1.

0 INTRODUCTION

Slabs are the flooring systems of most structures including office, commercial and
residential buildings, bridges, sports stadiums and other facilities building. The main functions
of slabs are generally to carry gravity forces, such as loads from human weight, goods and
furniture, vehicles and so on. In modern structure design particularly for high rise buildings
and basement structures, slabs as floor diaphragms help in resisting external lateral actions such
as wind, earthquake and lateral earth load.

Depending on the structure framing configuration, architectural requirement, analysis


and design methods selected by the engineer, slabs can be uniform thickness or ribbed spanning
in one way or two ways between beams and/or walls. These flooring systems can be cast-in-
situ reinforced concrete, metal deck with in-situ concrete, precast concrete or prestressed
concrete. Concrete slabs which are resting on support columns only either with or without
column heads and drop panels are defined as flat slabs.

In general, reinforced concrete floor slabs are often analyzed and designed as uniform
plate elements which only possess out-of plane stiffness to carry loads acting normal to the
plane of the slab. In other words, slabs are designed to resist only the bending moment in two
orthogonal directions as well as twisting moments.

Besides that, slabs also contribute to the lateral load resistance and stability by
transmitting the forces to main framing systems, that are, the floor beams, columns, shear walls
or core walls. This is based on the assumption that in-plane stiffness of slabs is so great that it
act as a rigid diaphragm. Three common types of lateral actions on a structure are the lateral
earth pressures, wind forces and seismic loads.

However, an important issue which is often overlooked by the design engineers is that
in order for a slab to provide ideal diaphragm actions, the slabs must possess adequate
thickness. The diaphragm stresses in slab due to in-plane forces, might have exceeded the
concrete resistance capacity and often slabs are not checked regarding this matter. The cast-in-
situ reinforced concrete connection between slabs and beams or between slabs and columns or
walls is another important feature that is often not carefully reviewed and detailed by the end
of design stage to tally with the preceding analysis assumption.
2.0 COMPANY PROFILE

The site visit was carried at at one of the site of BCB Construction project at Batu
Pahat. BCB Construction is the branch of BCB Berhad. BCB Berhad act as a developer
meanwhile BCB Construction act as a contractor and implementer of BCB Berhad.

BCB Berhad (“BCB”) was incorporated in Malaysia as a private limited company on


13 July 1988 under the name of Kemajuan Buditama Sdn. Bhd. On 21 August 1995, BCB
was converted into a public company and assumed its present name of BCB Berhad. BCB
was subsequently listed in the main board of Bursa Malaysia on 3 December 1996.

BCB’s roots are in Kluang, Johor. BCB is the largest property developer in Batu
Pahat and Kluang towns – the second and third largest towns in Johor state. The Company’s
development projects are spread over several towns in Johor namely Kluang, Batu Pahat,
Parit Raja, Pontian, Yong Peng and Johor Bahru. In addition, it has a development project in
Senawang, Negeri Sembilan.

In year 2010, BCB ventured into the Klang Valley and today is the proud owner and
developer of the high-end condominium project in Concerto North Kiara, Kuala Lumpur and
the high-end gated and guarded bungalow township in Home Tree at Kota Kemuning, Shah
Alam, Selangor.

Other than property development, it owns the largest hotel, Prime City (with 213
rooms) in Kluang town. In addition, it also owns 2 shopping malls – BCB Plaza in Kluang
and U-Mall in Taman Pulai Utama near Skudai.

BCB Construction will appoint a subcontractor to carry out the construction work like
slab and concreting. BCB Construction will only look and manage the work progress iat the
site. There are four projects going on under BCB Construction at Batu Pahat. The site manager
at BCB Construction is Mr. Chan Ching Hong and assisted by Mr. Teh Heng Keng and Mr.
Azhar Zainal as a site supervisors.