SOIL CLASSIFICATION BY ASTM 02487 AND AASHTO SYSTEM

SOFTWARE USCS-AASHTO.xls

Sr No. SPT No. USCS SOIL CLASSIFICATION

SPTl (ML) Sandy Silt


SPT2 (SM) Silty Sand
SPT3 (SM) Silty Sand
SPT4 (SM) Silty Sand
T66 SPTS (SM) Silty Sand
SPT6 (SP-SM) Poorly Graded Sand with Silt
SPT7 (SM) Silty Sa nd
SPT8 (SM) Silty Sand
SPT9 (SM) Silty Sand
UDSl (CL) Lean Clay
T69 UDS2 (CL) Lean Clay
UDS3 (CL) Lean Clay
UDSl (CL) Lean Clay
T71
UDS2 (CL) Lean Clay
T72 UDSl (CL) Lean Clay
UDSl (CL) Lean Clay
UDS2 (CL) Lea n Clay
SPTl (ML) Silt
SPT2 (CL) Lean Clay
SPT3 (ML) Silt
T75
SPT4 (CL) Lean Clay
SPTS (ML) Silt
SPT6 (ML) Silt
SPT7 (SM) Silty Sand
SPT8 (SM) Silty Sand
UDSl (CL) Lean Clay
SPTl (CL) Lean Clay
SPT2 (ML) Silt
SPT3 (ML) Silt with Sand
SPT4 (CL) Lean Clay
T79
SPTS (ML) Silt
SPT6 (ML) Silt with Sand
SPT7 (SM) Silty Sand
SPT8 (SM) Silty Sand
SPT9 (SM) Silty Sand
T81 UDSl (CL) Lean Clay
T84 UDSl (CL) Lean Clay
T87 UDSl (CH) Fat Clay
SOIL CLASSIFICATION BY ASTM 02487 AND AASHTO SYSTEM
SOFTWARE USCS-AASHTO.xls

Sr No. SPT No. USCS SOIL CLASSIFICATION

SPTl (ML) Silt with Sand


SPT2 (ML) Sandy Silt
SPT3 (CL) Lean Clay
SPT4 l(cl) Lean Clay
SPTS (CL) Lean Clay
T90
SPT6 (CL) Lean Clay
SPT7 (ML) Silt
SPT8 (CL) Lean Clay
SPT9 (CL) Lean Clay
SPTlO (ML) Silt with Sand
SPTl (ML) Silt
SPT2 (ML) Silt
SPT3 (CL) Lean Clay
SPT4 (ML) Silt
SPTS (CL) Lean Clay
T99
SPT6 (CL) Lean Clay
SPT7 (ML) Sandy Silt
SPT8 (ML) Sandy Silt
SPT9 (ML) Silt with Sand
SPTlO (M L) Silt with Sand
TllO UDSl (CL) Lean Clay
UDSl (CL) Lean Clay
UDS2 (CH) Fat Clay
SPTl (ML) Silt with Sand
SPT2 (CL) Lean Clay
SPT3 (ML) Silt with Sand
T112
SPT4 (CL) Lean Clay
SPTS (CL) Lean Clay
SPT6 (ML) Sandy Silt
SPT7 (SM) Si lty Sand
SPT8 (SM) Silty Sand
T114 UDSl (CL) Lean Clay
T117 UDSl (CL) Lean Clay
T120 UDSl (CH) Fat Clay
T129 UDSl (CL) Lean Clay
SOIL CLASSIFICATION BY ASTM 02487 AND AASHTO SYSTEM
SOFTWARE USCS-AASHTO.xls

Sr No. SPT No. USCS SOIL CLASSIFICATION

UDSl (CL) Lean Clay


SPTl (ML) Silt
SPT2 (SM) Silty Sand
SPT3 (SM) Silty Sand
SPT4 (SM) Silty Sand
Tl33
SPTS (SM) Silty Sand
SPT6 (ML) Sandy Silt
SPT7 (SM) Silty Sand
SPT8 (SM) Silty Sand
SPT9 (SM) Silty Sand
T135 UDSl (CL) Lean Clay
SPTl (SM) Silty Sand
SPT2 (SP-SM) Poorly Graded Sand with Silt
SPT3 (SP-SM) Poorly Graded Sand with Silt
SPT4 (SM) Silty Sand
SPTS (CL) Lean Clay
T145
SPT6 (ML) Silt
SPT7 (SM) Silty Sand
SPT8 (SM) Silty Sand
SPT9 (SM) Silty Sand
SPTlO (SM) Si lty Sa nd
SPTl (ML) Silt
SPT2 (SM) Silty Sand
SPT3 (SP-SM) Poorly Graded Sand with Silt
SPT4 (SP-SM) Poorly Graded Sand with Silt
SPTS (SP-SM) Poorly Graded Sand with Silt
T149
SPT6 (SM) Silty Sand
SPT7 (SP-SM) Poorly Graded Sand with Silt
SPT8 (SP-SM) Poorly Graded Sand with Silt
SPT9 (SP-SM) Poorly Graded Sand with Silt
SPTlO (SP-SM) Poorly Graded Sand with Silt
TlSl UDSl (CL) Lean Clay
T159 UDSl (CL) Lean Clay
T162 UDSl (CL) Lean Clay
SOIL CLASSIFICATION BY ASTM 02487 AND AASHTO SYSTEM
SOFTWARE USCS-AASHTO.xls

Sr No. SPT No. USCS SOIL CLASSIFICATION

SPTl (SM) Silty Sand


SPT2 (SP-SM) Poorly Grad ed Sa nd with Silt
SPT3 (SP-SM) Poorly Graded Sa nd with Silt
SPT4 (SP) Poorly Graded Sand
SPTS (SP) Poorly Graded Sand
T165
SPT6 (SP) Poor ly Graded Sand
SPT7 (SP-SM) Poorly Graded Sand w ith Silt
SPT8 (SP) Poorly Grad ed Sa nd
SPT9 (SP) Poorly Graded Sand
SPTlO (SM) Silty Sand
T42 Soil corrosivity (ML) Silt with Sand
T69 Soil corrosivity (CL) Lean Clay
T99 Soil corrosivity (ML) Silt
T120 Soil corrosivity (ML) Silt with Sand
T141 Soil corrosivity (SM) Silty Sand
T1S3 Soil corrosivity (SM) Silty Sand
T168 Soil corrosivity (SM) Silty San d
SOIL CLASSIFICATION BY ASTM 02487 AND AASHTO SYSTEM
SOFTWARE USCS-AASHTO .xl s

Sr No. SPTNo. USCS SOIL CLASSIFICATION

UDSl (CL) Lean Clay


G2 UDS2 (CL) Lean Clay
UDS3 (CL) Lean Clay
GS UDSl (ML) Si lt
T24 UDSl (M L) Si lt
UDSl (CL) Lean Clay
T26
UDS2 (CL) Lean Clay
SPTl (M L) Silt w ith Sand
SPT2 (M L) Silt with Sand
SPT3 (ML) Sa ndy Silt
SPT4 (SM) Silty Sand
SPTS (SP-SM) Poorly Graded Sand with Silt
T28 SPT6 (SM) Silty Sand
SPT7 (SM) Silty Sand
SPT8 (SM) Silty Sand
SPT9 (SP-SM) Poorly Graded Sand with Sil t
SPTlO (SM) Silty Sand
SPTl l (SP-SM) Poorly Graded Sand with Silt
T4S UDSl (ML) Silt
SPTl (SM) Silty Sand
SPT2 (SM) Silty Sand
SPT3 (SP-SM) Poorly Graded Sand with Silt
SPT4 (SP-SM ) Poorly Graded Sand with Silt
T49
SPTS (S M ) Silty Sand
SPT6 (SP-SM) Poorly Graded Sand with Silt
SPT7 (SM) Sil ty Sand
SPT8 (SP-SM) Poorly Graded Sand with Silt
TS4 UDSl (M L) Silt
TS7 UDS2 (CL) Lean Clay
T59 UDSl (CL) Lean Clay
SPTl (ML) Sil t
SPT2 (ML) Silt
SPT3 (M L) Silt
SPT4 (ML) Si lt with Sand
SPTS (SM) Silty Sand
T61 SPT6 (SM) Silty Sand
SPT7 (SM) Silty Sand
SPT8 (SM) Silty Sand
SPT9 (SM) Silty Sand
SPTlO (SP-SM) Poorly Grad ed Sa nd with Silt
SPTll (SP-SM) Poorly Graded Sand with Silt
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T24 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 2.50 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.10
Volume (cm3) 39.27 37.50
Weight of Ring (g) 74.62 74.62
Wt. of Ring and Soil (g) 149.74 147.68
Moisture Content (%) 18.00 21.68
Bulk Density (g/cm3) 1.913 1.948
Dry Density (g/cm3) 1.621 1.601
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.667 0.592
Degree of Saturation (%) 72.90 98.96
Height of Solids (mm) 11.99 11.99
0.70

