Você está na página 1de 14

FICHA DE IDENTIFICACION DE LA OBRA

”MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE EDUCACION DEL NIVEL


OBRA : INICIAL EN LA IEI N°601 DEL CENTRO POBLADO MANUEL SOANE CORRALES,
BARRANCA,BARANCA,LIMA-ETAPA I”

CONTRATISTA : CONSORCIO SUDAMERIS

ENTIDAD : GOBIERNO REGIONAL DE LIMA

PROCESO : ADJUDICACION SIMPLIFICADA Nº 024-2018-GRL/CS

FINANCIAMIENTO : RECURSOS DETERMINADOS

MODALIDAD : SUMA ALZADA

CONTRATO : CONTRATO Nº 060-2018-GRL/OBRAS

FECHA DE SUSCRIPCION DE CONTRATO : 8/29/2018

VALOR REFERENCIAL : S/. 1,077,220.71

FACTOR DE RELACION : 0.99

PRESUPUESTO CONTRATADO (C/IGV) : S/. 1,071,220.00


PRESUPUESTO CONTRATADO (S/IGV) : S/. 907,813.56

PLAZO DE EJECUCION : 120 d.c

FECHA DE ENTREGA DE TERRENO : 9/13/2018

FECHA DE INICIO CONTRACTUAL : 9/14/2018

FECHA DE TERMINO CONTRACTUAL : 1/11/2019

RESIDENTE DE OBRA : ING. JUAN EPIFANIO TINOCO ANAYA

SUPERVISOR DE OBRA : ING. JULIO MARTINEZ


CALCULO DEL ADELANTO PARA MATERIALES

OBRA ”MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE EDUCACION DEL NIVEL INICIAL EN LA IEI N°601 DEL CENTRO POBLADO MANUEL SOANE CORRALES, BARRANCA,BARANCA,LIMA-ETAPA I”

PROCESO ADJUDICACION SIMPLIFICADA Nº 024-2018-GRL/CS


AREA GEOGRAFICA 02
SUPERVISOR DE OBRA ING. JULIO MARTINEZ FACTOR DE RELACION : 0.99
RESIDENTE DE OBRA ING. JUAN EPIFANIO TINOCO ANAYA
VALOR REFERENCIAL S/. 1,077,220.71 S/IGV S. 912,898.91
PRESUPUESTO CONTRATADO S/. 1,071,220.00 S/IGV S. 907,813.56

FORMULA POLINOMICA ESTRUCTURAS

K = 0.281 (Mr/Mo) + 0.198 (ADr/ADo) + 0.191 (CAr/CAo) + 0.101 (Mr/Mo) + 0.059 (Mr/Mo) + 0.170 (Ir/Io)

M = MANO DE OBRA M = MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA


AD = ACERO DE CONSTRUCCION CORRUGADO M = MAQUINARIA Y EQUIPO NACIONAL
AD = DÓLAR MAS INFLACION DEL MERCADO USA I = INDICE GENERAL DE PRECIOS AL CONSUMIDOR
CA = AGREGADO GRUESO
CA = CEMENTO PORTLAND TIPO I

FORMULA POLINOMICA ARQUITECTURA

K = 0.377 (Mr/Mo) + 0.204 (DVr/DVo) + 0.119 (BCr/BCo) + 0.077 (Cr/Co) + 0.055 (Mr/Mo) + 0.168 (Ir/Io)

M = MANO DE OBRA BC = CEMENTO PORTLAND TIPO I


DV = VIDRIO INCOLORO NACIONAL C = CERAMICO ESMALTADA Y SIN ESMALTAR
DV = DÓLAR MAS INFLACION DEL MERCADO USA M = MAQUINARIA Y EQUIPO NACIONAL
BC = BLOQUE Y LADRILLO I = INDICE GENERAL DE PRECIOS AL CONSUMIDOR

FORMULA POLINOMICA INSTALACIONES ELECTRICAS Y ALUMBRADO GENERAL

K = 0.245 (Mr/Mo) + 0.221 (Dr/Do) + 0.086 (Ar/Ao) + 0.072 (Cr/Co) + 0.050 (Ar/Ao) + 0.051 (Ar/Ao) + 0.275 (Ir/Io)

M = MANO DE OBRA A = ARTEFACTO DE ALUMBRADO INTERIOR


D = DÓLAR MAS INFLACION DEL MERCADO USA A = ALAMBRE Y CABLE TIPO TW Y THW
A = ALAMBRE Y CABLE DE COBRE DESNUDO I = INDICE GENERAL DE PRECIOS AL CONSUMIDOR
C = CEMENTO PORTLAND TIPO I

