Você está na página 1de 22

02 01

of
MD426 WA -486055 K 1532120.03 4400008122
01
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. REFER TO SHEET WA- 486055.0000.0002

OW NER.
TS
OF I
NOTES LEGEND ABBREVIATIONS

CONSENT
ALL FAULTY AND TROUBLE SIGNALS SHOULD COME IN THE SCADA AFS - AIR FLOW SWITCH
1. DESIGN & INSTALLATION OF HVAC SYSTEM SHALL BE IN 28. MVD - MOTORIZED VOLUME DAMPER
AND ANNUNCIATOR PANEL.
ACCORDANCE WITH SEC STANDARDS TES-P-119.19, TES-K-100.01, - SUPPLY AIR CEILING DIFFUSER WITH PLENUM BOX APD - AIR PRESSURE DROP MFACP - MAIN FIRE ALARM CONTROL PANEL
AND PTS PART 5.1B.5.4
29. ALARM/BUZZER SHOULD BE INSTALLED WITH THE HVAC CONTROL AD - ACCESS DOOR MF/SD - COMBINATION MOTORIZED FIRE/SMOKE DAMPER
PANEL, TO GIVE ALARM AT THE TIME OF ANY TROUBLE.
2. ALL DIMENSIONS ARE IN MILLIMETERS & ELEVATION LEVELS BDD - BACK DRAFT DAMPER m/s - METER PER SECOND LEGEND

TTEN
- RETURN AIR CEILING DIFFUSER
ARE IN METERS UNLESS OTHERWISE SPECIFIED.
30. ALL BELL MOUTH OPENINGS SHALL BE PROVIDED WITH INSECT WIRE BF - BAG FILTER mm - MILLIMETER
MESH SCREENS. 1. REFER TO SHEET WA- 486055.0000.0002
3. A MINIMUM OF 10 MINUTES TIME DELAY SHALL PROTECT THE BMO - BELL MOUTH OPENING WITH WIRE MESH SCREEN

THE W RI
MIN - MINIMUM
COMPRESSOR FROM RESTARTING IN CASE OF POWER FAILURE.
31. DUCTWORK SHALL BE OF ASTM A653 HOT DIPPED GALVANIZED - EXHAUST AIR CEILING DIFFUSER MAX - MAXIMUM
THIS SHALL BE ACCOMPLISHED IN TWO EQUAL STAGES. THE
STEEL SHEET, LOCK-FORMING QUALITY, HAVING G90 ZINC COATING IN BOD - BOTTOM OF DUCT
FIRST ONE SHALL BE TAKEN CARE BY A 5-MINUTE TIME DELAY MO - MOTOR
CONFORMANCE WITH ASTM A90.
RELAY INSTALLED IN THE LOCAL CONTROL PANEL IN THE EVENT BWO - BOTTOM OF WALL OPENING
M - METER
OF POWER FAILURE. THE SECOND ONE SHALL BE ACTIVATED BY - FLEXIBLE DUCT
BOB - BOTTOM OF BEAM
32. STATUS OF ALL MF/SDS SHALL BE INCLUDED IN DDC CONTROL

THOUT
A BUILT-IN 5-MINUTE TIME DELAY NORMAL CONDITION, THE NO. - NUMBER
COMPRESSOR SHALL ALWAYS START FROM A 5-MINUTE TIME PANEL, AND SHALL CLOSE WITHIN 10 SECONDS. BOG - BOTTOM OF GRILLE

DELAY AT THE BEGINNING OF ANOTHER COOLING CYCLE. SD - DUCT-MOUNTED SMOKE DETECTOR


cmh - CUBIC METER PER HOUR

WI
33. COMBINATION MF/SD WILL BE INSTALLED IN ALL HVAC OPENINGS OA - OUTSIDE AIR
4. FRESH AIR INTAKE SHALL BE PROVIDED WITH SAND TRAP
PERTAINING TO THE AREAS PROTECTED WITH FIRE SUPPRESSION cfm - CUBIC FEET PER MINUTE
LOUVER,BIRD SCREEN, VOLUME DAMPER, WASHABLE FILTER, SYSTEM. COMBINATION MF/SD SHALL BE UL 555 S LISTED, 3 HOURS O.C - ON CENTER
- DUCT-MOUNTED TEMP. SENSOR

DOCUMENT
°C
AND MVD. C/P - CONTROL PANEL
FIRE RATING, AND FUSIBLE LINK OF 71 Deg.C SHALL BE INSTALLED O.P - OIL PRESSURE
IN DUCT PENETRATION AND OPENING OF LOUVERS AND GRILLES C.C - CENTER TO CENTER
5. ACCESS DOOR ON DUCT FOR MF/SD(S), MVD(S), & EDH H - DUCT-MOUNTED HUMIDITY SENSOR
SHALL BE PROVIDED WITH THE SIZE OF 600x600mm. WHERE CMS - CUBIC METER PER SECOND
34. COMMON SMOKE PURGE FAN SHALL BE PROVIDED FOR EACH PACU PACU - PACKAGED TYPE AIR CONDITIONING UNIT
POSSIBLE THE MINIMUM SIZE OF ACCESS DOOR FOR SUPPLY DUCT L.P - SPACE LOW PRESSURE SENSOR COMP. - COMPRESSOR
DUCT WORK SYSTEM CONNECTED TO MAIN RETURN DUCT.
IS 300x300mm AND 250X200mm FOR BRANCH DUCT. INSIDE THE POT - PORTABLE OPERATOR TERMINAL
°C - DEGREE CELCIUS
BUILDING SHALL BE PROVIDED.

S
THI
35. FOR MAINTENANCE FREE SEALED LEAD ACID TYPE BATTERIES AND T - THERMOSTAT PA - PRESSURIZATION AIR
FOR SAFETY VENTILATION AIR FLOW RATE SHALL BE DESIGNED
6. ALL DUCT INSULATION & INSULATION ADHESIVE SHALL HAVE PRD - PRESSURE RELIEF DAMPER
ATLEAST EIGHT(12) AIR CHANGES PER HOURS AS PER TES-K-100.01 T/H - COMBINATION THERMOSTAT/ HUMIDISTAT SENSOR D - DEPTH
FLAME SPREAD RATING OF NO HIGHER THAN 25 AND

FROM
AND TES-P-119.21.
A SMOKE DEVELOPED RATING OF NO HIGHER THAN 50. db - DRY BULB Pa. - PASCAL

36. NECESSARY MANUAL BALANCING DAMPERS SHALL BE PROVIDED TiHi - COMBINATION TEMP. & HUMIDITY INDICATOR DS - DISCONNECT SWITCH
7. ALL PACKAGED UNITS A/C CONTAIN BAG FILTERS PH - PHASE
IN ALL JUNCTION DUCTS.
KEY PLAN

NED
DIA - DIAMETER
8. UNLESS LONG RADIUS RECTANGULAR ELBOWS ARE USED, PROVIDE - SUPPLY FAN OR RETURN FAN
TURNING VANES IN ALL SHORT RADIUS RECTANGULAR ELBOWS . DPS - DIFFERENTIAL PRESSURE SWITCH

SHALL BE OBTAI
37.SIZE OF SCD/RCD/ECD INDICATED HERE ARE IN TERMS OF
QTY. - QUANTITY
NECK SIZE/LISTED SIZE & THE OVERALL SIZE SHALL BE AD DX - DIRECT EXPANSION COIL
9. INDICATED DUCT SIZES ARE CLEAR INSIDE DIMENSIONS IN MM (WxH).
- ACCESS DOOR

N
600X600 TO SUIT CEILING TILE MODULE RBMO - RETURN BELL MOUTH OPENING WITH WIRE MESH SCREEN
10. CONTRACTOR SHALL CONSIDER SIZE OF WALL OPENING 50MM
- COMBINATION MOTORIZED FIRE/SMOKE DAMPER RAD - RETURN AIR DUCT
ALL AROUND THE DUCT WHEREVER CROSSING WALL & FLOOR. 38.SCD IS CONNECTED TO SUPPLY PLENUM BOX HAVE A SIZE
VERTICAL MOUNTING (WALL) 5M WIDE TUNNEL FOR 110KV O/G FEEDERS

SUITABLE TO TO SCD NECK SIZE WHICH WILL CONNECTED RAG - RETURN AIR GRILLE
EDH - ELECTRIC DUCT HEATER
6M WIDE NEW 6M WIDE
11. AS FOR DUCTWORK ,OUTDOOR EXPOSED DUCTS SHALL BE PROTECTED TO MAIN SUPPLY DUCT BY FLEXIBLE DUCT WITH DIAMETER - COMBINATION MOTORIZED FIRE/SMOKE DAMPER ROAD CONCRETE ROAD
RAR - RETURN AIR REGISTER
BY 0.8 THICKNESS ALUMINIUM CLADDING, FACTORY INSULATED AS PER SELECTION. EX - EXFILTRATION AIR
HORIZONTAL MOUNTING (SLAB)

NG 8M
DE ROAD
T01 T02 T03

REACTOR AREA
AREA
DOUBLE SKINNED RECTANGULAR/SPIRAL DUCT WITH

ASPHALT AREA
E.A.T - ENTERING AIR TEMPERATURE RT - RETURN TRUNK

NG
39.ALL HVAC DUCTS,GRILLS, AND ACCSSORIES IN BATTERY ROOM

TI
A 56 KG/M3 DENSITY,RIGID FIBER GLASS BOARD WITH 50MM THICK

NG

TI
ASPHALT
SI

PART
STI

BANK

SI
PRD

ROAD
SHALL BE ANTI-CORROSIVE/ ACID RESISTANT, AND SINGLE SKIN - PRESSURE RELIEF DAMPER

WI
WEF - WALL MOUNTED EXHAUST FAN

EXI
THERMAL INSULATION AND SHALL BE EPOXY PAINTED FOR EXTENSIVE RCD - RETURN AIR CEILING DIFFUSER 33KV SWGR
AUX.01

EXI
EXI
ROOM
WEATHER PROTECTION, AND ALL INDOOR DUCTS SHALL BE FACTORY STAINLESS STEEL 304 GRADE WITHOUT INSULATION, WHILE
EAG - EXHAUST AIR GRILLE

CAP
AUX.02

INSULATED DOUBLE SKINNED RECTANGULAR/SPIRAL DUCT WITH BATTERY ROOM EXHAUST FAN SHALL BE ANTI-CORROSIVE/ RF - RAISED FLOOR
CONTROL

N
A 56 KG/M3 DENSITY,RIGID FIBER GLASS BOARD AND A 25MM THICK ACID RESISTANT EXPLOSION PROOF. ECD - EXHAUST AIR CEILING DIFFUSER

I
ROOM
- TRANSFER AIR GRILLE R - RADIUS
THERMAL INSULATION, LIKEWISE THE THICKNESS AND DENSITY
EA - EXHAUST AIR

FULL OR
40.ALL WALL/ ROOF OPENINGS SHALL BE PROVIDED WITH MIN. 3 HOURS EXISITING 5M
OF THE INSULATION SHALL BE AS PER NATIONAL GRID SA STANDARD REF - ROOF MOUNTED EXHAUST FAN WIDE ROAD
FIRE RATED MATERIAL, AND WITH WATERPROOFING/SEALING. EAD - EXHAUST AIR DUCT NEW ASPHALT AREA
SPECIFICATION TES-K-100.01. R1 8.1.3
41. LOW PRESSURE ALARM ON DDC PANEL SHALL BE PROVIDED TO - VOLUME DAMPER EL. - ELEVATION SFAN - SUPPLY FAN
12. AIR DISTRIBUTION SYSTEM SHALL BE THROUGH EXTERNALLY INSULATED AVOID INGRESS OF DUST INSIDE THE SUBSTATION FOR EACH ZONE. EXISITING S/S. BOUNDARY WALL

RECTANGULAR DUCTWORK ESP. - EXTERNAL STATIC PRESSURE SAD - SUPPLY AIR DUCT

N
42.UPS SHALL BE PROVIDED FOR BATTERY ROOM EXHAUST FAN FOR 2

I
- SUPPLY AIR REGISTER
SAR - SUPPLY AIR REGISTER
13. ALL MF/SD, AND MOTORIZED VOLUME DAMPER SHALL BE OF PARALLEL AND A HALF HOUR BACKUP CAPACITY TO ENSURE REMAINING

ON
BLADES TYPE, WHILE VOLUME CONTROL DAMPERS ARE OF OPPOSED OPERATIVE IN CASE OF NORMAL POWER FAILURE. SA - SUPPLY AIR

REPRODUCTI
BLADE TYPE.
- RETURN AIR REGISTER SWGR - SWITCHGEAR
43.CONDENSER AND EVAPORATOR COIL SHALL BE PROTECTED WITH FAF - FRESH AIR FILTER
14. CONTRACTOR SHALL PROVIDE ADEQUATE STEEL SUPPORT FOR
COPPER TUBE AND FINS NEAR TO SEA, WHILE CORROSION FA - FRESH AIR STL - SAND TRAP LOUVER
REFERENCE DRAWINGS
EXHAUST FAN BASED ON SPACE AVAILABILITY AS PER SMACNA AND
RESISTIVE COATING SHALL BE PROVIDED TO ALL THE
HVAC DUCT CONSTRUCTION STD. (METAL & FLEXIBLE) LATEST EDITION. DRAWING TITLE DRAWING NO.
M - MOTORIZED VOLUME DAMPER FPSP - FIRE PROTECTION SIGNALING PANEL SCD - SUPPLY AIR CEILING DIFFUSER
COMPONENTS/PARTS AND CASING OF THE PACU.
MVD-X FIN/CM- FINS PER CENTIMETER DRAWING CONTROL SHEET WE-485208
15. ACCESS DOORS SHALL BE AIR-TIGHT AND CONFORM TO THE SP - SPLITTER DAMPER
44.ELECTRIC DUCT HEATER SHALL BE FLANGED-TYPE MOUNTED IN
RECOMMENDATION OF NFPA AND SMACNA. F.V. - FACE VELOCITY PROJECT TECHNICAL SPECIFICATIONS PTS-15WR116
A DUCT SECTION WITH HEATER CONTROL ACCESS DOOR ON THE SPF - SMOKE PURGE FAN

NO
16. DUCT SMOKE DETECTORS SHALL BE PROVIDED FOR EACH SET OF PACU SIDE OF THE UNIT. - SAND TRAP LOUVER FAI - FRESH AIR INTAKE SPFP - SMOKE PURGE FAN PANEL HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS WA-486055
OF THE IONIZATION TYPE AND CONSIST OF DETECTOR HOUSING TUBES F.F.L - FINISHED FLOOR LEVEL

d SA
AND RESPONSE INDICATOR. SF-6 FAN- GIS INSULATING GAS (SF-6) EXHAUST FAN HVAC EQUIPMENT & DUCT LAYOUT, ROOF PLAN WA-486056
45.FOR PLUMBING DETAILS RELATED TO THE PACU CONDENSATION FC - FLEXIBLE CONNECTION
- PRE FILTER HVAC EQUIPMENT &DUCT LAYOUT, GROUND FLOOR PLAN WA-486057

onalGri
17. A POSITIVE PRESSURE OF APPROX. 50PA OR 0.2 INCH WATER GAUGE SYSTEM, REFER TO PLUMBING DRAWINGS. ST - SUPPLY TRUNK
WHICH SHALL BE MAINTAINED INSIDE THE BUILDING. FIN. - FINISHED
- BAG FILTER HVAC EQUIPMENT &DUCT LAYOUT, BASEMENT FLOOR PLAN WA-486058
F - FILTER
T.S.P - TOTAL STATIC PRESSURE BUILDING HVAC SECTIONS WA-486059
18. EXHAUST FAN FOR BATTERY ROOM SHALL BE ROOF/WALL MOUNTED,

OF Nati
°F - DEGREE FAHRENHEIT
EXPLOSION PROOF TYPE, IDEAL FOR 24 HOUR OPERATION, S-TAG - SUPPLY TRANSFER AIR GRILLE
- DUCT REDUCER
FF - FLAT (PRELIMINARY) FILTER HVAC EQUIPMENT SCHEDULE WA-486060
AND SHALL MAINTAIN OPERATION CASE OF POWER FAILURE. R-TAG - RETURN TRANSFER AIR GRILLE
IN CASE OF FIRE OCCUR INSIDE BATTERY ROOM WHICH IS HVAC INSTALLATION DETAILS WA-486061
FM-200 (CLEAN AGENT) PROTECTED AREA, EXHAUST FAN TYP. - TYPICAL
G.S - GALVANIZED STEEL HVAC AIR FLOW SCHEMATIC DIAGRAM WA-486062
MUST BE STOPPED AUTOMATICALLY FOR 30 MINUTES
TOP - TOP OF PARAPET

ARE THE SOLE PROPERTY


AND RESUME AUTOMATICALLY AFTER THE 30 MIN. STOPPAGE IS OVER. Ga - GAUGE
HVAC COORDINATION LAYOUT WA-486063
- SMOKE PURGE FAN / UP-BLAST EXHAUST FAN TOB - TOP OF BEAM
GALV.- GALVANIZED
19. THE GAP OF AIR DUCT AROUND THE WALL OPENNING
TOS - TOP OF SLAB
SHALL BE SEALED WITH FIRE RATED MATERIALS ACCORDING TO
TES-P-119.21 CLAUSE 3.3.4 (UL 1479 FIRE RETARDANT MATERIAL) TOA - TOP OF ASPHALT
HOA - HAND-OFF-AUTO
AND THE AREA AROUND THE AIR DUCT SHALL BE PROVIDED WITH
SHEET METAL FLASHING ON BOTH SIDES OF THE WALL OR FLOOR. Hz - HERTZ
- SIDE WALL MOUNTED EXHAUST FAN TOC - TOP OF CONCRETE
20. EXHAUST AIR IN THE BATTERY ROOM, KITCHEN, AND TOILET HVAC - HEATING, VENTILATING & AIR CONDITIONING THK. - THICKNESS
SHALL NOT BE RETURNED TO THE SYSTEM.
HP - HORSEPOWER
VD - VOLUME DAMPER
21. ALL EXHAUST FANS SHOWN 0N THE DRAWING SHALL BE PROVIDED
WITH BACK DRAFT DAMPERS OR GRAVITY TYPE DAMPERS. IF FIRE H - HEIGHT
V - VOLTS
HAZARD HAS HAPPENED AT BATTERY ROOM, EXHAUST FAN SHALL HI - HIGH AS-BUILT BY DATE
NOT STOP AT FIRE ALARM SIGNALS - BACKWARD INCLINED BELT DRIVE
CENTRIFUGAL FAN

N
WB - WET BULB

HEREI
22. THE BATTERY ROOM EXHAUST DUCTWORK INCLUDING DUCT CONNECTORS
ISP - INTERNAL STATIC PRESSURE
SHALL BE MADE OF STAINLESS STEEL ANTI-CORROSIVE MATERIAL W - WIDTH
C/P 02 10-2017 N.M AS PER NG COMMENTS LETTER M.E T.S
MATERIAL. THE EXHAUST FAN/MOTOR ASSEMBLY SHALL BE - HVAC DIS-CONNECT SWITCH
CORROSION PROOF AND EXPLOSION PROOF. kW - KILOWATT WEF - WALL EXHAUST FAN 01 09-2017 N.M AS PER NG COMMENTS LETTER M.E T.S

NED
BDD kV - KILOVOLT
YEL - YELLOW
23. THE REQUIRED 30 MINUTES TIMER SHALL BE PROVIDED FOR THE - BACK DRAFT DAMPER
KG./cu.M- KILOGRAM PER CUBIC METER 00 08-2017 N.M ISSUED FOR APPROVAL M.E T.S

CONTAI
EXHAUST FAN AT TOILET ONLY.
- SUPPLY TRANSFER AIR GRILL FLOOR MOUNTED REV. DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.
THE HVAC LOCAL CONTROL PANEL SHALL BE SUPPLIED BY L.A.T - LEAVING AIR TEMPERATURE
24.
AN APPROVED HVAC SYSTEM CONTROL SPECIALIST. DRAWING COMPLETION CERTIFICATE (DCC):
L - LENGTH

ON
- RETURN BELL MOUTH OPENING

NFORMATI
25. THERMOSTAT SHALL BE INSTALLED NEAR THE BELL MOUTH OF LP - LOW PRESSURE
RETURN AIR IN DUCT AS APPLICABLE.
LO - LOW
(+)

26. DUCT CONSTRUCTION SHALL BE ACCORDING TO STANDARD & SOW/PTS.


- A CHANGE IN DUCT LEVEL
(-)

27. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY DUCTWORK, MOTORIZED

THE I
N.MAHMOUD M.EL-BARBARY NTS
VOLUME DAMPERS, CONTROL DAMPERS, MOTORIZED FIRE & SMOKE DAMPERS, DRAWN BY CHECKED BY SCALE:

GRILLES, DIFFUSERS, LOUVERS AND ALL PIPEWORK, FITTINGS AND VALVES.


26.01.2017 15.10.2019
DATE STARTED DATE COMPLETED
THE LAYOUT AND DETAILS SHALL COMPLY WITH THIS SPECIFICATION AND - REVISION UPDATE
WITH GOOD ENGINEERING PRACTICE. FABRICATION & INSTALLATION SHALL --

AND
OPR'G. DEPT. ENG. DEPT.
BE IN ACCORDANCE WITH NFPA 90A, UMC AND SMACNA HVAC DUCT
CONSTRUCTION STANDARDS. FIRE RATING SHALL BE AS PER CLAUSE 3.5.3
THIS DRAWING IS NOT TO BE USED FOR CERTIFIED
OF TES-P-119.21.

NG
CONSTRUCTION OR FOR ORDERING

DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS


ADDITION OF NEW 3-80/100 MVA POWER TRANSFORMERS

S
THI
HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS MADINAH EAST( MEDEA) 380/110-33KV BSP SUBSTATION
SCALE NTS
MADINAH SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

01 of
4400008122 1532120.03 K MD426 WA-486055 01 02
NG-A (2012/01)

DMS VECTOR NGA00


02 01
of
MD426 WA -486056 K 1532120.03 4400008122
01
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. REFER TO SHEET WA- 486055.0000.0002

OW NER.
2. ALL B.O.D LEVELS ARE RELATIVE AND MEASURED FROM
SUBSTATION ZERO LEVEL.

TS
OF I
N

CONSENT
LEGEND

TTEN
01 02 03 04 05 06 07 08 09
1. REFER TO SHEET WA- 486055.0000.0002

THE W RI
3600 4600 4800 4800 4800 4700 6100 5700

THOUT
WI
EL(+)7.700 DN 50 MM UPVC
RT BOD(+6.80) TYP. CONDENSATE DRAIN PIPE 02
TOP
SLOPE 2% ALL TYP.

