Você está na página 1de 12
423 ncavidtng a piece (OE Hebsowebdon. TK Which of the following’W#t-Viading OSB TRY not use consum able electrodes (a) GMAW (b) GTAW (©) Submerged arc Welding (d) none of these Trepanning is performed for (a) finishing a drilled hole (b) producing @ large hole without drilling (©) truing a hole for alignment (4) enlarging a drilled hale Tha hardness of a grinding wheel is determined by the (a) hardness of abrasive grains (b) ability of the bond to retain abrasives (@ harcness of the bond (a) ability of the grinding wheel to penetrate the work piece 4 positive value of Joule-Thomson coefficient of a fiuid means (a) temperature drops during throttling (b) tem perature remains constant-during throttling (©) temperature rises during threttling (d) none of thasa If there are a physical quantities and n fundamental dimensions in a particular process, the number of non-dimensional parameters 1s (a) ma Xb) rae (ma (a) men If x is the distance measured from the leading adge of a flat plate, the laminar boundary layer thickness varies as ‘ re] 2 tb) xe (x? (a) x Flaw separation in flow pest a solid object is caused by (a) 4 reduction of pressure ta vapour pressure {b) a negative pressure gradient (©) 9 positive pressure gradient (d) the boundary layer thickness reducing to zero A correctly designed convergent-diver gent nozzle working at 2 designed load is (a) always isentropic (b) always choked te diet “al ESéebeitenbenlcTHia migtit He used fox Lest 425 2a 22 23 providing a piece pAgbabiltythatManish wilkarrive lateteta7 ‘The value of Biot numbePrshimey Sine TESS F001) when (a) the convective resistance of the fluid is negligible (b) the conductive resistance of the fluid is negligible (c) the conductive resistance of the solid is negligible (d) none of these For the same inlet and outlet temperatures of hot and cold fluids, the Log Mean Temperature Difference (LMTD) is (a) greater for parallel flow heat exchanger than for counter flow heat exchanger. (b) greater for counter flaw heat exchanger than for parallel flow heat exchanger. (©) same for both parallel and counter flow heat exchangers: (@) dependent on the properties of the fluids ‘This quastion consists of TWENTY-FIVE sub-questians (2.1 - 2.25) of TWO marks each. For each of these sub-questicns, four pasaible alternatives (4, & C and 0) are given, out of which ONLY ONE is correct, Indicate the carrect answer By Harkening the appropnate bubble against the question number an the left hand side of the Objective Response Sheet (ORS). Yau may use the answer book provided fer any rough wark, iFrizeded The following set of equabons has Bx +2y ez x-y+z ax+22 {a) na solution (b) 8 unique solution (©) multiple solutions () an incensistency The function # (x,y) = 2x + 2xy—y?has (a) only one stationary point at (940) (b) two stationary points at (0,0) and IG 4 (©) bea stationary points at (0,09 and (1,-1) (d) na stationary point Manish has to travel from A to 0 changing buses at stops 8 and C enroute, The maiimum waiting time at either stop can be & minutes each, but any time of waiting up to @ minutes is equally likely at both places. He can afford up to 12 minutes of total waiting time if he iz to arrive at D on time, What is the ial tne, This might bet @a fox a4 2.5 26 27 28 29 meavidinn < utece oF waw.pperuitment .guryy, 8 Oe © es oe fa) 13 Arrivals at @ telephone booth ere considered ta be Paisson, with an average time oF 10 minutes between successive arrivals. The length of @ phone call is distributed exponentially with mean 3 minutes. The probability that an arrival does nat have to wait before service is (a) 0.3 Kb) 0.5 (co) 0.7 0.9 Tha supply at three sources is $0, 40 and 60 units respectively whilst the dom and at the four destinations is 20, 30, 10 and 50 units. in solving this transportatian problem (a) a dummy source of capacity 40 units is needed (b) adummy destination of capacity 40 u (c) no solution exists as the problem is infeasible {@) none solution exists s-tne problem is degenerate is needed 4 project consists of three parallel paths with mean durations and variances of (10,4), (12,4) and (12,9) respectively. According te the standard PERT assumpbans, the distributicn of the project duraticn is (a) Beta with mean 19 and standard deviation 2 (b) Sets with mean 12 and standard deviation 2 (©) Normal with mean 29 and standard deviation 2 (a) Normal with maan 12 and standard deviation 3 The coupling used to connect twa shafts with large anguler misalignment is (a) a Flange coupling (0) an Oldham’s coupling (©) 2 Flexible bush coupling (d) a Hooke’s joint 4 static load is mounted at the center of a shaft rotating at uniform angular velocity. This shaft will be designed for (a) the maximum com pressive stress (static) (b) the maximum tensile (static) (©) the maximum bending moment (static) (d) fatigue loading Large speed reductions (greater than 20) in one stage of a gear train are possible through (@) Spur gearing (b) Worm gearing (©) Bevel gearing (a) Helical gearing formations This 46 sot an @a fox dial tne, This might net

Você também pode gostar