MEMORIA DE CALCULOS
lavadero 2 2 4.00
ducha 1 2 2.00
SUB TOTAL U.H. 20.00
Inodoro 4 3 12.00
Lavatorio 2 1 2.00
3° PISO
lavadero 2 2 4.00
Ducha 1 2 2.00
SUB TOTAL U.H. 20.00
Inodoro 4 3 12.00
Lavatorio 2 1 2.00
4° PISO
lavadero 2 2 4.00
Ducha 1 2 2.00
SUB TOTAL U.H. 20.00
Inodoro 4 3 12.00
Lavatorio 2 1 2.00
5° PISO
lavadero 2 2 4.00
Ducha 1 2 2.00
SUB TOTAL U.H. 20.00
TOTAL U.H. 87.50
DATOS :
Dotación por Persona = 200 lt/hab/día
N° de Habitaciones = 10 und.
N° personas x habitación = 2 und.
M.D.S. = Vcd
2.5 horas
Vcd = ###### lt
Datos :
PM = 30.00 m.c.a. PM = Presión en la Matriz
HT = 9.50 m HT = Desnivel entre la red matriz y el medidor
L= 4.00 m. L = Longitud de la red Matriz al Medidor
Ps = 3.00 m.c.a. Ps = Presión mínima de salida (RNE)
PM = HT + Hf + Ps Hf = HfL + Hfa
Hf = PM - HT - Ps
Hf = 17.50 m.c.a.
perdida de carga disponible
Hfm = 0.5 Hf
Diametro Hfm
5/8" 5.5 psi
3/4" 1.8 psi
Hf = 17.5 m - 3.85 m
Hf = 13.65 m.c.a.
Asumimos:
f= 3/4 "
Q= 0.85 lt/seg
CH= 140.00
m.c.a
Perdidas locales:
- 02 Valvula Compuerta = 0.30
Lt = 4.60 m.
Hf real = 10 7 x L x Q 1.85
5.813*(CH)1.85x(D)4.87
2.55<13.65 OK!
DATOS:
Q= 0.44 lt/seg
Ps = 2 m.c.a.
TRAMO AB
CH = 140 pie1/2/seg H= 4.3 m
Q= 0.85 lt/seg
f= 1.5 "
S = 10 7 x Q 1.85 hf = S x L
5.813*(CH)1.85x(D)4.87
S = 0.0189288 m/m
hf = 0.0976727
PRESION EN B:
PB = H - hf
PB = 4.2023273 > 2 m.c.a. OK!
TRAMO BQ
HfBQ = 0.0434382 m
PRESION EN Q:
PQ = PB - HfBQ
PQ = 4.1588892 > 2 m.c.a. OK!
TRAMO QC
HfQC = 0.3856613 m
PRESION EN C:
PC = PQ - HfQC
PC = 3.7732278 > 2 m.c.a. OK!
TRAMO CD
PRESION EN D:
PD = PC + H piso - HfCD
PD = 5.8186391 > 2 m.c.a. OK!
TRAMO DE
HfDE = 0.3894652 m
PRESION EN E:
PE = PD + H piso - HfDE
PE = 8.0291738 > 2 m.c.a. OK!
TRAMO EF
S=2.60*1.2*0.001
HfEF = 10 7 x S x Q 1.85 S = 0.00312
5.813*(CH)1.85x(D)4.87 H piso = 2.6 m
HfEF = 0.2362138 m
PRESION EN F:
PF = PE + H piso - HfEF
PF = 10.39296 > 2 m.c.a. OK!
TRAMO FG
S=2.75*1.2*0.001
HfFG = 10 7 x S x Q 1.85 S = 0.0033
5.813*(CH)1.85x(D)4.87 H piso = 2.75 m
HfFG = 0.7448125 m
PRESION EN G:
PG = PF + H piso - HfFG
PG = 12.398147 > 2 m.c.a. OK!
TRAMO QR
HfQR = 0.0303737 m
PRESION EN R:
PR = PQ - HfQR
PR = 4.1285155 > 2 m.c.a. OK!
TRAMO RH
S=2.60*1.2*0.001
HfRH = 10 7 x S x Q 1.85 S = 0.00312
5.813*(CH)1.85x(D)4.87 H piso = 2.6 m
HfRH = 0.3715588 m
PRESION EN H:
PH = PR + H piso - HfRH
PH = 6.3569567 > 2 m.c.a. OK!
TRAMO HI
S=2.60*1.2*0.001
HfHI = 10 7 x S x Q 1.85 S = 0.00312
5.813*(CH)1.85x(D)4.87 H piso = 2.6 m
HfHI = 0.2815522 m
PRESION EN I:
PI = PH + H piso - HfHI
PI = 8.6754045 > 2 m.c.a. OK!
TRAMO IJ
HfIJ = 0.7461008 m
PRESION EN J:
PJ = PH + H piso - HfIJ
PJ = 10.529304 > 2 m.c.a. OK!
TRAMO JK
HfJK = 0.4957236 m
PRESION EN K:
PK = PJ + H piso - HfJK
PK = 12.78358 > 2 m.c.a. OK!
TRAMO BL
HfBL = 0.5314415 m
PRESION EN L:
PL = PB - HfBL
PL = 3.6708858 > 2 m.c.a. OK!
TRAMO LM
HfLM = 0.2302913 m
PRESION EN M:
PM = PL + H piso - HfLM
PM = 6.0405944 > 2 m.c.a. OK!
TRAMO MN
S=2.60*1.2*0.001
HfMN = 10 7 x S x Q 1.85 S = 0.00312
5.813*(CH)1.85x(D)4.87 H piso = 2.6 m
HfMN = 0.6470883 m
PRESION EN N:
PN = PM + H piso - HfMN
PN = 7.9935061 > 2 m.c.a. OK!
TRAMO NO
S=2.60*1.2*0.001
HfNO = 10 7 x S x Q 1.85 S = 0.00312
5.813*(CH)1.85x(D)4.87 H piso = 2.6 m
HfNO = 0.3894652 m
PRESION EN O:
PO = PN + H piso - HfNO
PO = 10.204041 > 2 m.c.a. OK!
TRAMO OP
S=2.60*1.2*0.001
HfOP = 10 7 x S x Q 1.85 S= 0.0033
5.813*(CH)1.85x(D)4.87 H piso = 2.75 m
HfOP = 0.189853 m
PRESION EN P:
PP = PO + H piso - HfOP
PP = 12.764188 > 2 m.c.a. OK!