Ewijk NEW PROJECTS

Ewijk (Netherlands)
Bridge (Road Bridge)

Client: Rijkswaterstaat The delivery and fitting of 1.100 ton reinforcements in the
existing 1.055m long cable bridge over the “Waal” in “Ewijk”
General Contractor: Strukton - Ballast Nedam
near “Nijmegen”. The reinforcements are necessary as a
Steel Construction: Victor Buyck Steel Construction solution for the increasing load and fatigue of the existing
bridge. The pith of the matter is situated on the wharf where a
Dimensions: 1055 m significant amount of fitters and welders is working on different
Tonnage: 1100 locations and in multiple shifts. Time on the wharf: November
2012 – April 2014. Somewhat similar (though larger in size) to
Building time: August 2012 - June 2016 the bridge “Muiderbrug”, another project of our firm.