0.65
0.645
0.632

0.613
Void Ratio (e)

0.60
0.592
0.577

0.558
0.55
0.540
0.523
0.505
0.50

0.478

0.45
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6674
1.25 31 894 0.27 0.27 19.73 1.35 0.6449 0.07065 0.042948
2.50 62 832 0.16 0.43 19.57 2.13 0.6318 0.04132 0.025323 0.043613
5.00 125 745 0.22 0.65 19.35 3.24 0.6134 0.02899 0.017970 0.061199
10.00 249 645 0.25 0.90 19.10 4.51 0.5922 0.01666 0.010465 0.070344
22.50 561 485 0.41 1.31 18.69 6.54 0.5583 0.01066 0.006843 0.096203
45.00 1122 320 0.42 1.73 18.27 8.64 0.5234 0.00611 0.004010 0.116067
90.00 2243 105 0.55 2.27 17.73 11.37 0.4778 0.00398 0.002693 0.151239
22.50 561 235 -0.33 1.94 18.06 9.72 0.5054 0.00160 0.001066 0.045724
5.00 125 398 -0.41 1.53 18.47 7.65 0.5399 0.00776 0.005039 0.052841
1.25 31 575 -0.45 1.08 18.92 5.40 0.5774 0.03932 0.024929 0.062254
0.00 0 645 -0.18 0.90 19.10 4.51 0.5922
Tested By Checked By Approved By
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T26 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 3.00 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.07
Volume (cm3) 39.27 37.45
Weight of Ring (g) 74.52 74.52
Wt. of Ring and Soil (g) 152.04 149.68
Moisture Content (%) 17.37 19.66
Bulk Density (g/cm3) 1.974 2.007
Dry Density (g/cm3) 1.682 1.677
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.607 0.533
Degree of Saturation (%) 77.33 99.77
Height of Solids (mm) 12.44 12.44
0.60

0.573

0.555
0.55

0.531
Void Ratio (e)

0.511 0.510
0.50

0.482
0.474

0.45 0.453
0.443

0.423

0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6071
1.25 31 835 0.42 0.42 19.58 2.10 0.5734 0.10600 0.067365
2.50 62 745 0.23 0.65 19.35 3.24 0.5551 0.05782 0.037179 0.061022
5.00 125 629 0.29 0.94 19.06 4.71 0.5314 0.03726 0.024330 0.078650
10.00 249 525 0.26 1.21 18.79 6.03 0.5102 0.01670 0.011060 0.070514
22.50 561 385 0.36 1.56 18.44 7.81 0.4816 0.00899 0.006070 0.081136
45.00 1122 245 0.36 1.92 18.08 9.59 0.4530 0.00500 0.003439 0.094923
90.00 2243 98 0.37 2.29 17.71 11.46 0.4230 0.00262 0.001843 0.099669
22.50 561 195 -0.25 2.04 17.96 10.22 0.4428 0.00115 0.000800 0.032884
5.00 125 348 -0.39 1.66 18.34 8.28 0.4740 0.00702 0.004763 0.047807
1.25 31 528 -0.46 1.20 18.80 5.99 0.5108 0.03854 0.025512 0.061022
0.00 0 635 -0.27 0.93 19.07 4.64 0.5326
Tested By Checked By Approved By
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T26 Job No. Decon-2040A
Sample No. UDS-02 Lab No. 537
Sample Depth 7.50 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.00
Volume (cm3) 39.27 37.31
Weight of Ring (g) 72.35 72.35
Wt. of Ring and Soil (g) 147.63 145.85
Moisture Content (%) 17.10 21.03
Bulk Density (g/cm3) 1.917 1.970
Dry Density (g/cm3) 1.637 1.627
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.651 0.569
Degree of Saturation (%) 70.99 99.91
Height of Solids (mm) 12.11 12.11
0.65

0.609
0.60
0.594

0.576
Void Ratio (e)

0.555 0.554
0.55

0.530
0.523

0.50 0.501
0.494

0.468

0.45
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6511
1.25 31 801 0.51 0.51 19.49 2.53 0.6094 0.13134 0.081607
2.50 62 726 0.19 0.70 19.30 3.48 0.5937 0.04950 0.031060 0.052244
5.00 125 642 0.21 0.91 19.09 4.55 0.5761 0.02772 0.017588 0.058514
10.00 249 538 0.26 1.17 18.83 5.87 0.5543 0.01716 0.011040 0.072445
22.50 561 422 0.29 1.47 18.53 7.34 0.5299 0.00766 0.005004 0.069068
45.00 1122 285 0.35 1.82 18.18 9.08 0.5012 0.00502 0.003346 0.095433
90.00 2243 128 0.40 2.21 17.79 11.07 0.4683 0.00288 0.001960 0.109365
22.50 561 252 -0.31 1.90 18.10 9.50 0.4943 0.00152 0.001014 0.043189
5.00 125 388 -0.35 1.55 18.45 7.77 0.5228 0.00641 0.004210 0.043659
1.25 31 541 -0.39 1.17 18.83 5.83 0.5549 0.03366 0.021648 0.053289
0.00 0 608 -0.17 1.00 19.00 4.98 0.5689
Tested By Checked By Approved By
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T45 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 2.50 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.03
Volume (cm3) 39.27 37.36
Weight of Ring (g) 72.63 72.63
Wt. of Ring and Soil (g) 149.72 147.66
Moisture Content (%) 17.95 20.05
Bulk Density (g/cm3) 1.963 2.008
Dry Density (g/cm3) 1.664 1.673
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.624 0.545
Degree of Saturation (%) 77.75 99.39
Height of Solids (mm) 12.31 12.31
0.60

0.583

0.564
0.55
0.545
Void Ratio (e)

0.523 0.521

0.50 0.497
0.488

0.468
0.459
0.45
0.438

0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6241
1.25 31 802 0.50 0.50 19.50 2.51 0.5832 0.12854 0.081186
2.50 62 711 0.23 0.73 19.27 3.67 0.5645 0.05907 0.037760 0.062351
5.00 125 615 0.24 0.98 19.02 4.89 0.5447 0.03116 0.020173 0.065777
10.00 249 501 0.29 1.27 18.73 6.34 0.5212 0.01850 0.012163 0.078110
22.50 561 385 0.29 1.56 18.44 7.81 0.4972 0.00753 0.005030 0.067936
45.00 1122 245 0.36 1.92 18.08 9.59 0.4683 0.00505 0.003439 0.095924
90.00 2243 98 0.37 2.29 17.71 11.46 0.4380 0.00265 0.001843 0.100720
22.50 561 202 -0.26 2.03 17.97 10.13 0.4595 0.00125 0.000857 0.035629
5.00 125 338 -0.35 1.68 18.32 8.41 0.4875 0.00631 0.004239 0.042943
1.25 31 508 -0.43 1.25 18.75 6.25 0.5226 0.03679 0.024160 0.058240
0.00 0 618 -0.28 0.97 19.03 4.85 0.5453
Tested By Checked By Approved By
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T51 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 2.50 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.06
Volume (cm3) 39.27 37.43
Weight of Ring (g) 72.08 72.08
Wt. of Ring and Soil (g) 147.83 145.62
Moisture Content (%) 19.57 21.85
Bulk Density (g/cm3) 1.929 1.965
Dry Density (g/cm3) 1.613 1.612
Specific Gravity(assumed) 2.696 2.696
Void Ratio 0.671 0.593
Degree of Saturation (%) 78.61 99.36
Height of Solids (mm) 11.97 11.97
0.65
0.643

0.627

0.604
0.60

0.579
0.575
Void Ratio (e)

0.55
0.547
0.541

0.516
0.509
0.50

0.482

0.45
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6712
1.25 31 865 0.34 0.34 19.66 1.71 0.6425 0.09018 0.054903
2.50 62 790 0.19 0.53 19.47 2.67 0.6266 0.05010 0.030800 0.052878
5.00 125 685 0.27 0.80 19.20 4.00 0.6043 0.03507 0.021860 0.074029
10.00 249 565 0.30 1.10 18.90 5.52 0.5788 0.02004 0.012693 0.084605
22.50 561 415 0.38 1.49 18.51 7.43 0.5470 0.01002 0.006477 0.090395
45.00 1122 269 0.37 1.86 18.14 9.28 0.5160 0.00542 0.003574 0.102936
90.00 2243 111 0.40 2.26 17.74 11.29 0.4825 0.00293 0.001978 0.111396
22.50 561 238 -0.32 1.94 18.06 9.68 0.5094 0.00157 0.001041 0.044770
5.00 125 385 -0.37 1.56 18.44 7.81 0.5406 0.00701 0.004553 0.047762
1.25 31 545 -0.41 1.16 18.84 5.78 0.5746 0.03563 0.022626 0.056403
0.00 0 631 -0.22 0.94 19.06 4.69 0.5928
Tested By Checked By Approved By
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T54 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 2.50 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.02
Volume (cm3) 39.27 37.34
Weight of Ring (g) 72.15 72.15
Wt. of Ring and Soil (g) 146.53 144.62
Moisture Content (%) 18.99 22.62
Bulk Density (g/cm3) 1.894 1.941
Dry Density (g/cm3) 1.592 1.583
Specific Gravity(assumed) 2.696 2.696
Void Ratio 0.694 0.610
Degree of Saturation (%) 73.80 99.90
Height of Solids (mm) 11.81 11.81
0.70

0.659
0.65
0.642
Void Ratio (e)