FORMULA POLINOMICA INSTALACIONES SANITARIAS

K = 0.434 (MOr/MOo) + 0.204 (Ir/Io) + 0.190 (APAr/APAo) + 0.099 (TUBr/TUBo) + 0.073 (MVr/MVo)

M = MANO DE OBRA D = DÓLAR MAS INFLACION DEL MERCADO USA


T = TUBERIA DE PVC I = INDICE GENERAL DE PRECIOS AL CONSUMIDOR
A = AGREGADO GRUESO
M = MAQUINARIA Y EQUIPO NACIONAL

FORMULA POLINOMICA EQUIPAMIENTO Y MOBILIARIO

K = 0.833 (Dr/Do) +167 (Ir/Io)

D = DÓLAR MAS INFLACION DEL MERCADO USA


I = INDICE GENERAL DE PRECIOS AL CONSUMIDOR
CALCULO DEL ADELANTO PARA MATERIALES

OBRA ”MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE EDUCACION DEL NIVEL INICIAL EN LA IEI N°601 DEL CENTRO POBLADO MANUEL SOANE CORRALES, BARRANCA,BARANCA,LIMA-ETAPA I”

PROCESO ADJUDICACION SIMPLIFICADA Nº 024-2018-GRL/CS


AREA GEOGRAFICA 02
SUPERVISOR DE OBRA ING. JULIO MARTINEZ FACTOR DE RELACION : 0.99
RESIDENTE DE OBRA ING. JUAN EPIFANIO TINOCO ANAYA
VALOR REFERENCIAL S/. 1,077,220.71 S/IGV S. 912,898.91
PRESUPUESTO CONTRATADO S/. 1,071,220.00 S/IGV S. 907,813.56

CALCULO DE MONTO MAXIMO A SOLICITAR

MONTO MAXIMO = C.I * % INCIDENCIA * SALDO A VALORIZAR *F.R. * IMa/Imo

PRESUPUESTO BASE S/IGV S. 855,667.79

ESTRUCTURAS S/IGV 434,090.83


ARQUITECTURA S/IGV 241,641.11
INSTALACIONES ELECTRICAS Y ALUMBRADO GENERAL S/IGV 92,689.78
INSTALACIONES SANITARIAS S/IGV 37,936.87
EQUIPAMIENTO Y MOBILIARIO S/IGV 49,309.20

COEFICIENTE % SALDO BRUTO MONTO MAX. MONTO


IU DESCRIPCION
DE INCIDENCIA INCIDENCIA POR VALORIZAR S/IGV
FR IMa IMo
S/IGV SOLICITADO

ESTRUCTUCTURAS

47 MANO DE OBRA 0.281 100.000% S. 434,090.83 0.99443 602.11 582.52 S. 125,379.32


3 ACERO DE CONSTRUCCION CORRUGADO 0.198 56.566% S. 434,090.83 0.99443 512.37 506.47 S. 48,910.85 S. 42,233.07
30 DÓLAR MAS INFLUENCIA DEL MERCADO USA 0.198 43.434% S. 434,090.83 0.99443 481.37 471.87 S. 37,870.96
5 AGREGADO GRUESO 0.191 43.979% S. 434,090.83 0.99443 216.64 219.17 S. 35,841.89 S. 20,436.16
21 CEMENTO PORTLAND TIPO I 0.191 56.021% S. 434,090.83 0.99443 423.68 423.68 S. 46,189.03 S. 28,284.96
43 MADERA NACIONAL PARA ENCOF. Y CARPINT. 0.101 100.000% S. 434,090.83 0.99443 678.97 744.00 S. 39,788.14 S. 35,917.81
48 MAQUINARIA Y EQUIPO IMPORTADO 0.059 100.000% S. 434,090.83 0.99443 369.08 365.55 S. 25,714.63
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.17 100.000% S. 434,090.83 0.99443 448.81 446.14 S. 73,823.54
1.0000
SUB TOTAL S. 433,518.35 S. 126,872.00