525
625
SD SD

DOCUMENT
A A
ST 2-1 (1400X800) 800
(16,115 CFM)
TO SWGR GROUND &
6000

1400

1400
BASEMENT FLOORS

EL(+)5.480

S
THI
HPOC

SD-03
500

5000

6000

FROM
DN 50 MM UPVC SCHED. 80 EDH-02
CONDENSATE DRAINAGE PIPE SD-04 SD-03, 04 AD-01
ST BOD(+8.20) TYP. 1400 ROOF OVER 33KV SWGR ROOM
02 WITH CLEAN OUT TO 500
CONDENSATE DRAINAGE PIT-02 2 MVD 05,07
U-TRAP ALL TYP.
BDD-05,07 KEY PLAN

NED
1300 REFER TO DETAIL 10
7200 3650 2 AD-1
VD-66

SHALL BE OBTAI
RT BOD(+6.80) ST BOD(+8.20)

N
M

1700
RT BOD RISE FROM

1400

1400
A B (-) B

4% SLOPE
BOD(+6.80) PACU PACU
5M WIDE TUNNEL FOR 110KV O/G FEEDERS
- TO BOD (+8.00) 2A 2B
1900 6M WIDE NEW 6M WIDE
ROAD CONCRETE ROAD
(+)
5400 M

NG 8M
DE ROAD
T01 T02 T03

REACTOR AREA
AREA
ASPHALT AREA
2200

NG
TI
2 MVD 06,08

NG
M

TI
ASPHALT
SI

STI
EL(+)7.700

BANK

SI
ROAD
BDD-06,08

WI
EXI
AUX.01

PART
SPF-01 (5,897 CFM) 33KV SWGR

EXI
EXI
2 AD-1 02 TOP ROOM
6080

6080
500 1300 SPF EAD (1200X600)

CAP
AUX.02

WITH MVD-09,
850 BDD-09 &AD-02 S.T.L-01 (3,964 CFM) CONTROL
SUPPLY AIR PLENUM 1300 ROOM
RT 2-1 (1300X850) (2100X1800) WITH ALUMINUM 02

N
(1700X1900X1000)

I
S.T.L-02 (1,611 CFM)
(14,504 CFM) S.T.L-02 (1,611 CFM) RETURN AIR PLENUM WASHABLE FILTER,
(12,266 CFM) (1500X1050) WITH ALUMINUM EXISITING 5M
FROM SWGR GROUND & (1500X1050) WITH ALUMINUM (2450X2450X800) MVD-12, VD-74 & AD-2

FULL OR
WIDE ROAD
BOD(+8.10)
1300

WASHABLE FILTER,
BASEMENT FLOORS WASHABLE FILTER, (8,828 CFM) & WIRE MESH SCREEN NEW ASPHALT AREA
MVD-14, VD-76 & AD-02
MVD-13, VD-75 & AD-02 RETURN AIR PLENUM 1200 BOD(+6.70) FAD (750X750) EL(+)5.950
& WIRE MESH SCREEN
& WIRE MESH SCREEN (2450X2450X1050) HPOC
FAD (500X500) EXISITING S/S. BOUNDARY WALL
700

500 FAD (500X500) (8,858 CFM) SUPPLY AIR PLENUM


BOD(+6.70) (2450X2450X800)
C 2 MVD 02,04 (12,575 CFM) C

2200

N
350

I
63 BDD-02,04 BOD(+8.10) EL(+)5.950
SPF-02 (13,425 CFM)
2 AD-02 5570 HPOC

ON
SPF EAD (1300X850) 2600
STAIR-2 WITH MVD-10, ST BOD(+8.20) 3850

REPRODUCTI
BDD-10 &AD-01 M
2450 REFERENCE DRAWINGS

1200
2250

2250
1800

1500
1400
PACU PACU
DRAWING TITLE DRAWING NO.
5900

5900
1A 1B

DRAWING CONTROL SHEET WE-485208


M
3850 PROJECT TECHNICAL SPECIFICATIONS PTS-15WR116
RT BOD(+6.80) 800 MM WIDE
2600

NO
CROSS OVER
UP 2 MVD 01,03 RT 1-1 (1200X600) HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS WA-486055
DN BRIDGE FOR
1500
BDD-01,03 MAINTANANCE (8,828 CFM)

d SA
02
VD-65 2 AD-02 FROM OFFICE ROOM HVAC EQUIPMENT & DUCT LAYOUT, ROOF PLAN WA-486056
ACTIVITIES
ROOF OVER CONTROL ROOM 600
1200 HVAC EQUIPMENT &DUCT LAYOUT, GROUND FLOOR PLAN WA-486057

onalGri
D D

525
HVAC EQUIPMENT &DUCT LAYOUT, BASEMENT FLOOR PLAN WA-486058
S.T.L-01 (3,964 CFM)
(-)

1200
(2100X1800) WITH ALUMINUM BUILDING HVAC SECTIONS WA-486059
4% SLOPE

OF Nati
WASHABLE FILTER,
MVD-11, VD-73 & AD-2 02 (+) HVAC EQUIPMENT SCHEDULE WA-486060
EL(+)5.704
& WIRE MESH SCREEN

SD-02
HPOC HVAC INSTALLATION DETAILS WA-486061
FAD (750X750)
EL(+)7.700 EDH-01 600
TOP AD-02 HVAC AIR FLOW SCHEMATIC DIAGRAM WA-486062
6300

6300

ARE THE SOLE PROPERTY


RT BOD RISE FROM

W BP
B HVAC COORDINATION LAYOUT WA-486063

1
ST BOD(+8.20) SD-02 RT BOD(+6.80) BOD(+6.90)
- TO BOD (+8.00)
TYP.
EL(+)7.700
GRAPHIC SCALE:
TOP
8885

0 0.5 1 2 3 4 5 6 7m

O/H WATER TANK WITH


BOOSTER PUMP SCALE : 1 : 75

700
SD-01
SD-01
E E

SD
600
ROOF ACCESS EL(+)5.450
SD
LADDER-1 HPOC AS-BUILT BY DATE
EL(+)7.700
TOP
1500 945
DN 50 MM UPVC SCHED. 80

N
HEREI
CONDENSATE DRAINAGE PIPE 02
WITH CLEAN OUT TO 02 10-2017 N.M AS PER NG COMMENTS LETTER M.E T.S
CONDENSATE DRAINAGE PIT-01

01 09-2017 N.M AS PER NG COMMENTS LETTER M.E T.S

NED
ST 1-1 (1500X600)
C (12,575 CFM) 02
00 08-2017 N.M ISSUED FOR APPROVAL M.E T.S

CONTAI
- TO CONTROL ROOM

REV. DATE BY CHKD. CERT. APPD.


DESCRIPTION
3600 4600 4800 4800 4800 4700 6100 5700 NO.

DRAWING COMPLETION CERTIFICATE (DCC):

ON
NFORMATI
01 02 03 04 05 06 07 08 09

THE I
N.MAHMOUD M.EL-BARBARY 1:75
DRAWN BY CHECKED BY SCALE:

26.01.2017 15.10.2019
DATE STARTED DATE COMPLETED

AND
OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

HVAC EQUIPMENT AND DUCT LAYOUT, ROOF PLAN


ADDITION OF NEW 3-80/100 MVA POWER TRANSFORMERS

S
THI
HVAC EQUIPMENT AND DUCT LAYOUT, ROOF PLAN MADINAH EAST( MEDEA) 380/110-33KV BSP SUBSTATION
SCALE 1:75
MADINAH SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

01 of
4400008122 1532120.03 K MD426 WA-486056 01 02
NG-A (2012/01)

DMS VECTOR NGA00


02 01
of
MD426 WA - 486057 K 1532120.03 4400008122
01 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. REFER TO SHEET WA- 486055.0000.0002

OW NER.
2. ALL B.O.D & B.O.O LEVELS ARE MEASURED FROM ZERO LEVEL.

3. FOR BATTERY ROOM; DUCTWORK, AIR TERMINALS, DUCT


01 02 03 04 05 06 07 08 09 ACCESSORIES, AND DUCT SUPPORTS SHALL BE CORROSION
3600 4600 4800 4800 4800 4700 6100 5700 RESTISTANT.

TS
OF I
PROTECTIVE CRASH BARRIER
N

EL=-0.640

CONSENT
TOA

LEGEND

TTEN
1. REFER TO SHEET WA- 486055.0000.0002

THE W RI
ER
BARRI
REWALL

THOUT
CRASH
FI

WI
RC

VE
PROTECTI

DOCUMENT
540

S
THI
EL=-0.
TOA
GF SLAB OPENING MF/SD-05
800 (950X750) AD-01

FROM
SB SB SB

A A
UP VD-77

600
KEY PLAN

NED
750
1000

900
1400

1400

500
UP

SHALL BE OBTAI
ST 2-01 (1400X800)
(16,115 CFM) 750

N
SAR-01 SAR-01 SAR-01 SAR-01
BOD (+3.85) SAR-01 SAR-01 VD-09 VD-10 VD-11 VD-12
WALL OPENING (1600X1000) SAR-01 SAR-01 VD-07 VD-08
MF/SD-01 SAR-01 SAR-01
6000

6000
BOO(+3.75) VD-05 VD-06
AD-01 SAR-01 SAR-01 VD-03 VD-04 5M WIDE TUNNEL FOR 110KV O/G FEEDERS

500 VD-01 VD-02 6M WIDE NEW 6M WIDE


ROAD CONCRETE ROAD

SWGR ROOM ST 2-07 (750X550)

NG 8M
DE ROAD
T01 T02 T03

REACTOR AREA
AREA
(4,540 CFM) ST 2-02(1000X750) ST 2-03 (900X700) ST 2-04 (750X700) ST 2-05 (600X600) ST 2-06 (500X450)

ASPHALT AREA
12 SAR-01 12 RAR-01

NG
TO SWGR BASEMENT BOD(+3.85) BOD(+3.85) BOD(+3.85) BOD(+3.85) BOD(+3.85)

TI

NG
965 CFM 868 CFM

TI
ASPHALT
SI

STI

BANK
2N

SI
ROAD
WI
EXI
AUX.01

PART
(750X400) (900X450)

2U
33KV SWGR

EXI
EXI
ROOM

2V
2W

CAP
AUX.02

CONTROL
B A B ROOM

N
I
- RT 2-08 (700X350)
RT 2-02(1300X700) RT 2-03 (1100X700) RT 2-04(950X700) RT 2-05(750X700) RT 2-06(650X600) EXISITING 5M

FULL OR
(2,045 CFM) WIDE ROAD
BOD(+3.85) BOD(+3.85) BOD(+3.85) BOD(+3.85) BOD(+3.85) NEW ASPHALT AREA
FROM SWGR BASEMENT
RT 2-07(700X350) AUX.01
RT 1-03 (2,045 CFM)
Ti/Hi RT 1-06 RT 1-05 RT 1-04
GF SLAB OPENING 800X600 FROM SWGR BASEMENT EXISITING S/S. BOUNDARY WALL
(200X200) (500X450) (650X600)
DOWNLOAD PRD-01 T/H BOD(+4.00) TYP.
(900X550)
PLATFORM (300X150) RC FIREWALL
BMO-01
6080

6080
L.P
GF SLAB OPENING

N
FFL=+0.300

I
MF/SD-25 RAR-01 RAR-01 VD-60 (900X550)
BOO(+2.80) 850 VD-13 VD-14

ON
RAR-01 RAR-01 RAR-01
1100 RAR-01
VD-15 VD-16 VD-18 RAR-01 RAR-01 RAR-01 RAR-01 RAR-01 RAR-01

REPRODUCTI
VD-17 VD-19 VD-20 VD-21 VD-22 VD-23 VD-24
700
1300

1300

1300

1100

REFERENCE DRAWINGS

950

750

650
RT 2-01 (1300X850)

2N
(14,504 CFM) DRAWING TITLE DRAWING NO.

2U
2V
BOD (+3.85)
4400

2W
250
WALL OPENING (1500X1050) MF/SD-02 DRAWING CONTROL SHEET WE-485208
C BOO(+3.75) AD-01 C
MF/SD-04

650
700
300

MF/SD-03 PROJECT TECHNICAL SPECIFICATIONS PTS-15WR116

850
500 BMO-03 VD-75

NO
VD-74 RT 1-07

300
EAG-02 MF/SD-06
AD-01 (250X150) AD-01 HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS WA-486055

AD-04
VD-40 VD-62

R-1
VD-32

FFL=+0.
BOD(+4.05) DN

d SA
FM-200 ROOM 22
UP MF/SD-20 RCD-01 FROM R.F AUX.02 HVAC EQUIPMENT & DUCT LAYOUT, ROOF PLAN WA-486056

STAI
MF/SD-34

1 SAR-04 1 EAG-02 02

RCD-01
5900

25 17
BMO-01
SCD-01 SCD-01 HVAC EQUIPMENT &DUCT LAYOUT, GROUND FLOOR PLAN WA-486057

onalGri
624 CFM 668 CFM

MF/SD-33
VD-61
VD-46 VD-50

MF/SD-31
FM-200 EAD (250X250) BMO-01 WITH DN

AD-04
(750X250) (750X450) RT 1-08

5900
TO (WEF-03) THROUGH CORRIDOR HVAC EQUIPMENT &DUCT LAYOUT, BASEMENT FLOOR PLAN WA-486058
WIRE MESH, RCD-03
RCD-05 ST 1-12 ST 1-14 (300X150)
BOD(+4.10) BOD(+4.05)
(450X500) (450X500) FROM R.F BUILDING HVAC SECTIONS WA-486059
TYP.

OF Nati
VD-49 RCD-02
CORRIDOR NORTH RCD-01
Ti/Hi T/H L.P
HVAC EQUIPMENT SCHEDULE WA-486060
1 SCD-06 1 RCD-05 1 BMO-03 SAR-04 02
OFFICE ROOM
PRD-05 RCD-04
11
VD-33 1 SCD-05 1 RCD-04 1 BMO-04

250X200

250X200

250X200
216 CFM 196 CFM 196 CFM (300X150) UP RCD-01 HVAC INSTALLATION DETAILS WA-486061

MF/SD-24

MF/SD-23

MF/SD-22

MF/SD-21
MF/SD-19 SCD-01 SCD-01 271 CFM 253 CFM 253 CFM
(225X225) (225X225) (200X200) MF/SD-29
BOO(+2.80) VD-47 VD-51 BMO-06 BMO-05 BMO-04 (225X225) (225X225) (250X200) HVAC AIR FLOW SCHEMATIC DIAGRAM WA-486062
ST 1-7 BOD(+3.65) TYP.

ARE THE SOLE PROPERTY


STAIR-2 VD-43 VD-44 VD-45

VD-42
(300X300) BOD(+3.65) TYP. HVAC COORDINATION LAYOUT WA-486063
BMO-01 SCD-05 RT 1-01(1200X600)
D 02 D

525
600
SCD-01 SCD-01 VD-59 VD-57 (8,828 CFM)
VD-48 VD-52
SAR-03 SCD-06 BOD(+4.00)

1200
VD-34 WALL OPENING (1400X800) 02
BATTERY ROOM VD-58 GRAPHIC SCALE:
MF/SD-14 BOO(+3.90)
3 SAR-03 3 EAG-01 0 0.5 1 2 3 4 5 6 7m
RCD-01
669 CFM 716 CFM ST 1-06 Ti/Hi Ti/Hi
RCD-01
ST 1-10 (250X250) SCALE : 1 : 75
(750X250) (750X450) (350X450) ST 1-11 ST 1-13 RT 1-02 600
T/H T/H ST 1-08 BOD(+3.65)
3 EAG-01 (700X500) (700X500) (1100X600)

SCD-03
(350X500) CORRIDOR SOUTH

VD-55
BATTERY WEF-2 SAR-03 L.P L.P BOD(+4.00)

6300
@BOG=(+0.60) & BOD(+)3.65 AD-03 MF/SD-11
(2,149 CFM) VD-35 BOD(+3.625) 1 SCD-03 1 RCD-03 1 BMO-05
(+1.85) & (+3.15)
MF/SD-13

B EAD (500X450) MF/SD-15 RCD-01


WITH 3 VD-37:39 RCD-01 TYP. 257 CFM 234 CFM 234 CFM
- BDD-12 & MF/SD-17 & AD-03 SCD-04

MF/SD-32
MF/SD-08
MF/SD-10
AD-01

RESPECTIVELY VD-56 (225X225) (225X225) (250X200)


OPENING BOO(+4.20) ST 1-05 SCD-01 Ti/Hi L.P AS-BUILT
(SEE NOTE 03) BY DATE
VD-69

VD-68
(450X450) SCD-01 VD-53

AD-02
B'
6300

SCD-02
RAMP-2

VD-70 L.P T/H


VD-49 ECD-01 ECD-01
- 02 SAR-03 VD-54
VD-71 VD-72

N
VD-36 T/H Ti/Hi TOILET

HEREI
VD-41
MF/SD-16 EAD (200X100)
(+3.75) TYP. 02 10-2017 N.M AS PER NG COMMENTS LETTER M.E T.S
BOD(+3.60) TYP. MF/SD-09
VD-67 AD-03
E
02 TOILET ROOM E 01 09-2017 N.M AS PER NG COMMENTS LETTER M.E T.S
700

NED
1 SCD-04 2 ECD-01
ST 1-02 455 CFM 244 CFM
600

00 08-2017 N.M ISSUED FOR APPROVAL M.E T.S

CONTAI
BOD(+3.625)
RAMP-1 (1450X550) (350X300) 2500 (300X300) (225X225)
ST 1-09
ST 1-15 (239 CFM) BOD(+3.625) TYP. BOD(+3.675)
PRD-02 (350X350) REV. DATE BY DESCRIPTION CHKD. CERT. APPD.
(300X150) TO R.F ST 1-04 NO.
(300X150) 1500 945
MF/SD-30 (700X400) 02
MF/SD-26 ST 1-03 DRAWING COMPLETION CERTIFICATE (DCC):
VD-44& AD-04
BOO(+3.10) (1000X550)

ON
TOILET WEF-1
02

NFORMATI
SB BOD DROP FROM CONTROL ROOM ST 1-16 (487 CFM)
BOD(+4.45) 8 SCD-01 8 RCD-01 4 BMO-01 ST 1-01(1500x600) (250X150) EAD (250X250)
02 BDD-11 & MF/SD-12 & AD-04
TO BOD (+3.90) (12,575 CFM) TO R.F
995 CFM 927 CFM 1,855 CFM
(600X600) (600X600) (650X350)
BOD (+)3.60 AC/DC ROOM OPENING BOO(+3.70)
FM-200 WEF-03 MF/SD-07 & AD-01 1 SCD-02 1 RCD-02 1 BMO-06 PRD-03
(668 CFM) 02 RAISED FLOOR WALL OPENING (1700X800) (100X100)

THE I
390 CFM 358 CFM 358 CFM
EAD (250X250) BOO(+3.50) MF/SD-27 N.MAHMOUD M.EL-BARBARY 1:75
1 SAG-05 1 RAG-03 (300X300) (300X300) (250X250) DRAWN BY CHECKED BY SCALE:
BDD-13 & MF/SD-18 & AD-04 BOO(+3.10)
OPENING BOO(+3.85) 239 CFM 223 CFM
(300X300) (450X300)
RAISED FLOOR DATE STARTED
26.01.2017
DATE COMPLETED
15.10.2019

1 SAG-06 1 RAG-02

AND
OPR'G. DEPT. ENG. DEPT.
156 CFM 145 CFM
C (300X250) (300X250)
THIS DRAWING IS NOT TO BE USED FOR CERTIFIED
-

NG
3600 4600 4800 4800 4800 4700 6100 5700 CONSTRUCTION OR FOR ORDERING

DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

05 06
01 02 03 04 07 08 09 HVAC EQUIPMENT AND DUCT LAYOUT, GROUND FLOOR PLAN
ADDITION OF NEW 3-80/100 MVA POWER TRANSFORMERS

S
THI
MADINAH EAST( MEDEA) 380/110-33KV BSP SUBSTATION
HVAC EQUIPMENT AND DUCT LAYOUT, GROUND FLOOR PLAN MADINAH SAUDI ARABIA
SCALE 1:75 CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

01
4400008122 1532120.03 K MD426 WA-486057 of 01
02
NG-A (2012/01)

DMS VECTOR NGA00


02 01 of
MD426 WA - 486058 K 1532120.03 4400008122
01
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. REFER TO SHEET WA- 486055.0000.0002

OW NER.
2. ALL B.O.D & B.O.O LEVELS ARE MEASURED FROM ZERO LEVEL.

TS
OF I
N

CONSENT
LEGEND

TTEN
01 02 03 04 05 06 07 08 09
1. REFER TO SHEET WA- 486055.0000.0002

THE W RI
3600 4600 4800 4800 4800 4700 6100 5700

THOUT
ST 2-7 (750X550)
(4,540 CFM) ST 2-08 (600X550) ST 2-09 (450X500)
TO SWGR BASEMENT BOD(-1.10) BOD(-1.10)

WI
BOD(-1.10)
750

DOCUMENT
200

450
A A

1360
1160
550

450
600
SAR-02

750

S
THI
VD-31
6000

6000

FROM
SAR-02 SAR-02 SAR-02 SAR-02 SAR-02 SAR-02
VD-25 VD-26 VD-27 VD-28 VD-29 VD-30

KEY PLAN

NED
SHALL BE OBTAI
N
B A B 5M WIDE TUNNEL FOR 110KV O/G FEEDERS

-
6M WIDE NEW 6M WIDE
ROAD CONCRETE ROAD

NG 8M
SWGR ROOM BSMNT

DE ROAD
T01 T02 T03

REACTOR AREA
AREA
ASPHALT AREA

NG
07 SAR-02 2 BMO-02

TI

NG

TI
ASPHALT
SI

STI

BANK

SI
649 CFM 2,045 CFM

ROAD
WI
EXI
AUX.01

33KV SWGR

EXI

PART
EXI
ROOM
(450X450) (700X350)
6080

6080

CAP
AUX.02

CONTROL
1150
BMO-02 WITH WIRE MESH BMO-02 WITH WIRE MESH ROOM

N
I
BOD(-0.90) TYP. BOD(-0.90) TYP.
EXISITING 5M
WIDE ROAD

FULL OR
NEW ASPHALT AREA

RT 2-8 (700X350) RT 2-7 (700X350) 4500


(2,045 CFM) (2,045 CFM)

100
350

EXISITING S/S. BOUNDARY WALL


FROM SWGR FROM SWGR

450
BASEMENT BASEMENT T/H Ti/Hi L.P

C C

N
I
150

700

ON
PRD-04 300 700

REPRODUCTI
(300X150) UP
UP
R-2

STAIR-2
MF/SD-28
STAI

BOO(-1.20) REFERENCE DRAWINGS


UP DRAWING TITLE DRAWING NO.
5900

5900
DRAWING CONTROL SHEET WE-485208

PROJECT TECHNICAL SPECIFICATIONS PTS-15WR116

NO
HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS WA-486055
UP

d SA
HVAC EQUIPMENT & DUCT LAYOUT, ROOF PLAN WA-486056

HVAC EQUIPMENT &DUCT LAYOUT, GROUND FLOOR PLAN WA-486057

onalGri
D D HVAC EQUIPMENT &DUCT LAYOUT, BASEMENT FLOOR PLAN WA-486058

BUILDING HVAC SECTIONS WA-486059

OF Nati
HVAC EQUIPMENT SCHEDULE WA-486060

HVAC INSTALLATION DETAILS WA-486061

HVAC AIR FLOW SCHEMATIC DIAGRAM WA-486062

ARE THE SOLE PROPERTY


6300

6300
HVAC COORDINATION LAYOUT WA-486063

GRAPHIC SCALE:
0 0.5 1 2 3 4 5 6 7m

SCALE : 1 : 75

E E

AS-BUILT BY DATE

N
HEREI
02 10-2017 N.M AS PER NG COMMENTS LETTER M.E T.S
C
- 01 09-2017 N.M AS PER NG COMMENTS LETTER M.E T.S

NED
00 08-2017 N.M ISSUED FOR APPROVAL M.E T.S

CONTAI
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
3600 4600 4800 4800 4800 4700 6100 5700 NO.

DRAWING COMPLETION CERTIFICATE (DCC):

ON
NFORMATI
01 02 03 04 05 06 07 08 09

THE I
N.MAHMOUD M.EL-BARBARY 1:75
DRAWN BY CHECKED BY SCALE:

26.01.2017 15.10.2019
DATE STARTED DATE COMPLETED

AND
OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

HVAC EQUIPMENT AND DUCT LAYOUT, BASEMENT FLOOR PLAN


ADDITION OF NEW 3-80/100 MVA POWER TRANSFORMERS

S
THI
MADINAH EAST( MEDEA) 380/110-33KV BSP SUBSTATION
HVAC EQUIPMENT AND DUCT LAYOUT, BASEMENT FLOOR PLAN MADINAH SAUDI ARABIA
SCALE 1:75 CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

01 of
4400008122 1532120.03 K MD426 WA-486058 01 02
NG-A (2012/01)

DMS VECTOR NGA00


02 02 MD426 WA - 486059 K 1532120.03 4400008122
of
01 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. REFER TO SHEET WA- 486055.0000.0002

OW NER.
2. ALL B.O.D & B.O.O LEVELS ARE MEASURED FROM ZERO LEVEL.