0.624

0.60 0.603

0.587

0.567
0.560
0.55

0.536
0.530

0.505
0.50
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6937
1.25 31 841 0.40 0.40 19.60 2.02 0.6595 0.10764 0.064865
2.50 62 758 0.21 0.61 19.39 3.07 0.6416 0.05619 0.034229 0.059307
5.00 125 675 0.21 0.83 19.17 4.13 0.6238 0.02810 0.017302 0.059307
10.00 249 578 0.25 1.07 18.93 5.36 0.6029 0.01642 0.010242 0.069311
22.50 561 411 0.42 1.50 18.50 7.48 0.5670 0.01131 0.007215 0.101997
45.00 1122 268 0.36 1.86 18.14 9.30 0.5362 0.00538 0.003501 0.102180
90.00 2243 121 0.37 2.23 17.77 11.16 0.5046 0.00276 0.001837 0.105038
22.50 561 241 -0.30 1.93 18.07 9.64 0.5304 0.00150 0.000983 0.042873
5.00 125 379 -0.35 1.58 18.42 7.89 0.5601 0.00667 0.004277 0.045443
1.25 31 505 -0.32 1.26 18.74 6.29 0.5872 0.02843 0.017914 0.045016
0.00 0 613 -0.27 0.98 19.02 4.91 0.6104
Tested By Checked By Approved By
- - -
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T57 Job No. Decon-2040A
Sample No. UDS-02 Lab No. 537
Sample Depth 4.00 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.03
Volume (cm3) 39.27 37.37
Weight of Ring (g) 74.66 74.66
Wt. of Ring and Soil (g) 151.75 149.65
Moisture Content (%) 18.02 20.21
Bulk Density (g/cm3) 1.963 2.006
Dry Density (g/cm3) 1.663 1.669
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.625 0.547
Degree of Saturation (%) 77.93 99.94
Height of Solids (mm) 12.31 12.31
0.60
0.593
0.581

0.564
0.55
0.545

0.527
Void Ratio (e)

0.513
0.50 0.500

0.480
0.468

0.45
0.440

0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6250
1.25 31 845 0.39 0.39 19.61 1.97 0.5930 0.10068 0.063201
2.50 62 785 0.15 0.55 19.45 2.73 0.5807 0.03897 0.024656 0.041135
5.00 125 705 0.20 0.75 19.25 3.75 0.5642 0.02598 0.016611 0.054846
10.00 249 611 0.24 0.99 19.01 4.94 0.5448 0.01526 0.009882 0.064444
22.50 561 458 0.39 1.38 18.62 6.88 0.5132 0.00994 0.006568 0.089658
45.00 1122 295 0.41 1.79 18.21 8.95 0.4795 0.00588 0.003976 0.111749
90.00 2243 101 0.49 2.28 17.72 11.42 0.4395 0.00350 0.002432 0.133002
22.50 561 241 -0.36 1.93 18.07 9.64 0.4684 0.00168 0.001147 0.047991
5.00 125 395 -0.39 1.54 18.46 7.68 0.5002 0.00715 0.004763 0.048656
1.25 31 525 -0.33 1.21 18.79 6.03 0.5270 0.02815 0.018433 0.044563
0.00 0 620 -0.24 0.97 19.03 4.83 0.5466
Tested By Checked By Approved By
- - -
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T59 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 6.00 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.00
Volume (cm3) 39.27 37.31
Weight of Ring (g) 74.25 74.25
Wt. of Ring and Soil (g) 150.87 148.31
Moisture Content (%) 17.41 19.95
Bulk Density (g/cm3) 1.951 1.985
Dry Density (g/cm3) 1.662 1.655
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.627 0.545
Degree of Saturation (%) 75.11 98.88
Height of Solids (mm) 12.30 12.30
0.60

0.585

0.567

0.55 0.549

0.533
Void Ratio (e)

0.521

0.50 0.504
0.495

0.479

0.462
0.45
0.440

0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6266
1.25 31 801 0.51 0.51 19.49 2.53 0.5854 0.12938 0.081607
2.50 62 711 0.23 0.73 19.27 3.67 0.5669 0.05851 0.037345 0.061760
5.00 125 626 0.22 0.95 19.05 4.75 0.5493 0.02763 0.017835 0.058329
10.00 249 545 0.21 1.16 18.84 5.78 0.5326 0.01317 0.008591 0.055584
22.50 561 405 0.36 1.51 18.49 7.56 0.5036 0.00910 0.006053 0.082117
45.00 1122 285 0.30 1.82 18.18 9.08 0.4789 0.00433 0.002931 0.082346
90.00 2243 98 0.47 2.29 17.71 11.46 0.4402 0.00338 0.002345 0.128323
22.50 561 205 -0.27 2.02 17.98 10.10 0.4623 0.00129 0.000881 0.036713
5.00 125 365 -0.41 1.61 18.39 8.06 0.4954 0.00743 0.004969 0.050599
1.25 31 488 -0.31 1.30 18.70 6.50 0.5208 0.02666 0.017528 0.042202
0.00 0 607 -0.30 1.00 19.00 4.99 0.5454
Tested By Checked By Approved By
- - -
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T69 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 2.50 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.05
Volume (cm3) 39.27 37.40
Weight of Ring (g) 74.32 74.32
Wt. of Ring and Soil (g) 151.84 148.98
Moisture Content (%) 18.46 20.06
Bulk Density (g/cm3) 1.974 1.996
Dry Density (g/cm3) 1.666 1.663
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.622 0.545
Degree of Saturation (%) 80.21 99.49
Height of Solids (mm) 12.33 12.33
0.65

0.60 0.600
0.583

0.564
Void Ratio (e)

0.55
0.541
0.529
0.514
0.50 0.499
0.482

0.462
0.45
0.440

0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6220
1.25 31 895 0.27 0.27 19.73 1.33 0.6004 0.06808 0.042538
2.50 62 812 0.21 0.48 19.52 2.39 0.5833 0.05381 0.033988 0.056798
5.00 125 718 0.24 0.72 19.28 3.58 0.5640 0.03047 0.019485 0.064326
10.00 249 605 0.29 1.00 19.00 5.02 0.5407 0.01832 0.011888 0.077328
22.50 561 475 0.33 1.33 18.67 6.67 0.5139 0.00843 0.005568 0.076040
45.00 1122 322 0.39 1.72 18.28 8.61 0.4824 0.00551 0.003718 0.104701
90.00 2243 115 0.53 2.25 17.75 11.24 0.4397 0.00373 0.002589 0.141654
22.50 561 225 -0.28 1.97 18.03 9.84 0.4624 0.00132 0.000903 0.037637
5.00 125 405 -0.46 1.51 18.49 7.56 0.4995 0.00834 0.005559 0.056766
1.25 31 548 -0.36 1.15 18.85 5.74 0.5289 0.03091 0.020214 0.048929
0.00 0 626 -0.20 0.95 19.05 4.75 0.5450
Tested By Checked By Approved By
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T69 Job No. Decon-2040A
Sample No. UDS-02 Lab No. 537
Sample Depth 5.50 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.10
Volume (cm3) 39.27 37.50
Weight of Ring (g) 72.11 72.11
Wt. of Ring and Soil (g) 147.23 145.85
Moisture Content (%) 18.57 21.64
Bulk Density (g/cm3) 1.913 1.966
Dry Density (g/cm3) 1.613 1.617
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.675 0.600
Degree of Saturation (%) 74.32 97.51
Height of Solids (mm) 11.94 11.94
0.70

0.65 0.650

0.632

0.610
Void Ratio (e)

0.60
0.586
0.576

0.55 0.550
0.545

0.521
0.506
0.50
0.484

0.45
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6754
1.25 31 882 0.30 0.30 19.70 1.50 0.6503 0.07902 0.047884
2.50 62 795 0.22 0.52 19.48 2.60 0.6318 0.05826 0.035705 0.061495
5.00 125 691 0.26 0.78 19.22 3.92 0.6097 0.03482 0.021634 0.073511
10.00 249 581 0.28 1.06 18.94 5.32 0.5863 0.01842 0.011610 0.077752
22.50 561 412 0.43 1.49 18.51 7.47 0.5503 0.01132 0.007300 0.102105
45.00 1122 275 0.35 1.84 18.16 9.21 0.5212 0.00510 0.003351 0.096837
90.00 2243 101 0.44 2.28 17.72 11.42 0.4841 0.00324 0.002181 0.122990
22.50 561 205 -0.26 2.02 17.98 10.10 0.5063 0.00129 0.000856 0.036756
5.00 125 385 -0.46 1.56 18.44 7.81 0.5446 0.00861 0.005575 0.058634
1.25 31 535 -0.38 1.18 18.82 5.91 0.5765 0.03348 0.021240 0.053013
0.00 0 645 -0.28 0.90 19.10 4.51 0.5999
Tested By Checked By Approved By
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T69 Job No. Decon-2040A
Sample No. UDS-03 Lab No. 537
Sample Depth 8.50 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.02
Volume (cm3) 39.27 37.35
Weight of Ring (g) 72.54 72.54
Wt. of Ring and Soil (g) 151.43 149.66
Moisture Content (%) 18.71 19.05
Bulk Density (g/cm3) 2.009 2.065
Dry Density (g/cm3) 1.692 1.734
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.597 0.519
Degree of Saturation (%) 84.68 99.15
Height of Solids (mm) 12.52 12.52
0.60

0.557
0.55
0.541
Void Ratio (e)

0.521

0.50 0.503
0.489
0.478

0.462
0.455
0.45

0.433
0.419

0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.5972
1.25 31 802 0.50 0.50 19.50 2.51 0.5571 0.12641 0.081186
2.50 62 721 0.21 0.71 19.29 3.54 0.5406 0.05171 0.033567 0.054582
5.00 125 625 0.24 0.95 19.05 4.76 0.5212 0.03065 0.020146 0.064690
10.00 249 535 0.23 1.18 18.82 5.91 0.5029 0.01437 0.009558 0.060647
22.50 561 411 0.31 1.50 18.50 7.48 0.4778 0.00792 0.005357 0.071421
45.00 1122 298 0.29 1.78 18.22 8.92 0.4548 0.00401 0.002755 0.076145
90.00 2243 121 0.45 2.23 17.77 11.16 0.4189 0.00314 0.002212 0.119272
22.50 561 188 -0.17 2.06 17.94 10.31 0.4325 0.00079 0.000553 0.022574
5.00 125 335 -0.37 1.69 18.31 8.45 0.4623 0.00670 0.004584 0.045650
1.25 31 468 -0.34 1.35 18.65 6.76 0.4893 0.02830 0.019005 0.044811
0.00 0 616 -0.38 0.98 19.02 4.88 0.5193
Tested By Checked By Approved By
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T71 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 1.50 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.07
Volume (cm3) 39.27 37.44
Weight of Ring (g) 72.15 72.15
Wt. of Ring and Soil (g) 149.55 147.95
Moisture Content (%) 17.14 19.58
Bulk Density (g/cm3) 1.971 2.024
Dry Density (g/cm3) 1.683 1.693
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.606 0.532
Degree of Saturation (%) 76.39 99.52
Height of Solids (mm) 12.45 12.45
0.60

