he use of building information those in other countries, suggesting that
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND
compelling visuals that BIM offers, new for smaller projects, since 54% of non- Stephen A. Jones
adopters are coming on board, and existing users working only in Australia and New Senior Director
users are planning aggressive expansions Zealand (compared with 38% of those McGraw Hill Construction
of their BIM programs. working in and out of Australia and New
This research study focuses primarily Zealand) report that it is an important/very
on BIM users in Australia and New Zealand, important factor delaying their use of BIM.
and it shows that firms in these countries, ■ Demand by owners, including a govern-
though relatively new to the use of BIM, ment mandate, can be a key factor in
recognize its value and are planning to helping to spur adoption. Significantly
deepen their BIM investments. In fact, 51% more non-users working only on in-country
of firms are engaged with BIM on more projects believe that their competitors and
than 30% of their projects today, and this clients are not using BIM, compared with
number is expected to increase dramati- their peers at global firms.This suggests Harvey M. Bernstein
cally in the next two years—74% report that that education is needed in this market. F.ASCE, LEED AP
they will be engaged in BIM on more than Vice President
Throughout this report, we provide compar- Industry Insights & Alliances
30% of their projects by the end of 2015. McGraw Hill Construction
isons between the findings in Australia and
The research findings suggest that
New Zealand to those in other markets that
business benefits and returns from BIM are
we have studied since 2007, when notable.
key drivers behind that planned growth.
Firms in Australia and New Zealand have
■ Positive Return on Investment (ROI) for
the advantage of being able to learn about
BIM: Reported by 75% of firms, with 30%
the benefits that others have experienced
citing ROI of 25% or more.
and use that knowledge to help make the
■ Positive View of Potential Benefits from
case for more intensive use of BIM.
BIM: 52% of firms report that they can
We thank our partners who made this
gain more than they already receive, and
study possible, including our premier
39% believe that they are just scratching
partners Autodesk and AECOM, as well
the surface of what they can gain.
as our seven other contributing partners:
The study also includes a review of compa- Aconex, A.G. Coombs, AMCA, Consult
nies not yet using BIM in Australia and New Australia, CSI Global, Laing O’Rourke
Zealand. These non-users are similar to and Zuuse.
Stephen A. Jones, leads with Primavera Systems (now Harvey M. Bernstein, Foundation. He currently
McGraw Hill Construction’s Oracle), a leading provider of F.ASCE, LEED AP, has been serves as a member of the
(MHC) initiatives in BIM and project management soft- a leader in the engineering Princeton University Civil and
integrated project delivery, ware. Prior to that, he spent 19 and construction industry Environmental Engineering
as well as developing alliance years in creative, marketing for over 30 years. Currently, Advisory Council and as a
relationships for technol- and management roles with he has lead responsibility for visiting professor with the
MHC’s market research group University of Reading’s School
ogy and content. Active in design firms, most recently as
as well as MHC’s thought of Construction Management
numerous industry organiza- a Principal and Board of Direc- leadership initiatives in areas and Engineering in England.
tions, he frequently speaks tors member with Burt Hill such as green building, BIM, Bernstein has an M.B.A. from
at events around the world (now Stantec), a large, global interoperability, innovation and Loyola College, an M.S. in
about the business impact of architectural and engineering global construction markets. engineering from Princeton
emerging technologies and firm. Jones holds an M.B.A. Previously, Bernstein served University and a B.S. in civil
trends. Before joining MHC, from Wharton and a B.A. from as the president and CEO of engineering from the New
Jones was a vice president Johns Hopkins. the Civil Engineering Research Jersey Institute of Technology.
CONTENTS
4 Executive Summary
4 Executive Summary
6 Observations and Recommendations
7 Data
8 BIM Use
8 Company Involvement With BIM
9 BIM Implementation Levels
10 BIM Expertise Levels
11 Importance of BIM Capability for Project Team Selection
12 Trade Contractor Proficiency in BIM
12 Years of Experience Using BIM
13 Regional Comparison of BIM Engagement
14 SIDEBAR Engaging Trade Contractors With BIM
15 SIDEBAR Using BIM to Rebuild Christchurch
Front Cover and Page 3 right: Images courtesy of HYLC, a joint venture of Hansen Yuncken and Leighton Contractors; Page 3 left: Image courtesy of AECOM
Front Cover: Designers on the $1.85 billion New Royal Adelaide Hospital
project are using BIM extensively for analysis and visualization. Across
the entire team, BIM will be used from the design phases through to
operations and maintenance.
52 BIM Utilization
52 Top BIM Activities
54 Tools Used to Make Models Accessible to Field Personnel
55 Use of the Cloud
Case Studies
16 Advancing the State of the Art for Industrial/Infrastructure BIM With
Digital Engineering: Cape Lambert Port B, Pilbara Region, Western Australia
24 Enabling Green Design Through BIM on an Australian Tower Project:
1 Bligh Street, Sydney, Australia
34 Executing BIM on a Broad Scale From Design to Operations and Maintenance:
New Royal Adelaide Hospital, Adelaide, Australia
56 Multi-Party BIM Execution Planning:
Adelaide Oval Redevelopment, Adelaide, Australia
60 Methodology
61 Resources
Australia and New Zealand are among the world’s leading regions for building
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND
Adoption and Use of BIM Percentage of BIM Users with More than
About half of BIM users indicate that they have been Three Years’ Experience (Australia and New
engaged with BIM for more than three years. This Zealand Compared to Other Major Markets)
compares favorably with other regions, with the U.S. the Source: McGraw Hill Construction, 2013 75%
only major market with notably more experienced users.
49% 51%
45% 48%
BIM Implementation 37% 42%
28%
All users predict a strong increase in implementation (the 15%
percentage of their projects that involve BIM).
■ Currently, half (51%) of all users are engaged with BIM
Brazil Japan France Canada South U.S.
on more than 30% of their projects. That will grow to Korea
three-quarters (74%) of users by 2015. Australia/ Germany United
■ Design professionals lead contractors as users, with six New Zealand Kingdom
out of 10 (61%) currently using BIM on 30% or more of
their work, versus only one-third (33%) of contractors.
■ Contractors will partially close the gap over the next Current and Future BIM Implementation
two years, doubling (to 66%) the number implementing 5_1_ExS_01_#01.eps
Levels for A/E and Contractor Users
at heavy or very heavy levels of use by 2015. Source: McGraw Hill Construction, 2013
■ Over half (56%) of the design professionals will be very Very Heavy Implementation (Over 60% of Projects)
heavy users (more than 60% of projects) in just two years. Heavy Implementation (31%–60% of Projects)
Light or Moderate Implementation (Less Than 30% of Projects)
BIM Expertise 12%
36% 31%
The level of BIM expertise is reported highest among 56% 21%
larger architectural/engineering (A/E) firms. The top types 26% 35%
of trade contractors by their relative level of BIM expertise 21% 67%
include (in order of rank): 38% 34%
23%
■ Mechanical/Sheet Metal/Plumbing Contractors
About two-thirds of those surveyed indicate that they Top Five BIM Benefits Received
2012 by
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND
have been formally measuring ROI on BIM. Eight in 10 Architects/Engineers and Contractors
users rate the top three most important metrics for ROI to (Percentage Receiving the Benefit at a High or
be the following (in order of importance): Very High Level)
■ Process-related metrics (e.g., fewer RFIs and Source: McGraw Hill Construction, 2013
unplanned changes)
■ Project schedule metrics (e.g., faster project delivery) Benefit Architects/ Contractors
Engineers
■ Financial metrics (e.g., reduced cost, higher
A company’s level of BIM implementation and the project Overall Enhancement of Your Firm’s
Image as an Industry Leader 36% 43%
type it focuses on both have a distinct impact on ROI.
■ Over half (55%) of the companies that focus on infra-
Reducing Rework 31% 28%
structure projects report a very positive ROI (over 25%),
versus only 29% of firms that primarily do buildings. Ability to Work Collaboratively With
27% 24%
■ Almost half (46%) of users at a very high BIM
Owners or Design Firms
implementation level (more than 60% of their projects Offering New Services 24% 14%
involve BIM) report a very positive ROI (over 25%) on
BIM, versus only 10% of users at a low implementation
Impact of BIM Implementation Level on ROI
level (less that 15% of their projects involve BIM). Source: McGraw-Hill Construction, 2013
Respondents feel that improving project outcomes and Negative or Break-Even ROI Very Positive ROI (Over 25%)
5_3_ExS 03_#01.eps
better multi-party communications from 3D visuals are
46%
the benefits from BIM that will shape ROI in the future.
38%
Software Customization/
Interoperability Solutions
McGraw Hill Construction 5 www.construction.com 41% SmartMarket Report
Recommendations
Observations and Recommendations
A/E BIM Users firms from sharing models into punch list/snag list opportunity. Currently, it is a
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND
Two-thirds (66%) of A/E with contractors. and close-out activi- high or very high frequency
users identified “more 3D ties—each of which is BIM activity for 59% of
building product manufac- Contractor BIM performed by contractors BIM users in Australia and
turer-specific content“ as Users at a greater frequency in New Zealand. However,
very important to increas- Currently, three times as many other regions. it rates even more highly
ing their ability to experi- many A/E users consider among contractors in many
Among the trade contrac-
ence more business benefit themselves to be at the other markets, including
tors, the mechanical/sheet
from BIM. expert BIM skill level (see Germany, Japan, South
metal/piping, steel and
■ Recommendation: page 10 for definition) than Korea and the UK.
site/civil firms are seen
Rather than wait for do contractor users, two- ■ Recommendation: A/E
by general contractors as
the manufacturers that thirds of whom still classify firms and contractors may
being the most proficient
serve Australia and New themselves at a beginner or have an opportunity to
with BIM.This sends a clear
Zealand to develop BIM moderate skill level. provide this service.
message to the electrical,
content on their own time ■ Recommendation:
concrete/masonry, curtain
frames, A/E firms should Contractors should work
wall and drywall/ceilings
Non-Users
use their influence to to increase BIM skills BIM is fast becoming a
companies that they need
demand content that is because they correlate must-have capability. Only
to improve their capabilities.