3. FOR BATTERY ROOM; DUCTWORK, AIR TERMINALS, DUCT


ACCESSORIES, AND DUCT SUPPORTS SHALL BE CORROSION
09 08 07 06 05 04 RT 2-1 (850X1300) 03 02 01

TS
RESTISTANT.
(14,504 CFM)

OF I
SPF-02 (13,425 CFM) FROM SWGR GROUND
ST 1-1 (600X1500) SPF EAD (850X1300) & BASEMENT FLOORS
RT BOD RISE FROM (12,575 CFM) 02 WITH MVD-10, BOD(+6.80)
BOD(+6.80) TO CONTROL ROOM BDD-10 &AD-01
RETURN AIR PLENUM

CONSENT
ST 2-1 (800X1400)
TO BOD (+8.00) RETURN AIR PLENUM SPF-01 (5,897 CFM) (2450X2450X1050)
02 SUPPLY AIR PLENUM (16,115 CFM)
(2450X2450X800) SPF EAD (600X1200) (8,858 CFM)
(1700X1900X1000) TO SWGR GROUND &
S.T.L-01 (3,964 CFM) (8,828 CFM) WITH MVD-09, BOD(+6.70)
02 (12,266 CFM) BASEMENT FLOORS
(2100X1800) WITH ALUMINUM BOD(+6.70) BDD-09 &AD-02
BOD(+8.10) BOD(+8.20)
WASHABLE FILTER,
& WIRE MESH SCREEN SUPPLY AIR PLENUM S.T.L-02 (1,611 CFM)
RT 1-1 (600X1200) EL=+10.200
2 MVD 01,03 2 MVD 06,08 2 MVD 05,07 (1500X1050) WITH ALUMINUM LEGEND

TTEN
(8,828 CFM) FAD (750X750) (2450X2450X800)
BDD-01,03 PACU BDD-06,08 BDD-05,07 PACU WASHABLE FILTER, TOP
FROM OFFICE ROOM TO (12,575 CFM)
2 AD-02 BOD(+8.10) 2B 2 AD-1 2 AD-1 2A & WIRE MESH SCREEN 1. REFER TO SHEET WA- 486055.0000.0002
PACU-01 (A&B)

THE W RI
M FAD (500X500) STAIR-2

1000

850 550 800


600 800 600
PACU RT 2-1 BOD RISE

600
1B FROM BOD(+6.50)
TO BOD(+8.00)
EL=+7.700 M M

1050
TOP

600

THOUT
O/H POTABLE RT 2-1 (850X1300)
WATER TANK (14,504 CFM)
600 500 850
M
1900 FROM SWGR GROUND &

WI
EL=+5.950 (TOTTS) MAX. BASEMENT FLOORS
EL=+5.480 (TOTTS) MIN. BOO(+3.75)

DOCUMENT
RAR-01 RAR-01 RAR-01 RAR-01 RAR-01 1200 RAR-01 RAR-01 RAR-01 RAR-01 RAR-01 RAR-01 RAR-01
VD-24 VD-23 VD-22 VD-21 VD-20 VD-19 VD-18 VD-17 VD-16 VD-15 VD-14 VD-13

850
7700

7700
700

700

700

700
600

7900

6500

7900
6500
02 (+)3.200
RT 2-06(600X650) RT 2-05(700X750) RT 2-04(700X950) RT 2-03 (700X1100) RT 2-02(700X1300)

S
(TOCAN)

THI
BOD(+3.85) BOD(+3.85) BOD(+3.85) BOD(+3.85) BOD(+3.85) RT 2-08 (350X700)

6500
RT 1-01(600X1200)
3700

3550

3550
(8,828 CFM) RT 2-7(1000X450) SWGR ROOM L.P (2,045 CFM)
FROM SWGR BASEMENT
BOD(+4.00) (4,286 CFM) 12 SAR-01 12 RAR-01

FROM
700 700 T/H
GF SLAB OPENING
WALL OPENING (800X1400) FROM SWGR BASEMENT 965 CFM 868 CFM
Ti/Hi (450X800)
BOO(+3.90)
MF/SD-04 (750X400) (900X450) MF/SD-03
VD-75 FFL=+0.300 VD-74 (+)0.300
KEY PLAN

NED
AD-01 AD-01 (TOSW)

1200

1200

SHALL BE OBTAI
(-)0.735

GHT)
(TOA)

N
DROP BEAM

HI
SWGR ROOM BSMNT PRD-04
T/H L.P Ti/Hi

CLEAR
DUCT BANK (150X300)
07 SAR-02 2 BMO-02
MF/SD-28 5M WIDE TUNNEL FOR 110KV O/G FEEDERS

649 CFM 2,045 CFM BOO(-1.20) 6M WIDE NEW 6M WIDE

3000(
(450X450) (700X350) ROAD CONCRETE ROAD

NG 8M
DE ROAD
T01 T02 T03

REACTOR AREA
AREA
EL.=-3.450

ASPHALT AREA

NG
TOF

TI

PART
NG

TI
ASPHALT
SI

STI

BANK

SI
ROAD
WI
EXI
AUX.01

33KV SWGR

EXI
EXI
ROOM
BMO-02 WITH WIRE MESH

CAP
AUX.02

BMO-02 WITH WIRE MESH


BOD(-0.90) TYP. A SECTION

N
BOD(-0.90) TYP.

I
CONTROL
SCALE 1:75
- ROOM

FULL OR
EXISITING 5M
WIDE ROAD
NEW ASPHALT AREA

EXISITING S/S. BOUNDARY WALL

N
I ON
REPRODUCTI
01 02 03 04 05 06 07 08 09 REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

3600 4600 4800 4800 4800 4700 6100 5700


DRAWING CONTROL SHEET WE-485208

PROJECT TECHNICAL SPECIFICATIONS PTS-15WR116

NO
HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS WA-486055

d SA
HVAC EQUIPMENT & DUCT LAYOUT, ROOF PLAN WA-486056
ST 2-01 (800X1400) 02
(16,115 CFM) S.T.L-02 (1,611 CFM)
ST 2-1 (800X1400) HVAC EQUIPMENT &DUCT LAYOUT, GROUND FLOOR PLAN WA-486057

onalGri
BOD (+8.20) RT 2-1 (850X1300) (1500X1050) WITH ALUMINUM RETURN AIR PLENUM SUPPLY AIR PLENUM
(16,115 CFM) ST 1-1 (600X1500)
WALL OPENING (1000X1600) (14,504 CFM) WASHABLE FILTER, (2450X2450X1000) (2450X2450X1000)
TO SWGR GROUND & (12,575 CFM) 800 MM WIDE HVAC EQUIPMENT &DUCT LAYOUT, BASEMENT FLOOR PLAN WA-486058
G.F BOO(+3.75) FROM SWGR GROUND & MVD-13, VD-75 & AD-02 02 (8,828 CFM) (12,575 CFM) 02
BASEMENT FLOORS TO CONTROL ROOM CROSS OVER
BASEMENT FLOORS & WIRE MESH SCREEN BOD(+6.70) BOD(+8.10) BUILDING HVAC SECTIONS WA-486059
BOD(+8.20) BRIDGE FOR

OF Nati
FAD (500X500) S.T.L-01 (3,964 CFM) RT 1-1 (600X1200)
MAINTANANCE
EL=+10.200 (2100X1800) WITH ALUMINUM (8,828 CFM) HVAC EQUIPMENT SCHEDULE WA-486060
2 MVD 01,03 2 MVD 02,04 ACTIVITIES
WASHABLE FILTER, 2450 FROM OFFICE ROOM
TOP PACU PACU BDD-01,03 BDD-02,04 PACU
RT 2-01 (850X1300) & WIRE MESH SCREEN HVAC INSTALLATION DETAILS WA-486061
RT BOD RISE FROM
(14,504 CFM) 2A 1A 2 AD-02 2 AD-02 1B
FAD (750X750) 1500 BOD(+6.80)
BOD (+8.20) STAIR-2 HVAC AIR FLOW SCHEMATIC DIAGRAM WA-486062
TO BOD (+8.00)
WALL OPENING (1050X1500)

ARE THE SOLE PROPERTY


850 550 800

600 800 600


G.F BOO(+3.75) HVAC COORDINATION LAYOUT WA-486063

EL=+7.700 M
TOP GRAPHIC SCALE:
0 0.5 1 2 3 4 5 6 7m

EL=+5.950 (TOTTS) MAX. 850 M 600

7700
SCALE : 1 : 75
EL=+5.450 (TOTTS) MIN.

MF/SD-20 MF/SD-23 02
BATTERY WEF-2
02 (2,149 CFM)

6500
EAD (450X500) BMO-01 BMO-01 MF/SD-24 BMO-06 BMO-05 RT 1-1(600X1200)
FM-200 EAD MF/SD-34 MF/SD-22 SCD-04
7900

(8,828 CFM)

7700
BDD-12 & MF/SD-17 & AD-03 VD-43 VD-44
(250X250) VD-56 AS-BUILT BY DATE
OPENING BOO(+4.20) MF/SD-10 BOD(+4.00)
BMO-03

EAD (450X500) BOD(+4.10) SAR-03

MF/SD-21
WALL OPENING (800X1400)
6500

(SEE NOTE 03) EAG-01 RCD-01 RCD-02 AD-01


RCD-01

AD-01
VD-35 MF/SD-06 BOO(+3.90)
(+)4.000 450 VD-37

N
MF/SD-15

AD-01
VD-40

HEREI
SCD-01

AD-03
(TOCAN) SCD-01
3350

VD-48 BMO-01 VD-52


SCD-06
VD-58

RCD-03 02 10-2017 N.M AS PER NG COMMENTS LETTER M.E T.S


EAD (250X500)
WITH WIRE RT 1-02
3900

7900
L.P

3700
3700

L.P ST 1-11 BMO-01


EAG-01 ST 1-05 ST 1-10
3350
3300

250 MESH,VD-62 (600X1100) TOILET ROOM


VD-38 (450X450) T/H (500X700) VD-61 RT 1-07 02
T/H
BOD(+4.05) BOD(+4.00) (250X250) 01 09-2017 N.M AS PER NG COMMENTS LETTER M.E T.S
(150X250)

NED
BOD(+3.60) TYP. BOD(+3.70) 1 SCD-04 2 ECD-01
150 Ti/Hi TYP. ST 1-13
EAD (150X500) Ti/Hi & VD-42
(500X700) RT 1-08 455 CFM 244 CFM 00 08-2017 N.M ISSUED FOR APPROVAL M.E T.S

CONTAI
3700

3375
EAG-01 RAG-05 ST 1-09
3800

150 RT 1-05 (150X300) (300X300) (225X225)


VD-39 RT 1-06 RT 1-04 MF/SD-31 & MF/SD-33 (350X350)
(+)0.300 (450X500) REV.
(200X200) (600X650) AD-04 BOD(+3.675) DATE BY CHKD. CERT. APPD.
(TOSW) FFL=+0.300 VD-49 & AD-04 FFL=+0.300 NO.
DESCRIPTION
BOD(+4.00)
(-)0.526 TOA)
DRAWING COMPLETION CERTIFICATE (DCC):
RAR-03
300

ON
(-)0.735 02

NFORMATI
(TOA)
BATTERY ROOM
3 SAR-03 3 EAG-01 EL.=-1.700
669 CFM 716 CFM TOF
(750X250) (750X450)

THE I
N.MAHMOUD M.EL-BARBARY 1:75
CORRIDOR NORTH CONTROL ROOM CORRIDOR SOUTH DRAWN BY CHECKED BY SCALE:

1 SCD-06 1 RCD-05 1 BMO-03 B SECTION 8 SCD-01 8 RCD-01 4 BMO-01 1 SCD-03 1 RCD-03 1 BMO-05 DATE STARTED
26.01.2017
DATE COMPLETED
15.10.2019

216 CFM 196 CFM 196 CFM SCALE 1:75 995 CFM 927 CFM 1,855 CFM 257 CFM 234 CFM 234 CFM
-

AND
(225X225) (225X225) (200X200) (600X600) (600X600) (650X350) (225X225) (225X225) (250X200) OPR'G. DEPT. ENG. DEPT.

RAISED FLOOR
THIS DRAWING IS NOT TO BE USED FOR CERTIFIED
1 SAG-05 1 RAG-03

NG
AC/DC ROOM CONSTRUCTION OR FOR ORDERING

DRAW I
239 CFM 223 CFM MATERIAL UNTIL CERTIFIED AND DATED BY DATE
1 SCD-02 1 RCD-02 1 BMO-06
(300X300) (450X300)
390 CFM 358 CFM 358 CFM
(300X300) (300X300) (250X250)
BUILDING HVAC SECTIONS

RAISED FLOOR ADDITION OF NEW 3-80/100 MVA POWER TRANSFORMERS

S
THI
1 SAG-06 1 RAG-02
MADINAH EAST( MEDEA) 380/110-33KV BSP SUBSTATION
156 CFM 145 CFM
BUILDING HVAC SECTIONS (300X250) (300X250) MADINAH SAUDI ARABIA
SCALE 1:75 CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

01
4400008122 1532120.03 K MD426 WA-486059 of
02 02
NG-A (2012/01)

DMS VECTOR NGA00


02 02 MD426 WA - 486060 K 1532120.03 4400008122
of
02 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. REFER TO SHEET WA- 486055.0000.0002

OW NER.
2. ALL B.O.D & B.O.O LEVELS ARE MEASURED FROM ZERO LEVEL.

3. FOR BATTERY ROOM; DUCTWORK, AIR TERMINALS, DUCT

E D C B A ACCESSORIES, AND DUCT SUPPORTS SHALL BE CORROSION


RESTISTANT.

TS
SPF-02 (13,425 CFM)

OF I
SPF EAD (850X1300)
WITH MVD-10,
6300 5900 BDD-10 &AD-01 6080 6000

ST 1-1 (1500X600)

CONSENT
S.T.L-02 (1,611 CFM)
02 (12,575 CFM) (1500X1050) WITH ALUMINUM
TO CONTROL ROOM RT 2-1 WASHABLE FILTER,
BOD(+8.20) BOD RISE FROM MVD-14, VD-76 & AD-02
CONTROL ROOM ROOF BOD (+7.80) & WIRE MESH SCREEN
TO BOD(+8.00) FAD (500X500)
EL=+10.200
LEGEND

TTEN
TOP PACU
RT 1-1 (1200X600) SD-03, 04
PACU 2A
02 (8,828 CFM) VD-66 1400
ST 2-1 (800X1400) 1. REFER TO SHEET WA- 486055.0000.0002
1A

THE W RI
FROM OFFICE ROOM
(16,115 CFM)
BOD(+6.80)

850 550 800


SD-03 TO SWGR GROUND &

850
BASEMENT FLOORS
BOD(+8.20)
EL=+7.700 S.T.L-01 (3,964 CFM)
EL=+5.950 02 (1800X2100) WITH ALUMINUM
TOP

850
HPOTTS WASHABLE FILTER, RT 2-1 (850X1300)
SD-04

THOUT
MVD-11, VD-73 & AD-2 (14,504 CFM)
EL=+5.450
& WIRE MESH SCREEN FROM SWGR GROUND &
LPOTTS FAD (750X750) M 1300 BASEMENT FLOORS
BOD (+6.80)

WI
FM-200 EAD (250X250)
BOD DROP FROM
BMO-01 WITH VD-62 RT 2-01 (850X1300)
BOD(+4.45) ST BOD (+3.60) BOD(+4.05) TYP.

DOCUMENT
(14,504 CFM)
TO BOD (+3.90) TYP. SWGR ROOM

7900
ST 1-11 BOD (+3.85)
02 FM-200 WEF-03 ST 1-12
(500X700) 12 SAR-01 12 RAR-01
(668 CFM) (500X450)
EAD (250X250) 12 RAR-01 12 SAR-01 965 CFM 868 CFM
ST 1-03 ST 2-03 (700X900)

6500
BDD-13 & MF/SD-18 & AD-04 VD-13:24 VD-01:12 (750X400) (900X450)
(1000X550) BOD(+3.85)
OPENING BOO(+3.85) PRD-01
BOD(+3.625) TYP. SCD-01 SCD-01 SCD-01 SCD-01 (150X300)
VD-49 VD-48 VD-47 VD-46

S
MF/SD-25

THI
PRD-02 RT 2-3 (700X1100)
RT 1-05 BOO(+2.80)

3700

3550

3550
(150X300) BOD(+3.85) ST 2-07 (550X750)

3350
3325
(450X500) 550
MF/SD-26 (4,540 CFM)

2800
Ti/HiT/H L.P Ti/HiT/H L.P
BOO(+3.10) ST 1-15 BOD(+4.00)
TO SWGR BASEMENT

FROM
(150X300) RT 2-08 (350X700)
TO R.F MF/SD-03 (2,045 CFM)
350
VD-44 (+)0.300 (TORF) VD-74 FROM SWGR
(+)0.300 MF/SD-05
AD-01 BASEMENT FFL=+0.300 KEY PLAN

NED
(TOSW) (-)0.800(TOC) VD-77
(-)0.640 AD-01

1100

1200

1400

SHALL BE OBTAI
(TOA)

N
BMO-02 07 SAR-02
WITH WIRE MESH VD-25:31 ST 2-09 (500X450)
BOD(-0.90) TYP. BOD(-1.10)
EL.=-1.700 5M WIDE TUNNEL FOR 110KV O/G FEEDERS

TOF 6M WIDE NEW 6M WIDE


ROAD CONCRETE ROAD

NG 8M
DE ROAD
T01 T02 T03

REACTOR AREA
AREA
ASPHALT AREA

NG
CONTROL ROOM

TI
EL.=-3.450

NG

TI
EL.=-3.508

ASPHALT
SI

STI

BANK

SI
ROAD
WI
EXI
8 SCD-01 8 RCD-01 4 BMO-01 TOF TOF 33KV SWGR
AUX.01

EXI

PART
EXI
ROOM
995 CFM 927 CFM 1,855 CFM

CAP
AUX.02

(600X600) (600X600) (650X350)


CONTROL

RAISED FLOOR SWGR ROOM BSMNT ROOM

N
I
1 SAG-05 1 RAG-03 07 SAR-02 2 BMO-02 EXISITING 5M
WIDE ROAD

FULL OR
239 CFM 223 CFM 649 CFM 2,045 CFM NEW ASPHALT AREA

(300X300) (450X300) (450X450) (700X350)

C SECTION EXISITING S/S. BOUNDARY WALL

SCALE 1:75
-

N
I ON
REPRODUCTI
EL=+5.950 (TOTTS) MAX. REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.
EL=+5.450 (TOTTS) MIN.

DRAWING CONTROL SHEET WE-485208


01 02 03 04
PROJECT TECHNICAL SPECIFICATIONS PTS-15WR116

NO
3600 4600 4900 HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS WA-486055

d SA
HVAC EQUIPMENT & DUCT LAYOUT, ROOF PLAN WA-486056

HVAC EQUIPMENT &DUCT LAYOUT, GROUND FLOOR PLAN WA-486057

onalGri
HVAC EQUIPMENT &DUCT LAYOUT, BASEMENT FLOOR PLAN WA-486058

02 BATTERY WEF-2 BUILDING HVAC SECTIONS WA-486059

OF Nati
(2,149 CFM)
EAD (450X500) HVAC EQUIPMENT SCHEDULE WA-486060
BDD-12 & MF/SD-17 & AD-03
OPENING BOO(+4.20) HVAC INSTALLATION DETAILS WA-486061
(SEE NOTE 3) FM-200 EAD
HVAC AIR FLOW SCHEMATIC DIAGRAM WA-486062
(250X250)

250

ARE THE SOLE PROPERTY


BOD(+4.10)
HVAC COORDINATION LAYOUT WA-486063
EAD (450X500)
GRAPHIC SCALE:
SAR-03 BMO-03
0 0.5 1 2 3 4 5 6 7m
VD-35
MF/SD-15
SCALE : 1 : 75
EAG-01
@BOG=+3.15
(+)4.000 GRAPHIC SCALE:

450
450 VD-37
(TOCAN)
0 0.5 1 1.5 2 2.5m
450
SCALE : 1 : 25

SCD-06
EAD (250X500)
VD-58 AS-BUILT BY DATE

250 L.P

N
HEREI
3900

EAG-01 BATTERY ROOM T/H

@BOG=+1.85 ST 1-05 02 10-2017 N.M AS PER NG COMMENTS LETTER M.E T.S


3 SAR-03 3 EAG-01
VD-38 (450X450) Ti/Hi
01

3300
669 CFM 716 CFM BOD(+3.55) TYP.
150 01 09-2017 N.M AS PER NG COMMENTS LETTER M.E T.S
(750X250) (750X450)

NED
2850

00 08-2017 N.M ISSUED FOR APPROVAL M.E T.S

CONTAI
3800
EAD (150X500)
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

DRAWING COMPLETION CERTIFICATE (DCC):


1550

ON
EAG-01
@ BOG=+0.60 CORRIDOR NORTH

NFORMATI
VD-39
1 SCD-06 1 RCD-05 1 BMO-03
216 CFM 196 CFM 196 CFM
(225X225) (225X225) (200X200)
300

150

THE I
(+)0.300 FFL=+0.300 N.MAHMOUD M.EL-BARBARY AS SHOWN
DRAWN BY CHECKED BY SCALE:
(TOSW)
26.01.2017 15.10.2019
DATE STARTED DATE COMPLETED

AND
OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

DRAW I
B' BATTERY ROOM AND NORTH CORRIDOR ENLARGED SECTIONAL VIEW MATERIAL UNTIL CERTIFIED AND DATED BY DATE

SCALE 1:25
-
BUILDING HVAC SECTIONS

ADDITION OF NEW 3-80/100 MVA POWER TRANSFORMERS

S
THI
MADINAH EAST( MEDEA) 380/110-33KV BSP SUBSTATION
BUILDING HVAC SECTIONS MADINAH SAUDI ARABIA
SCALE 1:75 CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

02
4400008122 1532120.03 K MD426 WA-486059 of
02 02
NG-A (2012/01)

DMS VECTOR NGA00


02 02 MD426 WA - 486060 K 1532120.03 4400008122
of
01 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. REFER TO SHEET WA- 486055.0000.0002

OW NER.
2. FOR BATTERY ROOM; DUCTWORK, AIR TERMINALS, DUCT
ACCESSORIES, AND DUCT SUPPORTS SHALL BE CORROSION
RESTISTANT.

