Você está na página 1de 24

Pekerjaan :

Konsultan : Wheater :
Sta : 00+000 No. Titik :
Data Perhitungan
Penurunan Penetrasi
Pukulan CBR CBR* CBR Lapangan
(N) (%) (%) (%)
(mm) (mm)
0 0 0 0.00 0.00
1 21 21 8.43 42.74
2 43 22 7.94 43.88
3 61 18 10.29 39.15
4 75 14 14.24 33.93
5 103 28 5.81 50.34
6 123 20 8.98 41.57
7 139 16 11.98 36.61
8 154 15 13.02 35.29
9 185 31 5.09 53.34
10 228 43 3.34 64.26
11 247 19 9.59 40.37
12 265 18 10.29 39.15
13 288 23 7.49 45.01
14 306 18 10.29 39.15
15 321 15 13.02 35.29
16 349 28 5.81 50.34
17 375 26 6.39 48.26
18 394 19 9.59 40.37
5.43 %
19 410 16 11.98 36.61
20 435 25 6.73 47.19
21 451 16 11.98 36.61
22 475 24 7.09 46.11
23 498 23 7.49 45.01
24 523 25 6.73 47.19
25 542 19 9.59 40.37
26 563 21 8.43 42.74
27 603 40 3.66 61.67
28 654 51 2.68 70.81
29 695 41 3.55 62.54
30 732 37 4.05 58.99
31 771 39 3.79 60.78
34 854 83 1.43 93.42
35 919 65 1.96 81.29
36 955 36 4.20 58.08
37 978 23 7.49 45.01
38 1000 22 7.94 43.88
Jumlah 1000 1757.34

Pekerjaan :
Konsultan : Wheater :
Sta : 01+500 No. Titik :

Data Perhitungan
Penurunan Penetrasi
Pukulan CBR CBR* CBR Lapangan
(N) (%) (%) (%)
(mm) (mm)
0 0 0 0.00 0.00
1 18 18 10.29 39.15
2 37 19 9.59 40.37
3 58 21 8.43 42.74
4 94 36 4.20 58.08
5 129 35 4.35 57.15
6 185 56 2.37 74.68
7 228 43 3.34 64.26
8 267 39 3.79 60.78
9 284 17 11.08 37.90
10 314 30 5.31 52.35
11 349 35 4.35 57.15
12 378 29 5.55 51.35
13 405 27 6.09 49.31
14 428 23 7.49 45.01
15 473 45 3.15 65.94 4.14 %
16 511 38 3.92 59.89
17 534 23 7.49 45.01
18 563 29 5.55 51.35
19 584 21 8.43 42.74
20 614 30 5.31 52.35
21 643 29 5.55 51.35
22 684 41 3.55 62.54
23 723 39 3.79 60.78
24 782 59 2.22 76.93
25 854 72 1.71 86.16
26 922 68 1.84 83.40
27 964 42 3.44 63.40
28 993 29 5.55 51.35
29 1000 7 34.89 22.87
Jumlah 1000 1606.34

Pekerjaan :
Konsultan : Wheater :
Sta : 03+000 No. Titik :

Data Perhitungan
Penurunan Penetrasi
Pukulan CBR CBR* CBR Lapangan
(N) (%) (%) (%)
(mm) (mm)
0 0 0 0.00 0.00
1 18 18 10.29 39.15
2 37 19 9.59 40.37
3 58 21 8.43 42.74
5 94 36 4.20 58.08
6 130 36 4.20 58.08
7 152 22 7.94 43.88
8 192 40 3.66 61.67
9 231 39 3.79 60.78
10 273 42 3.44 63.40
11 293 20 8.98 41.57
12 314 21 8.43 42.74
13 350 36 4.20 58.08
14 361 11 19.45 29.58
15 406 45 3.15 65.94
16 439 33 4.70 55.27
17 483 44 3.24 65.10
4.82 %
18 513 30 5.31 52.35
19 542 29 5.55 51.35
20 561 19 9.59 40.37
21 586 25 6.73 47.19
22 613 27 6.09 49.31
23 648 35 4.35 57.15
24 687 39 3.79 60.78
25 721 34 4.52 56.22
26 756 35 4.35 57.15
27 785 29 5.55 51.35
28 822 37 4.05 58.99
29 856 34 4.52 56.22
31 917 61 2.12 78.40
32 963 46 3.06 66.77
33 985 22 7.94 43.88
34 1000 15 13.02 35.29
Jumlah 1000 1689.22

