Você está na página 1de 38

PORTFOLIO

J a a p Ko o p m a n s

Delft University of Technology


Student number: 4555953
jaapkoopmans@hotmail.nl
j.koopmans@student.tudelft.nl
Tel: (+31)652399135
2

Portfolio Jaap Koopmans Delft University of Technology


3

Portfolio Jaap Koopmans Delft University of Technology


About me
Education:

• Aarhus School of Architecture


2018-present: Exchange program

• Delft University of Technology


2016-present: Bachelor’s degree
Architectuur (Architecture)

4 Competences: Technical skills : • Kaj Munk College Hoofddorp


2009-2016: Havo and VWO,
Technasium program
1 Independent Sketchup
• Montessorischool Toolenburg
2002 - 2009: Primary school
AutoCAD
2 Flexible worker Work experience:

Rhino • MeerRadio en MeerTelevisie


2016 - present: Radio DJ at the local
3 Teamplayer radio station of the
Indesign Haarlemmermeer

• Gamma (hardware store) Hoofddorp


Illustrator
4 Motivated 2015 - present: Service desk
employee
Photoshop • Intertoys (toy store) Hoofddorp
5 Perseverance 2012-2015: Store employee

Portfolio Jaap Koopmans Delft University of Technology


Contents
YEAR 1
1 Private Housing Design Studio 1
1 2 2 Public Building Design Studio 2

YEAR 2 5
3 Urbanism Design Studio 3
3 4 4 Residential Design Studio 4

OT H E R P R OJ ECT S
Borneo Sporenburg Analysis GR4
Facade Renovation TE5

Portfolio Jaap Koopmans Delft University of Technology


D ES I G N S T U D I O 1
Ho u s e a n d i m p l e m e n t i n g i n t h e l a n d s c a p e
7

Portfolio Jaap Koopmans Delft University of Technology


C o n t ex t
The goal of this project was to design a
small free standing bed and breakfast home
with the corresponding lot in the province
Zuid-Holland.
The program and area of the house were
given but both had to be examined in order
to create a coherent design. In the first five
weeks, I worked with a team to research the
boundary conditions of the design. What
8 kind of measeurements were needed? And
what should be the exact location in the
area where you can fullfill the wishes of the
client from this assignment? It were these
kind of questions that had to be answered
while presenting the results of the research.
Afterwards, we had to develop a concept
drawing for the house itself individually and
work that out to a complete substantiated
design in five weeks.
The finished result had to be posters with a
maquette.

Portfolio Jaap Koopmans Delft University of Technology


Model

Portfolio Jaap Koopmans Delft University of Technology


S ke t c h e s

10

Portfolio Jaap Koopmans Delft University of Technology


Te c h n i c a l d r a w i n g s

11

scale 1:2000

Portfolio Jaap Koopmans Delft University of Technology


D ES I G N S T U D I O 2
D e s i g n a n d E n g i n e e r i n g
13

Portfolio Jaap Koopmans Delft University of Technology


C o n tex t
The title of this design studio was:
‘‘Designing and engineering.’’ This already
suggests that this project is more focused
on the combination of designing with the
technological aspect of it. We were asked
to design a small utilitarian building, in this
case a rowing club, at a given location in
Amsterdam with special attention for the
spatial- as well as the material design.
14 During the design process, we came across
different disciplines. From planning in
urban context to detailing of connections
in the building structures and calculating
the supporting structure. By integrating
these different disciplines, an overall plan
is formed. Always taking the environmental
aspects into account. Also, the climate
design is part of this overall plan. The overall
plan had to be presented with posters and
some supportive scale models.

Portfolio Jaap Koopmans Delft University of Technology


Models

15

Portfolio Jaap Koopmans Delft University of Technology


S ke t c h e s

16

Portfolio Jaap Koopmans Delft University of Technology


Te c h n i c a l d r a w i n g s

17

Portfolio Jaap Koopmans Delft University of Technology


D ES I G N S T U D I O 3
C i t y a n d t h e P u b l i c S p a c e
19

Portfolio Jaap Koopmans Delft University of Technology


C o n tex t
This course was an introduction to urban
design. The focus was on a certain location
around the Erasmus medical Center and
Museum Park in Rotterdam. At this project
work is done on different scales, from the
city as a whole to the details in the public
space.
In the first few weeks, a urban vision is
formed about the whole area. This was
20 done in teams. Afterwards, every team
member got its own ‘part’ of the urban vision
to furhter develop into a urban design. At
the same time, various small designs were
made to examine the relationship between
abstract vision and concrete public space.
The focus at our specific group was put on
to the historical context of the area and the
application of the bike as the primary means
of transport. This was done by designing a
whole new urban space without any roads
but only bike lanes. Also, without removing
any of the existing buildings but using their
qualities and giving them a contemporary
transformation, the historical print is kept
in place. My part was also about finding an
approriate design for an area were startup
companies could establish themselves
and providing them with a healthy business
climate in the public space (Silicon Maas).