COEFICIENTE % SALDO BRUTO MONTO MAX. MONTO


IU DESCRIPCION
DE INCIDENCIA INCIDENCIA POR VALORIZAR S/IGV
FR IMa IMo
S/IGV SOLICITADO

ARQUITECTURA

47 MANO DE OBRA 0.377 100.000% S. 241,641.11 0.99443 602.11 582.52 S. 93,637.79


79 VIDRIO INCOLORO NACIONAL 0.204 46.078% S. 241,641.11 0.99443 481.37 471.87 S. 23,042.27 S. 23,042.27
30 DÓLAR MAS INFLUENCIA DEL MERCADO USA 0.204 53.922% S. 241,641.11 0.99443 481.37 471.87 S. 26,964.83
17 BLOQUE Y LADRILLO 0.119 55.462% S. 241,641.11 0.99443 671.19 945.38 S. 11,259.69 S. 10,746.41
21 CEMENTO PORTLAND TIPO I 0.119 44.538% S. 241,641.11 0.99443 423.68 423.68 S. 12,735.69 S. 9,191.86
24 CERAMICA ESMALTADA Y SIN ESMALTAR AGREGADO FINO 0.077 100.000% S. 241,641.11 0.99443 243.50 243.60 S. 18,495.12 S. 16,564.74
48 MAQUINARIA Y EQUIPO NACIONAL 0.055 100.000% S. 241,641.11 0.99443 369.08 365.55 S. 13,343.85
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.168 100.000% S. 241,641.11 0.99443 448.81 446.14 S. 40,611.16
1.0000
SUB TOTAL S. 240,090.40 S. 59,545.27
CALCULO DEL ADELANTO PARA MATERIALES

OBRA ”MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE EDUCACION DEL NIVEL INICIAL EN LA IEI N°601 DEL CENTRO POBLADO MANUEL SOANE CORRALES, BARRANCA,BARANCA,LIMA-ETAPA I”

PROCESO ADJUDICACION SIMPLIFICADA Nº 024-2018-GRL/CS


AREA GEOGRAFICA 02
SUPERVISOR DE OBRA ING. JULIO MARTINEZ FACTOR DE RELACION : 0.99
RESIDENTE DE OBRA ING. JUAN EPIFANIO TINOCO ANAYA
VALOR REFERENCIAL S/. 1,077,220.71 S/IGV S. 912,898.91
PRESUPUESTO CONTRATADO S/. 1,071,220.00 S/IGV S. 907,813.56

COEFICIENTE % SALDO BRUTO MONTO MAX. MONTO


IU DESCRIPCION
DE INCIDENCIA INCIDENCIA POR VALORIZAR S/IGV
FR IMa IMo
S/IGV SOLICITADO

INSTALACIONES ELECTRICAS Y ALUMBRADO GENERAL

47 MANO DE OBRA 0.245 100.000% S. 92,689.78 0.99443 602.11 582.52 S. 23,341.94


30 DÓLAR MAS INFLUENCIA DEL MERCADO USA 0.221 100.000% S. 92,689.78 0.99443 481.37 471.87 S. 20,780.44
6 ALAMBRE Y CABLE DE COBRE DESNUDO 0.086 100.000% S. 92,689.78 0.99443 944.94 943.48 S. 7,939.18 S. 3,044.04
21 CEMENTO PORTLAND TIPO I 0.072 100.000% S. 92,689.78 0.99443 423.68 423.68 S. 6,636.49 S. 415.45
12 ARTEFACTO DE ALUMBRADO INTERIOR 0.05 100.000% S. 92,689.78 0.99443 319.93 318.55 S. 4,628.64 S. 574.00
7 ALAMBRE Y CABLE TIPO TW Y THW 0.051 100.000% S. 92,689.78 0.99443 685.35 675.04 S. 4,772.64 S. 4,497.03
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.275 100.000% S. 92,689.78 0.99443 448.81 446.14 S. 25,499.40
1.0000
SUB TOTAL S. 93,598.73 S. 8,530.52

COEFICIENTE % SALDO BRUTO MONTO MAX. MONTO


IU DESCRIPCION
DE INCIDENCIA INCIDENCIA POR VALORIZAR S/IGV
FR IMa IMo
S/IGV SOLICITADO S/IGV

INSTALACIONES SANITARIAS

47 MANO DE OBRA 0.393 100.000% S. 37,936.87 0.99443 602.11 582.52 S. 15,324.74


72 TUBERIA DE PVC 0.095 100.000% S. 37,936.87 0.99443 434.41 427.74 S. 3,639.81 1,846.42
5 AGREGADO GRUESO 0.089 100.000% S. 37,936.87 0.99443 216.64 219.17 S. 3,318.81 S. 157.84
48 MAQUINARIA Y EQUIPO NACIONAL 0.055 100.000% S. 37,936.87 0.99443 369.08 365.55 S. 2,094.94
30 DÓLAR MAS INFLUENCIA DEL MERCADO USA 0.201 100.000% S. 37,936.87 0.99443 481.37 471.87 S. 7,735.50
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.167 100.000% S. 37,936.87 0.99443 448.81 446.14 S. 6,337.87
1.0000
SUB TOTAL S. 38,451.67 S. 2,004.26