0.573

0.557
0.55
0.540
Void Ratio (e)

0.519
0.506
0.50
0.488
0.476

0.459
0.45 0.448

0.429

0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6065
1.25 31 835 0.42 0.42 19.58 2.10 0.5728 0.10595 0.067365
2.50 62 759 0.19 0.61 19.39 3.06 0.5573 0.04880 0.031338 0.051508
5.00 125 672 0.22 0.83 19.17 4.17 0.5395 0.02793 0.018144 0.058964
10.00 249 569 0.26 1.09 18.91 5.47 0.5185 0.01653 0.010889 0.069807
22.50 561 419 0.38 1.48 18.52 7.38 0.4879 0.00963 0.006473 0.086896
45.00 1122 275 0.37 1.84 18.16 9.21 0.4585 0.00514 0.003522 0.097595
90.00 2243 128 0.37 2.21 17.79 11.07 0.4286 0.00262 0.001835 0.099628
22.50 561 221 -0.24 1.98 18.02 9.89 0.4475 0.00111 0.000764 0.031515
5.00 125 359 -0.35 1.63 18.37 8.14 0.4757 0.00633 0.004289 0.043102
1.25 31 509 -0.38 1.25 18.75 6.24 0.5063 0.03211 0.021315 0.050831
0.00 0 634 -0.32 0.93 19.07 4.65 0.5318
Tested By Checked By Approved By
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T71 Job No. Decon-2040A
Sample No. UDS-02 Lab No. 537
Sample Depth 6.00 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.01
Volume (cm3) 39.27 37.33
Weight of Ring (g) 72.64 72.64
Wt. of Ring and Soil (g) 150.63 148.37
Moisture Content (%) 17.24 19.03
Bulk Density (g/cm3) 1.986 2.028
Dry Density (g/cm3) 1.694 1.704
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.596 0.517
Degree of Saturation (%) 78.23 99.49
Height of Solids (mm) 12.53 12.53
0.60

0.560
0.55
0.543

0.526
Void Ratio (e)

0.505
0.50
0.492

0.477
0.464
0.45 0.453

0.435
0.422

0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.5957
1.25 31 825 0.44 0.44 19.56 2.22 0.5602 0.11162 0.071541
2.50 62 740 0.22 0.66 19.34 3.30 0.5430 0.05421 0.035136 0.057221
5.00 125 655 0.22 0.88 19.12 4.38 0.5258 0.02711 0.017766 0.057221
10.00 249 555 0.25 1.13 18.87 5.65 0.5055 0.01595 0.010592 0.067319
22.50 561 412 0.36 1.49 18.51 7.47 0.4765 0.00912 0.006177 0.082284
45.00 1122 298 0.29 1.78 18.22 8.92 0.4534 0.00404 0.002779 0.076744
90.00 2243 144 0.39 2.17 17.83 10.87 0.4222 0.00273 0.001918 0.103671
22.50 561 205 -0.15 2.02 17.98 10.10 0.4346 0.00072 0.000502 0.020532
5.00 125 348 -0.36 1.66 18.34 8.28 0.4635 0.00651 0.004451 0.044364
1.25 31 489 -0.36 1.30 18.70 6.49 0.4921 0.02998 0.020091 0.047460
0.00 0 612 -0.31 0.99 19.01 4.93 0.5170
Tested By Checked By Approved By
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T72 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 5.50 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.04
Volume (cm3) 39.27 37.38
Weight of Ring (g) 74.66 74.66
Wt. of Ring and Soil (g) 152.81 149.32
Moisture Content (%) 18.85 19.82
Bulk Density (g/cm3) 1.990 1.997
Dry Density (g/cm3) 1.674 1.667
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.614 0.537
Degree of Saturation (%) 82.95 99.84
Height of Solids (mm) 12.39 12.39
0.60

0.580

0.565

0.55
0.547
Void Ratio (e)

0.523
0.514
0.50
0.494
0.489

0.462
0.45
0.454

0.433

0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6143
1.25 31 835 0.42 0.42 19.58 2.10 0.5804 0.10647 0.067365
2.50 62 762 0.19 0.60 19.40 3.02 0.5655 0.04710 0.030089 0.049716
5.00 125 671 0.23 0.84 19.16 4.18 0.5468 0.02936 0.018980 0.061974
10.00 249 555 0.29 1.13 18.87 5.65 0.5230 0.01871 0.012286 0.079000
22.50 561 411 0.37 1.50 18.50 7.48 0.4935 0.00929 0.006221 0.083825
45.00 1122 259 0.39 1.88 18.12 9.41 0.4624 0.00545 0.003726 0.103517
90.00 2243 115 0.37 2.25 17.75 11.24 0.4328 0.00258 0.001801 0.098069
22.50 561 218 -0.26 1.99 18.01 9.93 0.4540 0.00123 0.000846 0.035073
5.00 125 388 -0.43 1.55 18.45 7.77 0.4888 0.00784 0.005263 0.053355
1.25 31 509 -0.31 1.25 18.75 6.24 0.5136 0.02603 0.017194 0.041203
0.00 0 621 -0.28 0.96 19.04 4.81 0.5366
Tested By Checked By Approved By
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T75 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 2.50 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.03
Volume (cm3) 39.27 37.37
Weight of Ring (g) 74.58 74.58
Wt. of Ring and Soil (g) 152.26 149.99
Moisture Content (%) 18.40 19.95
Bulk Density (g/cm3) 1.978 2.018
Dry Density (g/cm3) 1.671 1.682
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.618 0.540
Degree of Saturation (%) 80.49 99.90
Height of Solids (mm) 12.36 12.36
0.60

0.581

0.565

0.55 0.548

0.526
Void Ratio (e)

0.524

0.50
0.495 0.496

0.467 0.468

0.45
0.442

0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6179
1.25 31 819 0.46 0.46 19.54 2.30 0.5807 0.11705 0.074051
2.50 62 745 0.19 0.65 19.35 3.24 0.5655 0.04786 0.030569 0.050510
5.00 125 662 0.21 0.86 19.14 4.29 0.5484 0.02684 0.017332 0.056653
10.00 249 555 0.27 1.13 18.87 5.65 0.5265 0.01730 0.011333 0.073034
22.50 561 409 0.37 1.50 18.50 7.51 0.4965 0.00944 0.006309 0.085180
45.00 1122 271 0.35 1.85 18.15 9.26 0.4681 0.00496 0.003377 0.094194
90.00 2243 145 0.32 2.17 17.83 10.86 0.4422 0.00226 0.001569 0.086003
22.50 561 268 -0.31 1.86 18.14 9.30 0.4675 0.00147 0.001004 0.041978
5.00 125 404 -0.35 1.51 18.49 7.57 0.4954 0.00628 0.004201 0.042780
1.25 31 544 -0.36 1.16 18.84 5.79 0.5242 0.03018 0.019800 0.047779
0.00 0 620 -0.19 0.97 19.03 4.83 0.5398
Tested By Checked By Approved By
- - -
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T75 Job No. Decon-2040A
Sample No. UDS-02 Lab No. 537
Sample Depth 7.50 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.03
Volume (cm3) 39.27 37.36
Weight of Ring (g) 74.32 74.32
Wt. of Ring and Soil (g) 151.72 148.98
Moisture Content (%) 17.36 19.39
Bulk Density (g/cm3) 1.971 1.998
Dry Density (g/cm3) 1.679 1.674
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.609 0.531
Degree of Saturation (%) 76.99 98.63
Height of Solids (mm) 12.43 12.43
0.60

0.587

0.571

0.55 0.548

0.525
Void Ratio (e)

0.509
0.50
0.494
0.482
0.472

0.456
0.45
0.445

0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6095
1.25 31 888 0.28 0.28 19.72 1.42 0.5866 0.07205 0.045415
2.50 62 811 0.20 0.48 19.52 2.40 0.5708 0.04954 0.031535 0.052284
5.00 125 701 0.28 0.76 19.24 3.80 0.5484 0.03538 0.022852 0.074692
10.00 249 585 0.29 1.05 18.95 5.27 0.5247 0.01866 0.012237 0.078766
22.50 561 435 0.38 1.44 18.56 7.18 0.4940 0.00965 0.006459 0.087059
45.00 1122 326 0.28 1.71 18.29 8.56 0.4717 0.00390 0.002647 0.074013
90.00 2243 195 0.33 2.04 17.96 10.22 0.4449 0.00234 0.001620 0.088951
22.50 561 248 -0.13 1.91 18.09 9.55 0.4558 0.00063 0.000434 0.017994
5.00 125 378 -0.33 1.58 18.42 7.90 0.4823 0.00597 0.004030 0.040680
1.25 31 509 -0.33 1.25 18.75 6.24 0.5091 0.02809 0.018615 0.044475
0.00 0 618 -0.28 0.97 19.03 4.85 0.5314
Tested By Checked By Approved By
- - -
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T79 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 4.50 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.03
Volume (cm3) 39.27 37.36
Weight of Ring (g) 74.16 74.16
Wt. of Ring and Soil (g) 152.31 149.38
Moisture Content (%) 17.06 18.88
Bulk Density (g/cm3) 1.990 2.013
Dry Density (g/cm3) 1.700 1.693
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.590 0.513
Degree of Saturation (%) 78.16 99.51
Height of Solids (mm) 12.58 12.58
0.60