TS
OF I
CONSENT
PACKAGED AIR CONDITIONING UNITS SCHEDULE
EVAPORATOR FAN SECTION EVAPORATOR COOLING COIL SECTION CONDENSER LEGEND

TTEN
AREA SERVED
NO REF. NO SUPPLY AIR FRISH AIR TOTAL COOLING CAPACITY SENSIBLE COOLING NO OF REF TYPE/NO OF 1. REFER TO SHEET WA- 486055.0000.0002
MIN. ESP V/PH/HZ ENTERING DB/WB LEAVING DB/WB V/PH/HZ

THE W RI
QUANTITY QUANTITY (MBH) CAPACITY (MBH) CIRCUITS COMPRESSOR

CONTROL , AC/DC ROOMS & RAISED FLOORS HERMETIC


PACU- 01
01 02 12,575 02 3,964 2.00" 400/3/60 413.7 386 90.51/69.70 60/59.4 LATER 400/3/60
BATTERY, FM-200, TOILET, OFFICE & CORRIDORS SCROLL
(A&B)

PACU- 02 SWGR ROOMS GROUND AND HERMETIC


02 16,115 1,611 2.00" 400/3/60 398 391 83.06/66.89 59/58.96 LATER 400/3/60

THOUT
(A&B) BASEMENT FLOOR SCROLL

WI
DOCUMENT
S
THI
VOLUME DAMPERS MOTORIZED FIRE/SMOKE DAMPERS MOTORIZED VOLUME DAMPERS
REF. N0. SERVICE SIZE (MM) LOCATION TYPE QUANTITY MAKE/ MATERIAL

FROM
LISTED SIZE MANUFACTURER/ SIZE
SAR-01 SWGR ROOM FLANGE GGC OR REF. N0. SERVICE LOCATION TYPE QUANTITY REF.NO. SERVICE/LOCATION TYPE QUANTITY MAKE
VD-01:12 750X400 12 N0S (MM X MM) (MM X MM)
SUPPLY DUCT GROUND FLOOR CONNECTION APPROVED EQUAL MATERIAL
PACU-01 (A&B) FLANGE GGC OR
MVD-01:02 1500x600 02 NOS
RAR-01 APPROVED EQUAL KEY PLAN

NED
SWGR ROOM FLANGE GGC OR ST 2-01 SWGR ROOM FLANGE GGC OR MAIN SAD CONNECTION
VD-13:24 900X450 12 N0S MF/SD-01 1400x800 01 N0S
RETURN DUCT GROUND FLOOR CONNECTION APPROVED EQUAL WALL MOUNTED GROUND FLOOR CONNECTION APPROVED EQUAL

SHALL BE OBTAI
PACU-01 (A&B) FLANGE GGC OR
MVD-03:04 1200x600 02 NOS APPROVED EQUAL
SAR-02 MAIN RAD CONNECTION

N
SWGR ROOM FLANGE GGC OR RT 2-01 SWGR ROOM FLANGE GGC OR
VD-25:31 450x450 07 N0S MF/SD-02 1300x850 01 N0S
SUPPLY DUCT BASEMENT FLOOR CONNECTION APPROVED EQUAL WALL MOUNTED GROUND FLOOR CONNECTION APPROVED EQUAL
PACU-02 (A&B) FLANGE GGC OR
MVD-05:06 1400x800 02 NOS APPROVED EQUAL
FM-200 FM-200 ROOM FLANGE GGC OR RT 2-08, RT 2-07 SWGR ROOM FLANGE GGC OR MAIN SAD CONNECTION
5M WIDE TUNNEL FOR 110KV O/G FEEDERS
VD-32 250X250 01 N0S MF/SD-03:04 700x350 02 N0S
EXHAUST DUCT GROUND FLOOR CONNECTION APPROVED EQUAL SLAB MOUNTED GROUND FLOOR CONNECTION APPROVED EQUAL
PACU-02 (A&B) FLANGE GGC OR 6M WIDE NEW 6M WIDE
MVD-07:08 1300x850 02 NOS APPROVED EQUAL ROAD CONCRETE ROAD
MAIN RAD CONNECTION
ST 1-07 CORRIDOR NORTH FLANGE GGC OR ST 2-07 SWGR ROOM FLANGE GGC OR
VD-33 300X300 01 N0S MF/SD-05 750X550 01 N0S

NG 8M
SUPPLY DUCT GROUND FLOOR CONNECTION APPROVED EQUAL SLAB MOUNTED GROUND FLOOR CONNECTION APPROVED EQUAL

DE ROAD
T01 T02 T03
GGC OR

REACTOR AREA
AREA
SPF-01 FLANGE

ASPHALT AREA
MVD-09 1200x600 01 NOS APPROVED EQUAL

NG
PACU-01 MAIN EAD CONNECTION

TI

NG

TI
ASPHALT
SAR-03 BATTERY ROOM FLANGE GGC / BMO-03 CORRIDOR NORTH FLANGE GGC OR

SI

STI

BANK
VD-34:36 750X250 03 N0S MF/SD-06 200X200 01 N0S

SI
ROAD
WI
EXI
AUX.01

SUPPLY DUCT GROUND FLOOR CONNECTION STAINLESS STEEL WALL MOUNTED GROUND FLOOR CONNECTION APPROVED EQUAL GGC OR 33KV SWGR

EXI
SPF-02 FLANGE

PART
EXI
MVD-10 1300x850 01 NOS APPROVED EQUAL
ROOM
PACU-02 MAIN EAD CONNECTION

CAP
AUX.02

EAG-01 BATTERY ROOM FLANGE GGC / ST 1-01 CONTROL ROOM FLANGE GGC OR
VD-37:39 750X450 03 N0S MF/SD-07 1500x600 01 N0S GGC OR CONTROL
SUPPLY DUCT GROUND FLOOR CONNECTION STAINLESS STEEL WALL MOUNTED GROUND FLOOR CONNECTION APPROVED EQUAL STL-01 FAD FLANGE
MVD-11:12 750x750 02 NOS APPROVED EQUAL
ROOM
FRESH AIR DUCT CONNECTION

N
I
RT 1-06 FLANGE GGC OR ST 1-08 AC/DC ROOM FLANGE GGC OR EXISITING 5M
VD-40 200X200 CONTROL ROOM 01 N0S MF/SD-08 350X500 01 N0S STL-02 FAD FLANGE GGC OR WIDE ROAD
RETURN DUCT CONNECTION APPROVED EQUAL WALL MOUNTED GROUND FLOOR CONNECTION APPROVED EQUAL

FULL OR
MVD-13:14 500x500 02 NOS APPROVED EQUAL NEW ASPHALT AREA
FRESH AIR DUCT CONNECTION
ST 1-16 AC/DC ROOM FLANGE GGC OR ST 1-09 CORRIDOR SOUTH FLANGE GGC OR
VD-41 250X150 01 N0S MF/SD-09:10 350x350 02 N0S
SUPPLY DUCT GROUND FLOOR CONNECTION APPROVED EQUAL WALL MOUNTED GROUND FLOOR CONNECTION APPROVED EQUAL EXISITING S/S. BOUNDARY WALL

RT 1-07 AC/DC ROOM FLANGE GGC OR ST 1-10 OFFICE ROOM FLANGE GGC OR
VD-42 250X150 01 N0S MF/SD-11 250X250 01 N0S
RETURN DUCT GROUND FLOOR CONNECTION APPROVED EQUAL WALL MOUNTED GROUND FLOOR CONNECTION APPROVED EQUAL DUCT SMOKE DETECTOR

N
I ON
BMO-06 AC/DC ROOM FLANGE GGC OR TOILET EAD TOILET ROOM FLANGE GGC OR SIZE
VD-43 250X250 01 N0S MF/SD-12 250X250 01 N0S REF.NO. SERVICE/LOCATION TYPE QUANTITY MAKE
RETURN DUCT GROUND FLOOR CONNECTION APPROVED EQUAL WALL MOUNTED GROUND FLOOR CONNECTION APPROVED EQUAL (MM X MM)

REPRODUCTI
BMO-05 CORRIDOR SOUTH FLANGE GGC OR ST 1-04 CORRIDOR NORTH FLANGE GGC OR PACU-01 (A&B) FLANGE AS PER
VD-44 250X200 01 N0S MF/SD-13 700x400 01 N0S SD-01 1500x600 01 NOS
RETURN DUCT GROUND FLOOR CONNECTION APPROVED EQUAL WALL MOUNTED GROUND FLOOR CONNECTION APPROVED EQUAL MAIN SAD CONNECTION APPROVED VENDOR REFERENCE DRAWINGS
PACU-01 (A&B) FLANGE AS PER DRAWING TITLE DRAWING NO.
BMO-04 OFFICE ROOM FLANGE GGC OR SAR-03 BATTERY ROOM FLANGE GGC / SD-02 1200x600 01 NOS
VD-45 250X200 01 N0S MF/SD-14:16 750X250 03 N0S MAIN RAD CONNECTION APPROVED VENDOR
RETURN DUCT GROUND FLOOR CONNECTION APPROVED EQUAL WALL MOUNTED GROUND FLOOR CONNECTION STAINLESS STEEL DRAWING CONTROL SHEET WE-485208
PACU-02 (A&B) FLANGE AS PER
SCD-01 CONTROL ROOM BUTTERFLY GGC OR BATTERY EAD BATTERY ROOM FLANGE GGC / SD-03 1400x800 01 NOS PROJECT TECHNICAL SPECIFICATIONS PTS-15WR116
VD-46:53 {450 08 N0S MF/SD-17 500X450 01 N0S MAIN SAD CONNECTION APPROVED VENDOR
APPROVED EQUAL

NO
SUPPLY DUCT GROUND FLOOR CONNECTION WALL MOUNTED GROUND FLOOR CONNECTION STAINLESS STEEL
PACU-02 (A&B) FLANGE AS PER HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS WA-486055
SCD-02 AC/DC ROOM BUTTERFLY GGC OR FM-200 ROOM EAD CORRIDOR NORTH FLANGE GGC OR SD-04 1300x850 01 NOS
MAIN RAD CONNECTION APPROVED VENDOR

d SA
VD-54 {300 01 N0S MF/SD-18 250X250 01 N0S
SUPPLY DUCT GROUND FLOOR CONNECTION APPROVED EQUAL WALL MOUNTED GROUND FLOOR CONNECTION APPROVED EQUAL HVAC EQUIPMENT & DUCT LAYOUT, ROOF PLAN WA-486056

SCD-03 CORRIDOR SOUTH BUTTERFLY HVAC EQUIPMENT &DUCT LAYOUT, GROUND FLOOR PLAN WA-486057

onalGri
VD-55 {225 01 N0S GGC OR SAR-04 FM-200 ROOM FLANGE GGC OR
SUPPLY DUCT GROUND FLOOR CONNECTION MF/SD-19 750X250 01 N0S
APPROVED EQUAL WALL MOUNTED GROUND FLOOR CONNECTION APPROVED EQUAL
HVAC EQUIPMENT &DUCT LAYOUT, BASEMENT FLOOR PLAN WA-486058
SCD-04 TOILET ROOM BUTTERFLY GGC OR EAG-02 FM-200 ROOM FLANGE GGC OR
PRESSURE RELIEF DAMPER
VD-56 {300 01 N0S MF/SD-20 750X450 01 N0S BUILDING HVAC SECTIONS WA-486059
SUPPLY DUCT GROUND FLOOR CONNECTION APPROVED EQUAL WALL MOUNTED GROUND FLOOR CONNECTION APPROVED EQUAL

OF Nati
SIZE
REF.NO. SERVICE/LOCATION TYPE QUANTITY MAKE HVAC EQUIPMENT SCHEDULE WA-486060
CORRIDOR & OFFICE (MM X MM)
GGC OR RT 1-01 FLANGE GGC OR
SCD-05 OFFICE ROOM BUTTERFLY MF/SD-21:23 1200x600 ROOMS 03 N0S
VD-57 {225 01 N0S WALL MOUNTED CONNECTION APPROVED EQUAL HVAC INSTALLATION DETAILS WA-486061
SUPPLY DUCT GROUND FLOOR CONNECTION APPROVED EQUAL GROUND FLOOR SWGR ROOM FLANGE GGC OR
PRD-01 400X200 01 NOS APPROVED EQUAL
GROUND FLOOR CONNECTION
RT 1-02 AC/DC ROOM FLANGE GGC OR HVAC AIR FLOW SCHEMATIC DIAGRAM WA-486062
SCD-06 CORRIDOR NORTH BUTTERFLY GGC OR MF/SD-24 1100x600 01 N0S

ARE THE SOLE PROPERTY


VD-58 {225 01 N0S WALL MOUNTED GROUND FLOOR CONNECTION APPROVED EQUAL CONTROL ROOM FLANGE GGC OR
SUPPLY DUCT GROUND FLOOR CONNECTION APPROVED EQUAL
PRD-02 300X150 01 NOS APPROVED EQUAL HVAC COORDINATION LAYOUT WA-486063
GROUND FLOOR CONNECTION
GGC OR PRD-01 SWGR ROOM FLANGE GGC OR
BMO-01 CONTROL ROOM FLANGE MF/SD-25 400X200 01 N0S
VD-59:62 650X350 04 N0S APPROVED EQUAL WALL MOUNTED GROUND FLOOR CONNECTION APPROVED EQUAL AC/DC ROOM FLANGE GGC OR
RETURN DUCT GROUND FLOOR CONNECTION PRD-03 100X100 01 NOS APPROVED EQUAL
GROUND FLOOR CONNECTION
PRD-02 CONTROL ROOM FLANGE GGC OR
RT 2-07:08 SWGR ROOM FLANGE GGC OR MF/SD-26 300X150 01 N0S GGC OR
VD-63:64 700X350 02 N0S WALL MOUNTED GROUND FLOOR CONNECTION APPROVED EQUAL STAIR-02 & SWGR FLANGE
RETURN DUCT GROUND FLOOR CONNECTION APPROVED EQUAL PRD-04:05 300x150 02 NOS APPROVED EQUAL
GROUND AND BASEMENT CONNECTION
PRD-03 AC/DC ROOM FLANGE GGC OR
ST 1-01 ROOF OVER FLANGE GGC OR MF/SD-27 100X100 01 N0S
VD-65 1500X600 01 N0S WALL MOUNTED GROUND FLOOR CONNECTION APPROVED EQUAL
SUPPLY DUCT CONTROL ROOM CONNECTION APPROVED EQUAL
PRD-04:05 STAIR-02 GROUND FLANGE GGC OR
ST 2-01 ROOF OVER FLANGE MF/SD-28:29 300x150 02 N0S
VD-66 1400X800 01 N0S GGC OR WALL MOUNTED & BASEMENT FLOORS CONNECTION APPROVED EQUAL
SUPPLY DUCT SWGR ROOM CONNECTION APPROVED EQUAL
ST 1-15 & RT 1-08 CONTROL ROOM FLANGE GGC OR AS-BUILT BY DATE
MF/SD-30:31 300x150 02 N0S
ST 1-02 CONTROL ROOM FLANGE GGC OR RAISED F. MOUNTED RAISED FLOOR CONNECTION APPROVED EQUAL
VD-67 1450X550 01 N0S
SUPPLY DUCT GROUND FLOOR CONNECTION APPROVED EQUAL

N
ST 1-16 & RT 1-07 AC/DC ROOM FLANGE GGC OR

HEREI
MF/SD-32:33 250X150 02 N0S
ST 1-08 CONTROL ROOM FLANGE RAISED F. MOUNTED AISED FLOORR CONNECTION APPROVED EQUAL
VD-68 350X500 01 N0S GGC OR
02 10-2017 N.M AS PER NG COMMENTS LETTER M.E T.S
SUPPLY DUCT GROUND FLOOR CONNECTION APPROVED EQUAL
FM-200 EAD FM-200 EAD FLANGE GGC OR
MF/SD-34 250X250 01 N0S
ST 1-11, 1-13 EXHAUST DUCT EXHAUST DUCT CONNECTION APPROVED EQUAL 01 09-2017 N.M AS PER NG COMMENTS LETTER M.E T.S
CONTROL ROOM FLANGE GGC OR
VD-69:70 700X500 02 N0S

NED
SUPPLY DUCT GROUND FLOOR CONNECTION APPROVED EQUAL
00 08-2017 N.M ISSUED FOR APPROVAL M.E T.S

CONTAI
TOILET ROOM TOILET ROOM FLANGE GGC OR
VD-71:72 200X100 02 N0S
EXHAUST DUCT EXHAUST DUCT CONNECTION APPROVED EQUAL REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

STL-01 PACU-01 FLANGE GGC OR DRAWING COMPLETION CERTIFICATE (DCC):


VD-73:74 750X750 02 N0S
FRESH AIR DUCT CONTROL ROOM ROOF CONNECTION APPROVED EQUAL

ON
NFORMATI
STL-02 PACU-02 FLANGE GGC OR
VD-75:76 500X500 02 N0S
FRESH AIR DUCT SWGR ROOM ROOF CONNECTION APPROVED EQUAL

ST 2-07 SWGR ROOM FLANGE GGC OR


VD-77 750X550 01 N0S
SUPPLY DUCT GROUND FLOOR CONNECTION APPROVED EQUAL

THE I
N.MAHMOUD M.EL-BARBARY NTS
DRAWN BY CHECKED BY SCALE:

26.01.2017 15.10.2019
DATE STARTED DATE COMPLETED

AND
OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

HVAC EQUIPMENT SCHEDULE


ADDITION OF NEW 3-80/100 MVA POWER TRANSFORMERS

S
THI
MADINAH EAST( MEDEA) 380/110-33KV BSP SUBSTATION
HVAC EQUIPMENT SCHEDULE
MADINAH SAUDI ARABIA
SCALE NTS
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

01
4400008122 1532120.03 K MD426 WA-486060 of
02 02
NG-A (2012/01)

DMS VECTOR NGA00


02 02 MD426 WA - 486060 K 1532120.03 4400008122
of
02 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. REFER TO SHEET WA- 486055.0000.0002

OW NER.
2. FOR BATTERY ROOM; DUCTWORK, AIR TERMINALS, DUCT
ACCESSORIES, AND DUCT SUPPORTS SHALL BE CORROSION
RESTISTANT.

TS
OF I
02

CONSENT
SUPPLY AIR TERMINALS EXHAUST FANS SCHEDULE
SP TYPE OF ELECTRICAL DATA
LOCATION CAPACITY TYPE OF MOUNTING POWER
SIZE NC REF. N0. (In WG) FAN QUANTITY MAKE / NOTES
REF. N0. CFM TYPE LOCATION QUANTITY MAKE / NOTES (CFM) (HP)
(MM X MM) RATING V PH Hz

BATTERY GREENHECK / ACID RESISTANT


WEF-02 2,149 0.45 CENTRIFUGAL 1 N0S 230 1 60 WALL MOUNTED LATER
LEGEND

TTEN
DOUBLE DEFLECTION SWGR ROOM GGC OR ROOM EXPLOSION PROOF
SAR-01 965 750X400 <30 12 NOS
SUPPLY REGISTER GROUND FLOOR APPROVED EQUAL
FM-200
WEF-03 668 0.15 CENTRIFUGAL 1 N0S 230 1 60 WALL MOUNTED LATER GREENHECK /EQUIVALENT 1. REFER TO SHEET WA- 486055.0000.0002
(FF)

THE W RI
DOUBLE DEFLECTION SWGR ROOM GGC OR
SAR-02 649 450X450 <30 07 NOS
SUPPLY REGISTER BASEMENT FLOOR APPROVED EQUAL TOILET CENTRIFUGAL 1 N0S 230 1 60 WALL MOUNTED LATER
WEF-01 487 0.12 GREENHECK /EQUIVALENT
DOUBLE DEFLECTION BATTERY ROOM GGC /
SAR-03 669 750X250 <30 03 NOS
SUPPLY REGISTER GROUND FLOOR STAINLESS STEEL SMOKE PURGE FANS
02
DOUBLE DEFLECTION FM-200 ROOM CONTROL ROOM GREENHECK /EQUIVALENT
GGC OR SPF-01 5,897 LATER CENTRIFUGAL 1 N0S 400 3 60 DUCT MOUNTED LATER
SAR-04 624 <30 01 NOS

THOUT
750X250 ROOF FIRE RATED & UL LISTED
SUPPLY REGISTER GROUND FLOOR APPROVED EQUAL
GREENHECK /EQUIVALENT
SPF-02 SWGR ROOF 13,425 LATER CENTRIFUGAL 1 N0S 400 3 60 DUCT MOUNTED LATER
SINGLE DEFLECTION CONTROL ROOM GGC OR FIRE RATED & UL LISTED
SAG-05 239 300X300 <30 01 NOS
SUPPLY GRILLE RAISED FLOOR APPROVED EQUAL

WI
SINGLE DEFLECTION AC/DC ROOM GGC OR
SAG-06 156 300X250 <30 01 NOS
SUPPLY GRILLE RAISED FLOOR APPROVED EQUAL

DOCUMENT
450X450 4-WAY SUPPLY CONTROL ROOM GGC OR
SCD-01 995 <30 08 NOS
NECK AREA CEILING DIFFUSER GROUND FLOOR APPROVED EQUAL

300X300 4-WAY SUPPLY AC/DC ROOM GGC OR


RETURN AIR TERMINALS
SCD-02 390 <30 01 NOS
NECK AREA CEILING DIFFUSER GROUND FLOOR APPROVED EQUAL
SIZE NC
REF. N0. CFM TYPE LOCATION QUANTITY MAKE / NOTES

S
225X225 4-WAY SUPPLY CORRIDOR SOUTH GGC OR RATING

THI
SCD-03 257 <30 01 NOS (MM X MM)
NECK AREA CEILING DIFFUSER GROUND FLOOR APPROVED EQUAL

300X300 4-WAY SUPPLY TOILET ROOM DOUBLE DEFLECTION SWGR ROOM GGC OR
GGC OR RAR-1 868 900X450 <30 12 NOS
02 SCD-04 455 <30 01 NOS

FROM
CEILING DIFFUSER GROUND FLOOR RETURN REGISTER GROUND FLOOR APPROVED EQUAL
NECK AREA APPROVED EQUAL

225X225 4-WAY SUPPLY OFFICE ROOM SINGLE DEFLECTION AC/DC ROOM GGC OR
GGC OR RAG-02 145 300X250 <30 01 NOS
SCD-05 271 <30 01 NOS RETURN GRILLE RAISED FLOOR APPROVED EQUAL
NECK AREA CEILING DIFFUSER GROUND FLOOR APPROVED EQUAL
KEY PLAN

NED
SINGLE DEFLECTION CONTROL ROOM GGC OR
225X225 4-WAY SUPPLY CORRIDOR NORTH GGC OR RAG-03 223 450X300 <30 01 NOS
SCD-06 216 <30 01 NOS RETURN GRILLE RAISED FLOOR APPROVED EQUAL

SHALL BE OBTAI
NECK AREA CEILING DIFFUSER GROUND FLOOR APPROVED EQUAL
SINGLE DEFLECTION BATTERY ROOM GGC /

N
EAG-01 736 750X450 <30 03 NOS
EXHAUST GRILLE GROUND FLOOR STAINLESS STEEL
02
SINGLE DEFLECTION FM-200 ROOM GGC OR
EAG-02 668 750X450 <30 01 NOS
EXHAUST GRILLE GROUND FLOOR APPROVED EQUAL 5M WIDE TUNNEL FOR 110KV O/G FEEDERS

6M WIDE NEW 6M WIDE


4-WAY RETURN CONTROL ROOM GGC OR
RCD-01 927 600X600 <30 08 NOS ROAD CONCRETE ROAD
CIELING DIFFUSER GROUND FLOOR APPROVED EQUAL

NG 8M
DE ROAD
T01 T02 T03

REACTOR AREA
AREA
4-WAY RETURN AC/DC ROOM GGC OR

ASPHALT AREA
RCD-02 358 300X300 <30 01 NOS

NG
CIELING DIFFUSER GROUND FLOOR APPROVED EQUAL

TI

NG

TI
ASPHALT
SI

STI

BANK

SI
ROAD
WI
EXI
AUX.01

4-WAY RETURN CORRIDOR SOUTH GGC OR 33KV SWGR

PART
EXI
EXI
RCD-03 234 225X225 <30 01 NOS ROOM
CIELING DIFFUSER GROUND FLOOR APPROVED EQUAL
DUCT MOUNTED ELECTRIC HEATER SCHEDULE