searchable and able to directly to greater benefits. 7% of owners surveyed say
be indexed. that BIM expertise has no
However, contractors from Contractor and influence on their selection
Sharing models with Australia and New Zealand A/E BIM Users of team members. Within
contractors is important for show global leadership in The data show that higher
two years, three-quarters
the continued advancement some areas, such as the BIM engagement correlates
(77%) of the A/E firms and
of integrated processes frequency with which they directly to greater enjoy-
two-thirds (66%) of the con-
between project stakehold- leverage BIM to visualize ment of benefits and better
tractors currently using BIM
ers.The table below shows design intent and conduct ROI on BIM.
in Australia and New Zea-
how frequently contractors safety planning. ■ Recommendation:
land will be doing so at high
in several major regions say ■ Recommendation: Regardless of a firm’s cur-
or very high implementa-
that they always or often Contractors should look to rent BIM Engagement Index
tion levels.
receive models from design other regions for lessons (see page 14), there is room
In addition to a variety of
professionals. Australia and to help expand the value for advancement through
aspects of improved proj-
New Zealand rank last (9%). of BIM.This is especially deeper implementation,
ect performance, these
■ Recommendation: It true for high-value activ- greater skills and more
users are enjoying better
would be useful to evalu- ities, such as multi-trade experienced staff.
profitability and success in
ate the trends in the rest of coordination, model-
Creating as-built models leveraging their BIM capa-
the world and reevaluate driven layout in the field
for owners is a growth bilities to market new busi-
the factors preventing A/E and integrating the model
ness, offer new services and
maintain repeat clients.
Frequency at Which Contractors Report That They Always or ■ Recommendations: Non-
S
ince McGraw Hill Construction (MHC) first identified
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
early compared with other regions studied by MHC. into two categories throughout the report—
However, with healthy growth predicted in the Australian GCs and Trade Contractors. Note, when
market and $40 billion worth of work in the reconstruction the term “contractor” is used in the data
of the Canterbury region in New Zealand over the next sections of the report, it is referring to
10 years (including Christchurch), insight into how far all the respondents from the following
the industry has gone in the adoption of BIM and how its two categories:
adoption compares with other areas, like North America • GCs: Refers to general contractors,
and South Korea, provides critical business intelligence that full-service contractors, construction
offers a glimpse of the evolution of BIM use and value in management companies and GC/CM
Australia and New Zealand. at-Risk firms
The study shows that the Australia and New Zealand • Trade Contractors: Refers to specialty
markets have their own unique drivers and obstacles for the subcontractors, fabricators and installers
use of BIM.The construction industry, despite the influence
BY COUNTRY/REGION
of large global players, remains a very local industry driven
The findings from this study of firms in Australia
by small firms and marked by regional differences.The data
and New Zealand are compared with findings
suggest that for Australia and New Zealand, building owners,
published in previous Business Value of BIM
both public and private, may emerge as the greatest drivers
SmartMarket Reports:
of BIM, and those seeking greater BIM adoption need to
■ North America (research published in 2009
consider owner education and outreach essential.
and 2012). Please note that unless otherwise
Overall, the study demonstrates that the construction
noted, references to North America refer to the
market in Australia and New Zealand is poised for greater
2012 study.
engagement and investment in BIM, similar to the North
■ South Korea (research published in 2012)
American market in 2009. All players in this industry need
to recognize the potential for an increasing shift to BIM in BY PROJECT TYPE
the next few years and to determine the best way for their Throughout the study, there were significant
companies to capitalize on this sea change. differences for those working primarily on
building projects compared with those working
primarily on infrastructure/industrial projects.
Those differences are noted when significant.
New Zealand is engaging with BIM in a variety of ways A/E firms represent the largest portion of the users that
and finding many valuable benefits. are only authoring models, as well as the largest portion
of those that are both authoring and working with
Definition of Involvement With BIM others’ models.
For the purposes of this research, a company does not
CONTRACTORS
have to be generating (authoring) models in order to be
Contractors dominate the group that is only working
considered to be engaged with BIM. Engagement can
with third-party models, reinforcing that model
mean that the company is working with models gener-
generation is still primarily concentrated among the
ated by one or more other project team members for
design professionals.
valuable activities such as spatial coordination (also
■ Among the contractors that are generating models,
known as clash detection), quantity take-offs, project
over half are using internal resources versus
sequencing or constructability evaluation. It can also
outsourcing.
mean that a company’s work is being modeled by other
■ Less than one-third of contractors are either demand-
parties but that those models end up benefitting the
ing models from trade contractors or receiving models
company and the greater project team.
from them without having to demand.
Once BIM is introduced on a project, many of the
■ Only about a quarter of construction companies using
companies involved on that project typically will engage
BIM are doing so because of a demand by an owner,
in some meaningful way with either the digital version of
indicating that their BIM growth is being driven primar-
the design or with models developed by builders, fabrica-
ily by internally generated interest.
tors and installers that guide their processes. The critical
distinction for BIM involvement is that the company is TRADE CONTRACTORS
not relying exclusively on CAD-generated documents ■ Trade contractors report receiving models from design
on all of its projects. The non-user analysis in this report professionals about half the time.
reflects those that are exclusively relying on CAD (see ■ Twenty-five percent of the trade contractors that
pages 41 through 48). develop models report that they are the only trade
contractor to do so on their projects.
BIM Involvement in Australia and
New Zealand Variation by Firm Size
Common trends among all the BIM users surveyed in this Companies with a high level of BIM involvement, both
research include: those that author their own models and those that primar-
■ Almost two-thirds (64%) are both authoring models ily work with others’ models, tend to be larger operations,
and working with models from other parties. such as large contractors and medium or large A/E firms.
■ Smaller groups are either only authoring models (19%) Conversely, those not engaged with BIM tend to be
or only working with models authored by others (17%). smaller companies.
Companies typically deepen their level of engagement Current and Forecasted BIM
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
with BIM as their experience and skill levels increase. This Implementation Levels
engagement is most easily identified by a company’s (According to Country/Region)
BIM implementation level, meaning the percentage Source: McGraw Hill Construction, 2013
1_3_A4_#02.eps
Future BIM Implementation
Two year forecasts by users show dramatic
increases in BIM implementation, indicating an
enthusiastic commitment.
■ 77% of A/E firms and 66% of contractors believe that
The chart shows BIM implementation in Australia and Australia and New Zealand anticipate being at a light
New Zealand compared with recent research in North level of implementation in two years (end of 2015), and
America and South Korea. In all cases BIM users were almost three quarters (74%) believe that they will be in
asked to report their current BIM implementation level the heavy or very heavy categories.
and also to forecast the level where they believed their ■ North America, the most mature BIM market among
company would be two years in the future. the three, shows continuing commitment with a
Users at all current levels of implementation in each forecast that 58% of current BIM users will be at the
of the three regions forecast strong increases in their very heavy level of implementation by the end of 2014,
application of BIM. and only 6% will remain light users.
Although there is no globally accepted standard by Regional Variances and Trends in BIM
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
classify themselves as experts compared with contrac- 18% 13% 18% 15%
tors (6%).
■ Conversely, two-thirds (65%) of contractor users 10%
32% 27%
consider themselves to have beginner or moderate skill
36%
levels, versus less than half of A/E respondents (47%).
43%
Variation by Country/Region
Expertise levels are also a useful way to compare regional 36%
38%
BIM activity and engagement. The chart shows the 33%
reported levels of BIM expertise in Australia and New
Zealand, along with recent (2012) SmartMarket Report 28%
17% 22%
research on North America and South Korea and, for 13%
trending analysis, the results from the 2009 study in
North America. South Australia & North North
Korea New Zealand America America
■ The difference between 2009 and 2012 in North
(2012) (2013) (2012) (2009)
America indicates that BIM expertise advances rela-
tively slowly, with only a small (3%) increase in the
expert tier. Meanwhile, the advanced tier grew by one-
third, likely reflecting beginner and moderate users
1_4_A5_#03.eps
moving to the next respective levels while new entrants
replaced many of the beginners.
■ As the newest region to embrace BIM, South Korea
As more companies engage with BIM, the value of Importance of BIM Capability
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
having other team members with BIM experience Source: McGraw Hill Construction, 2013
firms with BIM expertise improves project outcomes Reduces Cost 47%
and increases quality. Reduces Overall Project Duration
35%
■ Almost half see that project team members with BIM
Increases Profit 45%
expertise increase innovation (47%) and reduce overall
Reduces Cost 32%
project duration (45%).
■ Fewer see direct financial benefits in which having 35%
project team members with BIM expertise either Increases Profit
reduces cost (35%) or increases the profitability of their 32%
1_1_A2_#02.eps
organization (32%).