0.562
0.55
0.547

0.528
Void Ratio (e)

0.50 0.500 0.503

0.474
0.466

0.45 0.449
0.435

0.418

0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.5900
1.25 31 860 0.36 0.36 19.64 1.78 0.5617 0.08898 0.056974
2.50 62 788 0.18 0.54 19.46 2.69 0.5471 0.04576 0.029576 0.048296
5.00 125 695 0.24 0.77 19.23 3.87 0.5284 0.02955 0.019336 0.062382
10.00 249 569 0.32 1.09 18.91 5.47 0.5029 0.02002 0.013320 0.084518
22.50 561 428 0.36 1.45 18.55 7.26 0.4745 0.00896 0.006078 0.080843
45.00 1122 302 0.32 1.77 18.23 8.86 0.4490 0.00445 0.003070 0.084518
90.00 2243 149 0.39 2.16 17.84 10.81 0.4181 0.00270 0.001905 0.102629
22.50 561 235 -0.22 1.94 18.06 9.72 0.4355 0.00101 0.000705 0.028843
5.00 125 385 -0.38 1.56 18.44 7.81 0.4658 0.00681 0.004646 0.046369
1.25 31 555 -0.43 1.13 18.87 5.65 0.5001 0.03601 0.024008 0.057016
0.00 0 618 -0.16 0.97 19.03 4.85 0.5128
Tested By Checked By Approved By
- - -
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T81 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 6.00 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 18.99
Volume (cm3) 39.27 37.28
Weight of Ring (g) 74.62 74.62
Wt. of Ring and Soil (g) 150.01 148.54
Moisture Content (%) 18.96 21.54
Bulk Density (g/cm3) 1.920 1.983
Dry Density (g/cm3) 1.614 1.631
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.675 0.590
Degree of Saturation (%) 75.93 98.68
Height of Solids (mm) 11.94 11.94
0.70

0.65 0.653
0.637

0.618
Void Ratio (e)

0.60
0.595
0.579
0.562
0.55 0.550

0.527
0.513
0.50
0.489

0.45
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6749
1.25 31 899 0.26 0.26 19.74 1.28 0.6534 0.06762 0.040896
2.50 62 822 0.20 0.45 19.55 2.26 0.6371 0.05155 0.031490 0.054410
5.00 125 731 0.23 0.68 19.32 3.42 0.6177 0.03046 0.018831 0.064303
10.00 249 622 0.28 0.96 19.04 4.80 0.5945 0.01824 0.011442 0.077022
22.50 561 468 0.39 1.35 18.65 6.76 0.5618 0.01031 0.006602 0.093014
45.00 1122 305 0.41 1.77 18.23 8.83 0.5271 0.00606 0.003970 0.115179
90.00 2243 126 0.45 2.22 17.78 11.10 0.4890 0.00333 0.002236 0.126485
22.50 561 238 -0.28 1.94 18.06 9.68 0.5128 0.00139 0.000918 0.039571
5.00 125 415 -0.45 1.49 18.51 7.43 0.5505 0.00846 0.005459 0.057639
1.25 31 548 -0.34 1.15 18.85 5.74 0.5788 0.02968 0.018800 0.046990
0.00 0 601 -0.13 1.01 18.99 5.07 0.5900
Tested By Checked By Approved By
- - -
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T84 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 4.50 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.10
Volume (cm3) 39.27 37.49
Weight of Ring (g) 74.22 74.22
Wt. of Ring and Soil (g) 152.80 149.48
Moisture Content (%) 18.74 19.62
Bulk Density (g/cm3) 2.001 2.007
Dry Density (g/cm3) 1.685 1.678
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.604 0.531
Degree of Saturation (%) 83.87 99.79
Height of Solids (mm) 12.47 12.47
0.60

0.578

0.556
0.55

0.531
Void Ratio (e)

0.509
0.50
0.497

0.482

0.465
0.456
0.45
0.439

0.422

0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6040
1.25 31 874 0.32 0.32 19.68 1.60 0.5783 0.08078 0.051184
2.50 62 765 0.28 0.60 19.40 2.98 0.5561 0.06988 0.044910 0.073758
5.00 125 641 0.31 0.91 19.09 4.56 0.5308 0.03975 0.025966 0.083909
10.00 249 535 0.27 1.18 18.82 5.91 0.5092 0.01699 0.011257 0.071728
22.50 561 402 0.34 1.52 18.48 7.59 0.4821 0.00853 0.005753 0.076927
45.00 1122 275 0.32 1.84 18.16 9.21 0.4563 0.00452 0.003106 0.085939
90.00 2243 105 0.43 2.27 17.73 11.37 0.4216 0.00303 0.002130 0.115036
22.50 561 190 -0.22 2.06 17.94 10.29 0.4390 0.00101 0.000701 0.028759
5.00 125 318 -0.33 1.73 18.27 8.66 0.4650 0.00586 0.004001 0.039916
1.25 31 475 -0.40 1.33 18.67 6.67 0.4970 0.03355 0.022413 0.053120
0.00 0 644 -0.43 0.90 19.10 4.52 0.5314
Tested By Checked By Approved By
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T87 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 4.50 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.23
Volume (cm3) 39.27 37.75
Weight of Ring (g) 74.52 74.52
Wt. of Ring and Soil (g) 154.59 152.22
Moisture Content (%) 18.06 18.65
Bulk Density (g/cm3) 2.039 2.058
Dry Density (g/cm3) 1.727 1.735
Specific Gravity(assumed) 2.710 2.710
Void Ratio 0.569 0.508
Degree of Saturation (%) 85.99 99.42
Height of Solids (mm) 12.75 12.75
0.55

0.530

0.515
0.50 0.498

0.478 0.476
Void Ratio (e)

0.45
0.454
0.445
0.431
0.417

0.40
0.397

0.35
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.5691
1.25 31 804 0.50 0.50 19.50 2.49 0.5301 0.12293 0.080345
2.50 62 728 0.19 0.69 19.31 3.45 0.5149 0.04767 0.031466 0.050312
5.00 125 645 0.21 0.90 19.10 4.51 0.4984 0.02603 0.017372 0.054946
10.00 249 535 0.28 1.18 18.82 5.91 0.4765 0.01725 0.011682 0.072820
22.50 561 422 0.29 1.47 18.53 7.34 0.4540 0.00709 0.004875 0.063941
45.00 1122 308 0.29 1.76 18.24 8.79 0.4312 0.00397 0.002775 0.075468
90.00 2243 135 0.44 2.20 17.80 10.99 0.3968 0.00301 0.002158 0.114525
22.50 561 235 -0.25 1.94 18.06 9.72 0.4167 0.00116 0.000820 0.033100
5.00 125 375 -0.36 1.59 18.41 7.94 0.4446 0.00627 0.004342 0.042711
1.25 31 545 -0.43 1.16 18.84 5.78 0.4785 0.03554 0.024040 0.056270
0.00 0 695 -0.38 0.77 19.23 3.87 0.5084
Tested By Checked By Approved By
- - -
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T110 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 9.00 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.15
Volume (cm3) 39.27 37.60
Weight of Ring (g) 74.58 74.58
Wt. of Ring and Soil (g) 153.91 152.31
Moisture Content (%) 18.02 18.85
Bulk Density (g/cm3) 2.020 2.067
Dry Density (g/cm3) 1.712 1.739
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.579 0.512
Degree of Saturation (%) 84.10 99.52
Height of Solids (mm) 12.67 12.67
0.55
0.542

0.526

0.508
0.50
Void Ratio (e)

0.486
0.483

0.461
0.45 0.451

0.438

0.423

0.408
0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.5792
1.25 31 815 0.47 0.47 19.53 2.35 0.5421 0.11678 0.075727
2.50 62 735 0.20 0.67 19.33 3.37 0.5260 0.05050 0.033091 0.053298
5.00 125 645 0.23 0.90 19.10 4.51 0.5080 0.02840 0.018837 0.059960
10.00 249 535 0.28 1.18 18.82 5.91 0.4859 0.01736 0.011682 0.073284
22.50 561 411 0.31 1.50 18.50 7.48 0.4610 0.00783 0.005357 0.070613
45.00 1122 298 0.29 1.78 18.22 8.92 0.4384 0.00396 0.002755 0.075283
90.00 2243 145 0.39 2.17 17.83 10.86 0.4077 0.00268 0.001906 0.101932
22.50 561 222 -0.20 1.98 18.02 9.88 0.4231 0.00090 0.000632 0.025649
5.00 125 359 -0.35 1.63 18.37 8.14 0.4506 0.00618 0.004258 0.042062
1.25 31 519 -0.41 1.22 18.78 6.11 0.4827 0.03366 0.022705 0.053298
0.00 0 665 -0.37 0.85 19.15 4.25 0.5120
Tested By Checked By Approved By
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T112 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 4.50 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.08
Volume (cm3) 39.27 37.47
Weight of Ring (g) 74.59 74.59
Wt. of Ring and Soil (g) 153.48 151.15
Moisture Content (%) 19.36 19.55
Bulk Density (g/cm3) 2.009 2.043
Dry Density (g/cm3) 1.683 1.709
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.606 0.532
Degree of Saturation (%) 86.35 99.26
Height of Solids (mm) 12.45 12.45
0.60

