Você está na página 1de 1

GE Oil Gas Quality Management System

QF-SS-BAT-QUA-030
Subsea Systems - Quality Revision: 2.0
Pressure Test report

P/N: REV : B DESC : CONTROL LINE ASSY, C-77M, 1/4, BOLT-ON ARR FOR SALES ORDER: CBR0044 TEST REQUIREMENTS : TEST PROCEDURE: PSL:
GLAND CLEARANCE
R70815-1 EPS R70815-1 EPS R70815-1; N/A
SQR-PTT1
CHART RECORDER / PRESSURE
TEST TYPE TEST PRESSURE (PSI) GAGE
TRANSDUCER
HOLDING TIME(MIN)
ORDER
MFG. ORDER HYDRO GAS RESULT S/N S/N
QTY
HYDRO GAS DUE DATE DUE DATE
1 st Cycle 2 nd Cycle 3 rd Cycle 1 st Cycle 2 nd Cycle 3 rd Cycle 1 st Cycle 2 nd Cycle 3 rd Cycle RANGE RANGE
HYDRAULIC BODY LOW PRESSURE SPG01M2 MCP0231-18
M124760 20 EA TEST N/A 300 N/A N/A N/A N/A N/A 5 N/A N/A PASS 14-Oct-18 28-Dec-18
0-1000PSI 0-1000PSI
HYDRAULIC BODY HIGH PRESSURE SPG20M4 MCP0233-18 0-
#1 7 to 20 TEST N/A 15000 15000 N/A N/A N/A N/A 3 15 N/A PASS 9-Oct-18 4-Jan-19
0-20000 10000PSI
HYDRAULIC LOW PRESSURE SPG01M2 MCP0231-18
FUNCTION TEST NEEDLE N/A 300 N/A N/A N/A N/A N/A 5 N/A N/A PASS 14-Oct-18 28-Dec-18
0-1000PSI 0-1000PSI
HYDRAULIC HIGH PRESSURE SPG20M4 MCP0233-18 0-
FUNCTION TEST NEEDLE N/A 10000 N/A N/A N/A N/A N/A 15 N/A N/A PASS 9-Oct-18 4-Jan-19
0-20000 10000PSI

NOTE:

DRIFT TEST TPI/Customer Representative WITNESS


SINGN &
TESTED BY QC WITNESSED BY SINGN & DATE
DRIFT S/N DRIFT SIZE (INCH) RESULT DATE
NOM SIZE NAME/ORGANIZATION SINGNATURE & DATE

N/A N/A N/A N/A

GE PROPRIETARY
QT-SS-GLO-008/Rev:1.0 UNCONTROLLED WHEN PRINTED OR TRANSMITTED ELECTRONICALLY Page 1 of 1

Você também pode gostar