Você está na página 1de 4

Contract Nos.

: RDA/SEEP/CONT-S4

~
FSDI
Project Names: Construction of Extension of
Southern Expressway, Section 4 - Mattala to
Hambantota via Andarawewa
Contracor's Design Submission (CDS)

Part A: To be Prepared by Contractor


To: Engineer's Representative Mr. Dong Wei
Submission of working drawings for substructure of bridge BRI-04 at A0+859.000 part 2(for P14-P16)
Title of Submission :
(Rev.2)
Submission Ref. No. : CHEC/CDS/00977/A
Outgoing Log No. : CHEC/RDA/SEEP/CONT/S4/01.23/0/003422
Description Of Contents:
This bear refer to the incoming letter No. FSDI-CHEC/CDS/003372/A dated on 26th, August 2017.
Herewith we submit of working drawings for substructure of bridge BRI-04 at A0+859.000 part 2(for P14-P16)(Rev.2)

Your earlier response will be highly appreciated.

Appendix 1: Working drawings for substructure of bridge BRI-04 at A0+859.000 part 2(for P14-P16)(Rev.2)

REQUIRED INFORMATION DETAILS PROVIDED


Submission of working drawings for substructure of bridge BRI-04 at A0+859.000 part 2(for
Works Discipline
P14-P16)(Rev.2)
Sub-contractor N/A
Design Manager Shi Fulu
Nature of Works (Permanent I Temporary) Permanent
Applicable Standard As specified in Specifications
Design Drawings Provided (Yes I No) Yes
Design Calculations Provided (Yes I No) No
Purpose of Submission: For Approval
From : Contractor's Representative

~~l9()
Name : Yang Senyan I

~-
Date ' 29th "'" "'' 2017r!Uz
Signature~ I/ N/A I Shi Fulu I Sheng Hong Zhuan
Sub-contractor I Originator l Checked Bv
Distribution/ Reri arks :

Part B: To be completed by Engineer


A - Review & in line with 8 - Reviewed with comments C - Fails to comply R - Returned &
with the Contract incorporate comments & and resubmit Not reviewed
proceed

Comments (Enter below for each item separately or insert N/A

Title JName: ISignature IDate

~
ROAD DEVELOPMENT AUTHORITY
MINISTRY OF PORTS AND HIGHWAYS
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA

CONTRACT NO.: RDA/SEEP/CONT-S4

CONSTRUCTION OF EXTENSION OF SOUTHERN EXPRESSWAY FROM MATARA TO


HAMBANTOTA SECTION-4

WORKING DRAWINGS FOR SUBSTRUCTURE OF


BRIDGE BRI-04 AT A0+859.000
PART 2 (FOR P14 ~P16)
(REV.2)

CHINA HARBOUR ENGINEERING COMPANY LTD.


29 AUG 2017
NOTES: 
Herewith
h we makee some co
orrections for the working draawings forr substructure 
2 (for P14~P16) (reev.2)(8 AP
of bridgee BRI‐04 at A0+859..000 part 2 PR. 2017). This 
drawing will superrsede the previous aapproved drawings NO.SEEP//S4/04/09
9/10' 
(REV.2) (8 APR. 20
017) (detaiils attacheed in the fo
ollowing ccontents aand drawin
ng).   

Revision
n explanation: 
(Due to d
differentiaal interpre
etation of the calculation sheeet, the S1aa reinforce
ement   
was inco
orrectly arranged in the drawiing .Thereefore, Adju
ustments h
has been m
made to
 The S1a reinforceement bar in the Plaan drawingg 3‐3, refeerencing P15 and P1
16 bridge
 pier calcculation sh
heet and B
Bridge Pieer reinforcement Draawings.)   
1. Some excerpts ffrom the P
P15 and P16 bridge pier calcu
ulation sheeets: 
DESIGN OF PIER CO
PART 3: D OLUMN 
 

2. Modiffied content (middle
e of colum
mn): 
Employer CONSULTANT Scale 5 Project Title EXTENSION OF SOUTHERN EXPRESSWAY SECTION - 4 (ESEP-S4)
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA Designed FROM MATTALA TO HAMBANTOTA VIA ANDARAWEWA
4
MINISTRY OF HIGHER EDUCATION & HIGHWAYS
Drawn 3 Drawing Title BRIDGE BRI-04(A0+859.000)
FSDI
ROAD DEVELOPMENT AUTHORITY
Checked 2 2017.08.29 RE-DESIGN OF ANDARAWEWA INTERCHANGE ALIGNMENT REINFORCEMENT OF PIER
中 铁 第 一 勘 察 设 计 院 集 团 有 限 公 司 中国港湾工程有限责任公司 Sheet No. REV
PROJECT DIRECTOR - EXTENSION OF SOUTHERN EXPRESSWAY Approved 1 Drawing No.
No 74 Kaduwela Road, Battaramula. SEEP/S4/04/09/
SEEP/S4/04/09/10' 10/12
2
Tel : 0112871601 Fax : 0112889361 Email : adb34@slt.lk Date REV DESCRIPTION