Escolar Documentos
Profissional Documentos
Cultura Documentos
1/
GE Renewable Energy
2/19/2009
Wind Power
● Wind Power Plant
● Wind Energy & Power
Discussions
● Economic & Environmental Aspect
§ The earth receives 1.74 x
1017 watts of power (per
hour) from the sun
Energy in Wind 3/
GE Renewable Energy
2/19/2009
Kinetic Energy = Work =
½mV2 A
V
Where: d
M= mass of moving object
V = velocity of moving object
What is the mass of
moving air? = density (ρ) x
volume (Area x distance)
=ρxAxd
= (kg/m3) (m2) (m)
= kg
Power in Wind 5/
GE Renewable Energy
2/19/2009
Power from a Wind Turbine
Rotor
Cp½ρAV3
Albert
Betz
7/
GE Renewable Energy
2/19/2009
Wind Power
● Wind Energy & Power
● Wind Power Plant
Discussions
● Economic
1. The moving air spins the turbine blades. The blades are
connected to a low-speed shaft. When the blades spin,
the shaft turns.
Discussions
● Economic Considerations
San Jose, Dinagat
• consists of twelve (12) municipalities
• population of more than 30, 000 adults
or at most 6, 000 households
• San Jose also hosts a number of beach
resorts and recreation centers.
• presently powered by a diesel power
plant with installed capacity of 1.93 MW
which operates for 18 hours a day
• at other times of the day, San Jose is
deprived of electricity
13 /
GE Renewable Energy
2/19/2009
San Jose, Dinagat
• Dinagat Island exhibits moderate
wind resource.
• This means that Dinagat Island
can harness wind energy at a rate
of 200-300 W/m2 with a wind
speed of 5.6-6.4 m/s.
• At this rated wind speed and with
a fairly sized wind farm, the total
demand of San Jose can be met.
Load Survey 17 /
GE Renewable Energy
2/19/2009
0 2 4 6 8 10 12
Load Survey 18 /
GE Renewable Energy
2/19/2009
Wind Power
● Wind Power Plant
● Wind Energy & Power
Discussions
● Economic Considerations
Lay-outs
Transmission and Substation
Layout
Site
Floor
Floordevelopment
Plan
Plan Plant
Floor Plan
Floor
Plan
21 /
GE Renewable Energy
2/19/2009
Site
developm
ent Plant
22 /
GE Renewable Energy
2/19/2009
Transmissi
on and
Substation
Layout
23 /
GE Renewable Energy
2/19/2009
Specifications
Wind Turbine: Vestas V82
ü 3 wind turbines at 1.65MW rated
capacity each
24 /
GE Renewable Energy
2/19/2009
25 /
GE Renewable Energy
2/19/2009
Wind Power
● Wind Power Plant
● Wind Energy & Power
Discussions
● Economic Considerations
Economic Considerations
Pie Chart of Overall Capital Cost
27 /
GE Renewable Energy
2/19/2009
Equipment Quantity Unit Price Total
Including :
Interest during
2% 12,959,336.69
construction
PhP
Total 100%
647,966,834.40