Você está na página 1de 6

Bituminous Surfacing

Durable and Economical Technology for


Bituminous Surfacing
of Rural Roads
Prof. Prithvi Singh Kandhal

Introduction into the sprayed thick bitumen layer. This dressing was very effective in water-
completes the surface dressing operation proofing the water-bound macadam (WBM)
The Pradhan Mantri Grameen Sadak
as illustrated in Figure 1. roads because of heavy bitumen application
Yojna (PMGSY) has been one of the most
The premix carpet (PMC) simply consists rate followed by chip application. Surface
successful flagship programmes launched
of single size (about 12 mm) stone chips dressing was scheduled once in 3 or 4
by former Prime Minister Atal Bihari
mixed with 3.5% bitumen by weight at a years on all roads. Very few potholes dotted
Vajpayee in 2000 for constructing a wide
hot mix plant. PMC is highly open graded the roads at that time, and traffic volumes
network of rural roads across India. During
because the mix does not contain any fine were generally less. Road construction was
the last 17 years, a total of 5,29,975 km
aggregate (sand). This mix is laid in 20 mm largely manual and hardly mechanized.
of PMGSY roads has been constructed
thickness manually or with a paver. A sand Bitumen for surface dressing was applied
connecting villages of over 500 people,
seal coat is provided at the top. with perforated tin cans. Spreading the
which is a commendable task!
surface aggregate (chips) by hand was
Two technologies (surface dressing and The objective of this paper is to discuss
an art learnt through practice, usually
premix carpet) are specified in India’s ‘Rural these two technologies in detail and
by swirling the basket containing the
Roads Manual’ for bituminous surfacing of recommend the one which is better both in
aggregate.
rural roads such as those under PMGSY. terms of durability and economics.
As is often usual with surface dressing,
Either of these two technologies are History of Bituminous chips were dislocated and became loose if
permitted. Both are also standardized by
Surfacing the treated road was opened too soon to
the Indian Roads Congress (IRC).
When the author was serving as a highway traffic, or slow speeds were not maintained
Surface dressing (also called chip seal) just after construction. The finished road
engineer in the Rajasthan PWD during the
consists of spraying a thick film of bitumen surface was not black and, therefore, not
early 1960s, it was very common to use
over the compacted stone base layer too appealing to the public.
bituminous surface dressing (SD) or chip
(called water bound macadam) with the
sealing on most types of roads. Surface Too overcome these perceived “problems”,
help of a bitumen truck tank distributor
the premix carpet (PMC) was
at a specified rate. This is
introduced with the IRC publishing
followed by spreading stone
its specification for the first time in
chips (aggregate) at a specified
1962. As mentioned earlier, road
rate by a mechanized chip
construction was still manual.
spreader (available from many
Single size chips (nominal size
manufacturers in Gujarat and
12 mm) were either broken by
costing less than Rs. 2.5 lakhs).
labourers by hand or obtained from
Stone chips are then compacted
stone crusher plants (if available
with a road roller so as to
Figure 1: Schematic of surface dressing nearby). Hot bitumen was applied
embed/fix them (about 70%)