Pekerjaan :
Konsultan : Wheater :
Sta : 04+410 No. Titik :

Data Perhitungan
Penurunan Penetrasi
Pukulan CBR CBR* CBR Lapangan
(N) (%) (%) (%)
(mm) (mm)
0 0 0 0.00 0.00
1 17 17 11.08 37.90
2 36 19 9.59 40.37
3 61 25 6.73 47.19
4 93 32 4.89 54.31
5 130 37 4.05 58.99
6 152 22 7.94 43.88
7 196 44 3.24 65.10
8 234 38 3.92 59.89
9 256 22 7.94 43.88
10 277 21 8.43 42.74
11 295 18 10.29 39.15
12 311 16 11.98 36.61
13 340 29 5.55 51.35
14 366 26 6.39 48.26
15 382 16 11.98 36.61
16 403 21 8.43 42.74
17 437 34 4.52 56.22
18 469 32 4.89 54.31
5.66 %
19 513 44 3.24 65.10
20 542 29 5.55 51.35
21 562 20 8.98 41.57
5.66 %

22 587 25 6.73 47.19


23 615 28 5.81 50.34
24 650 35 4.35 57.15
25 689 39 3.79 60.78
26 723 34 4.52 56.22
27 758 35 4.35 57.15
28 786 28 5.81 50.34
29 825 39 3.79 60.78
30 859 34 4.52 56.22
31 892 33 4.70 55.27
32 923 31 5.09 53.34
33 945 22 7.94 43.88
34 967 22 7.94 43.88
35 992 25 6.73 47.19
36 1000 8 29.36 24.68
Jumlah 1000 1781.97
Cerah
DCP - 1

BR Lapangan
(%)

5.43 %
Cerah
DCP - 2

BR Lapangan
(%)

4.14 %
Cerah
DCP - 3

BR Lapangan
(%)

4.82 %
Cerah
DCP - 4

BR Lapangan
(%)

5.66 %
5.66 %
Pekerjaan :
Konsultan : Wheater :
Sta : 00+000 No. Titik :
Data Perhitungan
Penurunan Penetrasi
Pukulan CBR CBR* CBR Lapangan
(N) (%) (%) (%)
(mm) (mm)
0 0 0 0.00 0.00
1 22 22 7.94 43.88
2 47 25 6.73 47.19
3 63 16 11.98 36.61
4 79 16 11.98 36.61
5 105 26 6.39 48.26
6 122 17 11.08 37.90
7 143 21 8.43 42.74
8 157 14 14.24 33.93
9 185 28 5.81 50.34
10 209 24 7.09 46.11
11 232 23 7.49 45.01
12 249 17 11.08 37.90
13 266 17 11.08 37.90
14 293 27 6.09 49.31
15 311 18 10.29 39.15
16 325 14 14.24 33.93
17 354 29 5.55 51.35
18 375 21 8.43 42.74
19 405 30 5.31 52.35 5.83 %
20 451 46 3.06 66.77
21 475 24 7.09 46.11
22 502 27 6.09 49.31
23 523 21 8.43 42.74
24 569 46 3.06 66.77
25 611 42 3.44 63.40
26 634 23 7.49 45.01
27 659 25 6.73 47.19
28 703 44 3.24 65.10
29 739 36 4.20 58.08
30 782 43 3.34 64.26
31 823 41 3.55 62.54
32 857 34 4.52 56.22
33 889 32 4.89 54.31
34 924 35 4.35 57.15
35 957 33 4.70 55.27
36 980 23 7.49 45.01
37 1000 20 8.98 41.57
Jumlah 1000 1800.01

Pekerjaan :
Konsultan : Wheater :
Sta : 01+500 No. Titik :

