Você está na página 1de 1

500 KV TRANSMISSION LINE

BOJONEGARA - SURALAYA
Consortium Contractor : PT. PLN ( PERSERO ) Line Section :
PT. Perfect Circle Engineering UNIT INDUK PEMBANGUNAN JAWA BAGIAN BARAT

Contract No : Tower No :
0024.PJ/KON.02.01/UIP V/2016, Tertanggal
16 Pebruari 2016 INSPECTION WORK SHEET 25 /
AMANDEMEN 1 NO: 115AM-1/130/PIKITRING PC FOUNDATION Construction / Final
JBN/2010 Tgl. 20 Oktober 2010 Sheet 1 of 2
GENERAL
TOWER TYPE / FOUNDATION TOWER SET STUB DRAWING
FOUNDATION
BODY EXTN CLASS LEVEL DRAWING NO. No :
CC + 0 2b Non undercut + 0,0 m
TOWER / STUB MATERIALS High No
LEG CAP STUB EXT STUB CLEATS/ CLEATS D C
LEG
EXT EXT MARK NO LENGTH LEG BOLTS

A +9 2,0 5551 3 16

B -3 0,0 3456 3 16
C +0 0,0 3456 3 16
D +9 2,0 5551 3 16 A B
Line angle : 17°32'00" R
EXCAVATION LEG A LEG B LEG C LEG D
AVERAGE DEPTH to CP
EXCAVATION WIDTHS
STRATA
(describe)

DEWATERING REQUIRED YES / NO YES / NO YES / NO YES / NO


SHUTTERING EMPLOYED YES / NO YES / NO YES / NO YES / NO
CHANGE FOUND CLASS or TYPE YES / NO If Yes :
Comments :

FASE (mm) DIAGONALS (mm) TRUE SLOPE (mm/m)


STUB SETTING
A-B B-C C-D D-A A-C B-D A B C D
Required 24284,06 19213,41 23489,38 23586,26 31853,75 31960,79 311,13 311,13 311,13 311,13
Before concrete
STUB LEVEL
Measured ( mm )
Difference ( mm )
REINFORCEMENT ( If as per drawing (Yes) ; if not correct ( No ) + comments )
DIAMETER QUANTITY POSITION LENGTHS CONCRETE COVER

For PLN For Contractor For Supervisor


Comments :

R-01