0.578

0.563
0.55
0.545
Void Ratio (e)

0.523

0.506
0.50
0.493

0.477
0.468

0.45 0.449
0.435

0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6060
1.25 31 865 0.34 0.34 19.66 1.71 0.5785 0.08666 0.054903
2.50 62 790 0.19 0.53 19.47 2.67 0.5632 0.04815 0.030800 0.050816
5.00 125 699 0.23 0.76 19.24 3.82 0.5446 0.02921 0.018910 0.061656
10.00 249 595 0.26 1.03 18.97 5.14 0.5234 0.01669 0.010956 0.070464
22.50 561 448 0.37 1.40 18.60 7.01 0.4934 0.00944 0.006319 0.085133
45.00 1122 321 0.32 1.72 18.28 8.62 0.4675 0.00453 0.003086 0.086048
90.00 2243 162 0.40 2.13 17.87 10.64 0.4351 0.00284 0.001976 0.107729
22.50 561 228 -0.17 1.96 18.04 9.80 0.4485 0.00078 0.000542 0.022359
5.00 125 368 -0.36 1.61 18.39 8.03 0.4771 0.00642 0.004346 0.043714
1.25 31 511 -0.36 1.24 18.76 6.21 0.5063 0.03060 0.020315 0.048444
0.00 0 639 -0.33 0.92 19.08 4.58 0.5324
Tested By Checked By Approved By
- - -
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T112 Job No. Decon-2040A
Sample No. UDS-02 Lab No. 537
Sample Depth 9.00 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.04
Volume (cm3) 39.27 37.39
Weight of Ring (g) 72.12 72.12
Wt. of Ring and Soil (g) 148.46 146.95
Moisture Content (%) 18.48 20.68
Bulk Density (g/cm3) 1.944 2.001
Dry Density (g/cm3) 1.641 1.658
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.647 0.569
Degree of Saturation (%) 77.16 98.32
Height of Solids (mm) 12.14 12.14
0.65

0.612
0.60 0.601
0.588
Void Ratio (e)

0.567

0.55 0.549
0.540

0.520
0.512
0.50
0.490

0.475

0.45
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6474
1.25 31 830 0.43 0.43 19.57 2.16 0.6118 0.11194 0.069452
2.50 62 778 0.13 0.56 19.44 2.82 0.6010 0.03424 0.021388 0.036141
5.00 125 715 0.16 0.72 19.28 3.62 0.5878 0.02074 0.013064 0.043786
10.00 249 618 0.25 0.97 19.03 4.85 0.5675 0.01597 0.010187 0.067416
22.50 561 485 0.34 1.31 18.69 6.54 0.5397 0.00876 0.005688 0.079011
45.00 1122 355 0.33 1.64 18.36 8.19 0.5125 0.00476 0.003144 0.090352
90.00 2243 174 0.46 2.10 17.90 10.49 0.4746 0.00331 0.002245 0.125797
22.50 561 246 -0.18 1.92 18.08 9.58 0.4896 0.00088 0.000589 0.025020
5.00 125 389 -0.36 1.55 18.45 7.76 0.5196 0.00673 0.004426 0.045802
1.25 31 529 -0.36 1.20 18.80 5.98 0.5489 0.03073 0.019840 0.048651
0.00 0 623 -0.24 0.96 19.04 4.79 0.5685
Tested By Checked By Approved By
- - -
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T114 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 1.50 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.02
Volume (cm3) 39.27 37.34
Weight of Ring (g) 72.84 72.84
Wt. of Ring and Soil (g) 149.34 148.33
Moisture Content (%) 17.91 20.52
Bulk Density (g/cm3) 1.948 2.021
Dry Density (g/cm3) 1.652 1.677
Specific Gravity(assumed) 2.710 2.710
Void Ratio 0.640 0.560
Degree of Saturation (%) 75.80 99.32
Height of Solids (mm) 12.19 12.19
0.65

0.608
0.60
0.595
0.578
Void Ratio (e)

0.55 0.553
0.535
0.523
0.506
0.50
0.494
0.478

0.457
0.45

0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6403
1.25 31 845 0.39 0.39 19.61 1.97 0.6080 0.10163 0.063201
2.50 62 784 0.15 0.55 19.45 2.74 0.5953 0.03999 0.025071 0.042213
5.00 125 701 0.21 0.76 19.24 3.80 0.5780 0.02721 0.017243 0.057437
10.00 249 582 0.30 1.06 18.94 5.31 0.5532 0.01951 0.012558 0.082349
22.50 561 436 0.37 1.43 18.57 7.16 0.5228 0.00957 0.006286 0.086359
45.00 1122 298 0.35 1.78 18.22 8.92 0.4940 0.00503 0.003364 0.095497
90.00 2243 121 0.45 2.23 17.77 11.16 0.4572 0.00322 0.002212 0.122486
22.50 561 221 -0.25 1.98 18.02 9.89 0.4780 0.00121 0.000821 0.034600
5.00 125 355 -0.34 1.64 18.36 8.19 0.5059 0.00628 0.004167 0.042734
1.25 31 495 -0.36 1.28 18.72 6.41 0.5351 0.03060 0.019932 0.048441
0.00 0 614 -0.30 0.98 19.02 4.90 0.5599
Tested By Checked By Approved By
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T117 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 3.00 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.01
Volume (cm3) 39.27 37.33
Weight of Ring (g) 72.02 72.02
Wt. of Ring and Soil (g) 150.17 148.97
Moisture Content (%) 17.73 19.14
Bulk Density (g/cm3) 1.990 2.061
Dry Density (g/cm3) 1.690 1.730
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.599 0.520
Degree of Saturation (%) 80.00 99.48
Height of Solids (mm) 12.51 12.51
0.60

0.572

0.557
0.55

0.534
Void Ratio (e)

0.510
0.50 0.498

0.482
0.469
0.457
0.45
0.443
0.429

0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.5991
1.25 31 869 0.33 0.33 19.67 1.66 0.5725 0.08373 0.053249
2.50 62 795 0.19 0.52 19.48 2.60 0.5574 0.04730 0.030370 0.049922
5.00 125 682 0.29 0.81 19.19 4.04 0.5345 0.03611 0.023535 0.076232
10.00 249 561 0.31 1.12 18.88 5.58 0.5099 0.01934 0.012805 0.081629
22.50 561 426 0.34 1.46 18.54 7.29 0.4825 0.00863 0.005821 0.077846
45.00 1122 301 0.32 1.78 18.22 8.88 0.4571 0.00444 0.003046 0.084327
90.00 2243 165 0.35 2.12 17.88 10.60 0.4295 0.00241 0.001689 0.091748
22.50 561 232 -0.17 1.95 18.05 9.75 0.4431 0.00079 0.000550 0.022600
5.00 125 358 -0.32 1.63 18.37 8.15 0.4687 0.00575 0.003917 0.039173
1.25 31 501 -0.36 1.27 18.73 6.34 0.4977 0.03047 0.020342 0.048235
0.00 0 611 -0.28 0.99 19.01 4.94 0.5201
Tested By Checked By Approved By
- - -
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T120 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 3.00 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.00
Volume (cm3) 39.27 37.31
Weight of Ring (g) 72.08 72.08
Wt. of Ring and Soil (g) 150.23 148.91
Moisture Content (%) 18.79 19.38
Bulk Density (g/cm3) 1.990 2.059
Dry Density (g/cm3) 1.675 1.725
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.613 0.533
Degree of Saturation (%) 82.79 98.26
Height of Solids (mm) 12.40 12.40
0.60
0.591

0.572

0.554
0.55

0.533
Void Ratio (e)

0.517

0.50 0.501
0.490

0.472
0.458
0.45
0.438

0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6135
1.25 31 891 0.28 0.28 19.72 1.38 0.5911 0.07030 0.044181
2.50 62 798 0.24 0.51 19.49 2.57 0.5721 0.05998 0.038153 0.063304
5.00 125 711 0.22 0.73 19.27 3.67 0.5542 0.02805 0.018050 0.059220
10.00 249 605 0.27 1.00 19.00 5.02 0.5325 0.01709 0.011152 0.072153
22.50 561 451 0.39 1.39 18.61 6.97 0.5010 0.00993 0.006617 0.089601
45.00 1122 311 0.36 1.75 18.25 8.75 0.4723 0.00502 0.003407 0.095297
90.00 2243 145 0.42 2.17 17.83 10.86 0.4383 0.00297 0.002068 0.112995
22.50 561 242 -0.25 1.93 18.07 9.63 0.4581 0.00116 0.000794 0.033014
5.00 125 399 -0.40 1.53 18.47 7.63 0.4903 0.00723 0.004853 0.049250
1.25 31 529 -0.33 1.20 18.80 5.98 0.5169 0.02795 0.018423 0.044245
0.00 0 608 -0.20 1.00 19.00 4.98 0.5331
Tested By Checked By Approved By
- - -
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T129 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 3.00 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.05
Volume (cm3) 39.27 37.40
Weight of Ring (g) 74.45 74.45
Wt. of Ring and Soil (g) 149.57 152.62
Moisture Content (%) 18.80 21.58
Bulk Density (g/cm3) 1.913 2.090
Dry Density (g/cm3) 1.610 1.719
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.679 0.599
Degree of Saturation (%) 74.88 97.42
Height of Solids (mm) 11.91 11.91
0.70