COEFICIENTE % SALDO BRUTO MONTO MAX. MONTO


IU DESCRIPCION
DE INCIDENCIA INCIDENCIA POR VALORIZAR S/IGV
FR IMa IMo
S/IGV SOLICITADO S/IGV
CALCULO DEL ADELANTO PARA MATERIALES

OBRA ”MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE EDUCACION DEL NIVEL INICIAL EN LA IEI N°601 DEL CENTRO POBLADO MANUEL SOANE CORRALES, BARRANCA,BARANCA,LIMA-ETAPA I”

PROCESO ADJUDICACION SIMPLIFICADA Nº 024-2018-GRL/CS


AREA GEOGRAFICA 02
SUPERVISOR DE OBRA ING. JULIO MARTINEZ FACTOR DE RELACION : 0.99
RESIDENTE DE OBRA ING. JUAN EPIFANIO TINOCO ANAYA
VALOR REFERENCIAL S/. 1,077,220.71 S/IGV S. 912,898.91
PRESUPUESTO CONTRATADO S/. 1,071,220.00 S/IGV S. 907,813.56
EQUIPAMIENTO Y MOBILIARIO

30 DÓLAR MAS INFLUENCIA DEL MERCADO USA 0.833 100.000% S. 49,309.20 0.99443 481.37 471.87 S. 41,668.09
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.167 100.000% S. 49,309.20 0.99443 448.81 446.14 S. 8,237.77

SUB TOTAL S. 49,905.86 S. 0.00

RESUMEN DE ESPECIALIDADES

INSTALACIONES INSTALACIONES EQUIPAMIENTO Y


IU DESCRIPCION ESTRUCTURAS ARQUITECTURA
ELECTRICAS SANITARIAS MOBILIARIO
3 ACERO DE CONSTRUCCION CORRUGADO 42,233.07
5 AGREGADO GRUESO 20,436.16 157.84
21 CEMENTO PORTLAND TIPO I 28,284.96 9,191.86 415.45
43 MADERA NACIONAL PARA ENCOF. Y CARPINT. 35,917.81
17 BLOQUE Y LADRILLO 10,746.41
24 CERAMICA ESMALTADA Y SIN ESMALTAR AGREGADO FINO 16,564.74
6 ALAMBRE Y CABLE DE COBRE DESNUDO 3,044.04
12 ARTEFACTO DE ALUMBRADO INTERIOR 574.00
7 ALAMBRE Y CABLE TIPO TW Y THW 4,497.03
72 TUBERIA DE PVC 1,846.42

SUB TOTAL S. 126,872.00 S. 36,503.00 S. 8,530.52 S. 2,004.26 S. 0.00


IGV (18%) S. 22,836.96 S. 6,570.54 S. 1,535.49 S. 360.77 S. 0.00
TOTAL S. 149,708.96 S. 43,073.54 S. 10,066.01 S. 2,365.02 S. 0.00

TOTAL DE SOLICITUD DE ADELANTO DE MATERIALES S. 205,213.53

MONTO MAXIMO DEL ADELANTO DE MATERIALES S/. 214,244.00

% MAXIMO DEL ADELANTO DE MATERIALES 20.00%


RESOLUCIÓN JEFATURAL N° 118-2018-INEI

ÍNDICES UNIFICADOS DE PRECIOS DEL MES DE MARZO DEL 2018


ÁREAS GEOGRÁFICAS
(Base : Julio 1992 = 100,0)

