INSPECTION OVERVIEW
Reference: Ref: M013-JAC-HSE-RPT-00146
Unsafe storage of
construction materials was
kept on work location,
Handling/Stor obstructing workers from Materials removed from the work area and
engaged in their work Review project requirement on shifted to temporary storage area to avoid
5 age of
Materials Architectural Foreman was safe storage of materials.
smoothly/effectively. the obstruction of work and to perform
their work smoothly/effectively.
instructed to rearranged
the materials to avoid trips
& falls hazard
Unsafe working condition
was witnessed at
concourse level, as
electrical workers were
found working in an
energized electrical panel’s
rooms, were standing on a RnR is required to review project A stand -down toolbox talk conducted to
life panels without requirement/procedure in electrical supervisor and foreman on LOTO
adequate platform or working in an energized awareness.
access the work location rooms/area. A stand-down
6 Electrical Insulation provided on aluminium scaffold
and again aluminum Toolbox Talks to be while working near the electrical panels to
scaffolding was also found communicates to all frontline
being used by these electrical supervisors and avoid direct contact or coviction of
electricity.
workers. The activity was foremen on LOTO Awareness.)
ceased and advised the
RnR HSEDM to ensure
adequate supervision, valid
permit to work and safe
system of work is carried
out at all time.
Observed was architectural
materials with poor
housekeeping was Review arrangements for Unused material is removed from work area
Handling/Stor level. It was advised to the housekeeping
witnessed at shelter top and removal of and provided housekeeping to make the
waste and ensure that
7 age of site clean and tidy to avoid fire related
construction Manager to housekeeping is carried out on a
Materials deployed worker to hazard in the site and ensured this happens
daily basis and waste is disposed in timely manner to avoid the reoccurence.
embark on keeping the site regularly.)
clean and free from any
combustible materials.
Unsafe lifting operation
was witnessed, no
exclusion zone at the lifting
zone and there was no Conducted TBT to all riggers regarding safe
RnR should review project
proper communication, as requirement on lifting operation lifting and rigging operation and ensured
8 Lifting Ops workers were walking that all lifting area are isolated with
and TBT to should be conducted
under/through a adequate barrication and appropriate
to all riggers).
suspended load. signage.
Immediate instruct the
rigger to cease the lifting
and isolate the lifting area.
Issued by:
ZEESHAN ABDULAH Position: HS Manager Signature:
Date:4.10.18
PHOTO
Date: