1. TRABAJOS PRELIMINARES

1 INSTALACION DE FAENAS GLB 39.00 39.00 4,240.80 0.00 0.00 0.00 0.00 0.00 165,391.20 165,391.20

SUBTOTAL TRABAJOS PRELIMINARES 0.00 0.00 0.00 165,391.20 165,391.20

2. CONSTRUCCION DE POZOS

2 ESTUDIO HIDROGEOLOGICO GLB 39.00 39.00 5,364.32 0.00 0.00 0.00 0.00 0.00 209,208.48 209,208.48

3 PERFORACION DIAMETRO 6"+TOMA DE MUESTRAS ML 2,469.00 2,469.00 301.61 0.00 0.00 0.00 0.00 0.00 744,675.09 744,675.09

4 PERFILAJE ELECTRICO, ANALISIS DE MUESTRAS Y DISEÑO DE POZO GLB 39.00 39.00 1,429.93 0.00 0.00 0.00 0.00 0.00 55,767.27 55,767.27

5 ENSANCHE DE POZO PILOTO CON TREPANO DE 12 PLG. ML 2,469.00 2,469.00 223.91 0.00 0.00 0.00 0.00 0.00 552,833.79 552,833.79

6 ENTUBADO E INSTALACION DE FILTRO EN TUBERIA PVC DE 6 PLG E40 ML 2,469.00 2,469.00 169.55 0.00 0.00 0.00 0.00 0.00 418,618.95 418,618.95

7 PROVISION E INSTALACION EMPAQUE DE GRAVA SELECCIONADA ML 2,469.00 2,469.00 44.91 0.00 0.00 0.00 0.00 0.00 110,882.79 110,882.79

8 DESARROLLO DE POZO Y LIMPIEZA HR 457.50 457.50 423.94 0.00 0.00 0.00 0.00 0.00 193,952.55 193,952.55

9 PRUEBA DE BOMBEO - ESCALONADO Y CONTINUO HR 915.00 915.00 417.88 0.00 0.00 0.00 0.00 0.00 382,360.20 382,360.20

10 CONSTRUCCION DE SELLO SANITARIO DE HORMIGON GLB 39.00 39.00 208.22 0.00 0.00 0.00 0.00 0.00 8,120.58 8,120.58

11 ANALISIS FISICO QUIMICO Y BACTERIOLOGICO DEL AGUA GLB 39.00 39.00 775.15 0.00 0.00 0.00 0.00 0.00 30,230.85 30,230.85

SUBTOTAL CONSTRUCCION DE POZOS 0.00 0.00 0.00 2,706,650.55 2,706,650.55

3. INST. DE ENERGIA ELECT. TRANS. Y ACOMET.

12 REPLANTEO TOPOGRAFICO M.T. KM 10.97 10.97 788.28 0.00 0.00 0.00 0.00 0.00 8,647.43 8,647.43

13 EXCAVACION DE HOYOS EN TIERRA M3 90.76 90.76 120.27 0.00 0.00 0.00 0.00 0.00 10,915.71 10,915.71

14 PLANTADO Y COMPACTADO DE POSTE 10 M CLASE 6 PZA 64.00 64.00 1,434.88 0.00 0.00 0.00 0.00 0.00 91,832.32 91,832.32

15 PLANTADO Y COMPACTADO DE POSTE 11 M CLASE 6 PZA 49.00 49.00 1,648.58 0.00 0.00 0.00 0.00 0.00 80,780.42 80,780.42

16 ARMADO ESTRUCTURA MONOFASICA DE PASO VA1 PZA 46.00 46.00 516.31 0.00 0.00 0.00 0.00 0.00 23,750.26 23,750.26

17 ARMADO DE ESTRUCTURA MONOFASICA VA5-2 PZA 2.00 2.00 805.35 0.00 0.00 0.00 0.00 0.00 1,610.70 1,610.70

18 ARMADO DE RIENDA SIMPLE VE1-1 PZA 106.00 106.00 357.06 0.00 0.00 0.00 0.00 0.00 37,848.36 37,848.36

19 ARMADO DE ANCLA F2-1 PZA 112.00 112.00 330.60 0.00 0.00 0.00 0.00 0.00 37,027.20 37,027.20

20 INSTALACION DE PUESTA A TIERRA VM2-11 PZA 46.00 46.00 446.13 0.00 0.00 0.00 0.00 0.00 20,521.98 20,521.98

21 ARMADO DE CHISPERO VM10-14 PZA 55.00 55.00 116.18 0.00 0.00 0.00 0.00 0.00 6,389.90 6,389.90

22 INSTALACION DE DE TRANSFORMADOR MONOFASICO (15 KVA) PZA 34.00 34.00 11,767.28 0.00 0.00 0.00 0.00 0.00 400,087.52 400,087.52