Cod. 1 2 3 4 5 6 Cod. 1 2 3 4 5 6
01 905.29 905.29 905.29 905.29 905.29 905.29 02 529.67 529.67 529.67 529.67 529.67 529.67
03 506.47 506.47 506.47 506.47 506.47 506.47 04 548.18 1004.35 1036.83 587.58 365.28 770.05
05 449.53 219.17 422.53 607.83 (*) 634.49 06 943.48 943.48 943.48 943.48 943.48 943.48
07 675.04 675.04 675.04 675.04 675.04 675.04 08 905.86 905.86 905.86 905.86 905.86 905.86
09 240.29 240.29 240.29 240.29 240.29 240.29 10 416.69 416.69 416.69 416.69 416.69 416.69
11 234.20 234.20 234.20 234.20 234.20 234.20 12 318.55 318.55 318.55 318.55 318.55 318.55
13 1461.65 1461.65 1461.65 1461.65 1461.65 1461.65 14 283.57 283.57 283.57 283.57 283.57 283.57
17 626.79 945.38 703.89 863.40 747.80 866.46 16 354.83 354.83 354.83 354.83 354.83 354.83
19 783.82 783.82 783.82 783.82 783.82 783.82 18 348.82 348.82 348.82 348.82 348.82 348.82
21 476.04 423.68 449.56 431.73 449.56 410.96 20 1778.04 1778.04 1778.04 1778.04 1778.04 1778.04
23 439.25 439.25 439.25 439.25 439.25 439.25 22 367.30 367.30 367.30 367.30 367.30 367.30
27 461.56 461.56 461.56 461.56 461.56 461.56 24 243.60 243.60 243.60 243.60 243.60 243.60
31 377.40 377.40 377.40 377.40 377.40 377.40 26 369.89 369.89 369.89 369.89 369.89 369.89
33 851.92 851.92 851.92 851.92 851.92 851.92 28 573.00 573.00 573.00 565.77 573.00 573.00
37 304.11 304.11 304.11 304.11 304.11 304.11 30 471.87 471.87 471.87 471.87 471.87 471.87
39 446.14 446.14 446.14 446.14 446.14 446.14 32 468.41 468.41 468.41 468.41 468.41 468.41
41 414.55 414.55 414.55 414.55 414.55 414.55 34 470.76 470.76 470.76 470.76 470.76 470.76
43 726.59 744.00 894.42 647.62 1090.59 906.22 38 427.34 993.18 866.09 568.58 (*) 665.48
45 322.55 322.55 322.55 322.55 322.55 322.55 40 383.17 453.09 446.07 340.62 272.89 331.41
47 582.52 582.52 582.52 582.52 582.52 582.52 42 284.22 284.22 284.22 284.22 284.22 284.22
49 295.18 295.18 295.18 295.18 295.18 295.18 44 380.79 380.79 380.79 380.79 380.79 380.79
51 337.08 337.08 337.08 337.08 337.08 337.08 46 487.81 487.81 487.81 487.81 487.81 487.81
53 747.73 747.73 747.73 747.73 747.73 747.73 48 365.55 365.55 365.55 365.55 365.55 365.55
55 500.55 500.55 500.55 500.55 500.55 500.55 50 641.89 641.89 641.89 641.89 641.89 641.89
57 399.44 399.44 399.44 399.44 399.44 399.44 52 305.35 305.35 305.35 305.35 305.35 305.35
59 238.53 238.53 238.53 238.53 238.53 238.53 54 406.60 406.60 406.60 406.60 406.60 406.60
61 251.17 251.17 251.17 251.17 251.17 251.17 56 519.26 519.26 519.26 519.26 519.26 519.26
65 243.56 243.56 243.56 243.56 243.56 243.56 60 295.99 295.99 295.99 295.99 295.99 295.99
69 389.45 327.82 428.87 488.52 269.39 451.51 62 464.29 464.29 464.29 464.29 464.29 464.29
71 645.61 645.61 645.61 645.61 645.61 645.61 64 348.21 348.21 348.21 348.21 348.21 348.21
73 548.33 548.33 548.33 548.33 548.33 548.33 66 732.29 732.29 732.29 732.29 732.29 732.29
77 324.60 324.60 324.60 324.60 324.60 324.60 68 274.56 274.56 274.56 274.56 274.56 274.56
70 218.25 218.25 218.25 218.25 218.25 218.25
72 427.74 427.74 427.74 427.74 427.74 427.74
78 487.23 487.23 487.23 487.23 487.23 487.23
80 106.47 106.47 106.47 106.47 106.47 106.47
(*) Sin Producción.
Nota: El cuadro incluye los índices unificados de código: 30, 34, 39, 47, 49 y 53 que fueron aprobados mediante
Resolución Jefatural N° 103-2018-INEI.
RESOLUCIÓN JEFATURAL N° 241-2018-INEI

ÍNDICES UNIFICADOS DE PRECIOS DEL MES DE JULIO DEL 2018


ÁREAS GEOGRÁFICAS
(Base : Julio 1992 = 100,0)