2 NBM&CW SEPTEMBER 2018


Bituminous Surfacing

as tack coat through perforated tin cans. and mechanized chip spreaders (being thick OGFC towards the shoulders; and
The mix containing almost single size manufactured in Gujarat). A typical chip then exits from the exposed edge of the
aggregate (11.2 mm to 13.2 mm) could spreader is shown in Figure 2. OGFC onto the shoulders. Since there is
easily be coated with about 3-3.5% The PMC has probably served India well no rainwater on the surface of OGFC, there
bitumen either by hand on flat pans placed for over 50 years especially during the is no hydroplaning or skidding of motor
over wooden log fire; or small drums time mechanization was almost not there. vehicles on its surface. OGFC is highly
rotated by hand; or small portable mixing However, due to significant increase in permeable to water since it has over 18%
plants. Under such circumstances, graded vehicular traffic, and PMC’s inherent water- air voids. OGFC is durable despite high
aggregate could not be used. trapping characteristics, its service life has air voids because it has about 6 percent
The mix was taken in hand carts and decreased significantly in recent years. polymer modified bitumen content, which
spread over tack coated road surface Time has now come to think out of the box provides a thick bitumen film around the
using hand rakes. After rolling, the road and consider surface dressing in lieu of aggregate particles.
surface appeared “shining” black, with no PMC for low to medium-trafficked roads, The premix carpet (PMC) on the other
loose stones and impressive looking to because it is highly economical as well as hand, is substantially more open graded
the public, unlike surface dressing. It was highly effective in water-proofing the road and more porous than the OGFC because
realized that PMC was highly permeable pavement (as discussed later). the former uses very coarse aggregate
to rainwater due to single size aggregate (nominal size of 11.2 to 13.2mm) and
Premix Carpet (PMC)
being used in the mix. Therefore, the use no fine aggregate. Its air void content is
of sand seal coat was warranted to seal The undesirable water-trapping estimated to be over 25%. Although, a
the surface of the open graded mix. Sand characteristic of the PMC, which causes sand seal coat is provided on the surface
was mixed with about 7 percent bitumen, potholes due to increased hydraulic of the PMC, it is not completely effective in
applied on the open surface, and rolled. pressure under traffic, is discussed below: making the PMC water-proof at the surface.
With the advent of the PMC, surface To keep things in perspective, let’s Even if there is a small patch where the
dressing started to die across India and is compare PMC with open graded asphalt PMC has lost its sand seal, the surface
almost non-existent in many states such friction course (OGFC), which is used in water on the road can penetrate it at that
as Rajasthan. It is ironical that surface developed countries primarily for road spot, flow sidewards like in OGFC, and
dressing is still being used extensively and safety. Although, OGFC is not used in India, flood the entire PMC below the sand seal
successfully on low to medium-trafficked experience with OGFC is applicable to (Figure 3). The hydraulic pressure induced
roads in developed countries such as PMC used in India in certain aspects. Both by traffic in the water trapped within the
USA, Australia, New Zealand, and South are highly water permeable (porous) mixes PMC below the seal coat is likely to cause
Africa. Some Indian engineers argue and are placed 20mm thick. The OGFC stripping within the PMC and the underlying
that surface dressing is successful in is placed on dense bituminous concrete bituminous course. If the underlying course
those countries because the construction (similar to BC Grading 2) to provide a skid- is water bound macadam (WBM) or water
(bitumen application and chip spreading) is resistant wearing surface during rainfall or mixed macadam (WMM), it would get
mechanized there. However, the engineers when the pavement is wet. The rainwater saturated and lose its strength, especially if
can mandate bitumen distributors penetrates the open surface of the OGFC; it contains some plastic material.
(already available for tack coat work) goes to its bottom; then flows within 20mm

Figure 3: Surface water entering the premix carpet (PMC) through an


unsealed area saturating it under the seal as well, causing stripping within
Figure 2: Typical chip spreader manufactured in Gujarat PMC and the underlying bituminous course when subjected to traffic loads

NBM&CW SEPTEMBER 2018 3


Bituminous Surfacing

Figure 4: Field permeability of PMC without any sand seal coat Figure 5: Field permeability of PMC with moderate sand seal coat