1_1_A2_#02.eps
As BIM use expands and project teams engage more Trade Contractor Proficiency in BIM
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
fully in activities like spatial coordination, fabrication- Source: McGraw Hill Construction, 2013
Another useful measure of BIM engagement is the Regional Variances in Years of Experience
number of years that a user has been involved with BIM. Using BIM (According to Country/Region)
The chart compares BIM users in Australia and New Source: McGraw Hill Construction, 2013
Since the 2012 Business Value of BIM in North America BIM Engagement Index Weighting System
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
SmartMarket Report, McGraw Hill Construction has Source: McGraw Hill Construction, 2013
B
IM provides the greatest be trusted to be accurate and will Master Builders
benefit to a project when maintain the integrity of the shared Association (MBA) of
the largest number of team models. The standard has been wel- Victoria
members is engaged with comed by industry, with over $5 Radley de Silva, chief executive offi-
it. This is especially true for trade billion of construction projects cur- cer of the MBA, believes that BIM has
(specialty) contractors because rently using it, according to AMCA. the potential for a number of positive
they are the companies that imple- Sumit Oberoi, executive direc- transformations for all contractors,
ment the modeled work in the field. tor of AMCA, cites several impacts among which he cites “improved
Although not traditionally seen as of the BIM-MEPAUS initiative. “BIM visualization of the project, increased
aggressive adopters of new technol- is the platform for construction coordination of subcontractors and
ogies, trade contractors around the innovation,” he states. “Mechani- construction documentation, esti-
world are rapidly getting involved cal contractors recognize that it is mating and tendering efficiencies,
with BIM because of the immedi- the e-commerce of the construction less defects and less costs—just to
ate benefits that are relevant to their industry, where everything from name a few.”
business success, such as reduced estimating, documenting, fabricat- He acknowledges that “adapting
rework, the ability to accurately pre- ing, supply chain management and to change does not happen quickly
fabricate from models and improved equipment purchase can be neatly in our industry. Perceived costs and
labor productivity, safety and site defined through established rela- related benefits are the key, as well
logistics. Also, trade contractors with tionships and translated into a BIM as overcoming their ‘comfort’ with
BIM capabilities report seeing pos- workflow. AMCA members have existing systems in place.” Even
itive impacts on winning new work moved beyond piloting a design- though “usage of BIM technology is
and offering new services due to to-fabrication workflow into a con- very much in its early stages” among
their use of BIM. Thus it is not surpris- structible model and have adopted his members, de Silva also perceives
ing that organizations are focused on the use of robotic site layout and that “there is an increasing level of
engaging trade contractors with BIM. field BIM technology. BIM-MEPAUS is interest among those companies
providing direction and clarity to our that have not adopted BIM technol-
AMCA BIM-MEPAUS industry by enabling practical appli- ogy.” He states, “the Master Build-
Standard Initiative cation of standards, solutions, tools ers [Association] is actively watching
BIM-MEPAUS is an important stan- and workflows.” developments in the BIM space and
dard being developed by the Air Oberoi believes that owners may is playing a role in keeping the indus-
Conditioning and Mechanical Con- prove to be an important driver for try informed through our events and
tractors’ Association (AMCA) to facil- BIM adoption for trades. He says, publications. In addition, we are lob-
itate the exchange of design models “Most new large projects are being bying government to take the lead in
and information. It involves estab- specified now for BIM implementa- this area.”
lishing a common and practical set of tion and delivery of an as-built BIM More information on the AMCA
mechanical, electrical and plumbing model, progressing from 3D CAD to BIM-MEPAUS standard initiative and
(MEP) protocols—standards, specifi- full BIM.” If that becomes common- the MBA’s efforts are available at
cations, practices, models of compo- place, it will certainly require mod- http://www.bimmepaus.com.au and
nents and assemblies and workflow eled content from the trades that http://www.mbav.com.au. n
guidelines—that ensure that the data reflects interaction with suppliers
being shared between parties can and manufacturers.
BIM is poised to be an essential part of the estimated $40 billion rebuilding effort
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND
for Christchurch, New Zealand, and the Canterbury region. This massive effort
is likely to increase exposure to BIM in the New Zealand construction industry,
but the race to get work underway may undermine the use of BIM initially.
W
ork is just starting on contractors have as much access project, also sees slow adoption
the massive rebuild- to skills and technology as they can of BIM up to this point in the New
ing effort in the city possibly get.” Zealand market, but that has not
of Christchurch and prevented his firm from capitalizing
the region of Canterbury after the Opportunities and on BIM. He says, “We are working
devastating earthquake of February Immediate Benefits with companies that have no BIM
2011 and its serious aftershocks that According to Kane, “Christchurch experience, but we still see benefit
wreaked havoc in the area. It is likely provides an obvious opportunity in ‘lonely BIM.’ There is still benefit in
that this massive effort, which may to use [BIM] technology in a con- passing 3D information downstream
take as long as 10 years, will encour- strained environment, which is to fabricators and contractors,
age wider BIM use in New Zealand, where it could potentially be most as well as the ability to quickly
but currently, in the early stages, it beneficial.” He regards the very scale schedule materials.”
also poses unique challenges. of the work to be done in this region
as a key driver to improving the pro- Challenges
Improving Productivity ductivity of the industry: “We know Kane also notes a few challenges to
at Christchurch how much work [clients] want to put wider BIM use.The escalating cost of
Chris Kane, manager at the Produc- in place, but we also know that the doing work is driving owners to seek
tivity Partnership, sees the potential sector isn’t capable of delivering it as to start their projects as soon as possi-
and the challenges at Christchurch it currently stands.” ble. Kane states, “When you are rush-
through the lens of the ongoing Kane highlights the benefits of ing to get things started so that you
efforts that his government-run orga- cost savings that BIM can provide as can beat the tide, you are not likely to
nization has been making to help critical: “There is $40 billion worth take the time required to go outside
improve productivity in New Zea- of work to be put in, so even if you your traditional approach.”
land’s construction sector since 2010. manage to get to savings of 10%, However, Brian Clayton, partner at
Kane describes how his organiza- that is well worth chasing from the Chapman Tripp, a major construction
tion is taking two major roles in the perspective of government, so the law firm in New Zealand, believes
rebuilding efforts: “One is around opportunities are obviously around that the rush for work is creating a
providing information to clients time saving, greater certainty when it contractors’ market, which will lead
about how they might best manage comes to delivery schedules, quality, owners seeking to get large volumes
their investment. We do that by col- taking less resources to build a build- of work underway to consider using
lecting information from all of the ing, less waste, less downtime.” an Early Contractor Involvement
major construction clients and put- One strategy that the Partnership (ECI) procurement method. He says,
ting together a very scary forward has undertaken to encourage use of “The design is not that far advanced
projection of workloads. When we BIM is creating a BIM Handbook to on a number of projects...because of
share that with the clients, they begin educate the industry, as well as a cli- the fast track nature of getting these
to understand why they are find- ent’s implementation guide for BIM. projects up and running. As a result,
ing it difficult to get contractors to Glenn Jowett, senior structural [owners] may get the contractors in
respond to tenders, why prices have designer at BECA, a design firm earlier to help develop a design and
gone from $2,300 per square meters engaged in a wide range of projects develop up-pricing.” He believes
prior to the quake to $3,800 now.... in the rebuilding efforts, including that this collaborative approach will
The other [role] is making sure that the $130 million Burwood Hospital encourage wider use of BIM. n
W
ith over 20% of the Laing O’Rourke, one of the world’s partners in Thailand, which included
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND
world’s iron ore, West- largest privately owned engineering integrated transport and lifting steel
ern Australia has been and construction companies, is for safe and efficient installation
experiencing an iron responsible for supply, fabrication, when the assemblies reached the
ore mining boom since the early delivery and installation of the site. The 3D model was integral for
2000s. Cape Lambert is one of the structural, mechanical and piping the coordination of steel placement
seaports actively used for export- works needed for the port’s mission- for clash avoidance of secondary
ing iron ore from Rio Tinto’s mining critical in-loading and out-loading steel members and understanding
operations in the Pilbara region. To conveyors and its massive ore the safest and most efficient way of
support its forecast for continued transfer towers. removing temporary steel once the
growth, Rio Tinto has created a new module was in place onsite.
iron ore port facility known as Cape Leveraging BIM to Ryan King, structural design
Lambert Port B, located alongside Drive Fabrication engineer on the Laing O’Rourke
the existing Cape Lambert port. In line with its Design for Manufac- team, says the powerful
As one of the largest resource proj- ture and Assembly (DfMA) initiative, visualization enabled through
ects ever undertaken in Australia, an Laing O’Rourke is heavily leverag- the digital engineering models
important objective was to signif- ing BIM in the process of fabricating allowed the team to “adopt an
icantly expand the Cape’s iron ore approximately 3,500 tons of struc- iterative design process with a
export capacity, from 86 million to tural steel. Using the client’s 3D focus on eradicating many potential
139 million tons per annum. All three models, Laing O’Rourke applied its fabrication and construction issues
Rio Tinto ports in the Pilbara are own engineering expertise and vir- before they arose; thus leading to
expected to achieve a base run rate tual coordination skills to drive fabri- more holistic design solutions.”
of 290 million tons by mid-2014. cation of large pre-assemblies by its
Innovative Use of
BIM for Industrial/
Infrastructure Projects
Laing O’Rourke is making many
unique and valuable uses of digi-
tal engineering models and model-
derived data on this large and
complex project, significantly
advancing the state of the art for
industrial/infrastructure BIM.
Among these innovations are:
■ Laing O’Rourke’s site-based team
CONTINUED
TI
N
CO
Each user engages BIM in a way particular to their role Experience of Business Value from BIM
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
on a project, company objectives and personal view of Source: McGraw Hill Construction, 2013
its potential for process improvement and innovation. We're getting everything
The chart shows how much value users find that they are out of BIM that we believe
receiving from BIM. it can provide for us.
■ The majority (52%) feel that there is much more to 7%
be gained, which demonstrates that users see great We're getting a lot of value from BIM
potential for BIM. but feel there is more to be gained.
■ Only 2% believe that they are receiving no meaningful
52%
value from BIM, reinforcing the positive position
We're just scratching the surface of
of the majority. how much value BIM can provide for us.
39%
Variation by Firm Type
Consistent with findings from other McGraw Hill We're getting no meaningful value
Construction BIM research, A/E firms generally are from BIM.
more advanced in their use of BIM than contractors are 2%
because, in most cases, A/E firms started using it earlier.
As a result, although the individual disciplines respond-
ing to the question of how much value they receive from
BIM were generally aligned in their views, a few excep- 2_1_B1_#02.eps
tions emerged between A/E and contractor respondents.
■ Over half (58%) of contractors feel that they are only
McGraw Hill Construction’s BIM research consistently Short-Term BIM Benefits (By Percentage of Users
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
focuses on the business benefits being received by users, Experiencing Benefit at a High/Very High Level)
both internally (where they provide value directly to the Source: McGraw Hill Construction, 2013
company involved with BIM) and externally (where they Reduced Errors and Omissions
contribute to improving the overall process of designing,
45%
building and operating a project).