Cod. 1 2 3 4 5 6 Cod. 1 2 3 4 5 6
01 957.83 957.83 957.83 957.83 957.83 957.83 02 532.40 532.40 532.40 532.40 532.40 532.40
03 512.37 512.37 512.37 512.37 512.37 512.37 04 547.19 936.14 1036.46 589.75 365.28 751.32
05 453.63 216.64 425.85 605.75 (*) 619.23 06 944.94 944.94 944.94 944.94 944.94 944.94
07 685.35 685.35 685.35 685.35 685.35 685.35 08 904.70 904.70 904.70 904.70 904.70 904.70
09 251.38 251.38 251.38 251.38 251.38 251.38 10 414.88 414.88 414.88 414.88 414.88 414.88
11 236.99 236.99 236.99 236.99 236.99 236.99 12 319.93 319.93 319.93 319.93 319.93 319.93
13 1461.65 1461.65 1461.65 1461.65 1461.65 1461.65 14 283.57 283.57 283.57 283.57 283.57 283.57
17 622.77 671.19 697.96 858.99 795.04 865.97 16 354.83 354.83 354.83 354.83 354.83 354.83
19 783.88 783.88 783.88 783.88 783.88 783.88 18 350.24 350.24 350.24 350.24 350.24 350.24
21 476.04 423.68 449.56 438.28 449.56 410.96 20 1778.04 1778.04 1778.04 1778.04 1778.04 1778.04
23 439.25 439.25 439.25 439.25 439.25 439.25 22 367.30 367.30 367.30 367.30 367.30 367.30
27 465.25 465.25 465.25 465.25 465.25 465.25 24 243.50 243.50 243.50 243.50 243.50 243.50
31 378.15 378.15 378.15 378.15 378.15 378.15 26 377.26 377.26 377.26 377.26 377.26 377.26
33 859.31 859.31 859.31 859.31 859.31 859.31 28 577.58 577.58 577.58 569.16 577.58 577.58
37 305.61 305.61 305.61 305.61 305.61 305.61 30 481.37 481.37 481.37 481.37 481.37 481.37
39 448.81 448.81 448.81 448.81 448.81 448.81 32 470.47 470.47 470.47 470.47 470.47 470.47
41 419.01 419.01 419.01 419.01 419.01 419.01 34 503.52 503.52 503.52 503.52 503.52 503.52
43 725.34 678.97 914.43 650.56 1119.03 894.58 38 425.64 955.92 865.32 570.93 (*) 649.00
45 323.28 323.28 323.28 323.28 323.28 323.28 40 383.17 442.60 446.07 350.36 272.89 331.41
47 582.52 582.52 582.52 582.52 582.52 582.52 42 285.36 285.36 285.36 285.36 285.36 285.36
49 299.69 299.69 299.69 299.69 299.69 299.69 44 383.09 383.09 383.09 383.09 383.09 383.09
51 348.95 348.95 348.95 348.95 348.95 348.95 46 483.51 483.51 483.51 483.51 483.51 483.51
53 805.35 805.35 805.35 805.35 805.35 805.35 48 369.08 369.08 369.08 369.08 369.08 369.08
55 500.55 500.55 500.55 500.55 500.55 500.55 50 647.15 647.15 647.15 647.15 647.15 647.15
57 390.41 390.41 390.41 390.41 390.41 390.41 52 309.94 309.94 309.94 309.94 309.94 309.94
59 243.79 243.79 243.79 243.79 243.79 243.79 54 406.60 406.60 406.60 406.60 406.60 406.60
61 266.57 266.57 266.57 266.57 266.57 266.57 56 540.38 540.38 540.38 540.38 540.38 540.38
65 254.51 254.51 254.51 254.51 254.51 254.51 60 295.99 295.99 295.99 295.99 295.99 295.99
69 389.45 327.82 428.87 488.52 269.39 451.51 62 468.68 468.68 468.68 468.68 468.68 468.68
71 650.77 650.77 650.77 650.77 650.77 650.77 64 348.21 348.21 348.21 348.21 348.21 348.21
73 551.96 551.96 551.96 551.96 551.96 551.96 66 736.16 736.16 736.16 736.16 736.16 736.16
77 331.03 331.03 331.03 331.03 331.03 331.03 68 288.64 288.64 288.64 288.64 288.64 288.64
70 218.25 218.25 218.25 218.25 218.25 218.25
72 434.41 434.41 434.41 434.41 434.41 434.41
78 489.56 489.56 489.56 489.56 489.56 489.56
80 107.54 107.54 107.54 107.54 107.54 107.54
(*) Sin Producción.
Nota: El cuadro incluye los índices unificados de código: 30, 34, 39, 47, 49 y 53 que fueron aprobados mediante
Resolución Jefatural N° 226-2018-INEI.
PRESUPUESTO BASE

