Você está na página 1de 5

DIVISION OF WORK & RESPONSIBILITIES

Combined Heat and Power Cogen (GT+HRSG)


C-Conceptual Design & Engineering, B-Basic Design & Engineering; D-Detailed Design & Engineering
Siemens Siemens NEM NEM Customer Scope
Off-shore Scope On-shore Scope Off-shore Scope On-shore Scope
Tag Description Eng. Supply Install Eng. Supply Install Eng. Supply Install Eng. Supply Install Eng. Supply Install Notes/Remarks Rev. Change
No.

1 General
1.01 Project management X X X X
1.02 Construction and site management X
1.03 HSE management X
1.04 HAZOP including SIL management X
1.05 Quality assurance / Quality control X X X X Siemens/NEM for supplied equipment
1.06 Construction all risk insurance including third party X
1.07 Indoor installation X
1.08 Outdoor installation X

2 Design & Engineering


General design engineering
2.01 Interface and terminal points co-ordination C C C-B-D X

2.2 Process engineering


2.2.01 Main flow diagram C-B-D C-B-D Siemens/NEM for supplied equipment
2.2.02 Heat and mass balance C-B-D D C-B-D Siemens/NEM for the GT and HRSG
2.2.03 Overall water balance C-B-D
2.2.04 Plant requirements C-B-D
2.2.05 Define modes of operation plant level C B-D
2.2.06 Plant control descriptions C B-D
2.2.07 P&I Diagram C-B-D C-B-D C-B-D Siemens/NEM for supplied equipment
2.2.08 System description incl. Functions C-B-D C-B-D C-B-D Siemens/NEM for supplied equipment
2.2.09 Electrical load data C-B-D C-B-D C-B-D Siemens/NEM for supplied equipment
2.2.10 Instrument data C-B-D C-B-D C-B-D Siemens/NEM for supplied equipment
2.2.11 Component data / drawings C-B-D C-B-D C-B-D Siemens/NEM for supplied equipment
2.2.12 Installation instructions C-B-D C-B-D C-B-D Siemens/NEM for supplied equipment
2.2.13 Commissioning instructions C-B-D C-B-D C-B-D Siemens/NEM for supplied equipment
2.2.14 Operation descriptions C-B-D C-B-D C-B-D Siemens/NEM for supplied equipment

2.3 Electrical engineering


2.3.01 Single line diagram C-B-D
2.3.02 Electrical load list C-B-D C-B-D C-B-D Siemens/NEM for supplied equipment
2.3.03 Earthing principle C C C-B-D
2.3.04 Plant Circuit diagram incl. connection table and cable lists C-B-D
2.3.05 Fault level study/analysis C-B-D
2.3.06 Relay coordination study/analysis C-B-D
Cable interface schedule (off-package cable connection) recommended cable
2.3.07 schedule/sizes off-package C-B-D C-B-D Siemens/NEM for supplied equipment
2.3.08 GT Synchronizing panels C-B-D

2.4 Control

For equipment outside Siemens/NEM scope of supply:


- Customer to supply I&C documentation, sufficient for
2.4.01 Plant control system DCS C-B-D DCS engineering
2.4.02 Turbine(s) C-B-D
2.4.03 Overall function diagram C C-B-D
2.4.04 Instrument and valve data sheets C-B-D C-B-D C-B-D Siemens/NEM for supplied equipment
2.4.05 Safety philosophy C C C-B-D
2.4.06 Hookup drawing C-B-D C-B-D C-B-D Siemens/NEM for supplied equipment

2.5 Civil & Construction Buildings


2.5.01 Plant general arrangement drawing C C-B-D
2.5.02 GT(s) general arrangement drawings with loads C-B-D
2.5.04 Boiler(s) general arrangement drawings with loads C-B-D
2.5.05 Electrical equipment arrangement drawing C C-B-D Siemens/NEM for supplied equipment
2.5.06 3D model multidisciplinary C-B-D
2.5.07 Pipe design/routing of pipes and support structures C-B-D
2.5.08 Cable routing and support structures C-B-D
2.5.09 Civil work & foundation design C-B-D
2.5.10 Site, civil, structure & buildings, foundation & piling design C-B-D
DIVISION OF WORK & RESPONSIBILITIES
Combined Heat and Power Cogen (GT+HRSG)
C-Conceptual Design & Engineering, B-Basic Design & Engineering; D-Detailed Design & Engineering
Siemens Siemens NEM NEM Customer Scope
Off-shore Scope On-shore Scope Off-shore Scope On-shore Scope
Tag Description Eng. Supply Install Eng. Supply Install Eng. Supply Install Eng. Supply Install Eng. Supply Install Notes/Remarks Rev. Change
No.