Data Perhitungan
Penurunan Penetrasi
Pukulan CBR CBR* CBR Lapangan
(N) (%) (%) (%)
(mm) (mm)
0 0 0 0.00 0.00
1 19 19 9.59 40.37
2 38 19 9.59 40.37
3 60 22 7.94 43.88
4 101 41 3.55 62.54
5 132 31 5.09 53.34
6 159 27 6.09 49.31
7 188 29 5.55 51.35
8 220 32 4.89 54.31
9 263 43 3.34 64.26
10 316 53 2.55 72.37
11 352 36 4.20 58.08
12 382 30 5.31 52.35
13 409 27 6.09 49.31
14 432 23 7.49 45.01
15 481 49 2.82 69.21
16 523 42 3.44 63.40 4.72 %
17 544 21 8.43 42.74
18 573 29 5.55 51.35
19 595 22 7.94 43.88
20 627 32 4.89 54.31
21 661 34 4.52 56.22
22 688 27 6.09 49.31
23 723 35 4.35 57.15
24 758 35 4.35 57.15
25 790 32 4.89 54.31
26 820 30 5.31 52.35
27 858 38 3.92 59.89
28 892 34 4.52 56.22
29 933 41 3.55 62.54
30 974 41 3.55 62.54
31 1000 26 6.39 48.26
Jumlah 1000 1677.70

Pekerjaan :
Konsultan : Wheater :
Sta : 03+000 No. Titik :

Data Perhitungan
Penurunan Penetrasi
Pukulan CBR CBR* CBR Lapangan
(N) (%) (%) (%)
(mm) (mm)
0 0 0 0.00 0.00
1 18 18 10.29 39.15
2 37 19 9.59 40.37
3 58 21 8.43 42.74
5 94 36 4.20 58.08
6 130 36 4.20 58.08
7 152 22 7.94 43.88
8 192 40 3.66 61.67
9 231 39 3.79 60.78
10 273 42 3.44 63.40
11 293 20 8.98 41.57
12 314 21 8.43 42.74
13 350 36 4.20 58.08
14 361 11 19.45 29.58
15 406 45 3.15 65.94
16 439 33 4.70 55.27
17 483 44 3.24 65.10
4.82 %
18 513 30 5.31 52.35
19 542 29 5.55 51.35
20 561 19 9.59 40.37
21 586 25 6.73 47.19
22 613 27 6.09 49.31
23 648 35 4.35 57.15
24 687 39 3.79 60.78
25 721 34 4.52 56.22
26 756 35 4.35 57.15
27 785 29 5.55 51.35
28 822 37 4.05 58.99
29 856 34 4.52 56.22
31 917 61 2.12 78.40
32 963 46 3.06 66.77
33 985 22 7.94 43.88
34 1000 15 13.02 35.29
Jumlah 1000 1689.22

Pekerjaan :
Konsultan : Wheater :
Sta : 04+410 No. Titik :

Data Perhitungan
Pukulan Penurunan Penetrasi CBR CBR* CBR Lapangan
(N) (%) (%) (%)
(mm) (mm)
0 0 0 0.00 0.00
1 17 17 11.08 37.90
2 36 19 9.59 40.37
3 61 25 6.73 47.19
4 93 32 4.89 54.31
5 130 37 4.05 58.99
6 152 22 7.94 43.88
7 196 44 3.24 65.10
8 234 38 3.92 59.89
9 256 22 7.94 43.88
10 277 21 8.43 42.74
11 295 18 10.29 39.15
12 311 16 11.98 36.61
13 340 29 5.55 51.35
14 366 26 6.39 48.26
15 382 16 11.98 36.61
16 403 21 8.43 42.74
17 437 34 4.52 56.22
18 469 32 4.89 54.31
5.66 %
5.66 %
19 513 44 3.24 65.10
20 542 29 5.55 51.35
21 562 20 8.98 41.57
22 587 25 6.73 47.19
23 615 28 5.81 50.34
24 650 35 4.35 57.15
25 689 39 3.79 60.78
26 723 34 4.52 56.22
27 758 35 4.35 57.15
28 786 28 5.81 50.34
29 825 39 3.79 60.78
30 859 34 4.52 56.22
31 892 33 4.70 55.27
32 923 31 5.09 53.34
33 945 22 7.94 43.88
34 967 22 7.94 43.88
35 992 25 6.73 47.19
36 1000 8 29.36 24.68
Jumlah 1000 1781.97
Cerah
DCP - 1

BR Lapangan
(%)

5.83 %
Cerah
DCP - 2

BR Lapangan
(%)

4.72 %
Cerah
DCP - 3

BR Lapangan
(%)

4.82 %
Cerah
DCP - 4

BR Lapangan
(%)

5.66 %
5.66 %