ESTRUCTURAS 281,500.58 119,617.97 88,945.78 1,257.61


ARQUITECTURA - - - 241,641.11
INSTALACIONES ELECTRICAS 10,740.92 7,301.29 25,621.67 49,025.90
INSTALACIONES SANITARIAS 10,731.56 7,709.92 2,553.72 16,941.67
MOBILLIARIO - - - 49,309.20
302,973.06 134,629.18 117,121.17 358,175.49
491,321.95 88,437.95 579,759.90
241,641.11 43,495.40 285,136.51
92,689.78 16,684.16 109,373.94
37,936.87 6,828.64 44,765.51
49,309.20 8,875.66 58,184.86
912,898.91 164,321.80 1,077,220.71
RESOLUCIÓN JEFATURAL Nº 258-2018-INEI
CÓDIGO 47: ÍNDICE MANO DE OBRA

AÑO 2018 ÍNDICES


MES ANTERIOR MODIFICADO
JUNIO 582.52 602.11
JULIO 582.52 602.11
CALENDARIZACION DE MATERIALES
”MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE EDUCACION DEL NIVEL INICIAL EN LA IEI N°601 DEL CENTRO POBLADO MANUEL SOANE CORRALES, BARRANCA,BARANCA,LIMA-
OBRA ETAPA I”
PROCESO ADJUDICACION SIMPLIFICADA Nº 024-2018-GRL/CS
AREA GEOGRAFICA 02
SUPERVISOR DE OBRA ING. JULIO MARTINEZ FACTOR DE RELACION : 0.99
RESIDENTE DE OBRA ING. JUAN EPIFANIO TINOCO ANAYA
VALOR REFERENCIAL S/. 1,077,220.71 S/IGV S. 912,898.91
PRESUPUESTO CONTRATADO S/. 1,071,220.00 S/IGV S. 907,813.56

Ene. 2019
IU DESCRIPCION COSTO DIRECTO Set. (17 Días) Oct. (31 Dias) Nov. (30 Dias) Dic. ( 31 Dias)
( 11 Dias)

3 ACERO DE CONSTRUCCION CORRUGADO 42,233.07 9,497.18 7,344.18


5 AGREGADO GRUESO 20,436.16 1,986.32 1,272.17
21 CEMENTO PORTLAND TIPO I 37,476.82 24,956.84 2,273.18 1,005.21
43 MADERA NACIONAL PARA ENCOF. Y CARPINT. 35,917.81 9,720.45 1,959.27
17 BLOQUE Y LADRILLO 10,746.41 9,125.11 1,240.50 894.07
24 CERAMICA ESMALTADA Y SIN ESMALTAR AGREGADO FINO 16,564.74 2,667.04 2,641.15 111.30

COSTO DIRECTO 163,375.00 - 57,952.94 16,730.45 2,010.58


IGV (18%) 29,407.50 - 10,431.53 3,011.48 361.90
TOTAL DE PRESUPUESTO 192,782.50 - - 68,384.47 19,741.93 2,372.48
% DE AVANCE 0.00% 35.47% 10.24% 1.23%
% DE AVANCE ACUMULADO 0.00% 35.47% 45.71% 46.94%
CALENDARIZACION POR INSUMOS

OBRA ”MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE EDUCACION DEL NIVEL INICIAL EN LA IEI N°601 DEL CENTRO POBLADO MANUEL SOANE CORRALES, BARRANCA,BARANCA,LIMA-ETAPA I”

PROCESO ADJUDICACION SIMPLIFICADA Nº 024-2018-GRL/CS


AREA GEOGRAFICA 02
SUPERVISOR DE OBRA ING. JULIO MARTINEZ FACTOR DE RELACION :
RESIDENTE DE OBRA ING. JUAN EPIFANIO TINOCO ANAYA
VALOR REFERENCIAL S/. 1,077,220.71 S/IGV S. 912,898.91
PRESUPUESTO CONTRATADO S/. 1,071,220.00 S/IGV S. 907,813.56

COSTO Set. (17 Dic. ( 31 Ene. 2019


IU DESCRIPCION UND METRADO P. UNITARIO Oct. (31 Dias) Nov. (30 Dias)
DIRECTO Días) Dias) ( 11 Dias)