0.65 0.654

0.635

0.613
Void Ratio (e)

0.60
0.589

0.566 0.565
0.55
0.535 0.534

0.506
0.50
0.488

0.45
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6787
1.25 31 882 0.30 0.30 19.70 1.50 0.6535 0.07918 0.047884
2.50 62 793 0.23 0.53 19.47 2.63 0.6345 0.05972 0.036535 0.063030
5.00 125 690 0.26 0.79 19.21 3.94 0.6126 0.03456 0.021429 0.072945
10.00 249 581 0.28 1.06 18.94 5.32 0.5893 0.01828 0.011505 0.077195
22.50 561 466 0.29 1.36 18.64 6.78 0.5648 0.00772 0.004931 0.069615
45.00 1122 322 0.37 1.72 18.28 8.61 0.5341 0.00537 0.003499 0.101982
90.00 2243 105 0.55 2.27 17.73 11.37 0.4879 0.00404 0.002718 0.153681
22.50 561 190 -0.22 2.06 17.94 10.29 0.5060 0.00106 0.000701 0.030099
5.00 125 324 -0.34 1.72 18.28 8.59 0.5346 0.00642 0.004185 0.043734
1.25 31 470 -0.37 1.35 18.65 6.73 0.5657 0.03266 0.020857 0.051699
0.00 0 625 -0.39 0.95 19.05 4.76 0.5987
Tested By Checked By Approved By
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T133 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 3.00 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.13
Volume (cm3) 39.27 37.56
Weight of Ring (g) 74.55 74.55
Wt. of Ring and Soil (g) 152.97 150.35
Moisture Content (%) 19.23 19.95
Bulk Density (g/cm3) 1.997 2.018
Dry Density (g/cm3) 1.675 1.682
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.614 0.544
Degree of Saturation (%) 84.68 99.17
Height of Solids (mm) 12.39 12.39
0.60

0.585
0.571

0.55 0.551

0.532
Void Ratio (e)

0.513
0.50 0.499

0.483
0.472

0.456
0.45

0.434

0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6139
1.25 31 860 0.36 0.36 19.64 1.78 0.5852 0.09031 0.056974
2.50 62 790 0.18 0.53 19.47 2.67 0.5708 0.04516 0.028747 0.047660
5.00 125 695 0.24 0.77 19.23 3.87 0.5513 0.03064 0.019752 0.064682
10.00 249 599 0.24 1.02 18.98 5.09 0.5317 0.01548 0.010108 0.065363
22.50 561 442 0.40 1.42 18.58 7.09 0.4995 0.01013 0.006754 0.091369
45.00 1122 309 0.34 1.76 18.24 8.78 0.4722 0.00477 0.003238 0.090555
90.00 2243 122 0.47 2.23 17.77 11.15 0.4339 0.00335 0.002337 0.127321
22.50 561 229 -0.27 1.96 18.04 9.79 0.4558 0.00128 0.000878 0.036426
5.00 125 362 -0.34 1.62 18.38 8.10 0.4831 0.00613 0.004132 0.041732
1.25 31 509 -0.37 1.25 18.75 6.24 0.5132 0.03161 0.020889 0.050043
0.00 0 658 -0.38 0.87 19.13 4.34 0.5438
Tested By Checked By Approved By
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T135 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 9.00 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.04
Volume (cm3) 39.27 37.38
Weight of Ring (g) 74.81 74.81
Wt. of Ring and Soil (g) 152.21 151.51
Moisture Content (%) 18.14 19.91
Bulk Density (g/cm3) 1.971 2.052
Dry Density (g/cm3) 1.668 1.711
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.620 0.542
Degree of Saturation (%) 79.06 99.26
Height of Solids (mm) 12.34 12.34
0.60

0.579

0.563
0.55
0.540
Void Ratio (e)

0.523 0.522

0.50
0.497
0.487
0.472

0.45 0.450

0.435

0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6202
1.25 31 802 0.50 0.50 19.50 2.51 0.5794 0.12823 0.081186
2.50 62 722 0.20 0.71 19.29 3.53 0.5630 0.05181 0.033148 0.054682
5.00 125 612 0.28 0.99 19.01 4.93 0.5403 0.03562 0.023124 0.075188
10.00 249 522 0.23 1.21 18.79 6.07 0.5218 0.01457 0.009575 0.061517
22.50 561 401 0.31 1.52 18.48 7.61 0.4969 0.00784 0.005235 0.070694
45.00 1122 282 0.30 1.82 18.18 9.12 0.4724 0.00428 0.002908 0.081340
90.00 2243 100 0.46 2.29 17.71 11.43 0.4350 0.00327 0.002282 0.124402
22.50 561 172 -0.18 2.10 17.90 10.52 0.4498 0.00086 0.000596 0.024607
5.00 125 352 -0.46 1.65 18.35 8.23 0.4868 0.00833 0.005600 0.056700
1.25 31 528 -0.45 1.20 18.80 5.99 0.5231 0.03799 0.024946 0.060150
0.00 0 621 -0.24 0.96 19.04 4.81 0.5422
Tested By Checked By Approved By
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T151 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 3.00 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.03
Volume (cm3) 39.27 37.36
Weight of Ring (g) 74.65 74.65
Wt. of Ring and Soil (g) 152.33 149.68
Moisture Content (%) 18.41 19.69
Bulk Density (g/cm3) 1.978 2.008
Dry Density (g/cm3) 1.671 1.678
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.618 0.540
Degree of Saturation (%) 80.52 98.65
Height of Solids (mm) 12.36 12.36
0.60

0.586

0.570

0.55 0.548

0.527
Void Ratio (e)

0.517

0.50 0.500
0.486
0.474

0.458
0.45
0.440

0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6180
1.25 31 845 0.39 0.39 19.61 1.97 0.5862 0.10025 0.063201
2.50 62 765 0.20 0.60 19.40 2.98 0.5697 0.05174 0.032961 0.054610
5.00 125 658 0.27 0.87 19.13 4.34 0.5477 0.03460 0.022356 0.073040
10.00 249 555 0.26 1.13 18.87 5.65 0.5266 0.01665 0.010909 0.070310
22.50 561 425 0.33 1.46 18.54 7.30 0.4999 0.00841 0.005606 0.075852
45.00 1122 298 0.32 1.78 18.22 8.92 0.4738 0.00456 0.003096 0.086693
90.00 2243 135 0.41 2.20 17.80 10.99 0.4403 0.00293 0.002033 0.111267
22.50 561 222 -0.22 1.98 18.02 9.88 0.4582 0.00104 0.000715 0.029694
5.00 125 356 -0.34 1.64 18.36 8.18 0.4857 0.00619 0.004167 0.042154
1.25 31 507 -0.38 1.25 18.75 6.26 0.5167 0.03255 0.021463 0.051538
0.00 0 618 -0.28 0.97 19.03 4.85 0.5395
Tested By Checked By Approved By
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T159 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 7.50 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.20
Volume (cm3) 39.27 37.70
Weight of Ring (g) 74.18 74.18
Wt. of Ring and Soil (g) 154.72 153.69
Moisture Content (%) 17.64 17.89
Bulk Density (g/cm3) 2.051 2.109
Dry Density (g/cm3) 1.743 1.789
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.550 0.488
Degree of Saturation (%) 86.63 99.01
Height of Solids (mm) 12.90 12.90
0.55

0.515

0.50 0.498

0.478
Void Ratio (e)

0.456 0.456
0.45

0.435
0.423
0.412
0.40 0.397

0.382

0.35
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.5504
1.25 31 822 0.45 0.45 19.55 2.26 0.5154 0.11031 0.072796
2.50 62 732 0.23 0.68 19.32 3.40 0.4976 0.05578 0.037242 0.058869
5.00 125 631 0.26 0.94 19.06 4.69 0.4778 0.03130 0.021178 0.066064
10.00 249 522 0.28 1.21 18.79 6.07 0.4563 0.01689 0.011596 0.071297
22.50 561 415 0.27 1.49 18.51 7.43 0.4352 0.00663 0.004620 0.059823
45.00 1122 298 0.30 1.78 18.22 8.92 0.4122 0.00403 0.002852 0.076530
90.00 2243 145 0.39 2.17 17.83 10.86 0.3821 0.00263 0.001906 0.100077
22.50 561 222 -0.20 1.98 18.02 9.88 0.3972 0.00088 0.000632 0.025183
5.00 125 355 -0.34 1.64 18.36 8.19 0.4234 0.00589 0.004136 0.040091
1.25 31 521 -0.42 1.22 18.78 6.08 0.4561 0.03429 0.023550 0.054290
0.00 0 685 -0.42 0.80 19.20 4.00 0.4884
Tested By Checked By Approved By
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. T-162 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 9.00 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.04
Volume (cm3) 39.27 37.38
Weight of Ring (g) 74.66 74.66
Wt. of Ring and Soil (g) 151.59 148.95
Moisture Content (%) 18.35 20.31
Bulk Density (g/cm3) 1.959 1.987
Dry Density (g/cm3) 1.655 1.652
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.633 0.555
Degree of Saturation (%) 78.36 98.99
Height of Solids (mm) 12.25 12.25
0.65

