: RDA/SEEP/CONT-S4
~
FSDI
Project Names: Construction of Extension of
Southern Expressway, Section 4 - Mattala to
Hambantota via Andarawewa
Contracor's Design Submission (CDS)
Appendix 1: Working drawings for substructure of bridge BRI-04 at A0+859.000 part 2(for P14-P16)(Rev.2)
~~l9()
Name : Yang Senyan I
~-
Date ' 29th "'" "'' 2017r!Uz
Signature~ I/ N/A I Shi Fulu I Sheng Hong Zhuan
Sub-contractor I Originator l Checked Bv
Distribution/ Reri arks :
~
ROAD DEVELOPMENT AUTHORITY
MINISTRY OF PORTS AND HIGHWAYS
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA
Revision
n explanation:
(Due to d
differentiaal interpre
etation of the calculation sheeet, the S1aa reinforce
ement
was inco
orrectly arranged in the drawiing .Thereefore, Adju
ustments h
has been m
made to
The S1a reinforceement bar in the Plaan drawingg 3‐3, refeerencing P15 and P1
16 bridge
pier calcculation sh
heet and B
Bridge Pieer reinforcement Draawings.)
1. Some excerpts ffrom the P
P15 and P16 bridge pier calcu
ulation sheeets:
DESIGN OF PIER CO
PART 3: D OLUMN
2. Modiffied content (middle
e of colum
mn):
Employer CONSULTANT Scale 5 Project Title EXTENSION OF SOUTHERN EXPRESSWAY SECTION - 4 (ESEP-S4)
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA Designed FROM MATTALA TO HAMBANTOTA VIA ANDARAWEWA
4
MINISTRY OF HIGHER EDUCATION & HIGHWAYS
Drawn 3 Drawing Title BRIDGE BRI-04(A0+859.000)
FSDI
ROAD DEVELOPMENT AUTHORITY
Checked 2 2017.08.29 RE-DESIGN OF ANDARAWEWA INTERCHANGE ALIGNMENT REINFORCEMENT OF PIER
中 铁 第 一 勘 察 设 计 院 集 团 有 限 公 司 中国港湾工程有限责任公司 Sheet No. REV
PROJECT DIRECTOR - EXTENSION OF SOUTHERN EXPRESSWAY Approved 1 Drawing No.
No 74 Kaduwela Road, Battaramula. SEEP/S4/04/09/
SEEP/S4/04/09/10' 10/12
2
Tel : 0112871601 Fax : 0112889361 Email : adb34@slt.lk Date REV DESCRIPTION