Você está na página 1de 2

SUMMARY OF LOAD FOR DEMAND LESS THAN

100KVA(~140A)
MAP A
Project Name : Rumah di atas lot PTD4035 Application Number : PRJ-000-004-9093
A.BASIC INFORMATION
1. Address of Installation F,G,PTD4035,JLN SG TIRAM BT 16 1/2,81800 JOHOR BAHRU,JOH
2. Site Location(Lot & Mk Number) PTD4035
3. Premise Category Multi Premise
4. Type of Premise
5. Total Gross Built-in Floor Area
6. Total Land Area
7. Architect
Name
Address
Telephone No
Fax No
E-Mail Address
8. Surveyor
Name
Address
Telephone No
Fax No
E-Mail Address
9. Owner/Developer
Name MOHD NOR SANAWI BIN MUHAMAD SALEH
IC/Company No 810101-08-7235
Address F,G,PTD 4034,JLN SG TIRAM BT 16 1/2,81800 JOHOR BAHRU,JOHOR
Telephone No 0134719296
Fax No
E-Mail Address muhammad.zulhelmi.zawawi@gmail.com
10. Consultant Engineer
Name
Company No
Address
Telephone No
Fax No
E-Mail Address

Page1/2
SUMMARY OF LOAD FOR DEMAND LESS THAN
100KVA(~140A)
MAP A
11. Electrical Contractor
Name
Contractor No
Address
Telephone No
Fax No
E-Mail Address
12. Requirement For Temporary Supply MD(kW): Date Supply Required:
Voltage(V):
13. Date Supply Required - ORIGINAL MD(kW):8.00 Date Supply Required:27-Sep-2018
- FINAL MD(kW): Date Supply Required:
14 PLANS-CERTIFIED BY PROFESIONAL ENGINEER
3 SETS-Please specify Plan no & date below
14a. Master Development/Layout plan Plan No : Date :
(Approve by JPB&D)

14b. Site Plan/Proposed Sub-station Sites Plan No : Date :

14c. Layout Plan of Sub-station Building Plan No : Date :


(Stand-Alone/Compartment)

14d. Layout Plan of Main Switch Rooms Plan No : Date :

14e. Single Line Diagram/Schematic of Installation Plan No : Date :

15. Front elevation of building requiring supply

NOTES:
I The Master Development/ Layout Plans (14a) are approved by Local Authority/ Jabatan Perancangan Bandar & Desa/ Jabatan Tanah &
Galian. These plans should already contain TNB preliminary comments on sub-station and right of way/wayleave requirement, as the case
may be.
II The Site Plans/ Proposed Sub-stations Sites (14b) indicate the locations of sub-station sites for the overall development area.
III The Layout Plans of sub-station building (14c) must show the cable entry locations, trencing and ducting details according to TNB
specifications.
IV Layout Plans of Main Switch-room (14d) must indicate the location of MSB, trenching/ ducting details for cable entry.
V The wiring diagrams should indicate incoming switches, metering location and devices, protection schemes and devices, bus-bar and
switchgear rating
IV All drawings and plans are to be submitted in three (3) complete sets. Soft copies in ACAD are also preferable.

Page2/2

Você também pode gostar