The surface water permeability of an in- penetrated fully in about 5 seconds. The ring (Figure 8) rather than grease or putty
service PMC was determined recently second test (Fig. 5) was made on PMC ring was used to expedite testing. Unlike
with a grease ring method. Although it with moderate amount of sand seal coat. BC, the test data has indicated a very wide
is a simple, crude, falling head water The measured field permeability was 105 range of water permeability from very high
permeability test, it does give some seconds. The third test (Fig. 6) was made (60 seconds) to almost none. As mentioned
relative permeability values. A ring of about on PMC with adequate amount of sand earlier, it appears to be a function of
225mm in diameter and about 25mm high seal coat. The measured field permeability variability in sand seal coat application in
is made on the road surface to be tested was 545 seconds, which is still considered terms of its quality, quantity and mode of
using heavy grease. Putty can also be very high. It is not uncommon to see non- application. Practically, it is not possible to
used in lieu of heavy grease. The ring is uniform application of sand seal coat apply consistent and adequate amount of
filled with water upto a depth of 12.5mm on PMC because it is usually spread sand seal coat throughout a PMC project.
and a timer is started. Time taken by the manually. It is a matter of great concern. Recent detailed investigations by IIT
water to penetrate and disappear from the During a similar test on BC wearing course, Guwahati have also shown PMC to be
road surface is measured in seconds as a water remained at 12.5mm level for hours, highly permeable to water.
measure of relative water permeability. therefore, the field water permeability was
It is quite evident from the preceding field
The first test (Fig. 4) was made on PMC almost zero (Fig. 7).
experiments that generally the PMC with
without any seal coat. It was not even More field permeability test data has been sand seal coat would easily take in and trap
possible to fill the ring with water because obtained by students at Rasta, Bangalore; water during rains in many cases. Once the
it was penetrating the PMC as fast as IIT Guwahati; MNIT, Jaipur; and Kautilya PMC is saturated with water, the hydraulic
it was poured. On filling rapidly, water College of Engineering, Jaipur. A steel pressure resulting from traffic above can

Figure 6: Field permeability of PMC with adequate sand seal coat Figure 7: Field permeability of BC Grading 2

4 NBM&CW SEPTEMBER 2018


Bituminous Surfacing

Figure 8: Steel ring used for field permeability test Figure 9: Failure of premix carpet (PMC) during the first monsoon
within Jaipur city

loosen up the sand seal in other areas surface dressing in terms of its rational • It is very cheap at `2.62 lakhs per km
of the PMC. This phenomenon has been design, construction and performance. compared to PMC’s `7.88 lakhs per km.
observed on Jaipur streets (Figure 9). As There is hardly any research in India where • Due to thick sprayed film of bitumen, it is
already mentioned, the hydraulic pressure PMC is used, especially on its structure, highly effective in waterproofing the road.
also causes stripping in the PMC as well volumetric, performance and durability. Water is the biggest enemy of bituminous
as in the underlying bituminous courses, if It appears there is only a “conventional road and should be kept away from the
any. That is why; PMC deteriorates rather wisdom” that PMC does work and is “good” road surface.
rapidly during monsoons, especially in for India and, therefore, there is no need • Minimizes oxidation of bitumen because
towns and cities where streets usually get for any research on it. it is present as a thick film and stone
flooded. The average life of PMC in Jaipur No published data on the average life of chips provide protection from sun rays
is about 1-2 years. Its bitumen content is PMC in India could be found either. Some • Environment-friendly because chips
about 3.5 percent. PMGSY engineers revealed its average need not be heated
Obviously, there are cases where PMC service life to be 2 years without significant • Contractors cannot use lower bitumen
with good, uniform sand seal coat and/ distress such as ravelling and potholes. application rate because after
or very dry climate has endured well. Above all, the cost of PMC is about three construction the stone chips would be
However, fundamentally, the question is times the cost of surface dressing. This is lost with the movement of traffic
why to place a highly porous bituminous not acceptable. • Indian Roads Congress has an excellent
mix like PMC in the first place and then try standard for designing and ensuring
If the PMC is a panacea for low to
to seal it. There is no available data as to good quality surface dressing
medium trafficked roads in India, why is
what depth, if any, the estimated 6mm thick • Surface dressing is used successfully in
this technology not used in developed
sand seal coat really penetrates the 20mm both developing and developed countries
countries? However, that would require
thick PMC when rolled. (such as USA, Europe, and Australia) for
sound engineering justification, which is
blacktopping low and medium trafficked
PMC is used only in India; it is not used in almost non-existent and hard to come by
roads. No other country besides India
developed countries. There are numerous in case of PMC.
uses premix carpet
other questions related to PMC which Time has come now to ban PMC altogether • Hundreds of research papers have been
need to be answered: total air voids in because its continued use cannot be published on surface dressing across
PMC; absolute volume of sand seal coat; justified technically as well as economically, the world to fine tune this technology.
unfilled voids in PMC; depth of sand seal be it city streets, low volume roads (such (The author has published two papers in
penetration in PMC; its performance and as PMGSY), or medium to high volume international journals).
durability, etc. It is surprising to note as to roads. For low to medium-trafficked roads where
why no such research was conducted in
India during the last 60 years to answer Surface Dressing PMC is used right now, it is recommended
to use single or double surface treatment. If
these legitimate questions. On the other The alternative for PMC in India is surface
‘black” road surface is desirable for surface
hand, hundreds of research papers have dressing, which, as described earlier, has
dressing to “impress” motoring public as
been published across the world on the following advantages:

NBM&CW SEPTEMBER 2018 5


Bituminous Surfacing

Enormous Cost
Savings
Cost savings of over `22,000
crores could have resulted if
surface dressing was used
in lieu of PMC since the
inception of the Pradhan
Mantri Grameen Sadak Yojna
(PMGSY) in 2000. In addition,
if the changeover is made
now, cost savings of over
`4,400 crores can be realized
every year in resurfacing
already constructed rural
roads. This big saving can
be used in building and
upgrading more lengths of
rural roads in India.
The preceding cost savings
have been estimated based
on the following assumptions:
• PMGSY roads constructed
so far: 5,29,975 km
• Ratio of premix carpet and
surface dressing: 80:20
• Cost of premix carpet and
well as minimize chip loss, precoated Grading 2 in 25-40 mm depth according to surface dressing per km: `7.88 lakhs
chips can be used. It should be noted all IRC:111- 2009, it is preferable to use 40mm and `2.62 lakhs, respectively (based on
these alternatives are much cheaper than depth to ensure adequate compaction 2012 Rajasthan PWD Basic Schedule of
the PMC (as shown in Table 1). Note that during construction (thin lifts cool rapidly). Rates)
the cost of single coat surface dressing is • 5-year cycle of renewal of surface for
Although the initial cost of 40mm BC
only 1/3 of the cost of PMC. The cost of existing roads.
Grading 2 is about 50% more than the cost
the same with precoated chips increases of 20mm PMC, BC Grading 2 is actually Implementation of Surface
to only 40% of the cost of PMC. It is not 24.1% cheaper than the PMC based on Dressing
understood as to why it cannot be used on lifecycle cost analysis (LCCA) given in
low volume roads such as PMGSY, which Individuals cannot be blamed for this
the Annexure. This is a very conservative
would save India thousands of crores of collective “conventional wisdom” of using
analysis in that the remaining service life,
rupees every year. Even if double surface premix carpet for over 50 years despite
salvage value, maintenance expenses, and
dressing with precoated chips is used, its the fact that it is highly expensive and
user operating costs were not considered,
cost is only three-fourth the cost of PMC. is an undesirable technology. However,
which all favour BC. Therefore, savings
some engineers who “like” premix carpet
Obviously, the highway agencies have to will be much more than 24.1 percent.
would like to maintain the status quo and
mandate the use of mechanized bitumen More importantly, BC Grading 2 provides
would make one or more of the following
distributor and chip spreader, which are significant structural strength to the road
misleading statements (author’s response
already available in India, to ensure the pavement for future traffic growth, whereas
is in parenthesis):
functional success of surface dressing. PMC has almost zero structural strength.
1. Premix carpet is “good” for India. (It is
Bituminous Concrete in If there is some reluctance to use surface
just an unfounded vague statement; if it
dressing in lieu of the PMC on rural roads,
lieu of Premix Carpet is good why have we not been able to
40mm BC Grading 2 can be placed directly
For medium to heavy-trafficked roads and convince and export this technology to
on water bound macadam (WBM) or water
city roads, use BC Grading 2 in lieu of the rest of the world?)
mixed macadam (WMM), as practiced in
PMC. Although it is permissible to lay BC 2. I have seen it perform well. (Not all jobs
developed countries.
fail, but fundamentally it is water-trapping