CAP
AUX.02

4-WAY RETURN OFFICE ROOM GGC OR CONTROL


RCD-04 253 225X225 <30 01 NOS ROOM
DUCT CIELING DIFFUSER GROUND FLOOR APPROVED EQUAL

N
SERVICE/ HEATER VOLT / AIR FLOW NO OF TYPE OF AIR FLOW

I
DESIGNATION SIZE MANUFACTURER
LOCATION CAP., KW PHASE CFM STEPS CONTROL DIRECTION 4-WAY RETURN CORRIDOR NORTH GGC OR EXISITING 5M
MMXMM RCD-05 196 225X225 <30 01 NOS

FULL OR
WIDE ROAD
CIELING DIFFUSER GROUND FLOOR APPROVED EQUAL NEW ASPHALT AREA

4-WAY EXHAUST TOILET ROOM GGC OR


PACU (1A&1B) 02 ECD-01 244 225X225 <30 02 NOS
02 STEP CIELING DIFFUSER GROUND FLOOR APPROVED EQUAL
EDH-01 MAIN SAD 1500X600 40.0 400/3 12,575 02 HORIZONTAL BRASCH/EQUIVALENT EXISITING S/S. BOUNDARY WALL
CONTROL

N
I
PACU (2A&2B) STEP
EDH-02 MAIN SAD 1400X800 21.00 400/3 16,115 02 HORIZONTAL BRASCH/EQUIVALENT
CONTROL

ON
REPRODUCTI
SAND TRAP LOUVER SCHEDULE
SIZE REFERENCE DRAWINGS
SERVICE FRESH AIR FACE VELOCITY
DESIGNATION (MM) QTY MANUFACTURER DRAWING TITLE DRAWING NO.
LOCATION (CFM) (FPM)
(WxH)
DRAWING CONTROL SHEET WE-485208

BELL MOUTH SCHEDULE 02 STL#1 PACU-01 2100X1800 3,964 <300 GGC/EQUIVALENT


2 PROJECT TECHNICAL SPECIFICATIONS PTS-15WR116

NO
SIZE NC PACU-02 1,611 GGC/EQUIVALENT HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS WA-486055
REF. N0. CFM TYPE LOCATION QUANTITY MAKE STL#2 1500X1050 <300 2
(MM X MM) RATING

d SA
HVAC EQUIPMENT & DUCT LAYOUT, ROOF PLAN WA-486056
NOTES: ALL STL HAVE ALUMINUM WASHABLE PRE-FILTER
BMO WITH WIRE MESH CONTROL ROOM GGC OR HVAC EQUIPMENT &DUCT LAYOUT, GROUND FLOOR PLAN WA-486057

onalGri
BMO-01 1,855 650X350 <20 04 NOS
& VOLUME DAMPER GROUND FLOOR APPROVED EQUAL
HVAC EQUIPMENT &DUCT LAYOUT, BASEMENT FLOOR PLAN WA-486058
BMO WITH WIRE MESH SWGR ROOM GGC OR
BMO-02 2,045 700X350 <20 02 NOS
& VOLUME DAMPER BASEMENT FLOOR APPROVED EQUAL BUILDING HVAC SECTIONS WA-486059

OF Nati
BMO WITH WIRE MESH CORRIDOR NORTH GGC OR HVAC EQUIPMENT SCHEDULE WA-486060
BMO-03 196 200x200 <20 01 NOS
& VOLUME DAMPER GROUND FLOOR APPROVED EQUAL

BMO WITH WIRE MESH OFFICE ROOM GGC OR


ACCESS DOOR HVAC INSTALLATION DETAILS WA-486061

BMO-04 253 250x200 <20 01 NOS


& VOLUME DAMPER GROUND FLOOR APPROVED EQUAL HVAC AIR FLOW SCHEMATIC DIAGRAM WA-486062
SIZE

ARE THE SOLE PROPERTY


REF.NO. SERVICE/LOCATION QUANTITY MAKE
BMO WITH WIRE MESH CORRIDOR SOUTH GGC OR (MM X MM)
234 250x200 <20 01 NOS HVAC COORDINATION LAYOUT WA-486063
BMO-05 & VOLUME DAMPER GROUND FLOOR APPROVED EQUAL
GGC OR
AD-01 SAD & RAD 600X600 17 NOS APPROVED EQUAL
BMO WITH WIRE MESH AC/DC ROOM GGC OR
BMO-06 358 250X250 <20 01 NOS
& VOLUME DAMPER GROUND FLOOR APPROVED EQUAL
GGC OR
AD-02 SAD & RAD 450X450 13 NOS APPROVED EQUAL

GGC OR
AD-03 SAD & RAD 300X300 03 NOS APPROVED EQUAL

GGC OR
AD-04 SAD & RAD 200X200 06 NOS APPROVED EQUAL

AS-BUILT BY DATE

BACK DRAFT DAMPER

N
HEREI
SIZE
REF.NO. SERVICE/LOCATION TYPE QUANTITY MAKE/ MATERIAL
(MM X MM) 02 10-2017 N.M AS PER NG COMMENTS LETTER M.E T.S

PACU-01 (A&B) FLANGE GGC OR


BDD-01:02 1500x600 02 NOS APPROVED EQUAL 01 09-2017 N.M AS PER NG COMMENTS LETTER M.E T.S
MAIN SAD CONNECTION

NED
PACU-01 (A&B) FLANGE GGC OR
00 08-2017 N.M ISSUED FOR APPROVAL M.E T.S

CONTAI
BDD-03:04 1200x600 02 NOS APPROVED EQUAL
MAIN RAD CONNECTION
REV.
PACU-02 (A&B) FLANGE GGC OR NO.
DATE BY DESCRIPTION CHKD. CERT. APPD.
BDD-05:06 1400x800 02 NOS APPROVED EQUAL
MAIN SAD CONNECTION
DRAWING COMPLETION CERTIFICATE (DCC):
PACU-02 (A&B) FLANGE GGC OR

ON
BDD-07:08 1300x850 02 NOS APPROVED EQUAL
MAIN RAD CONNECTION

NFORMATI
SPF-01 FLANGE GGC OR
BDD-09 1200x600 01 NOS APPROVED EQUAL
PACU-01 MAIN EAD CONNECTION

SPF-02 FLANGE GGC OR


BDD-10 1300x850 01 NOS APPROVED EQUAL
PACU-02 MAIN EAD CONNECTION

THE I
N.MAHMOUD M.EL-BARBARY NTS
WEF-01 AS PER APPROVED FLANGE GGC OR DRAWN BY CHECKED BY SCALE:
BDD-11 01 NOS APPROVED EQUAL
TOILET ROOM EAD VENDOR CONNECTION
26.01.2017 15.10.2019
DATE STARTED DATE COMPLETED

WEF-02 AS PER APPROVED FLANGE GGC /


BDD-12 01 NOS

AND
BATTERY ROOM EAD VENDOR CONNECTION STAINLESS STEEL OPR'G. DEPT. ENG. DEPT.

WEF-03 AS PER APPROVED FLANGE GGC OR


BDD-13 01 NOS APPROVED EQUAL THIS DRAWING IS NOT TO BE USED FOR CERTIFIED
FM-200 ROOM EAD VENDOR CONNECTION

NG
CONSTRUCTION OR FOR ORDERING

DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

HVAC EQUIPMENT SCHEDULE


ADDITION OF NEW 3-80/100 MVA POWER TRANSFORMERS

S
THI
MADINAH EAST( MEDEA) 380/110-33KV BSP SUBSTATION
HVAC EQUIPMENT SCHEDULE
MADINAH SAUDI ARABIA
SCALE NTS
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

02
4400008122 1532120.03 K MD426 WA-486060 of
02 02
NG-A (2012/01)

DMS VECTOR NGA00


02 06
of
MD426 WA - 486061 K 1532120.03 4400008122
01 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. REFER TO SHEET WA- 486055.0000.0002

OW NER.
DUCT PENETRATION SHALL
WALL 200X150X150mm ALUMINUM
DUCT PENETRATION SHALL BE SEALED, ALUMINUM ENCLOSURE
ENCLOSURE WITH OPENABLE
BE SEALED, ALUMINUM ENCLOSURE WITH OPENABLE WEATHER SEALED
COVER. WEATHER SEALED COVER
WITH OPENABLE WEATHER SEALED

TS
BELL MOUTH OPENING COVER. TRANSPARENT FLEXI GLASS

OF I
WITH REMOVABLE
GALVANISED STEEL
WIRE MESH

CONSENT
COMBINATION MOTORIZED
AIR FLOW FIRE/SMOKE DAMPER RETURN AIR

FLANGE

DUCT
VOLUME DAMPER
LEGEND

TTEN
SPOT WELDING
1. REFER TO SHEET WA- 486055.0000.0002

THE W RI
WALL OPENING HANDLE METAL
MOTOR ACTUATOR PIANO HANG

DUCT WALL GASKET

THOUT
WI
1 SLIDE IN FLANGE JOINT CONNECTION DETAIL 2 RETURN AIR GRILLE INSTALLATION DETAIL 3 PROTECTIVE DAMPER ACTUATORS ENCLOSURE
- NOT TO SCALE - NOT TO SCALE - NOT TO SCALE

DOCUMENT
FUSIBLE LINK 165°F
DETAIL-C

S
THI
ACTUATOR SHAFT
DUCT
BLADES

FROM
WALL

ADJUSTABLE PACU
KEY PLAN

NED
CONNECTING ROD

SHALL BE OBTAI
FIRESTAT
BLADE (GA16)

N
DAMPER FRAME AIR FLOW
GALVAZIED FRAME

BEARING FLEX. 5M WIDE TUNNEL FOR 110KV O/G FEEDERS

CONDUIT 6M WIDE NEW 6M WIDE


ROAD CONCRETE ROAD

EXTERNAL ADJUSTMENT BOLT

NG 8M
PACU BASE

DE ROAD
T01 T02 T03

REACTOR AREA
AREA
ASPHALT AREA
CHANNEL

NG
JUNCTION COVER

TI

NG

TI
ASPHALT
DUCT MOUNTED

PART
SI

STI

BANK

SI
CENTER LOCK

ROAD
BOX

WI
EXI
AUX.01

BACKDRAFT DAMPER 33KV SWGR

EXI
EXI
ROOM

OPERATOR/

CAP
AUX.02

LOCK NUT
ACTUATOR CONTROL

N
I
ROOM
SLEEVE TO DUCT

FULL OR
NEGATOR CLOSURE CONNECTION UPPER HOUSING EXISITING 5M
WIDE ROAD
SPRING GASKET NEW ASPHALT AREA
SLEEVE CLAMP WITH BOLT
DUCT INTERNAL
INSULATION LOWER HOUSING VIBRATION ISOLATOR DAMPER CASING
SLIDE ON FLANGE EXISITING S/S. BOUNDARY WALL

EXPANSION BOLT

N
LAG SCREW & LOCK

I
BLADE STOPPER
WASHER {12mmx50mm L

ON
AIR DUCT
MOUNTING

REPRODUCTI
ANGLE

REFERENCE DRAWINGS
DETAIL-C
CONCRETE PAD DRAWING TITLE DRAWING NO.

DRAWING CONTROL SHEET WE-485208

PROJECT TECHNICAL SPECIFICATIONS PTS-15WR116

NO
HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS WA-486055

d SA
HVAC EQUIPMENT & DUCT LAYOUT, ROOF PLAN WA-486056
4 MOTORIZED FIRE & SMOKE DAMPER DETAIL 5 ISOLATOR MOUNTING DETAILS 6 BACKDRAFT DAMPER INSTALLATION DETAIL
HVAC EQUIPMENT &DUCT LAYOUT, GROUND FLOOR PLAN WA-486057

onalGri
- NOT TO SCALE - NOT TO SCALE - NOT TO SCALE
HVAC EQUIPMENT &DUCT LAYOUT, BASEMENT FLOOR PLAN WA-486058

BUILDING HVAC SECTIONS WA-486059

OF Nati
HVAC EQUIPMENT SCHEDULE WA-486060

HVAC INSTALLATION DETAILS WA-486061

HVAC AIR FLOW SCHEMATIC DIAGRAM WA-486062

ARE THE SOLE PROPERTY


HVAC COORDINATION LAYOUT WA-486063

GASKET
CLAMP WITH
FACTORY INSULATED DOUBLE-SKINNED
BOLT
RECTANGULAR DUCT WITH 50mm THICK
DAMPER
THERMAL INSULATION, AND 0.8 THICK
CASING SLIDE ON FLANGE
ALUMINUM CLADDING SHEET

EXPANSION SHIELDS
ANGLE
(80mmX80mmX8mm)

DETAIL-E
AS-BUILT BY DATE

EXPANSION NAIL
L=

N
HEREI
(W/
4)
,M
IN. 02 10-2017 N.M AS PER NG COMMENTS LETTER M.E T.S
15
0
MM
01 09-2017 N.M AS PER NG COMMENTS LETTER M.E T.S

NED
O=45°
GRILL OR REGISTER 00 08-2017 N.M ISSUED FOR APPROVAL M.E T.S

CONTAI
45
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION

°
NO.
STRAP (TYP.)

H
DRAWING COMPLETION CERTIFICATE (DCC):

ON
NFORMATI
THREADED ROD

W
CONCRETE ANCHORS
BOLT

THE I
N.MAHMOUD M.EL-BARBARY NTS
DRAWN BY CHECKED BY SCALE:
VOLUME DAMPER
26.01.2017 15.10.2019
FIGURE "B" DATE STARTED DATE COMPLETED

AND
OPR'G. DEPT. ENG. DEPT.
CLOSE OPENING AT CORNERS

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

7 RISER SUPPORT INSTALLATION DETAILS (OUTDOOR EXPOSED) 8 UPPER ATTACHMENT FOR DUCT HANGER 9 DUCT BRANCH/AIR OUTLET CONNECTION DETAIL
- NOT TO SCALE - NOT TO SCALE - NOT TO SCALE HVAC INSTALLATION DETAILS
ADDITION OF NEW 3-80/100 MVA POWER TRANSFORMERS

S
THI
MADINAH EAST( MEDEA) 380/110-33KV BSP SUBSTATION
HVAC INSTALLATION DETAILS MADINAH SAUDI ARABIA
SCALE NTS CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

01
4400008122 1532120.03 K MD426 WA- 486061 of 06
02
NG-A (2012/01)

DMS VECTOR NGA00


02 06
of
MD426 WA - 486061 K 1532120.03 4400008122
02 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. REFER TO SHEET WA- 486055.0000.0002

OW NER.
LISTED SIZE + 100 50x50x6MM THICK
L ANGLE

50x50x6MM THICK
L ANGLE

25

TS
OF I
DRAIN LINE SHALL BE AT LEAST THE SAME

+ 100
SIZE AS THE NIPPLE ON THE DRAIN PAN
PIPING SHALL BE RIGID COPPER TYPE L OR
TYPE M UNLESS NOTE BELOW IS MET

CONSENT
ZE
SI
10MM THREADED DUCT
PITCH DOWN TOWARDS DRAIN

STED
ROD
SLOPE 2% TYP. 10MM THREADED

LI
ROD

CLEAN OUT LEGEND

25

TTEN
DRIN PAN 1. REFER TO SHEET WA- 486055.0000.0002

THE W RI
100x50x6MM THICK. 100x50x6MM THICK.
16 GA.G.I. DUCT
C- CHANNEL SUPPORT C- CHANNEL SUPPORT
DIELECTRIC FITTING

ES

THOUT
50x50x6MM THICK 50x50x6MM THICK

VARI
L ANGLE L ANGLE

100x50x6MM THK. 100x50x6MM THICK.

WI
DOWN TO
CONDENSATE C- CHANNEL SUPPORT C- CHANNEL SUPPORT
DRAINAGE PIT

DOCUMENT
200x200x10MM THICK CABLE CONNECTOR 150x150x10MM THICK
BASE PLATE (COMPRESSION TYPE BASE PLATE
UPVC PIPE M10 ANCHOR BOLT(TYP.) TERMINAL LUG M10 ANCHOR BOLT(TYP.)
SCHED. 80 TYP. 02
FOR STEEL PLATE

150

150
FGL CONNECTION) FGL
EL. VARIES EL. VARIES

400

400

S
THI
250

250

FROM
500 500

MAIN GROUND GRID MAIN GROUND GRID


KEY PLAN

NED
GROUND ROD

SHALL BE OBTAI
10 CONDENSATE DRAIN P-TRAP DETAIL 11 DUCT SUPPORT INSTALLATION DETAIL - PACU AREA

N
- NOT TO SCALE - NOT TO SCALE

5M WIDE TUNNEL FOR 110KV O/G FEEDERS

6M WIDE NEW 6M WIDE


ROAD CONCRETE ROAD

NG 8M
DE ROAD
T01 T02 T03

REACTOR AREA
AREA
ASPHALT AREA

NG
TI

NG

TI
ASPHALT

PART
SI

STI

BANK

SI
ROAD
WI
EXI
AUX.01

33KV SWGR

EXI
EXI
ROOM

FACTORY INSULATED

CAP
AUX.02

DOUBLE SKINNED SPIRAL / CONTROL

N
I
NOTCHED LOCK OVER GALVANIZED STEEL DOOR ROOM
RECTANGULAR DUCT WITH
EDGE FOR QUICK (GAUGE 24)

FULL OR
25mm THICK THERMAL INSULATION INSULATION
EXISITING 5M
WIDE ROAD
NEW ASPHALT AREA

DETAIL-A 25mm NEOPRENE


COATED FIBER
EXISITING S/S. BOUNDARY WALL
GLASS INSULATION

N
I ON
LOCK OVER EDGE

REPRODUCTI
FRAME
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.
FOAM
50mm FIBER GLASS DRAWING CONTROL SHEET WE-485208
INSULATION FOR INTERNAL AND
CAM LOCK EXTERNAL DUCT CONSQUENTLY PROJECT TECHNICAL SPECIFICATIONS PTS-15WR116

NO
SHEET METAL CONTINUOUS HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS WA-486055
DOOR
DUCT GALV. HINGE

d SA
HVAC EQUIPMENT & DUCT LAYOUT, ROOF PLAN WA-486056
SEAL WITH DETAIL-A
FOAM GASKET
HVAC EQUIPMENT &DUCT LAYOUT, GROUND FLOOR PLAN WA-486057

onalGri
HVAC EQUIPMENT &DUCT LAYOUT, BASEMENT FLOOR PLAN WA-486058
NON FLAMMABLE
GALV. STEEL FRAME
DUCT ADHESIVE BUILDING HVAC SECTIONS WA-486059
(GAUGE 24) WITH SEAL

OF Nati
HVAC EQUIPMENT SCHEDULE WA-486060

HVAC INSTALLATION DETAILS WA-486061


NOTE:-

THE THICKNESS OF THE DUCT ACCESS DOOR INSULATION HVAC AIR FLOW SCHEMATIC DIAGRAM WA-486062

ARE THE SOLE PROPERTY


SHALL BE OF THE SAME THICKNESS AS THE DUCT.
12 DUCT INSULATION DETAIL (INDOOR DUCT) 13 DUCT ACCESS DOOR DETAIL HVAC COORDINATION LAYOUT WA-486063

- NOT TO SCALE - NOT TO SCALE

18 GA. SLEEVE DOUBLE VANE


FIRE RATED WALL
REFER TO SMACNA 25mm FIBER GLASS
FOR GAUGE MIN.
DETAIL-E CURTAIN TYPE BLADES
DUCT @ GALV. STEEL GAUGE 22 SLEEVE RETANING
ANGLE
38x38x5 ANGLE ALL
6mm BOLT & NUT WITH AS-BUILT BY DATE
AROUND THE DUCT
WASHER 300mm MAX. C.C.
WALL

N
HEREI
CURTAIN TYPE

8
1/2R

5
M
A
FIRE DAMPER

X
02 10-2017 N.M AS PER NG COMMENTS LETTER M.E T.S

.
R

01 09-2017 N.M AS PER NG COMMENTS LETTER M.E T.S


FIRE DAMPER

NED
9
0
°

N.
ACTUATOR
00 08-2017 N.M ISSUED FOR APPROVAL M.E T.S

CONTAI
MI
(SEE DETAIL-D)
DUCT LINER, UP TO

150
FIRST EXTRACTION REV. DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.
DAMPER PT. OR MAX. OF

OR
GASKET 8000mm ONLY DRAWING COMPLETION CERTIFICATE (DCC):
150
WALL
CLAMP WITH

ON
DUCT CONNECTOR

3/4W
MAX.
BOLT CONTROL ROD

NFORMATI
DAMPER
MOUNTING BRACKET SLIDE ON FLANGE
CASING
BOLTS & NUTS, TACK
WELDS OR STEEL POP
RIVETS 12 MAX. CC
"S" TYPE W
MOTOR ACTUATOR
SLIP FITTING

THE I
NOTES : DUCT WORK DRAWN BY
N.MAHMOUD
CHECKED BY
M.EL-BARBARY
SCALE:
NTS

SPLITTER DAMPER
DETAIL-E 1.ANNULAR SPACE BETWEEN DUCT AND WALL SHALL 26.01.2017 15.10.2019
NOT BE SEALED TO ALLOW SPACE FOR METAL EXPANSION BLADE SAME AS DATE STARTED DATE COMPLETED

DURING FIRE. DUCT GAUGE MIN.