23 ARMADO DE ESTRUCTURA VG-10 PZA 34.00 34.00 563.98 0.00 0.00 0.00 0.00 0.00 19,175.32 19,175.32

24 ARMADO DE SECCIONADOR VM3-4 PZA 47.00 47.00 1,586.02 0.00 0.00 0.00 0.00 0.00 74,542.94 74,542.94

25 ARMADO DE PARARRAYOS VM5-6 PZA 40.00 40.00 966.93 0.00 0.00 0.00 0.00 0.00 38,677.20 38,677.20

26 ARMADO DE PROTECCION MONOFASICO BT/XFO 1 CB-75 PZA 0.00 0.00 611.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00

27 ACOMETIDA (MEDIDOR Y OTROS ACCESORIOS) PZA 35.00 35.00 900.92 0.00 0.00 0.00 0.00 0.00 31,532.20 31,532.20

28 ARMADO DE ESTRUCTURA VA5 PZA 46.00 46.00 800.34 0.00 0.00 0.00 0.00 0.00 36,815.64 36,815.64

29 ARMADO DE PUESTA A TIERRA VM2-12A PZA 54.00 54.00 379.75 0.00 0.00 0.00 0.00 0.00 20,506.50 20,506.50
30 CABLEADO Y FLECHADO ACRS Nº 4 KM 26.56 26.56 6,257.58 0.00 0.00 0.00 0.00 0.00 166,201.32 166,201.32

SUBTOTAL INST. DE ENERGIA ELECT. TRANS. Y ACOMET. 0.00 0.00 0.00 1,106,862.92 1,106,862.92

CANTIDAD CANTIDAD PRECIO CANTIDAD CANTIDAD COST. PARCIAL COST. PARCIAL COSTO POR COSTO COSTO
ITEM

DESCRIPCIÓN UND. MODIF. ORIGINAL UNITARIO INCREMENTO DECREMENTO INCREMENTO DECREMENTO MODIF. CANT. ORIG. TOTAL

4. CONSTRUCCION DE CASETA DE BOMBEO

31 REPLANTEO M2 1,862.00 1,862.00 8.27 0.00 0.00 0.00 0.00 0.00 15,398.74 15,398.74

32 EXCAVACION DE CIMIENTOS M3 56.94 56.94 78.43 0.00 0.00 0.00 0.00 0.00 4,465.80 4,465.80

33 CIMIENTOS DE HºCº 50% PIEDRA DESP. M3 51.87 51.87 565.30 0.00 0.00 0.00 0.00 0.00 29,322.11 29,322.11

34 SOBRECIMIENTO DE HºCº 50% PIEDRA DESP. M3 24.57 24.57 742.47 0.00 0.00 0.00 0.00 0.00 18,242.49 18,242.49

35 IMPERMEABILIZACION DE SOBRECIMIENTO M2 129.48 129.48 36.70 0.00 0.00 0.00 0.00 0.00 4,751.92 4,751.92

36 DINTEL DE LADRILLO ML 93.60 93.60 81.68 0.00 0.00 0.00 0.00 0.00 7,645.25 7,645.25

37 BOTAGUAS DE HºAº ML 0.00 0.00 135.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00

38 PISO DE CEMENTO C/CONT. Y ENLUCIDO M2 257.40 257.40 208.11 0.00 0.00 0.00 0.00 0.00 53,567.51 53,567.51

39 ZOCALO DE CEMENTO H=0.20 M2 80.34 80.34 78.17 0.00 0.00 0.00 0.00 0.00 6,280.18 6,280.18

40 MURO DE LADRILLO GAMBOTE 18 HUECOS E=6,5 CM 12*25*6,25 M2 942.99 907.53 280.45 35.46 0.00 9,944.76 0.00 9,944.76 254,516.79 264,461.55

41 CUBIERTA - LOSA LLENA HºAº H=15 CM M3 48.79 47.97 2,827.61 0.82 0.00 2,318.64 0.00 2,318.64 135,640.45 137,959.09

42 PUERTA METALICA M2 0.00 0.00 594.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00

43 VENTANA METALICA PERFIL ANGULAR CON MALLA OLIMPICA Nº12 M2 0.00 0.00 303.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL CONSTRUCCION DE CASETA DE BOMBEO 12,263.40 0.00 12,263.40 529,831.24 542,094.64