When analyzing BIM benefits, McGraw Hill Construc- Enhancement of Organization’s
Image as an Industry Leader
tion differentiates between:
■ Short-term benefits of BIM that a company can begin to 38%
enjoy on its first BIM projects Reducing Rework
■ Long-term benefits of BIM that require completion of a
28%
number of projects before they become reliably apparent
Ability to Work Collaboratively
The two charts show the percentage of BIM users in 27%
Australia and New Zealand who reported that they are
experiencing the specific short- and long-term benefits at Offering New Services
a significant (either high or very high) level. 22%
ing new services and marketing new business—are Faster Client Approval Cycles
enjoyed by about one fifth of users. 6%
reducing the overall project duration. Comparisons of Top Five BIM Benefits
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
For benefits that generate business development Among Regions (By Percentage of Users
opportunities, more buildings-related companies report Experiencing Benefit at a High or Very High Level)
that they are finding BIM helps them with marketing new Source: McGraw Hill Construction, 2013
BIM users in Australia and New Zealand rated a variety of Factors Most Likely to Increase BIM
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
factors for how each would enhance their benefit of BIM. Benefits for Users (According to Type of Firm)
The chart shows how many users said that a factor would Source: McGraw Hill Construction, 2013
2_5_B3_#01.eps
McGraw Hill Construction 21 www.construction.com SmartMarket Report
BIM Use and Value—Benefits
Factors That Impact BIM Benefits CONTINUED
reflecting the tangible benefits that contractors are Top Five Factors With Greatest Differences Between
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
increasingly receiving from BIM. Australia & New Zealand and North America
■ Further reinforcing the importance of model author- Source: McGraw Hill Construction, 2013
ing for design professionals, 33% of A/E users want Australia & New Zealand (2013)
more readily available outsourced modeling services, North America (2009)
compared with only 14% of contractors. North America (2012)
closely with North America in 2009. In the interim, more MORE FIRMS WITH BIM USERS
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
owners have developed BIM execution programs, the The natural evolution of BIM in Australia and New Zealand
BIMForum has advanced the LOD (Level of Development) will create more opportunities for current non-user compa-
standard, and many firms have settled on reliable nies to get engaged with BIM projects. Comparatively, in
routines for exchange of BIM information during projects. 2009, architects were the dominant users of BIM in North
America. However, based on the adoption trends identified
MORE BIM CONTRACTS
in McGraw Hill Construction’s BIM research that year, 2010
Industry organizations in North America, such as the
was predicted to be the “Year of the Contractor” in BIM.
American Institute of Architects (AIA) and the Associ-
Indeed, although architects continued to come on board,
ated General Contractors of America (AGC), as well as
aggressive adoption by both general and trade contractors
numerous owners, have developed agreements specif-
swelled their numbers dramatically, ultimately resulting
ically tailored to supporting BIM processes. In addition,
in contractors exceeding the adoption level of architects in
Penn State University and several public owners have
the next (2012) study, reaching 74%.
created BIM execution guides that are widely available
A similar expansion of BIM capabilities is likely in
for project teams to adapt to their needs. Organizations in
Australia and New Zealand. As BIM projects proliferate,
Australia and New Zealand are working on a number of
trade organizations, such as AMCA and Consult
initiatives and standards programs that will make it easier
Australia, provide BIM guidance and encouragement to
for project teams to take more advantage of integrated
their members, and consulting firms, such as CSI Global
BIM processes and reduce this demand for BIM contracts.
Services, support training and continued development
(See page 51 for more information.)
within the companies that have adopted BIM.
Green building and BIM are two powerful construction Use of BIM to Enhance Project Sustainability
industry trends that are increasingly aligned as both (By Firm Type)
continue to gain traction globally. BIM users in Australia Source: McGraw Hill Construction, 2013
on an AustralianTower Project
1 Bligh Street
SYDNEY, AUSTRALIA
1
Bligh Street is a stunning tower along with the firm ingenhoven
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND
Thanks to a comprehensive BIM program and buy-in from all disciplines, 1 Bligh cal basement ramps was refined
Street’s double-skin façade design changed remarkably little from design to through clash detection to allow for
construction.
CONTINUED
TI
N
CO
This resulted in smaller plant rooms ity and performance aspects of the
and less excavation of the sandstone building, to improve the construc-
beneath the building. tion process and to provide a plat-
Sprinkler pipework was form for the management of the
coordinated so that, in the facility,” Perey says. “I have checked
basements, it could run in sleeves with various members of the design
through the beams—resulting in team, and they cannot think of a
a much cleaner appearance and single instance of a compromise to
eliminating hundreds of elbows the original design intent that was
and pipe cuts. Washrooms were made on the project. In at least one
assembled from prefabricated case, it actually went the other way:
modules that were manufactured Atrium glass walls and balustrades
offsite. From the commencement of that were initially designed as fac-
construction through to completion, eted were changed to curved during
more than 10,000 clashes were construction, when the curved glass
resolved though clash-detection and was found to offer better strength at
coordination processes. a given thickness.” ■
The building’s floor plans are oval,
with the long axis running south-
Project Facts
st
west to northeast. This orienta-
a
ts
tion places the office spaces on the and Figures
northwest and gives the upper floors Owner/Partnership
spectacular views of Sydney Harbor. DEXUS Property Group, DEXUS
Wholesale Property Fund and
The building changed remarkably
Cbus Property
little from its conceptual design
Architectus + ingenhoven’s design for Architects
to its completion in 2011. A multi- 1 Bligh Street allowed fully daylit office Architectus + ingenhoven
tude of considerations—including spaces, cyclical airflow and MEP equip- architects
sustainability, urban design, those ment concentrated mainly on the lower Contractor
views, the commercial position- floors of the structure. Grocon
ing of the office tower and tenant Type of Project
requirements—produced a design of Developer Commitment High-rise office building
Da Vinci–like simplicity. Developer DEXUS Property Group, Size
”It is the strength of the ini- Sydney, was committed to the six- 42,700 sq. metres over 28 stories
tial design in resolving these fac- star Green Star rating as well as the Completed
tors that has allowed the design to premium positioning of the tower July 2011
evolve and continue to be refined in the Sydney commercial office
Green Designations
without moving far from the sche- market. Perey says that while having ■ 6 Star Green Star Office Design
matic proposal,” Perey says. “One of the integrated team working together v2 Certified Rating
the values of BIM has been to allow in a BIM process was the enabling
6 Star Green Star Office As-
Photo © Ingenhoven Architects + Architectus
■
us to understand the complexity of factor, the project would have never
Built v2 Certified Rating
the geometry in 3D, resolve the junc- been able to achieve its ambitious
■ Designed to achieve 5-Star
tions of elements and constructabil- design and sustainability goals with- NABERS (National Austra-
ity issues and communicate that to out such a committed client. lian Built Environment Rating
the teams assembling the building. “They had a genuine desire to System) Energy Rating
So the vision didn’t change, but BIM future-proof the building as far as
allowed us to resolve the details.” possible, and BIM was part of that
Although there is no single widely accepted method for Perceived ROI for BIM
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
calculating a company’s return on its investments (ROI) Source: McGraw Hill Construction, 2013
24% 22%
Perceived ROI for BIM in Australia and
New Zealand
A/E and contractor users are about equally divided across
the three tiers, with contractors having slightly more pres-
ence in the moderately positive group and A/E users in A/E Firms Contractors
the very positive ROI group.This is likely due to the longer
period of time that design professionals have been engaged
with BIM, thereby having amortized more of the initial costs Impact of Project Types on Perception of ROI
and found the efficiencies that generate the payback.
55%
However, a dramatic difference in ROI appears among
companies that are primarily focused on infrastructure and
industrial work as opposed to those in the buildings sector. 40% 39%
■ Almost half (55%) of infrastructure companies report a 30% 30%
very positive ROI versus only 30% of buildings firms.
■ About a third (30%) of buildings firms are in the nega-
are also in the very positive ROI tier, clearly enjoying 10%
powerful benefits of BIM across the wide array of proj-
ects where they are deploying it. Although 22% are in
the negative or break-even tier, only 4% of those are LOW Implementation VERY HIGH Implementation
actually reporting a negative ROI, with the remaining (Less Than 15% BIM (More Than 60% BIM
Projects) Projects)
18% showing break-even status.
Only 10% of low implementation users have a very Perception of ROI by Contractors,
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
■
positive ROI, and well over one-third (38%) are in Architects and Engineers in Three Regions
the negative or break-even tier, split evenly between Source: McGraw Hill Construction, 2013
Zealand (8%) perceive themselves to be at negative ROI Negative or Moderately Very Positive
Break-Even Positive
than in North America (18%), and fewer also believe that
they are at break-even (17% and 20%, respectively).
The ROI results from architects show a different North America, however, still outnumber contractors
distribution pattern than contractors. for very positive ROI.
■ The negative or break-even tier displays a similar
ENGINEERS
pattern to that of the contractors, although the percent-
Engineers show yet another distinct pattern representing
ages are larger across the board. This highlights the
the challenges and opportunities they are engaged with.
ongoing challenge faced by architects to justify continu-
■ In North America, the perceived ROI for engineers
ing investments required for BIM. The call by architects
declined between 2009 and 2012, with 63% of these
and engineers for more hard data demonstrating the
firms now in the negative or break-even tier. Chal-
value of BIM in their ratings of factors that will increase
lenges of supporting multiple architects with different
BIM value (see page 21) underscores this point.
BIM platforms, working with relatively less mature BIM
■ Though still capturing the majority of users, the moder-
functionality and content, needing to provide more fully
ately positive ROI tier is not the dominant category as it
developed design solutions earlier in the process and
is with contractors. This is especially true among North
frequently being engaged in detailed virtual coordina-
American firms where larger companies that have been
tion all combine to suppress their ROI.
using BIM for a longer time are generating greater value,
■ Engineers from Australia and New Zealand and from
and smaller firms and newer entrants are more chal-
South Korea both express a more positive perception
lenged to defray and amortize the ongoing investment.
of their ROI, although their numbers in the very positive
■ South Korean architects express concern that their
tier are the lowest among all company types.
fees are not in line with the work required by BIM, espe-
cially early in the project process. This is reflected in
the large number that are in the lowest tier (42%) and
the small number in the very positive group (17%).