0.60 0.604
0.589

0.567
Void Ratio (e)

0.55
0.545
0.534
0.518
0.50 0.498
0.488

0.465
0.45 0.447

0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6330
1.25 31 860 0.36 0.36 19.64 1.78 0.6039 0.09138 0.056974
2.50 62 788 0.18 0.54 19.46 2.69 0.5890 0.04700 0.029576 0.049603
5.00 125 680 0.27 0.81 19.19 4.06 0.5666 0.03525 0.022499 0.074404
10.00 249 575 0.27 1.08 18.92 5.40 0.5448 0.01713 0.011091 0.072337
22.50 561 448 0.32 1.40 18.60 7.01 0.5185 0.00829 0.005459 0.074786
45.00 1122 299 0.38 1.78 18.22 8.90 0.4876 0.00540 0.003632 0.102650
90.00 2243 105 0.49 2.27 17.73 11.37 0.4474 0.00352 0.002430 0.133652
22.50 561 188 -0.21 2.06 17.94 10.31 0.4646 0.00100 0.000685 0.028590
5.00 125 351 -0.41 1.65 18.35 8.24 0.4984 0.00760 0.005072 0.051751
1.25 31 525 -0.44 1.21 18.79 6.03 0.5345 0.03786 0.024672 0.059937
0.00 0 622 -0.25 0.96 19.04 4.80 0.5546
Tested By Checked By Approved By
- - -
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. G2 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 2.50 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 18.99
Volume (cm3) 39.27 37.29
Weight of Ring (g) 74.58 74.58
Wt. of Ring and Soil (g) 151.51 153.32
Moisture Content (%) 18.92 20.41
Bulk Density (g/cm3) 1.959 2.111
Dry Density (g/cm3) 1.647 1.753
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.641 0.558
Degree of Saturation (%) 79.80 98.81
Height of Solids (mm) 12.19 12.19
0.65

0.612
0.60 0.599

0.579
Void Ratio (e)

0.559
0.55
0.538
0.526

0.511
0.50
0.495

0.476

0.457
0.45
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6408
1.25 31 860 0.36 0.36 19.64 1.78 0.6117 0.09182 0.056974
2.50 62 801 0.15 0.51 19.49 2.53 0.5994 0.03870 0.024195 0.040842
5.00 125 705 0.24 0.75 19.25 3.75 0.5794 0.03148 0.019933 0.066455
10.00 249 608 0.25 1.00 19.00 4.98 0.5591 0.01590 0.010201 0.067148
22.50 561 448 0.41 1.40 18.60 7.01 0.5258 0.01049 0.006878 0.094672
45.00 1122 301 0.37 1.78 18.22 8.88 0.4952 0.00536 0.003582 0.101760
90.00 2243 118 0.46 2.24 17.76 11.20 0.4570 0.00333 0.002288 0.126681
22.50 561 208 -0.23 2.01 17.99 10.06 0.4758 0.00109 0.000741 0.031151
5.00 125 375 -0.42 1.59 18.41 7.94 0.5106 0.00782 0.005179 0.053276
1.25 31 508 -0.34 1.25 18.75 6.25 0.5383 0.02908 0.018902 0.046034
0.00 0 604 -0.24 1.01 18.99 5.03 0.5583
Tested By Checked By Approved By
- - -
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. G2 Job No. Decon-2040A
Sample No. UDS-02 Lab No. 537
Sample Depth 5.50 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.08
Volume (cm3) 39.27 37.45
Weight of Ring (g) 72.08 72.08
Wt. of Ring and Soil (g) 149.48 147.65
Moisture Content (%) 19.41 20.68
Bulk Density (g/cm3) 1.971 2.018
Dry Density (g/cm3) 1.651 1.672
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.638 0.562
Degree of Saturation (%) 82.29 99.48
Height of Solids (mm) 12.21 12.21
0.65

0.605
0.60
0.589
0.571
Void Ratio (e)

0.55 0.550
0.539

0.519
0.506
0.50
0.493
0.476

0.45 0.451

0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6376
1.25 31 845 0.39 0.39 19.61 1.97 0.6054 0.10146 0.063201
2.50 62 765 0.20 0.60 19.40 2.98 0.5887 0.05237 0.032961 0.055270
5.00 125 682 0.21 0.81 19.19 4.04 0.5715 0.02716 0.017286 0.057343
10.00 249 578 0.26 1.07 18.93 5.36 0.5498 0.01702 0.010981 0.071851
22.50 561 432 0.37 1.44 18.56 7.21 0.5195 0.00956 0.006290 0.086217
45.00 1122 305 0.32 1.77 18.23 8.83 0.4930 0.00462 0.003093 0.087741
90.00 2243 105 0.51 2.27 17.73 11.37 0.4515 0.00364 0.002505 0.138175
22.50 561 222 -0.30 1.98 18.02 9.88 0.4758 0.00142 0.000961 0.040416
5.00 125 365 -0.36 1.61 18.39 8.06 0.5055 0.00669 0.004441 0.045529
1.25 31 525 -0.41 1.21 18.79 6.03 0.5388 0.03491 0.022687 0.055270
0.00 0 636 -0.28 0.92 19.08 4.62 0.5619
Tested By Checked By Approved By
- - -
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. G2 Job No. Decon-2040A
Sample No. UDS-03 Lab No. 537
Sample Depth 8.50 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.07
Volume (cm3) 39.27 37.44
Weight of Ring (g) 74.66 74.66
Wt. of Ring and Soil (g) 152.06 150.35
Moisture Content (%) 18.03 20.02
Bulk Density (g/cm3) 1.971 2.022
Dry Density (g/cm3) 1.670 1.684
Specific Gravity(assumed) 2.703 2.703
Void Ratio 0.619 0.543
Degree of Saturation (%) 78.77 99.62
Height of Solids (mm) 12.36 12.36
0.60

0.587

0.568

0.55
0.546
Void Ratio (e)

0.520 0.522

0.50
0.492 0.495

0.472

0.455
0.45
0.438

0.40
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6187
1.25 31 845 0.39 0.39 19.61 1.97 0.5868 0.10029 0.063201
2.50 62 755 0.23 0.62 19.38 3.11 0.5683 0.05823 0.037130 0.061460
5.00 125 645 0.28 0.90 19.10 4.51 0.5457 0.03559 0.023023 0.075118
10.00 249 531 0.29 1.19 18.81 5.96 0.5223 0.01844 0.012114 0.077850
22.50 561 399 0.34 1.53 18.47 7.63 0.4951 0.00854 0.005712 0.077049
45.00 1122 285 0.29 1.82 18.18 9.08 0.4717 0.00410 0.002784 0.077850
90.00 2243 119 0.42 2.24 17.76 11.19 0.4376 0.00298 0.002075 0.113360
22.50 561 205 -0.22 2.02 17.98 10.10 0.4552 0.00103 0.000708 0.029364
5.00 125 385 -0.46 1.56 18.44 7.81 0.4922 0.00832 0.005575 0.056647
1.25 31 519 -0.34 1.22 18.78 6.11 0.5198 0.02890 0.019016 0.045754
0.00 0 633 -0.29 0.93 19.07 4.66 0.5432
Tested By Checked By Approved By
- - -
CLIENT CONSULTANT CONTRACTOR
SNPDRI - Firm DECON

Project 660 KV HVDC Project from Mitiari to Lahore in Pakistan


decon
Soil and Concrete
Location Sindh, Pakistan
Testing Laboratory (Pvt) Ltd
BH / TP No. G5 Job No. Decon-2040A
Sample No. UDS-01 Lab No. 537
Sample Depth 4.00 Test Started -
Sampled Date - Test Completed -

CONSOLIDATION TEST ( ASTM D 2435 )


Details Initial Final
Ring Dia (mm) 50.00 50.00
Sample Height (mm) 20.00 19.03
Volume (cm3) 39.27 37.36
Weight of Ring (g) 74.12 74.12
Wt. of Ring and Soil (g) 149.40 148.65
Moisture Content (%) 17.70 21.11
Bulk Density (g/cm3) 1.917 1.995
Dry Density (g/cm3) 1.629 1.647
Specific Gravity(assumed) 2.696 2.696
Void Ratio 0.655 0.575
Degree of Saturation (%) 72.82 98.98
Height of Solids (mm) 12.08 12.08
0.65

0.630

0.612
0.60
0.588
Void Ratio (e)

0.564
0.55 0.552

0.533
0.523

0.505
0.50
0.492

0.469

0.45
10 100 Pressure (kPa) 1000 10000

Acc Sample
Load Pressure Dial Guage Change Strain Void av mv
Change Height Cc
(lb) (kPa) Reading (mm) (%) Ratio (cm2/kg) (cm2/kg)
(mm) (mm)
0.00 0 1000 0.00 0.00 20.00 0.00 0.6553
1.25 31 882 0.30 0.30 19.70 1.50 0.6305 0.07808 0.047884
2.50 62 795 0.22 0.52 19.48 2.60 0.6122 0.05756 0.035705 0.060756
5.00 125 682 0.29 0.81 19.19 4.04 0.5884 0.03738 0.023535 0.078913
10.00 249 565 0.30 1.10 18.90 5.52 0.5639 0.01935 0.012375 0.081706
22.50 561 418 0.37 1.48 18.52 7.39 0.5329 0.00973 0.006345 0.087747
45.00 1122 285 0.34 1.82 18.18 9.08 0.5050 0.00489 0.003248 0.092880
90.00 2243 115 0.43 2.25 17.75 11.24 0.4693 0.00312 0.002127 0.118719
22.50 561 222 -0.27 1.98 18.02 9.88 0.4917 0.00131 0.000879 0.037362
5.00 125 369 -0.37 1.60 18.40 8.01 0.5226 0.00695 0.004563 0.047309
1.25 31 508 -0.35 1.25 18.75 6.25 0.5519 0.03066 0.019755 0.048535
0.00 0 618 -0.28 0.97 19.03 4.85 0.5750
Tested By Checked By Approved By