5. PROV. E INST. DE BOMBA SUMERGIBLE

44 PROVISION E INSTALACION DE BOMBA SUMERGIBLE (POTENCIA 5 HP) GLB 31.00 32.00 31,375.04 0.00 -1.00 0.00 -31,375.04 -31,375.04 1,004,001.28 972,626.24

45 PROV. DE ACCESORIOS E INST. DE BOMBA SUM. TUB. DE IMPULSION GLB 39.00 39.00 2,482.50 0.00 0.00 0.00 0.00 0.00 96,817.50 96,817.50

SUBTOTAL PROV. E INST. DE BOMBA SUMERGIBLE 0.00 -31,375.04 -31,375.04 1,100,818.78 1,069,443.74

6. CONSTRUCCION DE MALLA DE PROTECCION

46 EXCAVACION DE CIMIENTOS M3 199.10 199.10 78.43 0.00 0.00 0.00 0.00 0.00 15,615.41 15,615.41

47 CIMIENTOS DE HºCº 50% PIEDRA DESP. M3 85.25 85.25 565.30 0.00 0.00 0.00 0.00 0.00 48,191.83 48,191.83

48 SOBRECIMIENTO DE HºCº 50% PIEDRA DESP. M3 70.95 70.95 742.47 0.00 0.00 0.00 0.00 0.00 52,678.25 52,678.25

49 MALLA OLIMPICA N° 12 CON TUBOS F.G. 2" C/2.5 M H=2 M ML 1,254.00 1,254.00 235.92 0.00 0.00 0.00 0.00 0.00 295,843.68 295,843.68

50 PROV. Y COLOCADO DE PUERTA MET. C/MALLA OLIMPICA Y F.G. 2" PZA 0.00 0.00 538.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00

51 LIMPIEZA GENERAL DE OBRA GLB 0.00 0.00 80.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL COSNTRUCCION DE MALLA DE PROTECCION 0.00 0.00 0.00 412,329.17 412,329.17

3. INST. DE ENERGIA ELECT. TRANS. Y ACOMET. ( NUEVOS ITEM)

52 () ARMADO DE ESTRUCTURA VA5-1 PZA 33.00 33.00 1,687.93 0.00 0.00 0.00 0.00 0.00 55,701.69 55,701.69

53 () ARMADO DE ESTRUCTURA VA5-3 PZA 12.00 12.00 1,557.52 0.00 0.00 0.00 0.00 0.00 18,690.24 18,690.24

54 () ARMADO DE ESTRUCTURA VA6 PZA 2.00 2.00 2,596.21 0.00 0.00 0.00 0.00 0.00 5,192.42 5,192.42

55 () ARMADO DE PROTECCION MONOFASICA BT/XFO 1 CB-75 PZA 34.00 34.00 4,095.15 0.00 0.00 0.00 0.00 0.00 139,235.10 139,235.10

56 () ARMADO DE PROTECCION MONOFASICO BT/XFO 1 CB-50 PZA 0.00 0.00 1,624.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00

57 () PLANTADO Y COMPACTADO DE POSTE 7 M PZA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

58 () PLANTADO Y COMPACTADO DE POSTE 12 M CLASE 6 PZA 3.00 3.00 1,630.85 0.00 0.00 0.00 0.00 0.00 4,892.55 4,892.55

59 () PLANTADO Y COMPACTADO DE POSTE DE 9 M CLASE 7 PZA 8.00 8.00 1,512.98 0.00 0.00 0.00 0.00 0.00 12,103.84 12,103.84
60 () ARMADO DE PUESTA A TIERRA PARA XFO VM2-11T PZA 36.00 36.00 1,702.55 0.00 0.00 0.00 0.00 0.00 61,291.80 61,291.80