3 Permits and authority approval and licenses


Permits/approvals - Electrical, Environmental, soil, water, emissions, noise, air studies,
3.01 among others X
3.02 Permits/approvals/licenses - Construction (national, regional, local, etc.) X
3.03 Permits/approvals - Fire safety X
3.04 Power grid connection X

4 Gas Turbine(s) incl. auxiliaries


4.02 Pulse clean filter C-B-D X X
4.09 Internal GT Liquid Fuel system C-B-D X X
4.10 Internal GT Gas Fuel System C-B-D X X
4.12 Lube oil coolers air cooled C-B-D X X
4.13 Compressed air distribution system within GT Enclosure C-B-D X X
4.15 GT Generator Air Cooled C-B-D X X
4.16 GT Fire Fighting System C-B-D X X
4.17 CO2 Cylinders C-B-D X X
4.19 Local electrical and control room for GT(s) C-B-D X X
4.20 Battery module C-B-D X X
4.21 Anchor bolts and embedment C-B-D X X
4.24 Lagging and cladding of of the turbine exhaust system X X
4.25 GT enclosure C-B-D X X

6 Boiler(s) [HRSG(s) / OTSG(s) / WHRU(s)]


6.01 Supplementary firing system C-B-D X X
6.02 Main stack C-B-D X X
6.03 Duct between GT and HRSG and expansion joints C-B-D X X
6.04 Exhaust silencer C-B-D X X
6.05 Diverter damper with guillotine C-B-D X X
6.06 Bypass stack C-B-D X X
6.07 Bypass silencer C-B-D X X
6.09 Supporting steel structures, platform(s), stairs(s) and/or ladder(s) C-B-D X X
6.10 Anchor bolts C-B-D X X
6.11 Embedded parts C-B D X X

7 Boiler feed water system


7.01 Feed water tank deaerating type C-B-D X X
7.02 Condensate preheater incl. valves and bypass C-B-D X X
7.03 Boiler feed water pumps C-B-D X X
7.04 Boiler blow down system C-B-D X X
7.05 Steam cycle chemical dosing system C-B-D X X
7.06 Steam /water sampling & analyzing system C-B-D X X
7.07 Anchors, anchor boxes, templates, base plates, embedment D X X

8 Fuel systems
8.01 Unloading/receiving equipment C-B-D X X
8.02 Liquid fuel tanks C-B-D X X
8.03 Liquid fuel forwarding pump C-B-D X X
8.04 Liquid fuel conditioning system C-B-D X X
8.05 Gas receiving equipment C-B-D X X
8.08 Gas pressure boosting system C-B-D X X
8.09 Propane bottle system for starting on Liquid fuel X X

9 Water supply & disposal


9.01 Raw water system C-B-D X X

9.02 Water treatment system, incl. cooling tower make-up water treatment system C-B-D X X
9.03 Water treatment system demineralization C-B-D X X
9.04 Process drainage system C-B-D X X
9.05 Process drains treatment system C-B-D X X
9.06 Domestic waste water collection and drainage system C-B-D X X
9.07 Sanitary water treatment skid C-B-D X X
9.08 Rain water collection and drainage system C-B-D X X
9.09 Return condensate system C-B-D X X

10 Steam and water system


10.01 Steam by-pass & conditioning valves C-B-D X X
10.02 Condensate pumps C-B-D X X
10.03 Process steam valves C-B-D X X
10.04 Process hot water valves C-B-D X X
DIVISION OF WORK & RESPONSIBILITIES
Combined Heat and Power Cogen (GT+HRSG)
C-Conceptual Design & Engineering, B-Basic Design & Engineering; D-Detailed Design & Engineering
Siemens Siemens NEM NEM Customer Scope
Off-shore Scope On-shore Scope Off-shore Scope On-shore Scope
Tag Description Eng. Supply Install Eng. Supply Install Eng. Supply Install Eng. Supply Install Eng. Supply Install Notes/Remarks Rev. Change
No.

12 Instrument/Service air system


12.01 Compressed air system C-B-D X X

13 Ancillary systems

13.01 Control Room Ventilation and (HVAC) System Gas Turbine Ctrl. Module C-B-D X X
13.02 Control Room Ventilation and (HVAC) System BoP C-B-D X X
13.03 Fire extinguishing system outside GT enclosure C-B-D X X
13.04 Lift equipment including cranes, hoists, lifting beams C-B-D X X
13.05 Workshop, stores and laboratory equipment C-B-D X X
13.06 Communication & information system, camera monitoring system C-B-D X X
13.07 Phone and internet connection C-B-D X X
13.08 Control room (located in electrical module) C-B-D X X