3 ACERO DE CONSTRUCCION CORRUGADO 45,332.89


ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 19,047.43 2.38 45,332.89 28,491.53 9,497.18 7,344.18

5 AGREGADO GRUESO 13,695.25


ARENA GRUESA m3 95.42 40.00 3,816.67 2,398.76 799.59 618.32
HORMIGON m3 105.82 38.14 4,035.94 2,536.57 845.52 653.85
PIEDRA CHANCADA 1/2 " m3 97.38 60.00 5,842.64 5,501.43 341.21

21 CEMENTO PORTLAND TIPO I 65,014.34


CEMENTO PORTLAND TIPO I bls 2,145.20 18.60 39,900.65 20,995.26 16,194.71 1,705.47 1,005.21
CEMENTO PORTLAND TIPO MS bls 1,168.08 21.50 25,113.69 15,783.85 8,762.13 567.71

43 MADERA NACIONAL PARA ENCOF. Y CARPINT. 40,841.06


MADERA NACIONAL P/ENCOFRADO p2 8,168.21 5.00 40,841.06 29,161.34 9,720.45 1,959.27

17 BLOQUE Y LADRILLO 11,259.69


LADRILLO ARCILLA KING KONG 18 HUECOS (TIPO IV) 9x12.5x2 und 16,085.27 0.70 11,259.69 9,125.11 1,240.50 894.07

24 CERAMICA ESMALTADA Y SIN ESMALTAR 5,419.49


PORCELANATO DE ALTO TRANSITO 60x60cm m2 55.00 264.46 5,419.49 2,667.04 2,641.15 111.30

COSTO DIRECTO 181,562.72 - 104,868.74 57,952.94 16,730.45 2,010.58


IGV (18%) 32,681.29 - 18,876.37 10,431.53 3,011.48 361.91
TOTAL DE PRESUPUESTO 214,244.01 - 123,745.11 68,384.47 19,741.93 2,372.49
% DE AVANCE 57.76% 31.92% 9.21% 1.11%
% DE AVANCE ACUMULADO 57.76% 89.68% 98.89% 100.00%
INSUMOS AR 405,242.57
INSUMOS EST 198,453.68
INSUMOS INST ELECT 76,557.88
INSUMOS SANIT 31,166.38
INSUMOS EQUI 41,091.00
752,511.51
CALENDARIZACION DE MATERIALES
”MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE EDUCACION DEL NIVEL INICIAL EN LA IEI N°601 DEL CENTRO POBLADO MANUEL SOANE CORRALES, BARRANCA,BARANCA,LIMA-
OBRA ETAPA I”
PROCESO ADJUDICACION SIMPLIFICADA Nº 024-2018-GRL/CS
AREA GEOGRAFICA 02
SUPERVISOR DE OBRA ING. JULIO MARTINEZ FACTOR DE RELACION : 0.99
RESIDENTE DE OBRA ING. JUAN EPIFANIO TINOCO ANAYA
VALOR REFERENCIAL S/. 1,077,220.71 S/IGV S. 912,898.91
PRESUPUESTO CONTRATADO S/. 1,071,220.00 S/IGV S. 907,813.56

Ene. 2019
IU DESCRIPCION COSTO DIRECTO Set. (17 Días) Oct. (31 Dias) Nov. (30 Dias) Dic. ( 31 Dias)
( 11 Dias)

3 ACERO DE CONSTRUCCION CORRUGADO 42,233.07 37,988.71 7,344.18


5 AGREGADO GRUESO 20,436.16 13,076.93 618.32
21 CEMENTO PORTLAND TIPO I 37,476.82 54,294.40 9,386.15 1,333.80
43 MADERA NACIONAL PARA ENCOF. Y CARPINT. 35,917.81 33,324.21 7,516.86
17 BLOQUE Y LADRILLO 10,746.41 9,125.11 1,240.50 894.07
24 CERAMICA ESMALTADA Y SIN ESMALTAR AGREGADO FINO 16,564.74 2,667.04 2,641.15 111.30

COSTO DIRECTO 163,375.00 - - 150,476.39 28,747.16 2,339.17


IGV (18%) 29,407.50 - - 27,085.75 5,174.49 421.05
TOTAL DE PRESUPUESTO 192,782.50 - - 177,562.14 33,921.65 2,760.22
% DE AVANCE 0.00% 92.10% 17.60% 1.43%
% DE AVANCE ACUMULADO 0.00% 92.10% 109.70% 111.13%

Você também pode gostar