61 () ARMADO DE ESTRUCTURA J6 PZA 6.00 6.00 487.05 0.00 0.00 0.00 0.00 0.00 2,922.30 2,922.30

62 () ARMADO DE ESTRUCTURA MONOFASICA VA4 PZA 3.00 3.00 1,501.99 0.00 0.00 0.00 0.00 0.00 4,505.97 4,505.97

CANTIDAD CANTIDAD PRECIO CANTIDAD CANTIDAD COST. PARCIAL COST. PARCIAL COSTO POR COSTO COSTO
ITEM

DESCRIPCIÓN UND. MODIF. ORIGINAL UNITARIO INCREMENTO DECREMENTO INCREMENTO DECREMENTO MODIF. CANT. ORIG. TOTAL

63 () ARMADO DE ESTRUCTURA MONOFASICA VA2 PZA 1.00 1.00 2,196.71 0.00 0.00 0.00 0.00 0.00 2,196.71 2,196.71

64 () ARMADO DE ESTRUCTURA VM5-7 PZA 3.00 3.00 882.12 0.00 0.00 0.00 0.00 0.00 2,646.36 2,646.36

65 () ARMADO DE CHISPERO VM10-15 PZA 4.00 4.00 874.25 0.00 0.00 0.00 0.00 0.00 3,497.00 3,497.00

66 () ARMADO DE ESTRUCTURA TRIFASICA VC1 PZA 1.00 1.00 2,100.77 0.00 0.00 0.00 0.00 0.00 2,100.77 2,100.77

67 () ARMADO DE ESTRUCTURA TRIFASICA VC7 PZA 3.00 3.00 2,937.36 0.00 0.00 0.00 0.00 0.00 8,812.08 8,812.08

68 () ARMADO DE ESTRUCTURA TRIFASICA VCB-2 PZA 2.00 2.00 3,980.93 0.00 0.00 0.00 0.00 0.00 7,961.86 7,961.86

69 () ARMADO DE ESTRUCTURA TRIFASICA VC8 PZA 1.00 1.00 4,194.97 0.00 0.00 0.00 0.00 0.00 4,194.97 4,194.97

70 () ARMADO DE ESTRUCTURA TRIFASICA VCB-7 PZA 1.00 1.00 2,867.37 0.00 0.00 0.00 0.00 0.00 2,867.37 2,867.37

71 () ARMADO DE ESTRUCTURA VM5-22 PZA 12.00 12.00 617.15 0.00 0.00 0.00 0.00 0.00 7,405.80 7,405.80

72 () ARMADO DE ESTRUCTURA VM5-9 PZA 6.00 6.00 1,632.55 0.00 0.00 0.00 0.00 0.00 9,795.30 9,795.30

73 () ARMADO DE ESTRUCTURA VE2-1 PZA 2.00 2.00 1,350.78 0.00 0.00 0.00 0.00 0.00 2,701.56 2,701.56

74 () ARMADO DE ESTRUCTURA V04 PZA 2.00 2.00 1,868.50 0.00 0.00 0.00 0.00 0.00 3,737.00 3,737.00

75 () ARMADO DE EMISELANEO VM5-2 PZA 5.00 5.00 716.10 0.00 0.00 0.00 0.00 0.00 3,580.50 3,580.50

76 () ARMADO DE SECCIONADOR 3Ø VM3-3 PZA 1.00 1.00 6,828.20 0.00 0.00 0.00 0.00 0.00 6,828.20 6,828.20

77 () INSTALACION DE ACOMETIDA Y MEDIDOR TRIFASICO PZA 2.00 2.00 8,685.70 0.00 0.00 0.00 0.00 0.00 17,371.40 17,371.40

78 () CABLEADO BOMBA PZA 1.00 1.00 3,692.96 0.00 0.00 0.00 0.00 0.00 3,692.96 3,692.96

79 () INSTALACION XFO TRIFASICO 30 KVA PZA 2.00 2.00 29,695.36 0.00 0.00 0.00 0.00 0.00 59,390.72 59,390.72

80 () CABLEADO Y FLECHADO DUPLEX N°4 AWG KM 0.74 0.74 11,086.10 0.00 0.00 0.00 0.00 0.00 8,203.71 8,203.71

81 () INSTALACION DE PLACA DE IDENTIFICACION PZA 119.00 119.00 278.00 0.00 0.00 0.00 0.00 0.00 33,082.00 33,082.00

SUBTOTAL INST. DE ENERGIA ELECT. TRANS. Y ACOMET. 0.00 0.00 0.00 494,602.18 494,602.18

4. CONSTRUCCION DE CASETA DE BOMBEO (NUEVOS ITEM)

82 () BOTAGUAS DE LADRILLO GAMBOTE ML 35.10 35.10 105.44 0.00 0.00 0.00 0.00 0.00 3,700.94 3,700.94

83 () PUERTA METALICA DE PLANCHA 1MM M2 56.16 56.16 390.00 0.00 0.00 0.00 0.00 0.00 21,902.40 21,902.40

84 () VENTANA METALICA PERFIL ANG. C/PROTEC. DE ACERO DE 5/16" M2 9.36 9.36 245.92 0.00 0.00 0.00 0.00 0.00 2,301.81 2,301.81