AND
OPR'G. DEPT. ENG. DEPT.
DETAIL-D 2. ALL FIRE DAMPERS SHALL BE INSTALLED IN ACCORDANCE
WITH UL STANDARD 555
THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
3. BLADES SHALL BE RECESSED OUT OF AIR STREAM. CONSTRUCTION OR FOR ORDERING

DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE
WALL SLEEVE
14 MOTORIZED VOLUME DAMPER DETAIL 16 TEE BRANCH DETAILS
- NOT TO SCALE
15 FIRE DAMPER INSTALLATION DETAIL (IF REQUIRED) HVAC INSTALLATION DETAILS
- NOT TO SCALE
- NOT TO SCALE
ADDITION OF NEW 3-80/100 MVA POWER TRANSFORMERS

S
THI
MADINAH EAST( MEDEA) 380/110-33KV BSP SUBSTATION
MADINAH SAUDI ARABIA
HVAC INSTALLATION DETAILS
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
SCALE NTS
02
4400008122 1532120.03 K MD426 WA- 486061 of 06
02
NG-A (2012/01)

DMS VECTOR NGA00


02 06
of
MD426 WA - 486061 K 1532120.03 4400008122
03 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. REFER TO SHEET WA- 486055.0000.0002

OW NER.
TS
OF I
10mm BOLT &
NUT WITH WASHER SEAM

CONSENT
AIR DUCT

SEAM
LEGEND

TTEN
1. REFER TO SHEET WA- 486055.0000.0002

THE W RI
30°
SHEET METAL "U" SEE DUCT CONSTRUCTION
STRIP (TYP.) DETAIL FOR CONNECTION

THOUT
HYPALON
COATED GLASS
FABRIC FLEXIBLE

WI
MAX. WIDTH

W
DUCT CONNECTION
OF DUCT OR STEEL ANGLE FULL RADIUS WHERE

DOCUMENT
FAN IN MM SIZE POSSIBLE
METAL SCREW (R=W)
8 - 1960 50 x 50 x 6

1961 - 2420 50 x 50 x 6 20° MAXIMUM 100 IN

W
300 ON DIVERING
OVER 2420 50 x 50 x 6

20°

S
THI
STEEL ANGLE

°
L

0
AIR FLOW AIR FLOW

FROM
PACU CONNECTION
COLLAR 30° MAXIMUM ON
CONTRACTING FLOW KEY PLAN

NED
175 IN 300

SHALL BE OBTAI
N
5M WIDE TUNNEL FOR 110KV O/G FEEDERS

6M WIDE NEW 6M WIDE


ROAD CONCRETE ROAD

17 FLEXIBLE DUCT CONNECTION DETAILS 18 OFFSET TYPE 2 (MITERED) 19 DUCT CONSTRUCTION DETAILS

NG 8M
DE ROAD
T01 T02 T03

REACTOR AREA
AREA
- NOT TO SCALE - NOT TO SCALE - NOT TO SCALE

ASPHALT AREA

NG
TI

NG

TI
ASPHALT

PART
SI

STI

BANK

SI
ROAD
WI
EXI
AUX.01

33KV SWGR

EXI
EXI
ROOM

CAP
AUX.02

CONTROL

N
I
ROOM

FULL OR
EXISITING 5M
WIDE ROAD
NEW ASPHALT AREA

EXISITING S/S. BOUNDARY WALL

N
I ON
REPRODUCTI
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

W1
DRAWING CONTROL SHEET WE-485208

CMU WALL PROJECT TECHNICAL SPECIFICATIONS PTS-15WR116

NO
25mm GAP ALL AROUND
FAN WHEEL
TO BE SEALED WITH HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS WA-486055

d SA
FIRE RETARDANT SEALANT
HVAC EQUIPMENT & DUCT LAYOUT, ROOF PLAN WA-486056

HVAC EQUIPMENT &DUCT LAYOUT, GROUND FLOOR PLAN WA-486057

onalGri
SELF
25mm
DRILLING W2 FAN MOTOR HVAC EQUIPMENT &DUCT LAYOUT, BASEMENT FLOOR PLAN WA-486058
DUCT LINING MECHANICAL
ANCHOR
FASTENERS BUILDING HVAC SECTIONS WA-486059
METAL SCREW

OF Nati
FOR LINERS AIR FLOW
HVAC EQUIPMENT SCHEDULE WA-486060
& {300 O.C
THREADED ROD HVAC INSTALLATION DETAILS WA-486061
10:12mm DIA IF W2 DOES NOT EQUAL TO W1 SPECIAL
* MAX. UNSUPPORTED VANE PROVISION MUST BE MADE IN VANE SHAPE HVAC AIR FLOW SCHEMATIC DIAGRAM WA-486062

ARE THE SOLE PROPERTY


SMALL SINGLE VANE 900 OR ANGLE OF ENTRY & EXIT APPLIES TO SPUN ALUMINUM HVAC COORDINATION LAYOUT WA-486063
LARGE SINGLE VANE 900 ALL TYPES OF VANES.
SELF APRON 25mm
VANES SHALL BE SECURELY SMALL DOUBLE VANE 1500
DRILLING INSULATION FASTENED TO RUNNERS. BACKDRAFT
ANCHOR LARGE DOUBLE VANE 1800
DAMPER
INSTALL VANES IN SECTIONS
ALL VANES SHALL BE SECURED
OR USE TIE RODS TO LIMIT
AND STABLE IN INSTALLED
THE UNBACKED VANE LENGTH REMOVEABLE BIRD SCREEN
OPERATING POSITIONS MADE FROM ALUMINUM
L-BAR
ANGLE AND MESH
ALL FOUR SIDES)
150 W 150
ANGLE 25x25x4mm
AS-BUILT BY DATE

DUCT HANGER / SUPPORT SCHEDULE M6 ANCHOR BOLT (TYP.)

N
HEREI
DUCT WIDTH HANGER SUPPORT THREADED
L-BAR SIZE 02 10-2017 N.M AS PER NG COMMENTS LETTER M.E T.S
(W) SPACING 25mm R
90° 90° 01 09-2017 N.M AS PER NG COMMENTS LETTER M.E T.S
ABOVE 800 2000 60X60X5 {12 MM

NED
400 - 800 1500 50x50x6 {10 MM 00 08-2017 N.M ISSUED FOR APPROVAL M.E T.S

CONTAI
R 115

BELOW 400 1200 50x50x6 {10 MM REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.
57mm 28mm
DRAWING COMPLETION CERTIFICATE (DCC):

ON
NFORMATI
50mm R

SINGLE VANED ELBOW


SINGLE VANED SMALL DOUBLE VANED SMALL DOUBLE VANED

THE I
N.MAHMOUD M.EL-BARBARY NTS
DRAWN BY CHECKED BY SCALE:

26.01.2017 15.10.2019
DATE STARTED DATE COMPLETED

AND
OPR'G. DEPT. ENG. DEPT.

20 RECTANGULAR DUCT HANGER DETAILS 21 VANED ELBOW DETAILS 22 WALL MOUNTED EXHAUST FAN DETAIL-TOILET AND KITCHEN ROOMS
NOT TO SCALE - NOT TO SCALE - NOT TO SCALE CERTIFIED
- THIS DRAWING IS NOT TO BE USED FOR

NG
CONSTRUCTION OR FOR ORDERING

DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

HVAC INSTALLATION DETAILS


ADDITION OF NEW 3-80/100 MVA POWER TRANSFORMERS

S
THI
MADINAH EAST( MEDEA) 380/110-33KV BSP SUBSTATION
HVAC INSTALLATION DETAILS
SCALE NTS MADINAH SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

03
4400008122 1532120.03 K MD426 WA- 486061 of 06
02
NG-A (2012/01)

DMS VECTOR NGA00


02 06
of
MD426 WA - 486061 K 1532120.03 4400008122
04 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. REFER TO SHEET WA- 486055.0000.0002

OW NER.
TS
OF I
WHEN CFM IS NOT LISTED, TRUNK MAY
15mm GAP ALL AROUND
BE DIVIDED AS FOLLOWS:
TO BE SEALED WITH
FIRE RETARDANT SEALANT

CONSENT
(W3)(D3)
200mm W 25mm A= W1
(W2)(D2) + (W3)(D3)
MF/SD BLADES

(W2)(D2)
B = W1
INSULATION (W2)(D2) + (W3)(D3)
MF/SD ACTUATOR
LEGEND

TTEN
LONGER DIMENSION
SLAB
1. REFER TO SHEET WA- 486055.0000.0002

THE W RI
W1 x D1
CONTROL ROD
SPLITTER DAMPER
BLADE LENGTH
1/3 W
45

SET SCREW EQUAL TO 3/4A


ROOF SLAB WITH 6" MIN.
°

STEEL SUPPORT
HINGE OR ROD
L80x80x8mm
A x D1 B x D1

THOUT
SUB
BRANCH (A = 4"MIN.)
RETURN
W +50

R
=
AIR FLOW

WI
/
4
W
3

DOCUMENT
R
=
A
M12 ANCHOR BOLT

+
W 3 x D3

FLOW
3
MAIN BRANCH

/
(TYP.) W

4
FLOW
FALSE

3
SLAB
CEILING
RETURN AIR DIFFUSER VOLUME CONTROL DAMPER

S
THI
W2 x D2
BMO WITH STEEL 15mm GAP ALL AROUND
WIRE MESH TO BE SEALED WITH

FROM
FIRE RETARDANT SEALANT
DUCT WIDTH WALL SUPPORT
ANGLE SIZE ALTERNATIVE
(W) SPACING MF/SD BLADES 38x38x5 ANGLE MAIN BRANCH
VANED ELBOW
@ GALV. STEEL GAUGE 22 ALL AROUND THE SUB WITH TRANSITION
ABOVE 800 2000 80x80x8
KEY PLAN

NED
DUCT BRANCH FOLLOWING.
400 - 800 1500 80x80x8

SHALL BE OBTAI
BELOW 400 1200 80x80x8

N
5M WIDE TUNNEL FOR 110KV O/G FEEDERS

6M WIDE NEW 6M WIDE


ROAD CONCRETE ROAD

NG 8M
DE ROAD
T01 T02 T03

REACTOR AREA
AREA
ASPHALT AREA

NG
TI

NG

TI
ASPHALT

PART
SI

STI
RECTANGULAR DUCT SIDE WALL ANGLE SUPPORT DETAIL 24 RETURN CEILING DIFFUSER INSTALLATION DETAIL 25 RETURN AIR DETAIL (BASEMENT) 26 DUCT Y BRANCH FITTING DETAIL WITH SPLIT DAMPER

BANK
23

SI
ROAD
WI
EXI
AUX.01

33KV SWGR

EXI
EXI
ROOM
NOT - NOT - NOT TO SCALE - NOT
- TO SCALE TO TO SCALE

CAP
AUX.02

CONTROL

N
I
ROOM

FULL OR
EXISITING 5M
WIDE ROAD
NEW ASPHALT AREA

EXISITING S/S. BOUNDARY WALL

N
I ON
REPRODUCTI
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

MOTORIZED VOLUME DAMPER


DRAWING CONTROL SHEET WE-485208
WASHABLE AIR
ACTUATOR FILTER SLIP-IN TYPE PROJECT TECHNICAL SPECIFICATIONS PTS-15WR116

NO
LISTED SIZE + 100
50x50x6MM THICK HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS WA-486055
L ANGLE

d SA
SAND TRAP LOUVER HVAC EQUIPMENT & DUCT LAYOUT, ROOF PLAN WA-486056
SAND TRAP LOUVER INSECT SCREEN

HVAC EQUIPMENT &DUCT LAYOUT, GROUND FLOOR PLAN WA-486057

onalGri
HVAC EQUIPMENT &DUCT LAYOUT, BASEMENT FLOOR PLAN WA-486058

25
SELF DRILLING
ANCHOR SUPPLY DUCT BUILDING HVAC SECTIONS WA-486059
10MM THREADED

OF Nati
+ 100
M12

ZE
ROD HVAC EQUIPMENT SCHEDULE WA-486060
VOLUME DAMPER

LOUVER SI

ZE
FRESH HVAC INSTALLATION DETAILS WA-486061

SI
GALVANISED SPRING M.B
AIR FLOW
10mm Dia STEEL CINCH CLAMP

STED
HVAC AIR FLOW SCHEMATIC DIAGRAM WA-486062

ARE THE SOLE PROPERTY


THREADED ROD INSULATED FLEXIBLE

LI
HVAC COORDINATION LAYOUT WA-486063
DUCT (MAX 1.6m LONG)
INSECT

25
SCREEN
GALVANISED SPRING
STEEL CINCH CLAMP
SAND
DISCHARGE
LISTED SIZE - 100
100x50x6MM THICKK.
16 GA.G.I. DUCT
C- CHANNEL SUPPORT
ES

50x50x6MM THICK FRESH AIR INTAKE


VARI

PLENUM BOX L ANGLE DUCT


AS-BUILT BY DATE

100x50x6MM THICK.

25
25 100 50 SAND CHUTE
C- CHANNEL SUPPORT

N
HEREI
T-RUNNERS 150x150x10MM THICK
COLLAR CABLE CONNECTOR 02 10-2017 N.M AS PER NG COMMENTS LETTER M.E T.S
BASE PLATE
(COMPRESSION TYPE
TERMINAL LUG M10 ANCHOR BOLT(TYP.) 01 09-2017 N.M AS PER NG COMMENTS LETTER M.E T.S

25

NED
FOR STEEL PLATE
CONNECTION) FGL
00 08-2017 N.M ISSUED FOR APPROVAL M.E T.S

CONTAI
BLADE INSECT SCREEN
EL. VARIES SELF EMPTYING
SUPPLY DIFFUSER CEILING
SAND DRAIN HOLES
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

AIR FLOW
DRAWING COMPLETION CERTIFICATE (DCC):

ON
500

NFORMATI
MAIN GROUND GRID
GROUND ROD

THE I
N.MAHMOUD M.EL-BARBARY NTS
27 FLEXIBLE DUCT & SUPPLY CEILING DIFFUSER INSTALLATION DETAIL 28 FRESH AIR INTAKE TYPICAL ARRANGEMENT DETAIL DRAWN BY CHECKED BY SCALE:

- NOT TO SCALE - 26.01.2017 15.10.2019


NOT TO SCALE DATE STARTED DATE COMPLETED

AND
OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

HVAC INSTALLATION DETAILS


ADDITION OF NEW 3-80/100 MVA POWER TRANSFORMERS
HVAC INSTALLATION DETAILS

S
THI
SCALE NTS MADINAH EAST( MEDEA) 380/110-33KV BSP SUBSTATION
MADINAH SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

04
4400008122 1532120.03 K MD426 WA- 486061 of 06
02
NG-A (2012/01)

DMS VECTOR NGA00


02 06
of
MD426 WA - 486061 K 1532120.03 4400008122
05 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. REFER TO SHEET WA- 486055.0000.0002

OW NER.
TS
OF I
CONSENT
LEGEND

TTEN
1. REFER TO SHEET WA- 486055.0000.0002

THE W RI
18 GA. SLEEVE

DUAL BELTS
(STANDARD FOR SMOKE CONTROL)
STAINLESS STEEL QUICK 6mm 6mm M10 NUT & BOLT WITH

THOUT
RELEASE FASTENERS WASHERS (TYPICAL)
REMOVABLE TOP CAP
100 X 50 X 5mm THK.
LIFTING LUGS STEEL CHANNEL (WELDED

WI
REGREASABLE PILLOBLOCK C TO BASE PLATE)
L
BEARINGS IN CAST IRON HOUSING SLAB SLAB

DOCUMENT
HIGH TEMPERATURE UNISTRUT 41x20mm
WIRING CONDUIT DISCONNECTOR SWITCH CHANNEL (OR)
(BOLTED TO CHANNEL) EQUIVALENT (TYP)
FRONT
MOTOR COOLING TUBE 38x38x5 ANGLE
ALL AROUND THE RIGID STEEL
DUCT CONDUIT (RSC)

S
THI
HEAT SHIELD INSULATION
TO PACU UNIT
CONTROL PANEL

FROM
STEEL WHEEL
BASE PLATE
150x150x6mm
STANDARD NEMA 3 STEEL BASE WITH EXP. BOLT
KEY PLAN

NED
RETURN AIR FLOW TO CABLE M8x75mm
WIRING BOX WELDED CORNERS
TRAY
TOC (+)5.590

SHALL BE OBTAI
COMBINATION MOTORIZED
FIRE/SMOKE DAMPER CONCRETE BLOCK CONCRETE BLOCK
FLEXIBLE CONNECTION TOS (VARIES)

N
AIR FLOW 5M WIDE TUNNEL FOR 110KV O/G FEEDERS

ROOF SCREED 6M WIDE NEW 6M WIDE


ROAD CONCRETE ROAD

NG 8M
DE ROAD
T01 T02 T03

REACTOR AREA
AREA
ASPHALT AREA

NG
TI

NG

TI
SMOKE PURGE FAN DETAIL

ASPHALT
29 30 DUCT PASSING THRU WALL & FLOOR DETAIL 31

PART
DISCONNECTING SWITCH INSTALLATION DETAIL

SI

STI

BANK

SI
ROAD
WI
EXI
AUX.01

33KV SWGR

EXI
EXI
- NOT TO SCALE - NOT TO SCALE - ROOM
NOT TO SCALE

CAP
AUX.02

CONTROL

N
I
ROOM

FULL OR
EXISITING 5M
WIDE ROAD
NEW ASPHALT AREA

EXISITING S/S. BOUNDARY WALL

N
I ON
REPRODUCTI
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

WALL WALL DRAWING CONTROL SHEET WE-485208

PROJECT TECHNICAL SPECIFICATIONS PTS-15WR116


CEILING

NO
RUBBER GASKET
HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS WA-486055
ALL AROUND ADJUSTABLE FACE

d SA
DAMPER SECTION HVAC EQUIPMENT & DUCT LAYOUT, ROOF PLAN WA-486056
190mm 102mm 6mm
6mm HVAC EQUIPMENT &DUCT LAYOUT, GROUND FLOOR PLAN WA-486057

onalGri
A/C DUCT SHUTTER TYPE
MOUNTING SCREW FIRE DAMPER
HVAC EQUIPMENT &DUCT LAYOUT, BASEMENT FLOOR PLAN WA-486058
HOLES(4)
JUNCTION BOX RETURN TUBE
6mm BUILDING HVAC SECTIONS WA-486059

OF Nati
PRESSURE RELIEF DAMPER
TRANSFER AIR GRILLE HVAC EQUIPMENT SCHEDULE WA-486060

ZE
GASKET DUCT SLEEVE (18 Ga) HORIZONTAL FIXED BLADE
REGISTER OR

STED SI
HVAC INSTALLATION DETAILS WA-486061
82mm
GRILLE
FLEXIBLE
332m m

1 HVAC AIR FLOW SCHEMATIC DIAGRAM WA-486062


CONDUIT {20mm

ARE THE SOLE PROPERTY


LI
WITH 4# 2.5 Sq.mm
AIR SAMPLING TUBE AIR FLOW
HVAC COORDINATION LAYOUT WA-486063
CONDUCTOR

ELECTRICAL CONNECTION
HOLE FOR CABLE GLANDS WIRE MESH LOUVER WITH BIRD SCREEN
(BOTH SIDES)
FLEXIBLE CONNECTOR
6mm
6mm
6mm

STEEL FRAME
METAL SCREW
(TYP.)
FIXATION

120mm AS-BUILT BY DATE

N
HEREI
02 10-2017 N.M AS PER NG COMMENTS LETTER M.E T.S

01 09-2017 N.M AS PER NG COMMENTS LETTER M.E T.S

NED
00 08-2017 N.M ISSUED FOR APPROVAL M.E T.S

CONTAI
32 PHOTOELECTRICTIC SMOKE DETECTOR, DUCT MOUNTED (AD-3I/ILI-1B) DETAILS 02
33 PRESSURE RELIEF DAMPER/LOUVER DETAIL 34 WALL MOUNTED INSTALLATION DETAIL 35 TRANSFER AIR GRILLE INSTALLATION DETAIL REV. DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.
- - NOT TO SCALE - -
NOT TO SCALE NOT TO SCALE NOT TO SCALE
DRAWING COMPLETION CERTIFICATE (DCC):

ON
NFORMATI
THE I
N.MAHMOUD M.EL-BARBARY NTS
DRAWN BY CHECKED BY SCALE:

26.01.2017 15.10.2019
DATE STARTED DATE COMPLETED

AND
OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

HVAC INSTALLATION DETAILS


HVAC INSTALLATION DETAILS
ADDITION OF NEW 3-80/100 MVA POWER TRANSFORMERS
SCALE NTS

S
THI
MADINAH EAST( MEDEA) 380/110-33KV BSP SUBSTATION
MADINAH SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

05
4400008122 1532120.03 K MD426 WA- 486061 of 06
02
NG-A (2012/01)

DMS VECTOR NGA00


02 06
of
MD426 WA - 486061 K 1532120.03 4400008122
06 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. REFER TO SHEET WA- 486055.0000.0002

OW NER.
H

TS
C D A B E F G H

OF I
CONSENT
E

B
OR
A
LEGEND

TTEN
1. REFER TO SHEET WA- 486055.0000.0002

THE W RI
D

THOUT
WI
E

DOCUMENT
DRIVE-SLIP ON S-SLIP ON
C
PITTSBURGH SEAM DOUBLE SEAM INSIDE GROOVED SEAM STANDING SEAM POCKET-CLIP BAR-CLIP (VERTICAL SIDES OF DUCT) (HORIZONTAL SIDES OF DUCT)

S
THI
FROM
36 TYPICAL SEAM APPLICATION (LONGITUDINAL & TRANSVERSE)
- NOT TO SCALE
KEY PLAN

NED
SHALL BE OBTAI
N
THROAT RADIUS (Rt) (IN.)
5M WIDE TUNNEL FOR 110KV O/G FEEDERS

6M WIDE NEW 6M WIDE


1 2 3 4 5 6 7 8 9 10 20 30 40 50 60 70 80 90 100 ROAD CONCRETE ROAD

NG 8M
DE ROAD
T01 T02 T03

REACTOR AREA
AREA
ASPHALT AREA

NG
TI

NG

TI
ASPHALT

PART
SI

STI

BANK

SI
ROAD
WI
EXI
AUX.01

33KV SWGR

EXI
EXI
ROOM

CAP
AUX.02

CONTROL

N
I
ROOM

FULL OR
EXISITING 5M
WIDE ROAD
ROD HANGERS TO NEW ASPHALT AREA
ANGLE REINFORCED
UPPER ATTACHMENT SHEET METAL THICKNESS AND CONSTRUCTIONS
STANDING SEAM
No 1 OF 3 FOR LOW VELOCITY RECTANGULAR DUCT WORK EXISITING S/S. BOUNDARY WALL

N
DUCT SIZE

I
U.S GAUGE
LONGITUDINAL INTERMEDIATE TRANSVERSE
LONGER G.I SHEET

ON
CONNECTIONS REINFORCEMENT CONNECTION
SIDE (mm)

REPRODUCTI
0
DOUBLE CORNER 1" STANDING S (22 Ga.)
TO 24 NOT REQUIRED DRIVE SLIP (24 Ga.)
REFERENCE DRAWINGS
No 1 OF 2 457 SEAM
DRAWING TITLE DRAWING NO.
458
DOUBLE CORNER 1" STANDING S (22 Ga.)
TO DRAWING CONTROL SHEET WE-485208
24
No 2 OF 3 No 1 OF 1 559
SEAM
NOT REQUIRED DRIVE SLIP (24 Ga.)
PROJECT TECHNICAL SPECIFICATIONS PTS-15WR116

NO
560
ELECTRIC DUCT HEATER SUPPLY AIR DUCT DOUBLE CORNER SLIDE ON FLANGE HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS WA-486055
TO 24 NOT REQUIRED
COIL BODY (SAF-30/ SAF-35)

d SA
762 SEAM
HVAC EQUIPMENT & DUCT LAYOUT, ROOF PLAN WA-486056
763
HVAC EQUIPMENT &DUCT LAYOUT, GROUND FLOOR PLAN WA-486057

onalGri
DOUBLE CORNER SLIDE ON FLANGE
TO 22 NOT REQUIRED
SEAM (SAF-30/ SAF-35)
915 HVAC EQUIPMENT &DUCT LAYOUT, BASEMENT FLOOR PLAN WA-486058
No 2 OF 2 916
BUILDING HVAC SECTIONS WA-486059

OF Nati
TO DOUBLE CORNER SLIDE ON FLANGE
22 NOT REQUIRED
1067 SEAM (SAF-30/ SAF-35) HVAC EQUIPMENT SCHEDULE WA-486060

DUCT EXTERNAL HVAC INSTALLATION DETAILS WA-486061


1068
INSULATION
TO DOUBLE CORNER SLIDE ON FLANGE
20 NOT REQUIRED HVAC AIR FLOW SCHEMATIC DIAGRAM WA-486062

ARE THE SOLE PROPERTY


1219 SEAM (SAF-30/ SAF-35)
HVAC COORDINATION LAYOUT WA-486063
DUCT 1220
No 3 OF 3 TO
PITTSBURGH COMPANION ANGLE
18 LOCK SEAM NOT REQUIRED 50x50x5mm
1524

1525 50x50x5mmx50mm
PITTSBURGH COMPANION ANGLE
TO ANGLE
ACCESS DOOR 18 LOCK SEAM 50x50x5mm
2438 @600mm C-C

AIR FLOW 2439 50x50x5mmx50mm COMPANION ANGLE


PITTSBURGH
FLANGE TYPE TO ANGLE 50X50X5MM
18 LOCK SEAM
ELECTRIC HEATER 3048 @600mm C-C + TIE ROD
AS-BUILT BY DATE
TERMINATION BOX WITH
DOOR INTERLOCK
1 2 3 4 5 6 7 8 9 10 20 30 40 50 60 70 80 90 100 NOTE: CONTRACOR SHOULD FOLLOW AS PER 3 INCH OF WG PRESSURE CLASS SMACNA
(1995) 2ND ED.

N
HEREI
HEEL RADIUS (Rh) (IN.) 02 10-2017 N.M AS PER NG COMMENTS LETTER M.E T.S

CENTERLINE RADIUS
01 09-2017 N.M AS PER NG COMMENTS LETTER M.E T.S
OF ELBOW (R)

NED
00 08-2017 N.M ISSUED FOR APPROVAL M.E T.S

CONTAI
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
VANES LOCATION NO.