14 Piping
14.06 Demineralized water distribution system piping C-B-D X X
14.07 Drainage piping C-B-D X X
14.09 Boiler plant interconnecting piping C-B-D X X
14.1 Insulation and trace heating C-B-D X X
14.11 Steam Piping C-B-D X X
14.12 Condensate piping system C-B-D X X
14.13 Boiler blow down piping C-B-D X X
14.14 Liquid fuel piping from unloading to tank C-B-D X X
Liquid fuel piping from tank to GT Skid terminal point (including piping between
14.15 different skids) C-B-D X X
14.16 Interconnecting gas piping including supports C-B-D X X
14.17 Instrument air tubing & fittings from plant air tie-in point to equipment C-B-D X X

15 Control systems

For equipment outside Siemens/NEM scope of supply:


- Customer to supply I&C documentation, sufficient for
15.01 Control system overall plant (DCS) C-B-D X X C-B-D DCS engineering
15.02 Control system turbine(s) C-B-D X X
15.03 Burner Management System (BMS) supplementary firing C-B-D X X
16.03 Gas compressor Management System C-B-D X X
15.04 Continuous emission monitoring system C-B-D X X
15.05 Communication Inside Power Plant C-B-D X X
15.06 Energy measurement commercial devices C-B-D X X

16 High voltage system (upstream step-up transformer)


16.01 High voltage system (upstream step-up transformer) C-B-D X X
16.02 Measuring and metering equipment C-B-D X X

17 Power Transmission (generator to step-up transformer)


17.01 Generator circuit breaker(s) (HIGS) MV C-B-D X X
17.02 Step-up transformer(s) C-B-D X X
17.03 Earthing and lightning protection system C-B-D X X
17.04 MV switchgear C-B-D X X
17.05 MV unit auxiliary power transformers MV/MV C-B-D X X
17.06 Black start diesel generator set C-B-D X X

18 Auxiliary system low voltage


18.01 LV main distribution boards C-B-D X X C-B-D X X Siemens GT for supplied equipment
18.02 Auxiliary transformers C-B-D X X
18.03 LV Stand by diesel generator set C-B-D X X
18.04 Uninterruptable power supply (UPS) converter and distribution C-B-D X X C-B-D X X Siemens GT for supplied equipment
18.05 Battery systems (110/220 VDC) C-B-D X X C-B-D X X Siemens GT for supplied equipment
18.06 DC distribution system C-B-D X X
18.07 Power distribution for BOP, Site and heat tracing C-B-D X X

19 Power cables
19.01 Power cables (upstream step-up transformers) C-B-D X X
19.02 Power cables or bus ducts between Generator(s) and GCB(s) MV C-B-D X X Siemens SoS (HIGS)

19.03 Power cables or bus ducts between GCB(s) and step-up transformer(s) C-B-D X X
19.04 Power cables to auxiliary transformer(s) C-B-D X X
19.05 Power cables from auxiliary transformers to distribution board C-B-D X X
DIVISION OF WORK & RESPONSIBILITIES
Combined Heat and Power Cogen (GT+HRSG)
C-Conceptual Design & Engineering, B-Basic Design & Engineering; D-Detailed Design & Engineering
Siemens Siemens NEM NEM Customer Scope
Off-shore Scope On-shore Scope Off-shore Scope On-shore Scope
Tag Description Eng. Supply Install Eng. Supply Install Eng. Supply Install Eng. Supply Install Eng. Supply Install Notes/Remarks Rev. Change
No.

19.06 BOP LV power cables to consumers C-B-D X X


19.07 GT LV power cables to consumers C-B-D C-B-D X X Sizing by Siemens

20 Instrumentation cables
20.01 GT instrumentation and control cables up to junction boxes C-B-D X X X

20.03 Boiler instrumentation and control cables up to junction box/remote I/O C-B-D X X
20.04 BOP instrumentation and control cables up to junction boxes C-B-D X X C-B-D X X

20.05 Instrumentation and control cables from junction boxes up to DCS system C-B-D X X
20.06 DCS and UPS Cables C-B-D X X
20.07 Earthing/lightning and corrosion protection C-B-D X X

21 able routing and installation material


21.01 Conduits and draw pits C-B-D X X
21.02 Cable ladders/trays/conduits incl. accessories C-B-D X X
21.03 Supporting steel for cable ladders/trays/conduits C-B-D X X
21.04 Heat tracing C-B-D X X

22 Transportation & handling of goods


22.01 FAS/FCA according to contract C-B-D X X C-B-D X X
22.02 Secure of Import License C-B-D X X
22.03 Ocean Freight C-B-D X X
22.04 Unloading at Port C-B-D X X
22.05 Customs Clearance / Duty Payment C-B-D X X
22.06 Transportation to Site C-B-D X X
22.07 Transit Insurance C-B-D X X
22.08 Secure Road Permits / Right of Way C-B-D X X
22.09 Unloading at Site C-B-D X X with Siemens TFA attended
22.10 Positioning of Equipment on Foundation C-B-D X X with Siemens TFA attended
22.11 Uncrate Shipment C-B-D X X with Siemens TFA attended
22.12 Perform Delivery Inspection C-B-D X X with Siemens TFA attended

