Você está na página 1de 5

Test Report of

33/0.415 KV Transformer

Name of Substation: 66 KV 25 MW Astra Solren SS


Name of Equipment: 33/0.415 KV , Auxi. Transformer
Date of Testing: 13/04/2017
MVA: 100 KVA
Serial No: 16107004
Manufacturer: Danish
Impedance: 4.5%
Weather: Clean
Vector Group: DYn11
Phases: 3
Year of Mfr: 2016
Ambient Temp° C: 40 ̊ C

1
Page

Name of Substation: 66 KV25 MW Astra Solran


Date of Testing: 13/04/2017
Tested By: Rakesh Patel
Approved By: Naresh Soni
1) Test Result of Magnetizing Current Measurement

Apply 3 Ф volts on H.V. terminals and L.V. keep open


1U1V=410
1V1W=410
1W1U=410

Tap Current Measured in mA


No
1U Phase 1V Phase 1W Phase
1 0.25 0.18 0.17
2 0.26 0.19 0.17
3 0.26 0.19 0.18
4 0.27 0.20 0.19
5 0.27 0.20 0.20

2) Test Result of Magnetic Balance Test

Apply 3 -Ф 440 volts on H.V. terminals and L.V. keep open at tap no.3
Voltage Applied at HV Voltage Measured at HV side Voltage Measured at LV side
Terminals Terminals
1U1V 1V1W 1W1U 2u2n 2v2n 2w2n
1U1V 410 410 404 16.0 2.97 3.06 0.14
1V1W 410 193 410 194 1.50 2.96 1.47
1W1U 410 103 285 410 0.90 2.50 2.96
2
Page

Name of Substation: 66 KV25 MW Astra Solran


Date of Testing: 13/04/2017
Tested By: Rakesh Patel
Approved By: Naresh Soni
3) Test Result of Voltage Ratio Measurement

Apply 3-Ф Volts on H.V. terminals and keep L.V. Open

Tap Voltage Measured in Volt Voltage Measured in Volt


No
1U1V 1V1W 1W1U 2u2v 2v2w 2w2u 2u2n 2v2n 2w2n
1 411 411 410 4.95 4.94 4.94 2.73 2.72 2.68
2 411 411 410 5.07 5.06 5.06 2.90 2.90 2.89
3 411 411 410 5.20 5.20 5.19 2.97 2.97 2.97
4 411 411 411 5.35 5.33 5.33 3.05 3.05 3.04
5 411 411 410 5.47 5.47 5.47 3.13 3.13 3.12

3
Page

Name of Substation: 66 KV25 MW Astra Solran


Date of Testing: 13/04/2017
Tested By: Rakesh Patel
Approved By: Naresh Soni
4) Test Report of Vector Group Measurement

Apply 3-ph 440 Volts on H.V. terminals and keep 1U-2U. Shorted (TAP-5)

Measured Voltage:

1U-1V=392
1V-1W=400
1W-1U=400
1W-2w= 387
1W-2v= 390
1V-2v = 387
1V-2w= 387
1U-2n= 2.77
1V-2n= 389

Conditions:
1) 1W-2w<1W-2v
387 < 390
2) 1V-2v=1V-2w
387 = 387
3) 1U-2n+1V-2n=1U-1V
2.77 + 389 =392

4
Page

Name of Substation: 66 KV25 MW Astra Solran


Date of Testing: 13/04/2017
Tested By: Rakesh Patel
Approved By: Naresh Soni
5) Test Result of Transformer Winding Resistance
Measurement
HV Winding

Tap 1U1N Phase 1V1N Phase 1W1N Phase


no (Ω) (Ω) (Ω)

1 228.3 231.4 229.7


2 223.2 226.3 224.8
3 218.2 221.3 219.9
4 213.1 216.2 215.0
5 207.8 209.9 209.6

LV Winding
Sr.No 2u2n Phase 2v2n Phase 2w2n Phase
(mΩ) (mΩ) (mΩ)
3 9.424 9.437 9.590

6) Testing Results of IR Measurement

Apply Voltage 1 Minute (GΩ)


HV to LV 5000 53.3
HV to Earth 5000 39.7
LV to Earth 500 2.96
5
Page

Name of Substation: 66 KV25 MW Astra Solran


Date of Testing: 13/04/2017
Tested By: Rakesh Patel
Approved By: Naresh Soni

Você também pode gostar