Você está na página 1de 8

Appendix to List of Drawings

Information to be included in the drawings submitted for approval, relevant to electrical


installations

No. Documents to be Information Notes


submitted (see Sec. 1
[2.1.1])

1. One line diagram of main and The drawing is to include the single line At least the following additional
emergency power systems diagram of: information are to be included in
(including ac and dc power - The main switchboard and all the feeders the drawing:
systems) including lighting connected to the main switchboard - Type of distribution system
systems (see Fig. 1). - The emergency switchboard and all - Interlocks
feeders connected to the emergency - Electrical protections of each
switchboard feeder
- Interconnector feeder between main - Electrical protection of generator
switchboard and emergency switchboard and batteries
- The main and emergency source of - Measuring instruments
electrical power (i.e. generators or - Ratings of machines,
batteries) transformers, batteries,
- Any section boards and distribution semiconductor converters, etc.
boards
- The motor control centers (MCC)
- The main and emergency lighting
distribution
- Transformers, converters and similar
appliance which constitute an essential
part of the electrical supply system
- Uninterruptible power system units (UPS)
when providing an alternative power
supply to essential services and/or when
providing an alternative power supply or
transitional power supply, if any, to the
emergency services.

2. Electrical power balance of main The load balance of the main supply is to The loads should be grouped in
and emergency supply (see Fig. include at least the following operating relation to the type of service, e.g.
2). modes: engine services, propulsion
- Navigation
services, air conditioning services,
- Port
- Maneuvering, when additional users galley services, accommodation
intended only for maneuvering (such as services, lighting, safety services,
bow thrusters) are installed. etc.
The load balance is to include all the loads
(essential and not-essential) supplied during Evidence that the emergency
source of electrical power is capable
normal operation of the vessel, taking into
of supplying the emergency loads
consideration their utilization factor and the for the time as requested by the
simultaneity factor. applicable Standard is to be
provided on the drawing.
The main load balance is to include the
expected operating profiles, i.e. the number of

1
generating sets connected to the network in
each operating modes.

The load balance of the emergency supply is to


include all the emergency loads in
simultaneous operation, taking into
consideration their utilization factor.

3. Calculation of short-circuit The drawing is to include the short circuit The content of the drawing is
currents for each installation in calculation of: under Designer responsibility and
which the sum of rated power of - main switchboard, will not be reviewed by RINA; the
the energy sources which may be - emergency switchboard document will be kept for
connected contemporaneously to - all the section board, distribution board, information only.
the network is greater than 500 MCC, including those fed from transformers.
kVA (kW)
4. List of circuits including, for each The drawing is to include at least the following
supply and distribution circuit, data/information:
data concerning the nominal For main generators:
current, type, length and - rated power, rated current and rated
cross-section of the cables, frequency;
nominal and setting values of the - cross sectional area of cables of feeder
protective and control devices connecting generators to the
(see Fig. 3). switchboards, type and manufacturer of
cables, length and current carrying
capacity;
- type and manufacturer of circuit breaker
and their electrical characteristics
(breaking and making capacity, rated
current), type and settings of relay
(instantaneous setting, short delay setting
and long delay setting);
- type of protections provided for
generators (e.g. reverse power protection,
undervoltage protection, etc.).
For emergency generators:
- rated power, rated current and rated
frequency;
- cross sectional area of cables of feeder
connecting generators to the
switchboards, type and manufacturer of
cables, length and current carrying
capacity;
- type and manufacturer of circuit breaker
and their electrical characteristics
(breaking and making capacity, rated
current), type and settings of relay;
- type of protections provided for
generators (e.g. undervoltage protection,
etc.).
For main switchboard, emergency
switchboards, each section board, each
distribution board, motor control centers and
UPS and/or battery distribution:
- rated voltage and short circuit currents;
- for each service (essential and not
essential):
o rated power and rated current,

2
o type, manufacturer, cross-sectional
area, current carrying capacity,
voltage drop and length of cables;
o type and manufacturer of circuit
breaker and their electrical
characteristics (breaking and making
capacity, rated current) and type and
settings of relay;
o emergency shutdown, if provided
o connection to the load shedding
device (or to other equivalent
arrangements).