Many firms regularly measure ROI of BIM at a project How Frequently BIM Users Formally
level. Among the BIM users surveyed for this research: Measure ROI on Projects
■ Two-thirds (65%) of users in Australia and New Zealand
Source: McGraw Hill Construction, 2013
Companies that measure ROI are about equally split Formal Measurement of ROI by BIM
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
among those doing it less than a year, those doing it for Implementation Level
one to two years and those that have been doing it for Source: McGraw Hill Construction, 2013
BIM users deploy a variety of metrics to track ROI. Five of Important Metrics for Formal ROI
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
the leading metrics used by A/E users and contractors in Measurement (By Company Type)
Australia and New Zealand are shown in the chart, indi- Source: McGraw Hill Construction, 2013
Internal Benefits
Variation by Type of Firm 87%
It is natural that the metrics related to project process and
58%
outcomes (financial, schedule, safety and process) are
rated more highly by contractors than A/E users because Safety Metrics
of the contractors’ responsibility for project execution. 84%
Within that group, small contractors (annual revenue of 58%
less than $5 million) show much higher-than-average
interest in all five metrics types.
In addition, 87% of all contractors are heavily focused
on internal benefits, compared with only 58% of A/E users. 3_7_C3_#02.eps
This finding is surprising in that these benefits are equally Importance of Metrics
available to both company types. Further research is called (According to All Users and Small Contractors)
for to determine the metrics favored by A/E firms, which Source: McGraw Hill Construction, 2013
3_8_C3_Table_#03.eps
Users have varying opinions about the degree to which Top Benefits That Would Contribute to
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
improvements in specific benefits would positively Improving BIM ROI (According to Type of Firm)
impact their ROI. Increasing BIM’s ability to improve Source: McGraw Hill Construction, 2013
Variation by Country/Region
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
BIM in Mining
W
ithin Australia’s tech- you could see on the model where be even further savings because
nologically advanced you’d have to shut some [of the facil- contractors will get more accurate
mining industry, the ities] down,” he says. “On one part, information and can offer a cheaper
adoption of BIM by we had to build over top of a building price,” Biggs adds.
engineering and construction firms is for the materials handling system.
starting to make inroads. That was very useful to explain the Value for Owners
The 3D aspects of modeling have plan to the clients.” Mark Long, senior project manager
been in use at mines for more than in mining at AECOM, says proving
a decade. Western Australia–based Operations and BIM’s value to clients is key
PDC, for example, used 3D modeling Maintenance to future adoption. “It will take
on a mining project for BHP Billiton in While modeling the information, engineering companies showing
North Queensland in 2002. However, GHD is also able to provide 6D infor- miners that they can save time and
in recent years, firms have started mation that could be used during rework by using a particular set of
to push the “information” aspect of future operations and maintenance. tools,” he says.
modeling, in an effort to leverage 4D, “[Clients] tend to want a lot of infor- One strategy that AECOM is
5D and 6D capabilities. mation on the process system, like developing is the ability to create
tons per hour and flow rates,” Biggs standardized and modularized
The Big Picture says. “Plus, they can click on a com- elements using BIM on projects for
Warwick Biggs, the materials han- ponent, and it will provide the infor- owners with multiple assets.
dling service line leader at GHD, says mation they need for maintenance.” “You could standardize all of the
that, while a few specific elements of Biggs sees multiple benefits for conveyors, the process buildings
a mine might have been modeled in owners. Although additional time and other elements,” Long says.
the past, all elements of a mine can is dedicated up front for additional “Then as these develop, you have
be modeled today, from geotechni- modeling, he says that design- a library of information that you
cal aspects to physical infrastructure, ers save time in the end. “Most [cli- can use for the next mine. If you
like conveyors, piping and buildings. ents] want you to do a review at 20% then tie that into a manufacturing
Biggs says that by combining all design, 50% and 70%,” he says. “In facility, they would already have
elements of a mining project, the the past, you used to stop and pro- that information in their machine
team can do more through analy- duce hundreds of 2D drawings for a shop, and they just push the button
sis that takes into account how each couple of weeks before each design to produce it. It would mean that
affects the other. In some cases, this review. After the review, we would all you’d have to do is adjust for
could be clash detection. In others, take a few weeks to input all of the geotechnical factors. The speed of
it could help find more efficient or changes. Now our models are live, so the design and development could
safer solutions. Biggs notes that this we can take that into a meeting and be 60% to 150% quicker.”
can be particularly helpful when capture the comments right there.” Long adds that by standardizing
expanding an existing plant. On one He estimates that the design team elements of a mine, an owner could
expansion project, GHD was able to saves roughly 10% on the schedule with optimize its workforce by creating
show a 4D animation of the effects BIM and that the construction team familiarity in one mine to the next.
that construction would have on saves up to 20% on the schedule due to This could improve productivity as
existing operations. reduction in errors and rework. well as safety. n
“Because it was a brownfield site, “As it goes forward, there will
T
he largest test of building Furthermore, Penn says that the analysis and documentation to
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND
information modeling (BIM) project’s tight program—which calls meet specific needs. By bringing
capabilities in Australia for two years of design and two years the models together, larger issues
is underway at the $1.85 of installation—would not be possi- can be explored, such as 3D clash
billion new Royal Adelaide Hospital ble without BIM. coordination of trade contractors.
(nRAH). To deliver the 260,000-sq-ft, “It was decided that we needed Nicholas Hagop of CDC Plumbing,
800-bed replacement facility in 2016, to embrace BIM to bring a faster, which is providing hydraulic services,
the team employed a broad-ranging smarter and better way of work- says that his team started using BIM
BIM execution plan that spans ing,” Penn says. “If we didn’t have for the first time on the nRAH project
from the design phases through to BIM, we would have needed twice as and quickly saw the benefits. “We’ve
operations and maintenance. many resources on the documenta- already encountered that, had it not
The plan was born out of both tion side.” been for an accurate model, one
necessity and altruism, says Chris [contractor’s installed work] would
Penn, BIM manager with HYLC, a Contractors and run into another pretty quickly,”
joint venture of Hansen Yuncken and Coordination he says. “That enabled us to find
Leighton Contractors. The project’s The HYLC joint-venture [clashes] before they happened in
BIM requirements will introduce team includes more than 65 real life.”
numerous Australian firms to the subcontractors and consultants, Using a third party to model
emerging capabilities of BIM—with with more than 200 people working its work, CDC Plumbing is able
several firms using BIM for the first simultaneously on the design. The to identify its work to the level of
time. The team implemented the new project is split into 19 sectors with plumbing fixtures and fittings. The
Australian and New Zealand Revit each sector acting “as a project of firm also required its suppliers to
Standards on the project, which aims its own,” Penn says. All models are provide the families that would be
to create a common framework for brought together into a federated needed to populate its models. “The
users and establish common families model to provide a project-wide suppliers will benefit from this, and
that can be used on projects through view. Under this plan, the models we benefit from this,” Hagop says.
the country (see related article on offer both trade-specific and team- “Once they create a family, they can
page 51). “This will drive the use of wide advantages. Each consultant then provide that to other people
BIM by the industry in South Australia,” and contractor can model its own who come to them [for materials].”
Penn says. scope, carrying out any necessary
Prefabrication and
Modularization
Image courtesy of HYLC, a joint venture of Hansen Yuncken and Leighton Contractors
TI
N
CO
st
at
Quality Management and Figures
s
For part of its overall management Operations and Joint Venture
strategy, the team developed the Maintenance Hansen Yuncken and Leighton
Single Point of Truth nRAH Informa- The team is also developing 6D Contractors
tion Centre (SPOTNIC) system. The models for operations and mainte- Type of Project
system incorporates 3D BIM models nance. Hagop notes that the BIM fam- Hospital
with QA management, document ilies provided by its suppliers include Project Budget
management and reporting. BIM pertinent information for facilities $1.85 billion
models can also be accessed via field management, such as part numbers Size
tablets, which the team claims is the and warranty information. 24,000 square meters over nine
first use of such a method in Austra- Penn says that design-construc- levels
lia. This system can be used by team tion teams and facilities managers Anticipated Completion
members in the field during design, are both investigating how BIM infor- 2016
construction and commissioning. mation can be used to support oper-
The project team is also testing ations and maintenance functions. BIM Usage
Image courtesy of HYLC, a joint venture of Hansen Yuncken and Leighton Contractors
4D and 5D BIM capabilities on the He notes that most facilities manag- BIM and related tools will be
job. Although 4D and 5D were ers currently use systems that don’t leveraged to aid in:
excluded from the original execution accept BIM data, but as owners begin ■ Visualization
plan, it was added in a revised to recognize the value, they will come ■ Coordination and clash
plan. The team is now using BIM- to expect that capability from man- detection
related software for model-based agement software.
■ Prefabrication and
scheduling exercises. Some use of In the case of the nRAH, Penn says modularization
5D for cost estimating is running that he is looking at the big-picture
in conjunction with the traditional potential.The project is being built ■ Scheduling
approach. Penn says that because under a public-private partnership ■ Cost estimating
so many team members needed to with a long-term interest in future ■ Quality management
get up to speed on BIM early in the operations. He says, “[Facilities ser-
■ Operations and maintenance
process, much of the cost-estimating vices firm] Spotless will be operat-
work was completed before BIM ing this hospital for 30 years, and
was implemented. we want to help them do that.”■
BIM programs require ongoing investments in hardware, BIM Investments Planned by Users
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
been tracking the categories of BIM users’ investment Australia & New Zealand (2013)
across several regions since 2007. North America (2012)
South Korea (2012)
Variation by Country/Region
Developing Internal BIM Procedures
Users were asked what level of investment that they are
planning to make in each of eight categories over the 58%
next two years. The chart shows the percentage of users 47%
rating each one either high or very high. 83%
■ Investment Plans in South Korea: The large number of
Developing BIM Processes With External Parties
South Korean users expressing high or very high intent
47%
to make these investments reflects both the relatively
54%
early stage of BIM engagement there and the aggres-
83%
sive growth path that users are on.