23 Temporary site facilities

23.01 Installation of offices, restrooms and change rooms with washing facilities C-B-D X X
23.02 Dining room facilities (dining room and potable water) C-B-D X X
23.03 Telephone and internet connection C-B-D X X
23.04 Area and point of use lighting C-B-D X X
23.05 First aid, first aid material C-B-D X X
23.06 Security, access facilities and safe keeping of parts and equipment C-B-D X X
23.07 Heated and unheated stores including lockable tool stores C-B-D X X
23.08 Tools, site tools and equipment transport, lifting equipment, cranes C-B-D X X
23.09 Special tools for turbine(s) / Boiler(s) installation and Commissioning C-B-D X X C-B-D X X

23.10 Temporary Electrical Supply for installation and commissioning (On no charge basis) C-B-D X X

23.11 Provision of Water Supply for installation and commissioning on no charge basis C-B-D X X
23.12 Provision of Temporary Air Supply for E&C on no charge basis C-B-D X X
23.13 Disposal of construction / erection waste C-B-D X X

24 Civil works & buildings


Site investigation (Topographic study, Geotechnical survey, Geoseismic survey,
Bathymetry survey, Climate survey, Underground water lowering survey, Concrete
24.01 consultant, Sealing consultant) C-B-D X X
Site preparatory work (Clearing/grubbing from man-made obstacles, Demolition
work, Removal and Disposal of hazardous material, Temporary roads outside site
24.02 border, Relocation of equipment) C-B-D X X

Site preparation (Excavation/Leveling, Rock excavation/blasting, Disposal of soil/rock,


Temporary roads & surfacing; Temporary storage and barrack area, Temporary
storage and barrack area, Temporary electrical cubicles during construction and
24.03 installation, Demolition, disassembly and removal of temporary installations) C-B-D X X
Site civil works (Sewer & Underground, Pipe & Cable ways, Piling, Foundations,
24.04 Structures, Roads, Landscaping, Ponds, Fences, gates) C-B-D X X Loadings by Siemens for supplied equipment
Structures & buildings (Gas Turbines, Steam Turbines, Boilers, Electrical & Control,
transformers, fuel, water treatment, cooling structures, administration, fencing,
24.05 gate/guard, acoustical barriers) C-B-D X X
24.06 Building service systems (fire fitting & HVAC, electrical, etc.) C-B-D X X
DIVISION OF WORK & RESPONSIBILITIES
Combined Heat and Power Cogen (GT+HRSG)
C-Conceptual Design & Engineering, B-Basic Design & Engineering; D-Detailed Design & Engineering
Siemens Siemens NEM NEM Customer Scope
Off-shore Scope On-shore Scope Off-shore Scope On-shore Scope
Tag Description Eng. Supply Install Eng. Supply Install Eng. Supply Install Eng. Supply Install Eng. Supply Install Notes/Remarks Rev. Change
No.

25 Pre-commissioning Services Ends with Mechanical Completion Certificates


25.01 Leak and pressure testing C-B-D X X with Siemens and NEM TFA attended
25.02 Functional checks equipment & skids and ready for operation C-B-D X X with Siemens and NEM TFA attended
25.03 Electrical and control systems energized C-B-D X X with Siemens and NEM TFA attended
25.04 Loop testing C-B-D X X with Siemens TFA attended
25.05 (Acid) Cleaning (HRSG, steam system) C-B-D X X with NEM TFA attended

26 Commissioning
26.01 Complete functional testing of plant C-B-D X X with Siemens TFA attended
26.02 Performance test (thermodynamic) C-B-D X X with Siemens TFA attended
26.03 Site acceptance test C-B-D X X with Siemens and NEM TFA attended
26.04 Authority test(s) C-B-D X X

27 Installation and Commissioning Services


27.01 Technical Field Advisors for installation of turbine(s) X
27.02 Technical Field Advisors for installation of boiler(s) X
27.03 Technical Field Advisors for installation of process BoP X X Siemens for supplied equipment
27.04 Technical Field Advisors for installation of electrical BoP X
27.05 Technical Field Advisors for commissioning of turbine(s) X
27.06 Technical Field Advisors for commissioning of boiler(s) X
27.07 Technical Field Advisors for commissioning of process BoP X X Siemens for supplied equipment
27.08 Technical Field Advisors for commissioning of electrical BoP X X Siemens for supplied equipment

28 Painting
28.01 Final painting for construction at Site and touch up painting X

29 Consumables
29.01 Lube oil (for flushing as well as first fill) X
29.02 Miscellaneous oil and greases X
29.03 Transformer oil X

30 Spare Parts
30.01 Spare parts commissioning GT X
30.02 Spare parts commissioning Boiler X
30.03 Spare parts commissioning Other X

Você também pode gostar