5. One line diagram and detailed The drawing of the single line diagram of the The functional diagram is necessary
functional diagram of the main main switchboard is to include at least: to check the operation of a
switchboard. • front view of the switchboard switchboard which include
• bus-bars dimension switchgear and controlgear
• electrical protection of each feeder assembly with associated control,
• indicating and control instruments measuring, signalling, protective,
• details of services supplied regulating equipment with all the
• type of electrical protection provided for internal electrical and mechanical
the main generators interconnections.
• degree of protection.
A functional description of
The functional diagram is to be a detailed operation of the main switchboard
two-wire, three-wire or four-wire diagram, as in all operational modes should be
applicable, and is to include: submitted for information to
• Measuring circuit and instruments support the approval of the
(voltmeters, insulation monitoring functional diagram of the
devices, ammeter, etc.) switchboard.
• Indicating and control circuits
• Protective devices (e.g. reverse power
protection, undervoltage protection, etc.)
of main generators
• Load shedding device
• Details of interlocks (e.g. interlocks of
circuit breakers of the main generators
with circuit breaker of shore connection,
etc.)
• List of components.

6. One line diagram and detailed The drawing of the single line diagram of the The functional diagram is necessary
functional diagram of the emergency switchboard is to include at least: to check the operation of a
emergency switchboard. • front view of the switchboard switchboard which include
• bus-bars dimension switchgear and controlgear
• electrical protection of each feeder assembly with associated control,
• indicating and control instruments measuring, signalling, protective,
• details of services supplied regulating equipment with all the
• type of electrical protection provided for internal electrical and mechanical
emergency source of power (batteries or interconnections.
generators)
• degree of protection. A functional description of
operation of the emergency
Where the emergency source of electrical switchboard in all operational
power is a generator, the functional diagram modes: e.g. manual, automatic (if
is to be a detailed two-wire, three-wire or required by the Rules) should be
four-wire diagram, as applicable, and is to submitted for information as a
include: support for the approval of the

3
• Measuring circuit and instruments functional diagram of the
(voltmeters, insulation monitoring emergency switchboard.
devices, ammeter, etc.)
• Indicating and control circuits
• Protective devices of emergency source
of power
• Preferential tripping device, if any
• Detail of interlocks (e.g. interlocks of
circuit breaker of the emergency
generator with circuit breaker of feeder
connecting main and emergency
switchboard, interlock of circuit breaker
of the emergency generator with circuit
breaker of shore connection, where
connected to the emergency
switchboard, etc.)
• Auxiliary circuits diagram and relevant
power supplies
• Operational modes (manual and
automatic, if required by the Rules)
• List of components including type and
manufacturer.

7. Diagrams of the section boards The drawing of motor control center is to It is intended that also the drawing
and motor control centres of include: of the distribution boards and single
essential and emergency services, • the single line diagram starters having nominal current
having a nominal current of • detailed three-wire functional diagram of greater than 100 A are to be
100 A or above. each starter, including power, control and submitted for approval.
signaling circuits (see Fig.4)
• detail of auxiliary power supplies (i.e. if
they are taken from the power circuit or
by an external power supplies)
• list of components
• front view.
8. Detailed diagram of the The drawing is to be a three-wire functional Type, number and characteristics of
navigation-light switchboard (see diagram of the distribution board specially navigation lights is not required to
Fig. 5). reserved for the navigation lights and is to be included in the present drawing
include:
- power supplies
- the change-over switch
- the electrical protection of each navigation
light (circuit breakers or double-pole switch
and a fuse)
- audible and/or visual warning provided in
case of failure of the navigation light

9. For electrical propulsion The single line diagram is to include:


installations: single line diagram, - ratings of electrical machines, transformers,
control system and its power batteries, harmonic filters, converters,
supply diagram, alarm and cables, etc.
monitoring -
system including list of alarms - size and current rating of cables
and monitoring points and its - type and rating of circuit-breakers and fuses
power supply diagram, safety - details of instrumentation and protective
system including the list of devices
monitored parameters and its - wiring diagram of power supplies of auxiliary
power supply diagram. circuits.

4
* The figures are only for the purpose of illustration of the type of layout of the referred document.

Figure 1

5
Figure 2

Figure 3

6
7
Figure 4

Figure 5