■ BIM Processes: All regions place a high priority on inter- Developing Custom 3D Libraries
nal and external BIM processes. The preference shown 47%
in North America for external over internal processes 32%
(54% to 47%) reflects the growing focus on integrated
69%
practices throughout the project team. In fact, this cate-
gory jumped to its highest level (from 33% to 54%) in New/Upgraded Desktop Machines
the most recent North American research. This trend is 43%
likely to repeat in Australia and New Zealand as users 39%
standardize internal procedures and shift focus to opti- 67%
mizing team use of models.
■ 3D Libraries: The need for custom 3D libraries is felt
Software Customization/Interoperability Solutions
has been trending down in North America from a high BIM Software
of 48% in 2009 to the 40% forecast level shown in the 37%
chart. The opposite trend is true, though, for software 40%
customization and interoperability solutions, which 63%
jumped from a 2009 level of 25% to the 38% forecast
shown here. This countertrend will probably take hold New/Upgraded Tablets/Mobile Devices
in Australia and New Zealand, and also in South Korea, 30%
once the initial first investment wave has completed. 39%
67%
4_1_D1_#03.eps
Length of Time Using Number of Years Contractors Have Been Using BIM
BIM Source: McGraw Hill Construction, 2013
Australia and New Zealand (ANZ) 1–2 Years 3–5 Years 6 –10 Years 11 or More Years
fall in the middle of the pack in terms
of the duration of BIM experience U.S. & Canada
reported by their users. Key compari- 22% 47% 24% 8%
son points with other regions:
■ The activity in ANZ contrasts Japan & South Korea
sharply with Brazil, which has 23% 63% 12% 2%
begun to adopt BIM much Australia & New Zealand
more recently.
39% 50% 9% 2%
■ The length of BIM use in Japan and
icantly more having used BIM for Expert Advanced Moderate Beginner
more than 10 years. This reveals
markets that are more mature 7% 3% 6% 7%
in BIM use. 18% 18% 10% 17% 13%
27% 35% 25% 15% 28%
26% 32% 20%
BIM Expertise Level 35%
Contractors rated their own 34% 37% 28%
40% 41% 29%
perception of BIM skills by one of 46% 42%
36%
four categories. Although there is 32% 34% 34% 37%
15% 23% 26%
no universally accepted standard for 10% 10%
BIM expertise, this self-description United Canada Brazil Japan France Germany South United
States Korea Kingdom
is still useful as a way to broadly
assess relative capability differences Australia &
between regions. New Zealand
Similar to their years of experi-
ence with BIM, contractors in ANZ 6_3_G2 Expertise_#01.eps
are about in the middle of the range
of skills assessment globally. Key Contractors’ BIM Implementation by Region (In Order of
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
comparison points on other markets: Percentage of Users at High and Very High Implementation Levels)
■ With its recently announced Source: McGraw Hill Construction, 2013
government mandate for BIM on Low BIM Moderate BIM High BIM Very High BIM
public projects, the UK shows the Implementation Implementation Implementation Implementation
highest number of beginner users, (Less Than 15% (15%–30% (31%–60% (More Than 60%
of Projects of Projects of Projects of Projects
likely because of the surge of users Involve BIM) Involve BIM) Involve BIM) Involve BIM)
realizing that they need to sharpen
their skills in order to comply with United States
requirements. 20% 25% 24% 31%
■ The U.S. and Canada show the
France
most expertise, likely correlated
with their longer use of BIM. 16% 45% 39%
Germany
BIM Implementation 22% 41% 34% 3%
Once companies become engaged
with BIM, an interesting trend to track Australia & New Zealand
over time is the increasing percent- 28% 42% 19% 11%
age of their projects that involve BIM, Canada
also known as a company’s level of
36% 36% 21% 8%
BIM implementation. McGraw Hill
Construction developed four tiers of United Kingdom
BIM implementation and has used 44% 28% 11% 17%
these tiers in its BIM research around
Japan
the world since 2009.
ANZ ranks fourth among regions 27% 47% 27%
for users at high and very high Brazil
implementation levels (i.e., engag- 35% 40% 22% 2%
ing with BIM on more than 30% of
their projects). Key comparisons to South Korea
other regions: 56% 21% 11% 12%
■ Because BIM started in Western
To assess the overall level of BIM (In Order of Percentage of High and Very High Engagement Users)
engagement by users in a region, Source: McGraw Hill Construction, 2013
McGraw Hill Construction developed Low BIM Medium BIM High BIM Very High BIM
a BIM Engagement Index (see page Engagement Engagement Engagement Engagement
13 for the calculation methodology),
which reflects the scope of a user’s United States
level of engagement with BIM. 21% 36% 22% 22%
The relative number of users in a
Canada
given region that populate the vari-
38% 31% 21% 10%
ous tiers is a useful way to compare
regions in terms of overall level of United Kingdom
BIM engagement. 54% 19% 17% 11%
ANZ falls below the midline in terms
of overall BIM engagement level when South Korea
the regions are ranked by the percent- 48% 30% 18% 4%
age of users at high or very high levels. Japan
Comparisons with other regions:
27% 57% 17%
■ The UK scores high in spite of its
6_5_G4a Engagement_#01.eps
The business value of BIM is Specific BIM Benefits at High or Very High Levels Compared
expressed most clearly in the ben- to Lowest and Highest Percent From Other Regions (In Order
efits received by users. In the chart, of Highest Benefits to Australia and New Zealand Contractors)
the regions that rated each benefit Source: McGraw Hill Construction, 2013
Non-users now comprise 29% of firms in North America, 2009 2012 % Change
and they have been hardening their resistance since
McGraw Hill Construction started polling them in 2009. Negative Attitude 13% 30% +131%
Starting that year, the percentage of negative non-users
grew by 131%, while the ranks of neutral and positive Neutral Attitude 43% 33% - 23%
non-users shrank by 23% and 18%, respectively. Where Positive Attitude 44% 36% -18%
only 13% of non-users were negative in 2009, now almost
a third (30%) have adopted that attitude.
As any major technology trend matures, a certain level
of non-adoption is natural and can be expected. Based
4_3_E1_Table_#03.eps
on these trends, a similar pattern is a likely forecast for
Australia and New Zealand in the coming years.
Non-users express a variety of objections and identify a Most Important Reasons for Not
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
number of obstacles preventing them from adopting. The Adopting BIM (According to Non-Users
chart shows the percentage of non-users that rated each by Company Type)
of these reasons either high or very high in impact on Source: McGraw Hill Construction, 2013
Competitive pressure can be a powerful factor in driving Perception of Competitors’ Use of BIM
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
companies to adopt BIM. As an ongoing feature of its BIM (According to Non-Users By Firm Type)
research, McGraw Hill Construction asks non-users for Source: McGraw Hill Construction, 2013
Since BIM is a fairly recent phenomenon, every current Top BIM Benefits That Would Convince
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
BIM user was a non-user at some point and was driven Non-Users to Consider Adopting BIM
to adopt by some set of circumstances or opportunities. (According to Non-Users by Firm Type)
Non-users were asked to rate the relative importance of a Source: McGraw Hill Construction, 2013
aligns with the top reason for not adopting: lack of Improved Budgeting and Cost-
Estimating Capabilities
demand from owners (see page 45).
■ Improved project outcomes (reduced construction 64%
costs and schedule) round out the list, but these are the 67%
least compelling of the top benefits. Reduced Number and Need for
Information Requests
Variation by Country/Region 68%
In general, higher percentages of North American and 58%
South Korean non-users gave top ratings to these bene-
fits than did the non-users in Australia and New Zealand. Reduced Construction Costs
■ Over 20% more non-users in North America and 64%
South Korea feel that owner demand would sway 58%
them to adopt.
Owners Demanding BIM on Their Projects
■ In South Korea, a higher percentage of non-users
68%
would be attracted by the promise of more accurate
construction documentation and improved budgeting/ 50%
cost estimating. Reduced Construction Schedule
■ In North America, benefits of fewer field problems and
50%
50%
4_6_E4a_#01.eps
reduced construction costs would provide a greater Top BIM Benefits That Would Convince
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
incentive than in Australia and New Zealand. Non-Users to Consider Adopting BIM
(According to Non-Users by Type of Project)
Variation by Types of Projects Source: McGraw Hill Construction, 2013
To assess a sense of urgency among non-users, they Importance of BIM in the Next Five Years
were asked how important they believe BIM will be to the (According to Non-Users by Firm Type)
design and construction industry in five years. Source: McGraw-Hill Construction, 2013
perhaps foreshadowing faster growth of BIM adoption No Importance Low Importance Moderate High Very High
Importance Importance Importance
in that segment of the industry.
Non-users cite a variety of obstacles that are standing in Factors Delaying the Decision to Use BIM
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
the way of their adoption of BIM. The chart shows where (According to Non-Users by Type of Firm)
contractors and A/E firms agree and differ on the relative Source: McGraw Hill Construction, 2013
Through an open-ended question, non-users were asked Most Important Factor Encouraging BIM
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
to identify the single most important factor that would Adoption (According to Non-Users)
encourage them to adopt BIM. In keeping with the diverse Source: McGraw Hill Construction, 2013
nature of the design and construction industry, responses If Needed/Required for Job or Client
varied widely. Top categories include: 18%
■ Demand: 20% of non-users would be ready to adopt if
4_10_E7_#02.eps
G
iven the diverse soft- In part, the guide serves as a costly rework.
ware used on construction checklist of project elements that To facilitate the growth of BIM
projects, various indus- should be addressed, not a set of usage among mechanical contrac-
try efforts are under way prescriptive standards that should tors in Australia, the Air Condition-
to guide and standardize use of BIM be followed. ing and Mechanical Contractors’
and related tools. Although the fed- According to NATSPEC, the BIM Association (AMCA) has initiated an
eral governments in Australia and Guide can be used during three ambitious standards initiative called
New Zealand have yet to mandate stages of a project. BIM-MEPAUS. It consists of:
BIM on federal projects, govern- ■■Initial Discussions: As a ■■Practices: To provide documented
ments in other countries, such as framework for discussion and a instructions for the performance of
the United Kingdom, have adopted comprehensive list of items for particular operations and functions
such requirements. Regardless, consideration when deciding the throughout the BIM design process
BIM use is growing in Australia and scope of BIM use. and workflow.