6 NBM&CW SEPTEMBER 2018


Bituminous Surfacing

and therefore premature potholing is roads. Both have been standardized by the structural strength whereas PMC
highly likely). Indian Roads Congress. However, premix strength is almost zero)
3. It provides structural strength to the carpet is highly expensive (three times the • Remaining service life after analysis
road. (This is absolutely wrong. Both cost of surface dressing); generally, soaks period of 6 years considered equal
surface dressing and premix carpet do up water readily which results in early (although BC would have more service
not contribute to structural strength of potholes; and not used anywhere in the life because it is dense graded)
the road). world. Surface dressing is cheap (only one- • No maintenance activity considered
third the cost of premix carpet); makes the during the 6-year period (although PMC
4. It provides a black and shiny surface
road highly waterproof thus less potential is likely to require some activity)
and is laid sometimes with a paver,
for potholes; and is used successfully • User operating costs considered equal
which pleases the public. (This seems
throughout the world. Therefore, there is no (although BC would provide a smoother
to indicate public perception is more
doubt that surface dressing has significant ride and less operating costs).
important than proper engineering and
advantages over premix carpet in terms of Deterministic Approach was used for LCCA,
the welfare of our country in terms of
life (performance) and cost. Besides new which is easy and is used traditionally. The
costs and performance).
construction, savings of over `4,400 crore Net Present Value (NPV) was calculated
5. Let’s undertake some research projects can be realized per year for resurfacing for PMC and BC for the 6-year period as
to compare the performance of premix existing rural roads if surface dressing is follows:
carpet versus surface dressing. (This used in lieu of premix carpet. NPV of PMC = 14.89 lakhs
is just a delaying tactic. Satisfactory
performance of surface dressing has Annexure NPV of BC Grading 2 = 12.00 lakhs
been proven and reported worldwide. Life cycle cost analysis (LCCA) of This means, PMC is 24.1% more expensive
Moreover, India’s Rural Roads Manual Premix Carpet (PMC) and Bituminous than BC Grading 2. If the remaining service
allows either one so why not use surface Concrete (BC) Grading 2 life, salvage value, maintenance costs, and
dressing which costs only one-third of Analysis period = 6 years user operating costs are considered (which
premix carpet. The Manual also states all are in favour of BC), PMC would be much
Assumptions:
that surface dressing is an age-old more expensive than 24.1 percent, which
technique that really seals the road well). • Average life of 20 mm PMC with sand was calculated with very conservative
seal coat = 3 years (real 2 years) assumptions, listed above.
6. Let’s set up some demonstration project
• Average life of 40 mm BC Grading 2 = 6
to “reintroduce” surface dressing. (Again, About the author
years (real 7-8 years)
it is just a delaying tactic. Why do it when Prof. Prithvi Singh Kandhal is Associate
[This means 20 mm PMC will be required
we have an excellent and easy to follow Director Emeritus of the National Center
for rehabilitation of the pavement after 3
IRC standard for surface dressing for for Asphalt Technology (NCAT) based
years.]
our road engineers? Most states have at Auburn University, Alabama, U.S.A.
• Cost of 20 mm PMC per km lane = 7.88
surface dressing as item in their Basic NCAT is the largest asphalt (bitumen)
lakhs
Schedule of Rates. If notices inviting road technology center in the world. Prof.
• Cost of 40 mm BC Grading 2 per km
tenders are issued, Indian engineers/ Kandhal has been a practicing highway
lane = 12.00 lakhs
contractors are smart to execute the engineer in India for over 20 years and in
• Real discount rate = 4%
contracts without any problem). the US for 30 years. He has drafted many
• Net present value (NPV) = Initial cost +
Summary Rehab cost (1/(1+r)n) standards for the Indian Roads Congress
• Salvage value considered equal after including specifications for dense graded
India’s Rural Roads Manual permits two
the 6 years analysis period (although bituminous mixes, stone matrix asphalt and
technologies: surface dressing or premix
BC would have a significantly higher readymade pothole patching mix.
carpet for bituminous surfacing of rural

NBM&CW SEPTEMBER 2018 7

Você também pode gostar