SUBTOTAL CONSTRUCCION DE CASETA DE BOMBEO 0.00 0.00 0.00 27,905.15 27,905.15

5. PROV. E INST. DE BOMBA SUMERGIBLE (NUEVOS ITEM)

85 () PROV.E INST.DE BOMBA SUMERGIBLE MONOFASICO (POTEN. 3 HP) GLB 3.00 1.00 26,385.48 2.00 0.00 52,770.96 0.00 52,770.96 26,385.48 79,156.44

86 () PROV. E INST. DE BOMBA SUMERGIBLE TRIFASICO (POTEN.5HP) GLB 1.00 2.00 30,782.83 0.00 -1.00 0.00 -30,782.83 -30,782.83 61,565.66 30,782.83

87 () PROV. E INST.DE BOMBA SUMERGIBLE ( POT. 7.5 HP) GLB 1.00 1.00 36,131.46 0.00 0.00 0.00 0.00 0.00 36,131.46 36,131.46

88 () PROV.E INST.DE BOMBA SUMERGIBLE (POT. 10 HP) GLB 1.00 1.00 37,387.91 0.00 0.00 0.00 0.00 0.00 37,387.91 37,387.91

89 () PROTECCION ELECTRICA DE LA BOMBA GLB 39.00 39.00 544.92 0.00 0.00 0.00 0.00 0.00 21,251.88 21,251.88

SUBTOTAL PROV. E INST. DE BOMBA SUMERGIBLE 52,770.96 -30,782.83 21,988.13 182,722.39 204,710.52

6. COSNTRUCCION DE MALLA DE PROTECCION (NUEVOS ITEM)

90 () PROV.Y COLOC. DE PUERTA MET C/MALLA OLIMP. Y F.G. 1 1/2 PZA 55.00 55.00 813.10 0.00 0.00 0.00 0.00 0.00 44,720.50 44,720.50

SUBTOTAL COSNTRUCCION DE MALLA DE PROTECCION 0.00 0.00 0.00 44,720.50 44,720.50


7 TANQUE ELEVADO METALICO 10 M3 (NUEVOS ITEM)

91 () EXCAVACION DE CIMIENTOS M3 110.56 110.56 517.42 0.00 0.00 0.00 0.00 0.00 57,205.96 57,205.96

92 () ZAPATAS DE HøAø DOSIF: 1:2:3 M3 23.04 23.04 2,725.63 0.00 0.00 0.00 0.00 0.00 62,798.52 62,798.52

93 () COLUMNA DE HORMIGON ARMADO M3 32.40 33.60 4,146.87 0.00 -1.20 0.00 -4,976.24 -4,976.24 139,334.83 134,358.59

CANTIDAD CANTIDAD PRECIO CANTIDAD CANTIDAD COST. PARCIAL COST. PARCIAL COSTO POR COSTO COSTO
ITEM

DESCRIPCIÓN UND. MODIF. ORIGINAL UNITARIO INCREMENTO DECREMENTO INCREMENTO DECREMENTO MODIF. CANT. ORIG. TOTAL

94 () VIGA DE HORMIGON ARMADO DOSIF: 1:2:3 M3 31.78 32.80 3,470.03 0.00 -1.02 0.00 -3,539.43 -3,539.43 113,816.98 110,277.55

95 () HORMIGON ARMADO LOSA M3 40.48 40.48 5,094.40 0.00 0.00 0.00 0.00 0.00 206,221.31 206,221.31

96 () HORMIGON CICLOPEO M3 6.43 4.49 907.81 1.94 0.00 1,761.15 0.00 1,761.15 4,076.07 5,837.22

97 () TANQUE METALICO PROTECCION INTERNA EPOXI 10 M3 GLB 16.00 16.00 30,927.16 0.00 0.00 0.00 0.00 0.00 494,834.56 494,834.56

98 () ACCESORIOS GLB 16.00 16.00 4,136.34 0.00 0.00 0.00 0.00 0.00 66,181.44 66,181.44

99 () ESCALERA METALICA GLB 16.00 16.00 6,201.68 0.00 0.00 0.00 0.00 0.00 99,226.88 99,226.88

100 () TAPA CAMARA DE HøAø PRECIO POR M2 E=8 CM DOSF:1:2:4 M2 5.76 5.76 220.28 0.00 0.00 0.00 0.00 0.00 1,268.81 1,268.81