AS PER CHART
DRAWING COMPLETION CERTIFICATE (DCC):
R2

ON
NFORMATI
HEEL RADIUS (R )
R1 h

THROAT RADIUS (R ) T

THE I
N.MAHMOUD M.EL-BARBARY NTS
37 ELECTRIC DUCT HEATER INSTALLATION DETAIL 38 GUIDE VANES LOCATION CHART FOR RECTANGULAR ELBOWS 39 SHEET METAL THICKNESS AND CONSTRUCTION SCHEDULE DRAWN BY CHECKED BY SCALE:

- - - NOT TO SCALE DATE STARTED


26.01.2017
DATE COMPLETED
15.10.2019
NOT TO SCALE NOT TO SCALE

AND
OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

HVAC INSTALLATION DETAILS


ADDITION OF NEW 3-80/100 MVA POWER TRANSFORMERS

S
THI
HVAC INSTALLATION DETAILS MADINAH EAST( MEDEA) 380/110-33KV BSP SUBSTATION
SCALE NTS MADINAH SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

06
4400008122 1532120.03 K MD426 WA- 486061 of 06
02
NG-A (2012/01)

DMS VECTOR NGA00


02 03 MD426 WA - 486062 K 1532120.03 4400008122
of
01 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. REFER TO SHEET WA- 486055.0000.0002

OW NER.
TS
OF I
CONSENT
LEGEND

TTEN
1. REFER TO SHEET WA- 486055.0000.0002

THE W RI
THOUT
WI
DOCUMENT
ST 2-1 SAD SAD
(16,115 CFM)

SD-03
TO SWGR GROUND &
ROOF OVER 33KV SWGR ROOM
BASEMENT FLOORS
RAD

S
THI
RAD
EDH-02 VD-66

SAD
SD-04 SD-03, 04

FROM
2 MVD 05,07 2 MVD 06,08
BDD-05,07 BDD-06,08

M
KEY PLAN

NED
RAD RAD

SHALL BE OBTAI
RAD

N
PACU PACU

2A 2B
SAD SAD
5M WIDE TUNNEL FOR 110KV O/G FEEDERS

M 6M WIDE NEW 6M WIDE


ROAD CONCRETE ROAD

NG 8M
DE ROAD
M T01 T02 T03

REACTOR AREA
AREA
ASPHALT AREA

NG
TI

NG

TI
ASPHALT
SI

STI

BANK

SI
ROAD
WI
EXI
AUX.01

33KV SWGR

PART
EXI
EXI
ROOM

CAP
AUX.02

S.T.L-02 (1,611 CFM) S.T.L-02 (1,611 CFM) S.T.L-01 (3,964 CFM) 02 CONTROL
RT 2-1 (1500X1050) WITH ALUMINUM (1500X1050) WITH ALUMINUM ROOM
SPF-02 (13,425 CFM) SPF-01 (5,897 CFM) (2100X1800) WITH ALUMINUM

N
(14,504 CFM) 02

I
WASHABLE FILTER, WASHABLE FILTER, WASHABLE FILTER,
FROM SWGR GROUND & WITH MVD-10, WITH MVD-09, EXISITING 5M
MVD-13, VD-75 MVD-14, VD-76 MVD-12, VD-74 & AD-2

FULL OR
WIDE ROAD
BASEMENT FLOORS BDD-10 BDD-09
& WIRE MESH SCREEN & WIRE MESH SCREEN & WIRE MESH SCREEN NEW ASPHALT AREA

FAD (500X500) FAD (500X500) FAD (750X750)

EXISITING S/S. BOUNDARY WALL

2 MVD 02,04
BDD-02,04

N
I
M

ON
REPRODUCTI
AIR BALANCE TABLE FOR GROUP#01 PACU (01A&01B)
PACU SAD SAD PACU
SUPPLY RETURN EXHAUST PRESS. EXF. AIR
NO. ZONE
CFM
1A 1B REFERENCE DRAWINGS
CFM CFM CFM CFM

RAD RAD DRAWING TITLE DRAWING NO.


01 CONTROL/ PROTECTION ROOM 7,959 7,418 00 541 00
M
800 MM WIDE DRAWING CONTROL SHEET WE-485208
CROSS OVER RT 1-1
02 239 223 00 16 00
CONTROL ROOM RAISED FLOOR BRIDGE FOR PROJECT TECHNICAL SPECIFICATIONS PTS-15WR116
02 (8,828 CFM)

NO
MAINTANANCE FROM OFFICE ROOM
VD-65
03 AC/DC ROOM 390 358 00 26 06 ACTIVITIES HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS WA-486055
2 MVD 01,03

d SA
BDD-01,03
156 145 00 11 00
HVAC EQUIPMENT & DUCT LAYOUT, ROOF PLAN WA-486056
04
AC/DC ROOM RAISED FLOOR

S.T.L-01 (3,964 CFM) HVAC EQUIPMENT &DUCT LAYOUT, GROUND FLOOR PLAN WA-486057

onalGri
05 2,008 00 2,149 00 00 02 (2100X1800) WITH ALUMINUM
BATTERY ROOM

02 WASHABLE FILTER, RAD RAD HVAC EQUIPMENT &DUCT LAYOUT, BASEMENT FLOOR PLAN WA-486058
MVD-11, VD-73 & AD-2

SD-02
624 00 668 00 00

SAD
06 FM-200 ROOM
& WIRE MESH SCREEN BUILDING HVAC SECTIONS WA-486059

OF Nati
FAD (750X750)
07 CORRIDOR NORTH 216 196 00 14 06
HVAC EQUIPMENT SCHEDULE WA-486060

08 CORRIDOR SOUTH 257 234 00 17 06 HVAC INSTALLATION DETAILS WA-486061

EDH-01 SD-02
09 OFFICE/ RECORD ROOM 271 253 00 18 00 HVAC AIR FLOW SCHEMATIC DIAGRAM WA-486062

ARE THE SOLE PROPERTY


HVAC COORDINATION LAYOUT WA-486063
10 TOILET 455 00 487 00 00
02 ROOF OVER CONTROL ROOM
TOTAL 12,575 8,828 3,304 643 17

SD-01 SD-01

AIR BALANCE TABLE FOR GROUP#02 PACU(02A&02B)


AS-BUILT BY DATE

SUPPLY RETURN EXHAUST PRESS. EXF. AIR


NO. ZONE
CFM CFM CFM CFM CFM

N
HEREI
ST 1-1
02 (12,575 CFM)
01 SWGR ROOM GROUND FLOOR 11,575 10,415 00 1,150 10 02 10-2017 N.M AS PER NG COMMENTS LETTER M.E T.S
TO CONTROL ROOM

02 SWGR ROOM BASEMENT FLOOR 4,540 4,089 00 451 00 01 09-2017 N.M AS PER NG COMMENTS LETTER M.E T.S

NED
TOTAL 16,115 14,504 00 1,601 10 00 08-2017 N.M ISSUED FOR APPROVAL M.E T.S

CONTAI
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

DRAWING COMPLETION CERTIFICATE (DCC):

ON
NFORMATI
THE I
N.MAHMOUD M.EL-BARBARY NTS
DRAWN BY CHECKED BY SCALE:

26.01.2017 15.10.2019
DATE STARTED DATE COMPLETED

AND
OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

HVAC AIR FLOW SCHEMATIC DIAGRAM,ROOF PLAN


ADDITION OF NEW 3-80/100 MVA POWER TRANSFORMERS

S
THI
MADINAH EAST( MEDEA) 380/110-33KV BSP SUBSTATION
HVAC AIR FLOW SCHEMATIC DIAGRAM, ROOF PLAN
MADINAH SAUDI ARABIA
SCALE NTS
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

01
4400008122 1532120.03 K MD426 WA-486062 of
03 02
NG-A (2012/01)

DMS VECTOR NGA00


02 03
of
MD426 WA - 486062 K 1532120.03 4400008122
02 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. REFER TO SHEET WA- 486055.0000.0002

OW NER.
2. FOR BATTERY ROOM; DUCTWORK, AIR TERMINALS, DUCT
ACCESSORIES, AND DUCT SUPPORTS SHALL BE CORROSION
RESTISTANT.

TS
OF I
CONSENT
LEGEND

TTEN
1. REFER TO SHEET WA- 486055.0000.0002

THE W RI
THOUT
ST 2-07
(4,540 CFM)
TO SWGR BASEMENT

WI
MF/SD-05

DOCUMENT
VD-77

ST 2-01 ST 2-02 ST 2-03 ST 2-04 ST 2-05 ST 2-06

S
THI
ST 2-1
(16,115 CFM)

FROM
MF/SD-01 SAR-01 SAR-01 SAR-01 SAR-01 SAR-01 SAR-01 SAR-01 SAR-01 SAR-01 SAR-01 SAR-01 SAR-01
VD-01 VD-02 VD-03 VD-04 VD-05 VD-06 VD-07 VD-08 VD-09 VD-10 VD-11 VD-12

SWGR ROOM KEY PLAN

NED
12 SAR-01 12 RAR-01

SHALL BE OBTAI
965 CFM 868 CFM
(750X400) (900X450)

N
5M WIDE TUNNEL FOR 110KV O/G FEEDERS
RT 2-08
6M WIDE NEW 6M WIDE
(2,045 CFM) ROAD CONCRETE ROAD
FROM SWGR BASEMENT

NG 8M
MF/SD-03 & VD-74 RT 2-07

DE ROAD
T01 T02 T03

REACTOR AREA
AREA
ASPHALT AREA
Ti/Hi (2,045 CFM)

NG
TI
FROM SWGR BASEMENT

NG

TI
ASPHALT

PART
SI
T/H

STI

BANK

SI
ROAD
PRD-01 MF/SD-04 & VD-75

WI
EXI
AUX.01

33KV SWGR

EXI
EXI
MF/SD-25 L.P ROOM

CAP
AUX.02

RAR-01 RAR-01 RAR-01 RAR-01 RAR-01 RAR-01 RAR-01 RAR-01 RAR-01 RAR-01 RAR-01 RAR-01 CONTROL

N
I
ROOM
VD-13 VD-14 VD-15 VD-16 VD-17 VD-18 VD-19 VD-20 VD-21 VD-22 VD-23 VD-24

FULL OR
EXISITING 5M
WIDE ROAD
RT 2-01 RT 2-02 RT 2-03 RT 2-04 RT 2-05 RT 2-06
NEW ASPHALT AREA

RT 2-1 RT 1-06
EXISITING S/S. BOUNDARY WALL
(14,504 CFM)
Ti/Hi T/H L.P
MF/SD-02

N
I
RT 1-05 RT 1-04 RT 1-03
BMO-03

ON
VD-62 RT 1-07

REPRODUCTI
EAG-02 BMO-01 BMO-01 DN
MF/SD-06 (146 CFM)
VD-32 VD-61 VD-60
FM-200 ROOM VD-40 RCD-01
22
UP MF/SD-20
1 SAR-04 1 EAG-02 REFERENCE DRAWINGS

MF/SD-33
02
MF/SD-34

624 CFM 668 CFM SCD-01 SCD-01 RCD-01 DRAWING TITLE DRAWING NO.
(750X250) (750X450) VD-46 VD-50
DN
RT 1-08 RCD-03 DRAWING CONTROL SHEET WE-485208
FM-200 EAD (687 CFM) RCD-05 BMO-01 WITH
ST 1-12 224 CFM STAIR-1

MF/SD-31
02 THROUGH CORRIDOR TO WIRE MESH ST 1-14 VD-49 PROJECT TECHNICAL SPECIFICATIONS PTS-15WR116

NO
FM-200 WEF-03 02 Ti/Hi T/H L.P
RCD-01 RCD-01 OFFICE ROOM HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS WA-486055
CORRIDOR NORTH

d SA
11
UP 1 SCD-05 1 RCD-04 1 BMO-04
PRD-05 SAR-04 HVAC EQUIPMENT & DUCT LAYOUT, ROOF PLAN WA-486056

RCD-02
1-07
RCD-02
1 SCD-06 1 RCD-05 1 BMO-03 VD-33 SCD-01 SCD-01 271 CFM 253 CFM 253 CFM
MF/SD-29
216 CFM 196 CFM 196 CFM MF/SD-19 VD-47 VD-51 HVAC EQUIPMENT &DUCT LAYOUT, GROUND FLOOR PLAN WA-486057

onalGri
(225X225) (225X225) (200X200)

MF/SD-24

MF/SD-23

MF/SD-22
STAIR-2

RT
(225X225) (225X225) (200X200) RCD-04
BMO-01 HVAC EQUIPMENT &DUCT LAYOUT, BASEMENT FLOOR PLAN WA-486058
ST 1-07 BMO-06 BMO-05
VD-59
VD-43 VD-44 SCD-05 BMO-04 RT 1-01 BUILDING HVAC SECTIONS WA-486059

OF Nati
VD-57 VD-45 (8,828 CFM) 02
SAR-03
BATTERY ROOM VD-34 VD-42 MF/SD-21 HVAC EQUIPMENT SCHEDULE WA-486060
3 SAR-03 3 EAG-01 MF/SD-14
02 SCD-01 SCD-01 RCD-01 RT 1-01 HVAC INSTALLATION DETAILS WA-486061
669 CFM 716 CFM RCD-01
ST 1-06 L.P L.P VD-48 VD-52
(750X250) (750X450) SCD-02 HVAC AIR FLOW SCHEMATIC DIAGRAM WA-486062
T/H T/H ST 1-13 MF/SD-11
ST 1-11 VD-54 ST 1-10

ARE THE SOLE PROPERTY


SAR-03 RT 1-02
SCD-06 Ti/HiTi/Hi HVAC COORDINATION LAYOUT WA-486063

MF/SD-08
BATTERY WEF-2 3 EAG-01 VD-35 SCD-01
3 VD-37:39 VD-58 VD-49 RCD-01 L.P L.P SCD-03 CORRIDOR SOUTH
02 (2,149 CFM) MF/SD-15 VD-55
SCD-01 SCD-04 1 SCD-03 1 RCD-03 1 BMO-05
BDD-12 & MF/SD-17 (SEE NOTE 02) T/H T/H
VD-53 MF/SD-10 VD-56 257 CFM 234 CFM 234 CFM
ST 1-05 Ti/HiTi/Hi
(225X225) (225X225) (250X200)
MF/SD-13 VD-70 VD-69 VD-68 ECD-01 ECD-01
SAR-03
VD-71 VD-72
VD-36 ST 1-04 ST 1-03 ST 1-02 ST 1-08 ST 1-09 TOILET
MF/SD-16 MF/SD-09 EAD (200X100)
VD-67 MF/SD-32
MF/SD-30
VD-41 02
TOILET ROOM
1 SCD-04 2 ECD-01
02
455 CFM 244 CFM
AS-BUILT BY DATE
(300X300) (225X225)
ST 1-16
ST 1-15 PRD-02 (156 CFM)

N
HEREI
VD-44 MF/SD-26
PRD-03
239 CFM 02 10-2017 N.M AS PER NG COMMENTS LETTER M.E T.S
MF/SD-27

CONTROL ROOM AC/DC ROOM TOILET WEF-1 01 09-2017 N.M AS PER NG COMMENTS LETTER M.E T.S

NED
FM-200 WEF-03 8 SCD-01 8 RCD-01 4 BMO-01 1 SCD-02 1 RCD-02 1 BMO-06 (487 CFM) 02
(668 CFM) BDD-11 & MF/SD-12
995 CFM 927 CFM 1,855 CFM 390 CFM 358 CFM 358 CFM 00 08-2017 N.M ISSUED FOR APPROVAL M.E T.S

CONTAI
ST 1-01
EAD (250X250) 02
02 (600X600) (600X600) (650X350) (12,575 CFM) (300X300) (300X300) (250X250)
BDD-13 & MF/SD-18
MF/SD-07 REV. DATE BY DESCRIPTION CHKD. CERT. APPD.
RAISED FLOOR RAISED FLOOR NO.

1 SAG-05 1 RAG-03 1 SAG-06 1 RAG-02


DRAWING COMPLETION CERTIFICATE (DCC):
239 CFM 223 CFM 156 CFM 145 CFM

ON
(300X300) (450X300) (300X250) (300X250)

NFORMATI
THE I
N.MAHMOUD M.EL-BARBARY NTS
DRAWN BY CHECKED BY SCALE:

26.01.2017 15.10.2019
DATE STARTED DATE COMPLETED

AND
OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

HVAC AIR FLOW SCHEMATIC DIAGRAM,GROUND FLOOR PLAN


ADDITION OF NEW 3-80/100 MVA POWER TRANSFORMERS

S
THI
MADINAH EAST( MEDEA) 380/110-33KV BSP SUBSTATION
HVAC AIR FLOW SCHEMATIC DIAGRAM, GROUND FLOOR PLAN MADINAH SAUDI ARABIA
SCALE NTS CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

02
4400008122 1532120.03 K MD426 WA-486062 of 03
02
NG-A (2012/01)

DMS VECTOR NGA00


02 03
of
MD426 WA - 486062 K 1532120.03 4400008122
03 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. REFER TO SHEET WA- 486055.0000.0002

OW NER.
TS
OF I
CONSENT
LEGEND

TTEN
1. REFER TO SHEET WA- 486055.0000.0002

THE W RI
THOUT
WI
DOCUMENT
S
THI
FROM
ST 2-07 KEY PLAN

NED
(4,540 CFM)

SHALL BE OBTAI
TO SWGR BASEMENT

N
5M WIDE TUNNEL FOR 110KV O/G FEEDERS

6M WIDE NEW 6M WIDE


ROAD CONCRETE ROAD

ST 2-07 ST 2-08 RT 2-09

NG 8M
DE ROAD
T01 T02 T03

REACTOR AREA
AREA
ASPHALT AREA

NG
TI

NG

TI
ASPHALT

PART
SI

STI

BANK

SI
ROAD
WI
EXI
AUX.01

33KV SWGR

EXI
EXI
ROOM
SAR-02 SAR-02 SAR-02 SAR-02 SAR-02 SAR-02 SAR-02

CAP
AUX.02

VD-25 VD-26 VD-27 VD-28 VD-29 VD-30 VD-31


CONTROL

N
I
ROOM

FULL OR
EXISITING 5M
WIDE ROAD
NEW ASPHALT AREA

EXISITING S/S. BOUNDARY WALL

N
I ON
REPRODUCTI
SWGR ROOM BSMNT
07 SAR-02 2 BMO-02 REFERENCE DRAWINGS
649 CFM 2,045 CFM BMO-02 WITH WIRE MESH
DRAWING TITLE DRAWING NO.
(600X450) (700X350)

BMO-02 WITH WIRE MESH DRAWING CONTROL SHEET WE-485208

PROJECT TECHNICAL SPECIFICATIONS PTS-15WR116

NO
HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS WA-486055

d SA
RT 2-8 HVAC EQUIPMENT & DUCT LAYOUT, ROOF PLAN WA-486056
RT 2-7
(2,045 CFM)
(2,045 CFM)
HVAC EQUIPMENT &DUCT LAYOUT, GROUND FLOOR PLAN WA-486057

onalGri
FROM SWGR
FROM SWGR
BASEMENT
BASEMENT
HVAC EQUIPMENT &DUCT LAYOUT, BASEMENT FLOOR PLAN WA-486058

T/H L.P Ti/Hi


BUILDING HVAC SECTIONS WA-486059

OF Nati
HVAC EQUIPMENT SCHEDULE WA-486060
PRD-04
UP
R-2

STAIR-2
MF/SD-28 UP HVAC INSTALLATION DETAILS WA-486061
STAI

HVAC AIR FLOW SCHEMATIC DIAGRAM WA-486062

ARE THE SOLE PROPERTY


HVAC COORDINATION LAYOUT WA-486063
UP

UP

AS-BUILT BY DATE

N
HEREI
02 10-2017 N.M AS PER NG COMMENTS LETTER M.E T.S

01 09-2017 N.M AS PER NG COMMENTS LETTER M.E T.S

NED
00 08-2017 N.M ISSUED FOR APPROVAL M.E T.S

CONTAI
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

DRAWING COMPLETION CERTIFICATE (DCC):

ON
NFORMATI
THE I
N.MAHMOUD M.EL-BARBARY NTS
DRAWN BY CHECKED BY SCALE:

26.01.2017 15.10.2019
DATE STARTED DATE COMPLETED

AND
OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

HVAC AIR FLOW SCHEMATIC DIAGRAM,BASEMENT FLOOR PLAN


ADDITION OF NEW 3-80/100 MVA POWER TRANSFORMERS

S
THI
MADINAH EAST( MEDEA) 380/110-33KV BSP SUBSTATION
HVAC AIR FLOW SCHEMATIC DIAGRAM, BASEMENT FLOOR PLAN MADINAH SAUDI ARABIA
SCALE NTS CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

03
4400008122 1532120.03 K MD426 WA-486062 of 03
02
NG-A (2012/01)

DMS VECTOR NGA00


02 05
of
MD426 WA - 486063 K 1532120.03 4400008122
01 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. REFER TO SHEET WA- 486055.0000.0002

OW NER.
2. ALL B.O.D & B.O.O LEVELS ARE MEASURED FROM ZERO LEVEL.

3. FOR BATTERY ROOM; DUCTWORK, AIR TERMINALS, DUCT


01 02 03 04 05 06 07 08 09 ACCESSORIES, AND DUCT SUPPORTS SHALL BE CORROSION
3600 4600 4800 4800 4800 4700 6100 5700 RESTISTANT.

TS
OF I
PROTECTIVE CRASH BARRIER
N

EL=-0.640

CONSENT
TOA

LEGEND

TTEN
1. REFER TO SHEET WA- 486055.0000.0002

THE W RI
ER
BARRI
REWALL

THOUT
CRASH
FI

WI
RC

VE
PROTECTI

DOCUMENT
540

S
THI
EL=-0.
TOA
800

FROM
SB SB SB

A A
UP

600
KEY PLAN

NED
750
1000

900
1400

1400

500
UP

SHALL BE OBTAI
750

N
MET/EAR
6000

6000
5M WIDE TUNNEL FOR 110KV O/G FEEDERS

500

B/S-AB
6M WIDE NEW 6M WIDE

AUX-1

B/R-1
CAP-2
CAP-1

/C-1
AH-02

AH-03

AH-04

AH-05

AH-07

AH-08

AH-12

AH-13

AH-14

AH-15

AH-17

AH-18

AH-22

AH-23

AH-24

AH-25

AH-27

AH-28
AH-09

AH-19
AH-01

AH-06

AH-16

AH-26
AH-10

AH-20

/C-2
CAP-3
AH-11

AH-21

O/G

B/T
ROAD CONCRETE ROAD

O/G
O/G
O/G
O/G

O/G
FUT

FUT

O/G
O/G

O/G

O/G

O/G

O/G

O/G

O/G
O/G

O/G

O/G
BUS-A

NG 8M
I

DE ROAD
T01 T02 T03

REACTOR AREA
AREA
ASPHALT AREA

NG
TI

NG

TI
ASPHALT
SI

STI

BANK
2N

SI
ROAD
WI
EXI
AUX.01

PART
2U
33KV SWGR

EXI
EXI
ROOM

2V
SWGR ROOM

2W

CAP
AUX.02

FRONT FRONT
CONTROL
B A B ROOM

N
I
-
EXISITING 5M
FRONT FRONT

FULL OR
WIDE ROAD
NEW ASPHALT AREA

AUX.01

MET/EAR

MET/EAR
Ti/Hi

CAP-5

AUX-2
CAP-6
AH-55

AH-54

AH-53

AH-52

AH-48

AH-47

AH-45

AH-44

AH-43

AH-42

AH-35

AH-34

AH-33

AH-32
AH-49

AH-29
AH-56

AH-46

AH-36
AH-50

AH-40

AH-30
/C-3

CAP-4
AH-51

AH-41

AH-31
EXISITING S/S. BOUNDARY WALL
FUT

FUT

O/G

O/G

O/G

O/G

O/G

O/G

O/G

O/G

O/G

O/G

O/G

O/G

O/G

O/G

O/G

O/G
O/G

B/T
B/R-2

AH-37
B/S-BC

AH-38
AH-39
T/H

I
RC FIREWALL
6080

6080
L.P

N
I
BUS-C

BUS-B
850

ON
1100

REPRODUCTI
700
1300

1300

1300

1100

REFERENCE DRAWINGS

950

750

650

2N
DRAWING TITLE DRAWING NO.

