Escolar Documentos
Profissional Documentos
Cultura Documentos
CONTRATISTA :
ACTA No: CONTROL
. O B R A C O N T R A T A D A CANTIDAD PRESENTE TOTAL EJECUTADO POR EJECUTAR
UNID CANT V. UNIT. VALOR HASTA ACTA CANTI. VALOR CANTI. VALOR
CANTI
CONT CONT TOTAL ANTERIOR EJECUT. TOTAL EJECUT. TOTAL
(+) IMPREVISTOS:
(+) UTILIDAD:
CONTRATISTA :
ACTA No: CONTROL
(+) IVA SOBRE LA UTILIDAD:
TOTAL A PAGAR EN LA PRESENTE ACTA
ARCIAL DE PAGOS
CONTROL
POR EJECUTAR
% EJECUTADO
VALOR TOTAL
EJEMPLO CLASE
ACTA PARCIAL DE PAGOS
CONTRATISTA :
ACTA No: 05
1. CANALIZACION .
1.1 I -2" CALZADA DESTAPADA ML 50 $4,774 $238,700 30 15 $71,610 45
1.2 I -4" CALZADA DESTAPADA ML 45 $7,882 $354,690 55 $433,510 55
1.3. VI 4" CALZADA ASFALTO ML 25 $28,385 $709,625 19 6 $170,310 25
1.5. VI 4" CALZADA DESTAPADA ML 550 $11,396 $6,267,800 400 120 $1,367,520 520
1.6. CAMARAS TIPO D UN 10 $867,897 $8,678,970 3 9 $7,811,073 12
402047444.xlsx Página 5
EJEMPLO CLASE
ARCIAL DE PAGOS
CONTROL
TOTAL EJECUTADO POR EJECUTAR
LA PRESENTE %
EJECUTADO
VALOR VALOR
CANTI
TOTAL
TOTAL
###
$3,335,532
###
402047444.xlsx Página 6