101 () PROV. DE ACCESORIOS E INST. (BOMBA SUM.-TUB. DE IMPULSION GLB 16.00 16.00 2,864.86 0.00 0.00 0.00 0.00 0.00 45,837.76 45,837.76

102 () PARARAYOS GLB 16.00 16.00 5,410.17 0.00 0.00 0.00 0.00 0.00 86,562.72 86,562.72

SUBTOTAL TANQUE ELEVADO METALICO 10 M3 1,761.15 -8,515.67 -6,754.52 1,377,365.84 1,370,611.32

8 TANQUE DE FERROCEMENTO 20 M3 (NUEVOS ITEM)

103 () LIMPIEZA Y DESHIERBE DE TERRENO M2 584.82 584.82 9.02 0.00 0.00 0.00 0.00 0.00 5,275.08 5,275.08

104 () REPLANTEO TECNICO M2 584.82 584.82 4.93 0.00 0.00 0.00 0.00 0.00 2,883.16 2,883.16

105 () MOVIMIENTO DE TIERRA NIVELACION Y COMPACTADO M2 584.82 584.82 7.52 0.00 0.00 0.00 0.00 0.00 4,397.85 4,397.85

106 () EXCAVACION MANUAL EN TERRENO DURO M3 438.66 438.66 65.15 0.00 0.00 0.00 0.00 0.00 28,578.70 28,578.70

107 () SOLADO DE PIEDRA BRUTA E=15 CM M2 584.82 584.82 38.75 0.00 0.00 0.00 0.00 0.00 22,661.78 22,661.78

108 () HORMIGON CAPA BASE Cº 1:3:5 E=5 CM M2 378.90 378.90 43.87 0.00 0.00 0.00 0.00 0.00 16,622.34 16,622.34

109 () PISO DE HORMIGON C/ENFERRADURA BASE M3 10.44 10.44 701.83 0.00 0.00 0.00 0.00 0.00 7,327.11 7,327.11

110 () ENCOFRADO Y ARMADO DE ESTRUCTURA M3 48.78 48.78 1,532.52 0.00 0.00 0.00 0.00 0.00 74,756.33 74,756.33

111 () MORTERO DE CEMENTO PARED TANQUE DOSIF. 1:3 M3 21.06 21.06 946.27 0.00 0.00 0.00 0.00 0.00 19,928.45 19,928.45

112 () HORMIGON CHAFLAN MURO PISO M3 0.36 0.36 790.28 0.00 0.00 0.00 0.00 0.00 284.50 284.50

113 () IMPERMEABILIZACION MURO SIKA M2 434.34 434.34 46.17 0.00 0.00 0.00 0.00 0.00 20,053.48 20,053.48

114 () REVOQUE EXTERIOR M2 434.34 434.34 78.15 0.00 0.00 0.00 0.00 0.00 33,943.67 33,943.67

115 () ENCOFRADO Y ARMADO DE ESTRUCTURA BOVEDA M3 5.73 5.73 866.72 0.00 0.00 0.00 0.00 0.00 4,966.31 4,966.31

116 () MORTERO DE CEMENTO CUBIERTA M3 5.73 5.73 1,003.90 0.00 0.00 0.00 0.00 0.00 5,752.35 5,752.35

117 () IMPERMEABILIZACION CUBIERTA SIKA M2 208.44 208.44 35.52 0.00 0.00 0.00 0.00 0.00 7,403.79 7,403.79

118 () REVOQUE EXTERIOR BOBEDA M2 208.44 208.44 69.63 0.00 0.00 0.00 0.00 0.00 14,513.68 14,513.68

119 () PINTURA ASFALTICA INTERIOR TANQUE M2 411.66 411.66 24.90 0.00 0.00 0.00 0.00 0.00 10,250.33 10,250.33

120 () HORMIGON EN PAREDES DE CAMARA M3 5.40 5.40 836.60 0.00 0.00 0.00 0.00 0.00 4,517.64 4,517.64

121 () PROV. E INSTALACION DE TAPA METALICA EN TANQUES GLB 54.00 54.00 329.49 0.00 0.00 0.00 0.00 0.00 17,792.46 17,792.46

122 () PROV. DE ACCESORIOS E INST. (BOMBA SUM.-TUB. DE IMPULSION GLB 18.00 18.00 3,678.52 0.00 0.00 0.00 0.00 0.00 66,213.36 66,213.36