2U
2V
4400

2W
250
DRAWING CONTROL SHEET WE-485208
C C

.1

.2

.6
.3

.5
650
.4
700
300

E
PROJECT TECHNICAL SPECIFICATIONS PTS-15WR116

+850
C

S
P
500

P
P

P
P

NO
B

B
B

B
B

300
C

C
C

C
C

+
DCDB-2

+
+ +

+
+

+
HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS WA-486055

R-1
FFL=+0.
DN

d SA
FM-200 ROOM 22
UP AUX.02 HVAC EQUIPMENT & DUCT LAYOUT, ROOF PLAN WA-486056

STAI
5900

25 17

HVAC EQUIPMENT &DUCT LAYOUT, GROUND FLOOR PLAN WA-486057

onalGri
DN
DCDB-1

5900
HVAC EQUIPMENT &DUCT LAYOUT, BASEMENT FLOOR PLAN WA-486058

T
1

.2

.3

.5

.8

.9
.6

+ 32 .1 PP

1 P
.7

U
T .12 P
. .

+ 32 .1 P

F
P
.1 PP PP

.1 PP PP

.1 PP PP

+ 05 PP

P
+ 04 PP

F
0

F
P

P
P

+
+ WA-486059

+
BUILDING HVAC SECTIONS
F

F
F

F
.
+

+
+
+

OF Nati
T
.1 PP

.1 PP

.
+ 05

U
CORRIDOR NORTH

+ 04
Ti/Hi T/H L.P

N ACDB
F
HVAC EQUIPMENT SCHEDULE WA-486060

2
F

U
D

D
1

1
OFFICE ROOM

D
D

D
3

7
6

R
+

F
R
R

R
DCDB

T
11

U
UP HVAC INSTALLATION DETAILS WA-486061

MAI
. HVAC AIR FLOW SCHEMATIC DIAGRAM WA-486062

T
U

ARE THE SOLE PROPERTY


G12

STAIR-2

F
CONTROL ROOM
HVAC COORDINATION LAYOUT WA-486063
D NC D

525
600
Y
+S
1

-2
-2

-3

.
-1
-2

-3

-3
1

-4
- - -

T
BB-1 BB-2
U

E
P

E
U

E
P

U
T

.1
O
T

O
M

M
G11

O
M

1200
R

S
S
R

S
S

S
S

M
BATTERY ROOM GRAPHIC SCALE:

R
+
0 0.5 1 2 3 4 5 6 7m

2
.

M
R
Ti/Hi Ti/Hi
DDR

SCALE : 1 : 75

+
600

.3
T/H T/H

M
AC/DC ROOM

R
+
L.P L.P + +

6300
+
=U +R

=U R

=U +R

=U R

C C C .
+

A
T

4
C
C

.
F 2

F 1

V 2

V 1

V
B
V
U

+
P
P

M
L

C
F
-1
-5

-4

-3

-2

R
S

.3

.2

+
- E.W. +
.2
.1

-1

CORRIDOR SOUTH
-2

-3
A

5
N
N

.
Z

AS-BUILT
Z

Ti/Hi
V
N

L.P
N

BY DATE
B

M
B

C
A
A

R
+

.1
+
+

B'

+
6300

RAMP-2

L.P T/H

6
- .

N
M
T/H Ti/Hi

HEREI
R
+
.1

2
I.

I 02 10-2017 N.M AS PER NG COMMENTS LETTER M.E T.S


M

HVAC-1 HVAC-2 PP-1 PP-2


A

OLP ELP ILP ILPB


+

E TOILET ROOM E 01 09-2017 N.M AS PER NG COMMENTS LETTER M.E T.S


700

NED
600

00 08-2017 N.M ISSUED FOR APPROVAL M.E T.S

CONTAI
RAMP-1 2500
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.
1500 945
DRAWING COMPLETION CERTIFICATE (DCC):

ON
UP

NFORMATI
SB

THE I
N.MAHMOUD M.EL-BARBARY 1:75
DRAWN BY CHECKED BY SCALE:

26.01.2017 15.10.2019
DATE STARTED DATE COMPLETED

AND
OPR'G. DEPT. ENG. DEPT.

C
THIS DRAWING IS NOT TO BE USED FOR CERTIFIED
-

NG
3600 4600 4800 4800 4800 4700 6100 5700 CONSTRUCTION OR FOR ORDERING

DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

05 06
01 02 03 04 07 08 09 HVAC COORDINATION LAYOUT, GROUND FLOOR PLAN
ADDITION OF NEW 3-80/100 MVA POWER TRANSFORMERS

S
THI
MADINAH EAST( MEDEA) 380/110-33KV BSP SUBSTATION

02 HVAC COORDINATION LAYOUT, GROUND FLOOR PLAN MADINAH SAUDI ARABIA


SCALE 1:75 CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

01
4400008122 1532120.03 K MD426 WA-486063 of 05 02
NG-A (2012/01)

DMS VECTOR NGA00


02 05 of
MD426 WA - 486063 K 1532120.03 4400008122
02
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. REFER TO SHEET WA- 486055.0000.0002

OW NER.
2. ALL B.O.D & B.O.O LEVELS ARE MEASURED FROM ZERO LEVEL.

TS
OF I
N

CONSENT
LEGEND

TTEN
01 02 03 04 05 06 07 08 09
1. REFER TO SHEET WA- 486055.0000.0002

THE W RI
3600 4600 4800 4800 4800 4700 6100 5700

THOUT
WI
BL-1300
BC-1600 BOD(-1.10)
750

DOCUMENT
200

450
A A

1360
1160
550

450
600
750

S
THI
6000

6000

FROM
KEY PLAN

NED
SHALL BE OBTAI
N
B A B 5M WIDE TUNNEL FOR 110KV O/G FEEDERS

-
6M WIDE NEW 6M WIDE

SWGR ROOM BSMNT ROAD CONCRETE ROAD

NG 8M
DE ROAD
T01 T02 T03

REACTOR AREA
AREA
ASPHALT AREA

NG
TI

NG

TI
ASPHALT
SI

STI

BANK

SI
ROAD
WI
EXI
AUX.01

33KV SWGR

EXI

PART
EXI
ROOM
6080

6080
CL-1000

CAP
AUX.02

AC-1300
CONTROL
1150 ROOM

N
I
CL-1600 EXISITING 5M
WIDE ROAD

FULL OR
BOD(-0.90) BOD(-0.90)
NEW ASPHALT AREA
4500

100
350

EXISITING S/S. BOUNDARY WALL

450
T/H Ti/Hi L.P

C C

N
I
150

700

ON
300 700

REPRODUCTI
UP UP
R-2

STAIR-2
STAI

REFERENCE DRAWINGS
UP DRAWING TITLE DRAWING NO.
5900

5900
DRAWING CONTROL SHEET WE-485208

PROJECT TECHNICAL SPECIFICATIONS PTS-15WR116

NO
HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS WA-486055
UP

d SA
HVAC EQUIPMENT & DUCT LAYOUT, ROOF PLAN WA-486056

HVAC EQUIPMENT &DUCT LAYOUT, GROUND FLOOR PLAN WA-486057

onalGri
D D HVAC EQUIPMENT &DUCT LAYOUT, BASEMENT FLOOR PLAN WA-486058

BUILDING HVAC SECTIONS WA-486059

OF Nati
HVAC EQUIPMENT SCHEDULE WA-486060

HVAC INSTALLATION DETAILS WA-486061

HVAC AIR FLOW SCHEMATIC DIAGRAM WA-486062

ARE THE SOLE PROPERTY


6300

6300
HVAC COORDINATION LAYOUT WA-486063

GRAPHIC SCALE:
0 0.5 1 2 3 4 5 6 7m

SCALE : 1 : 75

E E

AS-BUILT BY DATE

N
HEREI
02 10-2017 N.M AS PER NG COMMENTS LETTER M.E T.S
C
- 01 09-2017 N.M AS PER NG COMMENTS LETTER M.E T.S

NED
00 08-2017 N.M ISSUED FOR APPROVAL M.E T.S

CONTAI
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
3600 4600 4800 4800 4800 4700 6100 5700 NO.

DRAWING COMPLETION CERTIFICATE (DCC):

ON
NFORMATI
01 02 03 04 05 06 07 08 09

THE I
N.MAHMOUD M.EL-BARBARY 1:75
DRAWN BY CHECKED BY SCALE:

26.01.2017 15.10.2019
DATE STARTED DATE COMPLETED

AND
OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

HVAC COORDINATION LAYOUT, BASEMENT FLOOR PLAN


ADDITION OF NEW 3-80/100 MVA POWER TRANSFORMERS

S
THI
MADINAH EAST( MEDEA) 380/110-33KV BSP SUBSTATION

02 HVAC COORDINATION LAYOUT, BASEMENT FLOOR PLAN MADINAH SAUDI ARABIA


SCALE 1:75 CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

02 of
4400008122 1532120.03 K MD426 WA-486063 05 02
NG-A (2012/01)

DMS VECTOR NGA00


02 05 of
MD426 WA - 486063 K 1532120.03 4400008122
03
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. REFER TO SHEET WA- 486055.0000.0002

OW NER.
2. ALL B.O.D & B.O.O LEVELS ARE MEASURED FROM ZERO LEVEL.

TS
OF I
N

CONSENT
LEGEND

TTEN
01 02 03 04 05 06 07 08 09
1. REFER TO SHEET WA- 486055.0000.0002

THE W RI
3600 4600 4800 4800 4800 4700 6100 5700

THOUT
WI
BOD(-1.10)
750

DOCUMENT
200

450
A A

1360
1160
550
DM-3200
DM-3500

450
600
750

S
THI
6000

6000

FROM
KEY PLAN

NED
SHALL BE OBTAI
N
B A B 5M WIDE TUNNEL FOR 110KV O/G FEEDERS

-
6M WIDE NEW 6M WIDE

SWGR ROOM BSMNT ROAD CONCRETE ROAD

NG 8M
DM-3500

DE ROAD
T01 T02 T03

REACTOR AREA
AREA
ASPHALT AREA

NG
TI

NG

TI
ASPHALT
SI

STI
DM-1900

BANK

SI
ROAD
WI
EXI
AUX.01

33KV SWGR

EXI

PART
EXI
ROOM
6080

6080

CAP
AUX.02

CONTROL
1150 ROOM

N
I
EXISITING 5M
WIDE ROAD

FULL OR
BOD(-0.90)
NEW ASPHALT AREA
4500

100
350

EXISITING S/S. BOUNDARY WALL

450
T/H Ti/Hi L.P

C C

N
I
150

700

ON
300 700

REPRODUCTI
UP UP
R-2

STAIR-2
STAI

REFERENCE DRAWINGS
UP DRAWING TITLE DRAWING NO.
5900

5900
DRAWING CONTROL SHEET WE-485208

PROJECT TECHNICAL SPECIFICATIONS PTS-15WR116

NO
HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS WA-486055
UP

d SA
HVAC EQUIPMENT & DUCT LAYOUT, ROOF PLAN WA-486056

HVAC EQUIPMENT &DUCT LAYOUT, GROUND FLOOR PLAN WA-486057

onalGri
D D HVAC EQUIPMENT &DUCT LAYOUT, BASEMENT FLOOR PLAN WA-486058

BUILDING HVAC SECTIONS WA-486059

OF Nati
HVAC EQUIPMENT SCHEDULE WA-486060

HVAC INSTALLATION DETAILS WA-486061

HVAC AIR FLOW SCHEMATIC DIAGRAM WA-486062

ARE THE SOLE PROPERTY


6300

6300
HVAC COORDINATION LAYOUT WA-486063

GRAPHIC SCALE:
0 0.5 1 2 3 4 5 6 7m

SCALE : 1 : 75

E E

AS-BUILT BY DATE

N
HEREI
02 10-2017 N.M AS PER NG COMMENTS LETTER M.E T.S
C
- 01 09-2017 N.M AS PER NG COMMENTS LETTER M.E T.S

NED
00 08-2017 N.M ISSUED FOR APPROVAL M.E T.S

CONTAI
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
3600 4600 4800 4800 4800 4700 6100 5700 NO.

DRAWING COMPLETION CERTIFICATE (DCC):

ON
NFORMATI
01 02 03 04 05 06 07 08 09

THE I
N.MAHMOUD M.EL-BARBARY 1:75
DRAWN BY CHECKED BY SCALE:

26.01.2017 15.10.2019
DATE STARTED DATE COMPLETED

AND
OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

HVAC COORDINATION LAYOUT, BASEMENT FLOOR PLAN


ADDITION OF NEW 3-80/100 MVA POWER TRANSFORMERS

S
THI
MADINAH EAST( MEDEA) 380/110-33KV BSP SUBSTATION

02
HVAC COORDINATION LAYOUT, BASEMENT FLOOR PLAN MADINAH SAUDI ARABIA
SCALE 1:75 CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

03 of
4400008122 1532120.03 K MD426 WA-486063 05 02
NG-A (2012/01)

DMS VECTOR NGA00


02 05
of
MD426 WA - 486063 K 1532120.03 4400008122
04 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. REFER TO SHEET WA- 486055.0000.0002

OW NER.
01 02 03 04 05 06 07 08 09
3600 4600 4800 4800 4800 4700 6100 5700

TS
OF I
PROTECTIVE CRASH BARRIER
N

EL=-0.640

CONSENT
TOA

LEGEND

TTEN
1. REFER TO SHEET WA- 486055.0000.0002

THE W RI
ER
BARRI
REWALL

THOUT
CRASH
FI

WI
RC

VE
PROTECTI

DOCUMENT
540

S
THI
EL=-0.
350

TOA

FROM
SB SB SB

A A
750

UP
KEY PLAN

NED
1600

UP

SHALL BE OBTAI
950

HVAC WALL OPENING


(1600X1000) HVAC SLAB OPENING
OPENING BOO (+3.75) (950X750)
6000

6000
2N

PART
2U
2V
2W
B A B

N
I
-

FULL OR
AUX.01
SWGR ROOM

HVAC WALL OPENING RC FIREWALL


6080

6080

N
500

I
(500X350)
OPENING BOO (+2.80)

ON
HVAC SLAB OPENING HVAC SLAB OPENING

REPRODUCTI
(900X550) (900X550)
1500

REFERENCE DRAWINGS

2N
DRAWING TITLE DRAWING NO.

2U
HVAC WALL OPENING
550

550

2V
(1500X1050)

2W
4400

250
DRAWING CONTROL SHEET WE-485208
385

OPENING BOO (+3.75)


C C
715

400

900
965

PROJECT TECHNICAL SPECIFICATIONS PTS-15WR116


300

1050 900 HVAC RAISED FLOOR

NO
HVAC RAISED FLOOR
TILE OPENING HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS WA-486055
HVAC WALL OPENING
950

TILE OPENING
(500X350)
(400X400) (450X350) DN

d SA
22
UP HVAC WALL OPENINGS AUX.02 HVAC EQUIPMENT & DUCT LAYOUT, ROOF PLAN WA-486056
BOO(+3.90)

SOUTH
450

(950X650) TYP.
5900

25 17

BOD (+3.90) HVAC EQUIPMENT &DUCT LAYOUT, GROUND FLOOR PLAN WA-486057

onalGri
HVAC WALL OPENING
(450X450) DN

5900
HVAC EQUIPMENT &DUCT LAYOUT, BASEMENT FLOOR PLAN WA-486058
FM-200 ROOM BOO(+4.00)
BUILDING HVAC SECTIONS WA-486059

DOR

OF Nati
NORTH

HVAC WALL OPENINGS HVAC EQUIPMENT SCHEDULE WA-486060


(950X450) TYP.

CORRI
950

11
BOD (+3.50)
HVAC WALL OPENING UP OFFICE ROOM HVAC INSTALLATION DETAILS WA-486061
500

(500X350) CONTROL ROOM HVAC WALL OPENING HVAC AIR FLOW SCHEMATIC DIAGRAM WA-486062
OPENING BOO (+2.80)
950

(1300X800)

ARE THE SOLE PROPERTY


DOR

STAIR-2 2 HVAC WALL OPENINGS


BOO(+3.90) HVAC COORDINATION LAYOUT WA-486063
(1400X800)

425

425
D D

575
BOO(+3.90)
CORRI
950

1400

1400

1400
1200
GRAPHIC SCALE:
0 0.5 1 2 3 4 5 6 7m
HVAC WALL OPENING
1080

(1400X800)
HVAC WALL OPENING 450 3770 SCALE : 1 : 75
BOO(+3.90)
3 HVAC WALL OPENINGS (900X600)
BOO(+3.525)
AC/DC ROOM
HVAC WALL OPENING (950X450) TYP.
950

6300
(700X650) BOD (+3.60) HVAC WALL OPENING
700

550
B OPENING BOO (+4.20) HVAC WALL OPENING (450X450)
- HVAC RAISED FLOOR (550X500) BOO(+3.60)
1080

BOO(+3.575)
TILE OPENING TOILET ROOM AS-BUILT BY DATE
BATTERY ROOM (500X350)
6300

RAMP-2

3050

550

550

2770
HVAC WALL OPENING
950

HVAC WALL OPENING

N
(550X550)

HEREI
900

1000 (550X700)
BOO(+3.55)
BOO(+3.50) 02 10-2017 N.M AS PER NG COMMENTS LETTER M.E T.S

650
650
1700 450
475

E E 01 09-2017 N.M AS PER NG COMMENTS LETTER M.E T.S

NED
775

500
845 300
HVAC WALL OPENING HVAC WALL OPENING 00 08-2017 N.M ISSUED FOR APPROVAL M.E T.S

CONTAI
RAMP-1 (500X350) (1700X800) 2500
960 450 2500
BOO(+3.10) BOO(+3.50) REV. DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.

SB DRAWING COMPLETION CERTIFICATE (DCC):


HVAC WALL OPENING

ON
(450X450)
UP

NFORMATI
BOO(+3.85)
HVAC WALL OPENING HVAC WALL OPENING
(300X300) (450X450)
BOO(+3.10) BOO(+3.70)

HVAC RAISED FLOOR

THE I
TILE OPENING N.MAHMOUD M.EL-BARBARY 1:75
DRAWN BY CHECKED BY SCALE:
(450X350)
26.01.2017 15.10.2019
DATE STARTED DATE COMPLETED

AND
OPR'G. DEPT. ENG. DEPT.

C
- THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
3600 4600 4800 4800 4800 4700 6100 5700 CONSTRUCTION OR FOR ORDERING

DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

05 06
01 02 03 04 07 08 09 HVAC COORDINATION LAYOUT, GROUND FLOOR HVAC OPENINGS
ADDITION OF NEW 3-80/100 MVA POWER TRANSFORMERS

S
THI
MADINAH EAST( MEDEA) 380/110-33KV BSP SUBSTATION
HVAC COORDINATION LAYOUT, GROUND FLOOR HVAC OPENINGS MADINAH SAUDI ARABIA
02
SCALE 1:75 CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

04
4400008122 1532120.03 K MD426 WA-486063 of 05
02
NG-A (2012/01)

DMS VECTOR NGA00


02 05 of
MD426 WA - 486063 K 1532120.03 4400008122
05
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
1. REFER TO SHEET WA- 486055.0000.0002

OW NER.
2. ALL B.O.D & B.O.O LEVELS ARE MEASURED FROM ZERO LEVEL.

TS
OF I
N

CONSENT
LEGEND

TTEN
01 02 03 04 05 06 07 08 09
1. REFER TO SHEET WA- 486055.0000.0002

THE W RI
3600 4600 4800 4800 4800 4700 6100 5700

THOUT
WI
DOCUMENT
A A

S
THI
6000

6000

FROM
KEY PLAN

NED
SHALL BE OBTAI
N
B A B 5M WIDE TUNNEL FOR 110KV O/G FEEDERS

-
6M WIDE NEW 6M WIDE
ROAD CONCRETE ROAD

NG 8M
SWGR ROOM BSMNT

DE ROAD
T01 T02 T03

REACTOR AREA
AREA
ASPHALT AREA

NG
TI

NG

TI
ASPHALT
SI

STI

BANK

SI
ROAD
WI
EXI
AUX.01

33KV SWGR

EXI

PART
EXI
ROOM
6080

6080

CAP
AUX.02

CONTROL
ROOM

N
I
EXISITING 5M
WIDE ROAD

FULL OR
NEW ASPHALT AREA

650
EXISITING S/S. BOUNDARY WALL
500

C C

N
I ON
REPRODUCTI
HVAC WALL OPENING
(500X350) UP UP
R-2

STAIR-2
BOO(-1.20)
STAI

REFERENCE DRAWINGS
UP DRAWING TITLE DRAWING NO.
5900

5900
DRAWING CONTROL SHEET WE-485208

PROJECT TECHNICAL SPECIFICATIONS PTS-15WR116

NO
HVAC GENERAL NOTES, LEGENDS, AND SYMBOLS WA-486055
UP

d SA
HVAC EQUIPMENT & DUCT LAYOUT, ROOF PLAN WA-486056

HVAC EQUIPMENT &DUCT LAYOUT, GROUND FLOOR PLAN WA-486057

onalGri
D D HVAC EQUIPMENT &DUCT LAYOUT, BASEMENT FLOOR PLAN WA-486058

BUILDING HVAC SECTIONS WA-486059

OF Nati
HVAC EQUIPMENT SCHEDULE WA-486060

HVAC INSTALLATION DETAILS WA-486061

HVAC AIR FLOW SCHEMATIC DIAGRAM WA-486062

ARE THE SOLE PROPERTY


6300

6300
HVAC COORDINATION LAYOUT WA-486063

GRAPHIC SCALE:
0 0.5 1 2 3 4 5 6 7m

SCALE : 1 : 75

E E

AS-BUILT BY DATE

N
HEREI
02 10-2017 N.M AS PER NG COMMENTS LETTER M.E T.S
C
- 01 09-2017 N.M AS PER NG COMMENTS LETTER M.E T.S

NED
00 08-2017 N.M ISSUED FOR APPROVAL M.E T.S

CONTAI
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
3600 4600 4800 4800 4800 4700 6100 5700 NO.

DRAWING COMPLETION CERTIFICATE (DCC):

ON
NFORMATI
01 02 03 04 05 06 07 08 09

THE I
N.MAHMOUD M.EL-BARBARY 1:75
DRAWN BY CHECKED BY SCALE:

26.01.2017 15.10.2019
DATE STARTED DATE COMPLETED

AND
OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

HVAC COORDINATION LAYOUT, BASEMENT FLOOR HAVC OPENINGS


ADDITION OF NEW 3-80/100 MVA POWER TRANSFORMERS

S
THI
MADINAH EAST( MEDEA) 380/110-33KV BSP SUBSTATION

02
HVAC COORDINATION LAYOUT, BASEMENT FLOOR HAVC OPENINGS MADINAH SAUDI ARABIA
SCALE 1:75 CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

05 of
4400008122 1532120.03 K MD426 WA-486063 05 02
NG-A (2012/01)

DMS VECTOR NGA00