Portfolio Jaap Koopmans Delft University of Technology


Concept model

21

Portfolio Jaap Koopmans Delft University of Technology


S ke t c h e s

22

Portfolio Jaap Koopmans Delft University of Technology


Conceptual sections

23

Portfolio Jaap Koopmans Delft University of Technology


24
D ES I G N S T U D I O 4
Residential Building and Living Environment

Portfolio Jaap Koopmans Delft University of Technology


25

Portfolio Jaap Koopmans Delft University of Technology


C o n tex t
In the fourth design studio, we got to work
on a design for an ensemble of existing
and new residential buildings in Slotervaart,
Amsterdam. It was also asked to design the
connecting collective space between these
buildings.
In groups, the location and context was
analyzed and with that information, a
new urban plan was formed. It was really
26 important with this plan, not only to focus on
the architectural quality and living comfort,
but also to its collective space or its ‘social
sustainability.’
Later on, every group member gets a part
of the urban plan to furhter develop into a
full elaborate design. This part must contain
a new constructed- but also a renovation
part. Moreover, a part of the urban space
is designed. The outcomes were mostly
presented in sections to show the cohesion
between the elements and how they
interact with eachother. It was furthermore
asked to choose one of the elements
(renovation or new) and furhter detail it
with construction drawings and a more
comprehensive facade design. The new part
of my design consisted of small self-build
homes but with written out guidelines and
examples of homes and facades.

Portfolio Jaap Koopmans Delft University of Technology


Conceptual model

27

Portfolio Jaap Koopmans Delft University of Technology


Concept
Existing building

EIN
IS PL
HU
EN
EIG
Rising points

Transparant passage

T
AA
S TR
28 BO
OM
ON
HO
SC
Gallery entrances

11660 mm 13000 mm 23700 mm 20000 mm

Portfolio Jaap Koopmans Delft University of Technology


Te c h n i c a l d r a w i n g s 120
m2 12
0m
2
12
0m
2

2
0m
17
2
0m
17

2
m
80
2
m
35
2
m
30

Ve
rd
.2
t/
m
2

3
m
80
2
m
80
29

2
0m
20
2
0m
20

m
6
m
6
m
6
m
6
m
6
Portfolio Jaap Koopmans Delft University of Technology
G R O N D S L AG E N 3
Analysis of Borneo Sporenburg
31

Portfolio Jaap Koopmans Delft University of Technology


C o n tex t
In this team project, one of the exercises
was the central point in which already built
designs of residential environments and
the ideas behind them are examined by
means of comparative plan analysis. As a
team, you get one main project which in my
case was the Borneo Sporenburg project in
Amsterdam by west 8. Every team member
gets one reference project.
32 Our goal was to constantly compare the
reference projects to the main project.
Eventually, you had to create a showcase
display in which you would present the
vision behind the main project. This also
included different found striking features
from the project. Furthermore, a small-form
report was requested wherein you showed
the hand drawn comparsions with the
other reference projects on different scale
levels; city; neighborhood; residential block
and the house. We ended up with a model
that did not only show the differentiation in
the project, but also the meeting of all the
elements by looking to the model from a
distance and seeing it become a whole.

Portfolio Jaap Koopmans Delft University of Technology


33

Portfolio Jaap Koopmans Delft University of Technology


T EC H N O LO GY 5
F a c a d e R e n o v a t i o n
35

Portfolio Jaap Koopmans Delft University of Technology


C o n tex t
This project was part of the overall
Technology 5 course which was about
dwelling technology. Especially at this
course, there was explicit attention to the
technical aspects of reusing residential
buildings. The goal was to technically
redesign an outdated residential building
in Delft (in this case it was the Tingieterpad)
so that it would meet the technical
Modulogreen
36 XPS-Isolatie Gevelsysteem requirements of today.
To achieve that, an analyisis of the whole
Bestaande constructie constructional part of the building is made
in the first place. Then, the weak parts are
getting improved by adding, removing and
changing parts of the existing design.
Al this was done in a team of three people.
After that, every member of the group
gets a part of the building for redesigning
the facade. This was done in such a way
that every member end up with its own
Zwevende dekvloer redesign of the facade. I made the decision
met vloerverwarming of using the Modulogreen system and an
angled solar panel system so that not only
Gevelklemmen the appearance of the facade would be
improved but also its thermal, acoustic and
energy genereating quality. Challenge with
this, was to deail the system correctly to the
already existing facade without having to
remove a lot of the old facade.

Portfolio Jaap Koopmans Delft University of Technology


Modulogreen
Facade system

Houten kozijn 67x114mm HR+ dubbel glas U=1,3 W/m2K

Vensterbank

37

Vloeropbouw:
- Afwerkingslaag 90mm
- Vloerverwarming
- Druklaag
- Contactisolatie 30mm
- Bestaande hollebaksteen-
vloer 160mm

Houten voorzetwand
voor
constructie van
Moduologreen gevel.

Portfolio Jaap Koopmans Delft University of Technology


38

Portfolio Jaap Koopmans Delft University of Technology

Você também pode gostar