SUBTOTAL TANQUE DE FERROCEMENTO 20 M3 0.00 0.00 0.00 368,122.37 368,122.37

9 TUBERIA DE IMPULSION(NUEVOS ITEM)

123 () TRAZADO Y REPLANTEO DE LINEA DE TUBERIA DE IMPULSION ML 20,391.24 20,191.05 2.70 200.19 0.00 540.51 0.00 540.51 54,515.84 55,056.35
124 () EXCAVACION DE TERRENO SEMIDURO (0-2 M) C/RETROEXCAVADORA M3 3,627.29 3,591.29 11.16 36.00 0.00 401.76 0.00 401.76 40,078.80 40,480.56

125 ()RELLENO Y COMPACTADO CON TIERRA CERNIDA TUB. DE IMPULSION M3 1,828.05 1,810.05 15.03 18.00 0.00 270.54 0.00 270.54 27,205.05 27,475.59

126 ()RELLENO Y COMPACTADO CON TIERRA COMUN TUB. DE IMPULSION M3 1,828.05 1,810.05 22.55 18.00 0.00 405.90 0.00 405.90 40,816.63 41,222.53

127 () TENDIDO DE TUB. DE IMPULSION PVC E-40 . DIAMETRO 2" ML 20,080.35 20,080.35 38.92 0.00 0.00 0.00 0.00 0.00 781,527.22 781,527.22

128 () TENDIDO DE TUB. DE IMPULSION FG D=2" ML 110.70 110.70 122.75 0.00 0.00 0.00 0.00 0.00 13,588.43 13,588.43

CANTIDAD CANTIDAD PRECIO CANTIDAD CANTIDAD COST. PARCIAL COST. PARCIAL COSTO POR COSTO COSTO
ITEM

DESCRIPCIÓN UND. MODIF. ORIGINAL UNITARIO INCREMENTO DECREMENTO INCREMENTO DECREMENTO MODIF. CANT. ORIG. TOTAL

129 () ACCESORIOS ADUCCION - IMPULSION GLB 1.00 1.00 3,307.85 0.00 0.00 0.00 0.00 0.00 3,307.85 3,307.85

130 () PASO DE ALCANTARILLA TUBERIA DE IMPULSION GLB 5.00 5.00 1,925.37 0.00 0.00 0.00 0.00 0.00 9,626.85 9,626.85

131 () PASO DESNIVEL TUBERIA DE IMPULSION GLB 8.00 8.00 653.76 0.00 0.00 0.00 0.00 0.00 5,230.08 5,230.08

SUBTOTAL TUBERIA DE IMPULSION 1,618.71 0.00 1,618.71 975,896.75 977,515.46

10 RED DE DISTRIBUCION (NUEVOS ITEM)

132 () TRAZADO Y REPLANTEO DE LINEA DE TUBERIA DE DISTRIBUCION ML 9,061.37 8,802.16 1.96 259.21 0.00 508.05 0.00 508.05 17,252.23 17,760.29

133 () EXCAVACION DE TERRENO SEMIDURO (0-2 M) C/RETROEXCAVADORA M3 1,492.24 1,445.44 11.11 46.80 0.00 519.95 0.00 519.95 16,058.84 16,578.79

134 ()RELLENO Y COMPACTADO CON TIERRA COMUN TUB. DE DISTRIBUCIN M3 746.11 722.71 22.55 23.40 0.00 527.67 0.00 527.67 16,297.11 16,824.78

135 ()RELLENO Y COMPAC. CON TIERRA CERNIDA RED DE DISTRIB. M3 746.11 722.71 30.07 23.40 0.00 703.64 0.00 703.64 21,731.89 22,435.53

136 () TENDIDO DE TUB. PVC SDR 21 C 12 DIAM. 2" TUB DE DISTRI. ML 7,408.00 7,408.00 55.77 0.00 0.00 0.00 0.00 0.00 413,144.16 413,144.16

137 () TENDIDO DE TUB. PVC SDR 21 C 12 DIAM. 1 1/2" DISTRIB. ML 100.38 100.38 116.85 0.00 0.00 0.00 0.00 0.00 11,729.40 11,729.40

138 () TENDIDO DE TUB. FG D= 1 1/2" DISTRIBUCION ML 417.87 417.87 198.15 0.00 0.00 0.00 0.00 0.00 82,800.94 82,800.94

139 () TENDIDO DE TUB. PVC SDR 21 DIAM. 1" TUB DE DISTRIBUCIO ML 383.93 383.93 32.76 0.00 0.00 0.00 0.00 0.00 12,577.55 12,577.55