New Zealand, and industry groups ■■Detailed Project Planning: As ■■Specifications: To detail explicit
are working together to establish a a means of documenting mutually sets of requirements to be satisfied
framework to improve adoption. agreed decisions about how BIM is by a design model of plant, equip-
to be implemented. ment and fittings.
NATSPEC ■■Project Execution: As a common ■■Guidelines: To provide information
NATSPEC, a not-for-profit organi- reference to communicate and and options to support the use of
zation focused on national building enact decisions made about BIM other BIM-MEPAUS standards.
specifications in Australia, released implementation to project teams. ■■Models: 3D representations of the
Not only is it important to monitor how much BIM activity Top BIM Activities During Design and
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
is going on in various regions, but it is also useful to track Pre-Construction in Australia and New
the frequency of specific BIM activities. Users in Austra- Zealand
lia and New Zealand were asked to rate how often they Source: McGraw Hill Construction, 2013
Construction
Model-driven layout in the field (50%) and model-driven
prefabrication (40%) are both highly rated construc-
tion-phase BIM activities in Australia and New Zealand.
In addition, these two activities rank first and second
among contractors in nine other global markets surveyed
by McGraw Hill Construction, underlining the global
The use of BIM for project status and progress monitor- Australia and New Zealand
ing is also important both to Australia and New Zealand Source: McGraw Hill Construction, 2013
users and to global users, although there are no regions Model-Driven Layout Onsite
where over half of respondents are doing it at a high or 50%
very high frequency.
Emerging activities at this stage include: Status/Progress Monitoring
■ Augmented reality and laser scanning are emerging 44%
technologies that show enormous potential and are Model-Driven Prefabrication
especially gaining traction with German users (47% and (for Working With Other Companies)
44%, respectively). 40%
■ Supply chain management rates highly with only 20%
Augmented Reality to Visualize Model
of users in Australia and New Zealand, but is more popular and Existing Conditions Together
in both the UK (35%) and Japan (37%), indicating that the
35%
practice may gain more use over time, especially as more
supply-chain members become engaged with BIM. Laser Scanning During Construction
■ Model/GPS control of equipment and onsite robot-
to Confirm That Work Put in Place
Matches Model
ics are still in early stages of use in most markets, although,
29%
among other regions studied, contractors in France (39%)
are leading with equipment and Japan (35%) with robotics. Supply-Chain Management
20%
Post-Construction
Integrating Model With GPS to
Creating as-built models for owners is a high or very high Control Equipment Onsite
frequency BIM activity for 59% of BIM users in Australia
17%
and New Zealand. It also rates highly among contrac-
tors in many other markets, including South Korea (77%), Model-Driven
Robotics Onsite
Japan (73%), UK (67%) and Germany (66%). Clearly, this is
an important trend. 10%
Enhancing an as-built model with maintenance
and operation data is also reported to be a common
post-construction service by over half (54%) of Austra-
4_12_F2_#02.eps
lia and New Zealand BIM users. Contractors in France Top BIM Activities During Post-Construction
(87%), Japan (83%) and Germany (75%) are doing in Australia and New Zealand
this service even more, indicating that users in many Source: McGraw Hill Construction, 2013
regions see its value. Preparing Final Model for Owner That Shows
Forty-one percent of Australia and New Zealand What Was Actually Built
users are frequently managing models for an owner 59%
after construction. This new service opportunity is
Adding Maintenance and Operations
popular with contractors in Japan (77%), France (68%) Data to Model
and Germany (66%), though still relatively rare in the 54%
U.S. (14%).
Leveraging the model for close-out is the least Managing Model for the Owner
Beyond Close-Out
frequently reported post-construction BIM activity
41%
in Australia and New Zealand (36%). This is the same
frequency as in the U.S., but contractors in several other Integrating With Model for Punch List/
regions report much more activity, including Japan Snag List and Close-Out Activities
(90%), Germany (75%) and France (68%). 36%
The ability of contractors to bring the value of BIM to the Technologies Used to Make Models
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
field is one of the big trends happening everywhere that Available to Workers Onsite in Australia and
BIM is being deployed, as revealed clearly in the Informa- New Zealand
tion Mobility SmartMarket Report published in November (According to Contractors Using BIM Either
2013. The chart shows what percentage of contractors in Often or Always)
Australia and New Zealand responded that they are either Source: McGraw Hill Construction, 2013
Another important trend among BIM users is the shift Activities Conducted in the Cloud in
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND DATA
to cloud computing instead of hosting data and applica- Australia and New Zealand
tions locally or on their network servers. These services Source: McGraw Hill Construction, 2013
most active users of cloud capability, with French A/E Firms Contractors
contractors (84%) particularly focused on hosting
models and Germans (78%) accessing software
for projects.
■ Regarding data security, large contractors (83%) are 4_15_F5_#02.eps
the most concerned, perhaps because of the sizes
of their projects and the amount of data related to
them. Among the global regions studied by McGraw
Hill Construction in 2014, South Korean (79%) and U.S.
(66%) contractors express the greatest concern about
security, while those in Germany (31%) and Japan (43%)
show the least.
I
n redeveloping the iconic author models and access project Whenever possible, team
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND NEW ZEALAND
Adelaide Oval, the project team data. Cox Architecture as Lead members worked within native BIM
aims to transform the facility Architect, working in collaboration formats, minimizing the need to
into a multisport venue with with Walterbrooke and Hames convert to other formats. As a result,
expanded capacity and a range of Sharley made up the design team data exchange between designers
contemporary amenities. with Cox serving as the BIM manager and contractors was “reasonably
To achieve its goals and increase for the entire project. Other team seamless,” according to Jürgens.
seating capacity from 32,000 to 50,000, members who would leverage All parties agreed to regular
the project team established a broad- BIM data included engineering uploads of project data to a
reaching BIM plan tailored to meet the firms Arup, Walbridge and Gilbert, management platform specified by
$535 million project’s tight program. Aurecon and AECOM, contractor the contractor. As such, data wasn’t
The design aims to respect and Baulderstone and subcontractors necessarily exchanged in realtime but
preserve elements of the venue’s OPIs, Hindmarsh, Neilsen, Trojan, instead at agreed stages of the project
heritage, including local Moreton Laser Linings and SKS Survey. for coordination purposes among
Bay Fig trees and Northern Mound, The team recognized that, as an disciplines, according to Jürgens.
the 1911 scoreboard and views of the emerging technology, there would During the design phase, most of
Cathedral and surrounding parkland. be a wide range of proficiency with the parties worked in a project office
Portions of the project had to remain BIM tools among the team members, where they had direct access to a
operational throughout construction, according to Dan Jürgens, national central server. Aecom and Aurecon
which began in March 2012 and will be BIM manager, Cox Architecture. In live linked their service models and
completed in March 2014. developing the BIM execution plan, maintained real-time coordination,
the team contractually established hence there was no issuing of
Project Execution terms and expectations. models between Aurecon and
Planning For BIM The team then followed up with AECOM because they were always
As BIM would be used throughout the workshops to clarify goals and referencing the working files.
design and construction phases, the determine how success would be
team decided to create a BIM execution measured. Cox also found it critical Reduced RFI Through
plan based on the Penn State Project to support the firms that weren’t as Early Clash Detection
Execution Planning Guide. proficient in BIM, assisting them in The BIM execution plan proved
Multiple team members from a being able to provide required critical when BIM data was leveraged
variety of disciplines would need to project deliverables. for clash detection of building
Image courtesy of Cox Architecture
To develop the Adelaide Oval, multiple team members from a variety of disciplines needed to author and access project data.
The team created a BIM execution plan to contractually establish terms and expectations.
CONTINUED
TI
N
CO
st
at
saw mixed results. Due to the reduction basis of their shop drawings, adding and Figures
s
in RFI, consultants saved weeks of work further detail to enable fabrication. Architect
during the RFI process communicating Cox estimates that this approach Cox Architecture,in collaboration
with the contractor. However, saved nearly six weeks in the shop with Walterbrooke Architects and
contractors spent double the estimated drawing process and also meant that Hames Sharley
drafting time coordinating and architectural intent was preserved. Contractor
modeling shop drawings, directly as a Without the BIM model, the design Baulderstone
result of using these new workflows. might have been value-managed out Project Manager
To help preserve the facility’s of the process, according to Jürgens. Mott McDonald
Moreton Bay fig trees, laser scans and Type of Project
an arborist were commissioned, as a Value Of Visualization Sports venue
very limited number of limbs could be Across The Project Team Construction Start
cut.The level of detail achieved with Although the team had some March 2012
the laser scans enabled the team to run limitations due to BIM being a new Completion
clash detection on the proposed design process for many firms, visualization March 2014
and the fig trees. proved to be a significant benefit for all
These designs translated across parties, regardless of their respective
BIM-Enabled Benefits
into construction, where the surveyor experience levels. All parties could
used the BIM for digital site set out. Any look at the model and know what they
■ Reduced RFIs
point of the BIM model could be located were looking at, enabling everyone
Image courtesy of Cox Architecture
accurately, rather than using traditional “to understand instantly what we’re ■ Improved Clash Detection
chalk lines on the ground.This meant building,” according to Jürgens. ■ Time savings during precast-panel
that the contractors could proceed Trying to fit concessions under shop-drawing process
with a high degree of certainty that the concrete plats in one area of the oval ■ Enhanced visualization
proposed design would work. required constant model review
What is your experience with BIM probably would have shut us down project. So when that finishes in
historically? for about a month, but because we August 2015, it will be a fully BIM
TAIT: Back in 2006/2007, we deliv- were aware of it, we lost one day operational usage.
ered our first fully integrated BIM while we dealt with it. You don’t
project on a building called “The report that you saved that month, but What are the challenges pre-
Ark,” or Coca-Cola place, in North if we would have lost [track of] it, we venting you from going back
Sydney.... It finished in 2010 and was would have been in a fairly awkward and looking at existing buildings
successful, fully tenanted and won contractual position with the tenants with BIM?
