General Assumptions on Labis Signalling Plan

1. Station platform and other civil elements ie; ROB, RUB and BRV is directly measured from
Plan & Profile CAD drawing - Plan & Profile received on 22-10-2018.
2. DB’s are provided for wayside equipment in design, which are placed 400m away from the
LSC.
3. Axle Counter is located 10m away from signal (for block section).
4. IRJ to Signal Pole distance at station is located 10m away.
5. Track circuit naming as per SEGDT practise.
6. Turnout Layout based on KVDT drawing Turnout Layout 54E1-450-1 in 15. Refer drawing KVDT
1IN15 Turnout Layout.pdf
7. SRJ chainage has been measured directly from - Alignment 2018-10-12a - working SA.dwg.
(See pic below). Preferably to be supplied with SRJ table in the layout diagram (example in
KVDT) in making sure the chainage measured is correct.