140 () PROV. E INSTALACION TUBERIA DE FG D= 1" ML 354.10 354.10 42.92 0.00 0.00 0.00 0.00 0.00 15,197.97 15,197.97

141 () TENDIDO DE TUB. PVC SDR 21 DIAM. 3/4" TUB DE DISTRIB. ML 137.88 137.88 30.03 0.00 0.00 0.00 0.00 0.00 4,140.54 4,140.54

142 () CONEXIONES DE PILETAS PUBLICAS GLB 26.00 26.00 439.66 0.00 0.00 0.00 0.00 0.00 11,431.16 11,431.16

143 () PEDESTAL DE H°A° M3 3.38 3.38 1,415.53 0.00 0.00 0.00 0.00 0.00 4,784.49 4,784.49

144 () PILETA PUBLICA GLB 26.00 26.00 256.13 0.00 0.00 0.00 0.00 0.00 6,659.38 6,659.38

145 () CONEXION RED DE DISTRIBUCION GLB 22.00 22.00 364.48 0.00 0.00 0.00 0.00 0.00 8,018.56 8,018.56

146 () CAMARA DE LLAVES PARA LA RED DE SITRIBUCION GLB 27.00 27.00 214.48 0.00 0.00 0.00 0.00 0.00 5,790.96 5,790.96

SUBTOTAL RED DE DISTRIBUCION 2,259.31 0.00 2,259.31 647,615.18 649,874.50

11 PANEL SOLAR (NUEVOS ITEM)

147 () PANEL SOLAR GLB 2.00 2.00 149,804.84 0.00 0.00 0.00 0.00 0.00 299,609.68 299,609.68

SUBTOTAL PANEL SOLAR 0.00 0.00 0.00 299,609.68 299,609.68

12 LIMPIEZA GENERAL (NUEVOS ITEM)

148 () LIMPIEZA GENERAL DE OBRA GLB 39.00 39.00 68.87 0.00 0.00 0.00 0.00 0.00 2,685.93 2,685.93

SUBTOTAL LIMPIEZA GENERAL DE OBRA 0.00 0.00 0.00 2,685.93 2,685.93

COSTO P/ORDEN DE TRABAJO 0.00 10,443,129.83 10,443,129.83


RESUMEN GENERAL DEL PRESUPUESTO
N° ACTIVIDAD Bs.
1 TRABAJOS PRELIMINARES 165,391.20
2 CONSTRUCCION DE POZOS 2,706,650.55
3 INST. DE ENERGIA ELECT. TRANS. Y ACOMET. 1,601,465.10
4 CONSTRUCCION DE CASETA DE BOMBEO 569,999.79
5 PROV. E INST. DE BOMBA SUMERGIBLE 1,274,154.26
6 CONSTRUCIION DE MALLA DE PROTECCION 457,049.67
7 TANQUE ELEVADO METALICO DE 10 M3 1,370,611.32
8 TANQUE DE FERROCEMENTO 20 M3 368,122.37
9 TUBERIA DE IMPULSION 977,515.46
10 RED DE DISTRIBUCION 649,874.50
11 PANEL SOLAR 299,609.68
12 LIMPIEZA GENERAL DE LA OBRA 2,685.93
TOTAL CONSTRUCCION DE OBRAS 10,443,129.83
TOTAL POR ORDEN DE TRABAJO 10,443,129.83
SUPERVISION ( Contraparte G.A.M ) 0
COSTO TOTAL DEL PROYECTO 10,443,129.83
COSTO TOTAL PARA EJECUCION 10,443,129.83

* según el cuadro anterior se tiene como costo total del proyecto para la ejecucion , el monto de ( 10,443,129.83 Bs)
por lo que el monto de la resolucion modificatoria no tendria ningun incremento ni decremento .
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 -0.01
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
9,944.76 0.00
2,318.64 0.00
0.00 0.00
0.00 0.00
12,263.40 0.00
0.00 0.00
-31,375.04 0.00
0.00 0.00
-31,375.04 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
52,770.96 0.00
-30,782.83 0.00
0.00 0.00
0.00 0.00
0.00 0.00
21,988.13 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
-4,976.24 0.00

-3,539.43 0.00
0.00 0.00
1,761.15 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
-6,754.52 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
540.51 0.00
401.76 0.00
270.54 0.00
405.90 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
1,618.71 0.00
0.00 0.00
508.06 -0.01
519.95 0.00
527.67 0.00
703.64 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
2,259.32 -0.01
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

Você também pode gostar