drainage piping C-B-D X X
14.09 Boiler plant interconnecting piping C-B-D X X
14.1 Insulation and trace heating C-B-D X X
14.11 Steam Piping C-B-D X X
14.12 Condensate piping system C-B-D X X
14.13 Boiler blow down piping C-B-D X X
14.14 Liquid fuel piping from unloading to tank C-B-D X X
Liquid fuel piping from tank to GT Skid terminal point (including piping between
14.15 different skids) C-B-D X X
14.16 Interconnecting gas piping including supports C-B-D X X
14.17 Instrument air tubing & fittings from plant air tie-in point to equipment C-B-D X X
15 Control systems
19 Power cables
19.01 Power cables (upstream step-up transformers) C-B-D X X
19.02 Power cables or bus ducts between Generator(s) and GCB(s) MV C-B-D X X Siemens SoS (HIGS)
19.03 Power cables or bus ducts between GCB(s) and step-up transformer(s) C-B-D X X
19.04 Power cables to auxiliary transformer(s) C-B-D X X
19.05 Power cables from auxiliary transformers to distribution board C-B-D X X
DIVISION OF WORK & RESPONSIBILITIES
Combined Heat and Power Cogen (GT+HRSG)
C-Conceptual Design & Engineering, B-Basic Design & Engineering; D-Detailed Design & Engineering
Siemens Siemens NEM NEM Customer Scope
Off-shore Scope On-shore Scope Off-shore Scope On-shore Scope
Tag Description Eng. Supply Install Eng. Supply Install Eng. Supply Install Eng. Supply Install Eng. Supply Install Notes/Remarks Rev. Change
No.
20 Instrumentation cables
20.01 GT instrumentation and control cables up to junction boxes C-B-D X X X
20.03 Boiler instrumentation and control cables up to junction box/remote I/O C-B-D X X
20.04 BOP instrumentation and control cables up to junction boxes C-B-D X X C-B-D X X
20.05 Instrumentation and control cables from junction boxes up to DCS system C-B-D X X
20.06 DCS and UPS Cables C-B-D X X
20.07 Earthing/lightning and corrosion protection C-B-D X X
23.01 Installation of offices, restrooms and change rooms with washing facilities C-B-D X X
23.02 Dining room facilities (dining room and potable water) C-B-D X X
23.03 Telephone and internet connection C-B-D X X
23.04 Area and point of use lighting C-B-D X X
23.05 First aid, first aid material C-B-D X X
23.06 Security, access facilities and safe keeping of parts and equipment C-B-D X X
23.07 Heated and unheated stores including lockable tool stores C-B-D X X
23.08 Tools, site tools and equipment transport, lifting equipment, cranes C-B-D X X
23.09 Special tools for turbine(s) / Boiler(s) installation and Commissioning C-B-D X X C-B-D X X
23.10 Temporary Electrical Supply for installation and commissioning (On no charge basis) C-B-D X X
23.11 Provision of Water Supply for installation and commissioning on no charge basis C-B-D X X
23.12 Provision of Temporary Air Supply for E&C on no charge basis C-B-D X X
23.13 Disposal of construction / erection waste C-B-D X X
26 Commissioning
26.01 Complete functional testing of plant C-B-D X X with Siemens TFA attended
26.02 Performance test (thermodynamic) C-B-D X X with Siemens TFA attended
26.03 Site acceptance test C-B-D X X with Siemens and NEM TFA attended
26.04 Authority test(s) C-B-D X X
28 Painting
28.01 Final painting for construction at Site and touch up painting X
29 Consumables
29.01 Lube oil (for flushing as well as first fill) X
29.02 Miscellaneous oil and greases X
29.03 Transformer oil X
30 Spare Parts
30.01 Spare parts commissioning GT X
30.02 Spare parts commissioning Boiler X
30.03 Spare parts commissioning Other X