numerous awards. It was the first that were coming into the building. TAIT: Acceptance within the market
high-rise commercial building in and skill base within the market is
Australia that I’m aware of to have What do you think are the key one [significant challenge]. A stan-
a BIM solution. drivers to using BIM today? dard set of procedures and object
TAIT: If the owner says it’s a BIM libraries is the other issue that Aus-
What benefits have you received project, there will be no hesitation. If tralia is still struggling with. If we can
from using BIM? you’re talking about the trades, I think get on top of those issues and have a
TAIT: We [reduced risk on] the proj- a lot of them are trying to do it for a common implementation program,
ect through coordination with and competitive advantage. then we’d be a lot more comfortable
collaboration among the entire team. in rolling [BIM] out across all
That has certainly de-risked the deliv- Are you facing any challenges in our projects.
erables and given us better-quality using BIM for new buildings? There is a growing knowledge
outcomes. Then we saved time along TAIT: Because we don’t typically base—the majority of companies we
the way because we’ve been able to deal with the same party over and deal with now have BIM managers
manage things that would have been over again, we continually have to rather than CAD managers or those
disruptive but weren’t because we reeducate and reestablish expecta- who have never heard of BIM. A lot
did them in a 3D, virtual world before tions, outputs and deliverables. of them are BIM proficient or at least
we went inside. Generally, owners are uneducated claim to be so, but we’re finding there
in Australia, so that’s a hurdle that is a wide variance in the [actual] level
What kind of specific quality out- [we need] to get over because if of expertise.
comes are you seeing? [BIM adoption] is going to be led by
TAIT: Typically, we have had clash the owners, then the owners need What do you think is the future
detection, and we see the layout of to be educated [about expectations of BIM in Australia?
images, fixtures and other things. and outcomes] to know what they’re TAIT: I think it will get adopted. I think
They go in once and not do have to actually asking for. the government will have to mandate
be rebuilt because they’ve all been it for government projects because
coordinated and stored correctly How are you using BIM in build- that will bring the market to task a lot
off the virtual model. That has led ing operations and maintenance? quicker than it would otherwise....
to a better-quality outcome for TAIT: We’re doing it on the North [Getting that mandate in place] is the
the product. Sydney [project that we are working most important thing in Australia to
Time wise, we had a fairly intrusive on], and we’re setting it up now as we help accelerate BIM adoption. n
concrete culvert on The Ark coming come through the first year of con-
in from the building next door. That struction on our Melbourne
VANZI, a not-for profit organization the water, the gas, wastewater—that How do you see this being used
running the Virtual Australia and New services your property. And all of the by building owners?
Zealand (VANZ) project, was set up to rights, responsibilities and restric- HAINES: If you sell a property, then
broker the development, legal frame- tions that relate to your property in you will give a physical key to the
work and web services architecture a legal sense, are converted into 3D new owner but also a virtual key to
among key stakeholders in order to legal objects. your virtual property. That becomes
create an integrated 3D model of the the official data set.... You can link
natural and built environment for use Why is it important to include the ownership of the property back
throughout the entire property cycle. the legal rights? to the titles office, so when you regis-
HAINES: If you think about a virtual ter a change of ownership, the previ-
How will VANZ work? world that is a true mirror of your ous owner is locked out of the model
HAINES: If we look at the evolution of physical world on every scale that automatically, and the new owner
the 3D built environment, it’s going you need for decision-making—and gets access to it automatically. And
to happen fairly quickly over the next it’s used for traffic management, you can give a lessee access [in the
five years through commercial and emergency management, property model] to just the rooms that they are
government building owners want- development, construction, leasing leasing in the real world.
ing their own models for facilities and financing—then it’s absolutely
management and leasing, financing integral to the operation of our How will the creation of VANZ
and insurance purposes. The ques- cities. That piece of infrastructure impact the property, design and
tions then arise: If you have all these needs to be well regulated and construction industries?
individual models, how do you inte- protected.... The worst thing you HAINES: At the moment, every time
grate them into a holistic virtual could have is have big hunks of you have a new project, you have to
world?... What we’re trying to do is your virtual world sitting on servers sit down with all of the project play-
say, “Well, if each owner is going to in some other country, subject to ers, the fabricators and consultants
be creating their own models, using somebody else’s laws. We need to and work out “OK, who’s going to do
their own software, collecting their have a legal framework that enables what and how are we going to share
own data, how do we securely inte- [regulated] commercial entities [to this data?” Where we see, in time,
grate those to protect privacy and hold your digital information] just each stakeholder will have one rela-
the basic property rights that people like commercial banks are regulated tionship, [which] will be with their
have in the real property?”... We want to hold your money.... Your property “bank.” So if I am the architect or the
to establish a capability where you exists only in law, and we need to mechanical engineer, the electrical
can deposit your property model ensure that those property rights are engineer or the surveyor, I will do my
securely in an “account” [similar to mirrored in the virtual world if we’re bit of work using whatever software I
how you deposit money in a bank going to create a virtual world that choose, and I will lock the results and
account], and the “banks” would be is as simple as possible to transact lodge it in my bank. And then...I can
a combination of commercial enti- business in. That’s the basic principle give access to X,Y and Zed for the
ties and government entities [that] that we’re working on; whatever duration of the project to this model.
would hold your property model and rights you have in the real world, It’s much easier for a limited set of
integrate that model with the local those same rights will exist in the banks to develop expanded protocols
community model together with the authorized, virtual world. for sharing data than it is for all sorts
models of the utilities—the power, of different parties on every project. n
This study continues McGraw Hill individuals who are authoring and/or projects by firm size.
REPORT
ZEALAND
ent markets around the world. This (e.g., owners). • Medium: $1 million to less than
study expands that research to the $10 million
TITLE
Australian and New Zealand markets. Survey Sample • Large: $10 million or more
THE BUSINESS VALUE OF BIM IN AUSTRALIA AND
use of and attitudes toward building recruited through a combination • Small: Less than $50 million
information modeling (BIM). of professional-association invita- • Medium: $50 million to less than
The research was conducted tions and a supplemental industry $250 million
through an internet survey of panel. The sample splits into the • Large: $250 million or more
industry professionals between following demographics.
RESPONDENT BY
September 25, 2013, and Novem-
RESPONDENT BY PLAYER PROJECT TYPE
ber 5, 2013. The survey was open to
The survey was open to architects, The respondents engaged in
design and construction industry
engineers, contractors (general and building and non-building work. In
professionals who were classified as
specialty), owners, consultants and comparisons on BIM in buildings
either BIM users or non-users based
other professionals that use BIM. versus infrastructure or industrial
on how they responded to a question
Player results were as follows. work, the primary project type
about BIM engagement.
■ Architectural/engineering (A/E) identified by the respondent was
The total sample size (435) used
firms include architects, engineers used. The respondent pool split into
benchmarks at a 95% confidence
and multidisciplinary design firms: the following primary work types.
interval (CI) with a margin of error
185 respondents (42.5%). ■ Buildings: 65%
(MOE) of less than +/- 5% for catego-
■ Contractors were grouped into ■ Infrastructure/Industrial: 19%
rizing participants as BIM users or
the two following categories. When ■ Landscape/Parks/Recreation: 2%
non-users. Australia’s 331 respon-
the term “contractor” is used in ■ Mining/Minerals: 3%
dents benchmark at a 95% CI with an
the data, it is referring to all ■ Other: 11%
MOE of +/- 5.37%. New Zealand’s 93
contractor respondents.
respondents benchmark at a 95% CI
with an MOE of +/- 10.15%.
• GCs refer to general contractors, Comparisons With Other
The use of a sample to repre-
full-service contractors, Regions
construction management Throughout the report, McGraw Hill
sent a true population is based on
companies (CMs) and GCs/CMs Construction compares the find-
a firm foundation of statistics. The
at-risk: 93 respondents (21.4%). ings from this study with findings
sampling size and technique used
• Trade contractors refer to on South Korea and North America
in this study conform to accepted
specialty subcontractors, published in the 2012 Business Value
industry research standards that are
fabricators and installers: 58 of BIM SmartMarket Reports (SMRs)
expected to produce results with a
respondents (13.3%). issued on those regions. A nearly
high degree of confidence and low
■ Owner/consultants: identical survey was used for all
margin of error.
26 respondents (6.0%). these studies so that comparisons
■ Other: 73 respondents (16.8%). could be made directly.
BIM User Definition Other global findings are drawn
For the purpose of this survey, BIM RESPONDENT BY FIRM SIZE
from the 2014 Business Value of
was defined as the creation and The distribution by size of firms
BIM for Construction in Major
use of digital models and related includes 29% small firms, 29%
Global Markets SMR, which includes
collaborative processes among medium firms and 23% large firms.
data on BIM use by contractors in
companies to leverage the value of The remainder either refused to
10 countries. n
these models. answer or did not know their firm
Practitioners or users are size. The following is the definition of
Acknowledgements:
The authors wish to thank our premier partner Autodesk and corporate partner
AECOM for helping us bring this information to the market. We also thank our
contibuting partners who also helped support and make this study possible,
McGraw Hill Construction
including Aconex, AMCA, A.G. Coombs, Consult Australia, CSI Global
Main Website : construction.com
Services, Laing O’Rourke and Zuuse.
Dodge : construction.com/dodge
Research & Analytics : We would also like to thank the following organizations for helping
construction.com/dodge/ distribute the survey to their members: AMCA, Consult Australia,
dodge-market-research Australian Construction Industry Forum (ACIF), Australian Institute of
Architectural Record : archrecord.com Building Surveyors (AIBS) and Green Building Council of Australia (GBCA).
Engineering News-Record : enr.com Finally, we would like to thank the firms that provided information about their
Sweets : sweets.com projects and experiences with building information modeling in Australia
SmartMarket Reports : and New Zealand as well as for their assistance in helping us secure images to
construction.com/market_research supplement their project information.
Autodesk AECOM
www.autodesk.com.au www.aecom.com
SmartMarket Report
www.construction.com