PAMSIMAS KABUPATEN SIJUNJUNG 2012

PENGUKURAN DEBIT AIR BAKU


Nagari : Solok Ambah Nama Sumber : Singuntung
Jorong : Koto Ranah Tanggal : 30/06/2012
Metode Pengukuran : Apung Elevasi Sumber : 540 m
Elevasi D.Pelayanan : 473 m

Lebar Kedalaman, h (cm)


Profil Sungai h rata-rata (m) Luas Penampang, (m2)
(m) h1 h2 h3
1 1 0.1 0.17 0.08 0.0012 0.0012
2 1 0.5 0.11 0.07 0.0023 0.0023
A rata-rata 0.0017

Jarak v= 0.7005 m/dtk


Pengukur Waktu
Pengukur
an (dtk) Q = 0.85 x v x A
an (m)
1 2 3.73 Q= 0.001 m3/dtk
2 2 3.01 Q= 1.02 l/dtk
3 2 2.52
4 2 2.65
5 2 2.97
6 2 3.15
7 2 2.97
8 2 2.83
9 2 2.2
10 2 2.52
Waktu Rata-rata 2.855
PROYEKSI KEBUTUHAN AIR BERSIH
GAMPONG JABOI

Tahun Proyeksi Ke n ANALISA PERHITUNGAN


Tahun
No Uraian Satuan 5th 10th 15th
Perenc. KODE
2014 2019 2024 2029

1 Jumlah penduduk Jiwa 723 798 881 973 1


Pelayanan penduduk % 100 100 100 100 2
Jiwa 723 798 881 973 3
2 Pelayanan SR % 70 90 100 100 4
Jiwa 506 718 881 973 5
Jiwa/sb 5 5 5 5 6
Jmlh. Sb 101 144 176 195 7
Pemakaian Air Lt/org/hr 90 90 90 90 8
Lt/sb/hr 450 450 450 450 9
Lt/det 0.53 0.75 0.92 1.01 10
3 Pelayanan KU / HU % 30 10 - - 11
jiwa 217 80 - - 12
Jiwa/HU 100 100 100 100 13
Jmlh. HU 2 1 - - 14
Pemakaian Air Lt/org/hr 60 60 60 60 15
Lt/HU/hr 6,000 6,000 6,000 6,000 16
Lt/det 0.15 0.06 - - 17
4 Total Domestik Lt/det 0.68 0.80 0.92 1.01 18
5 Total Non Domestik % ### ### ### ### 19
Lt/det - - - - 20
6 Total Kebutuhan Air Lt/det 0.68 0.80 0.92 1.01 21
7 Kehilangan Air % 20 20 20 20 22
Lt/det 0.14 0.16 0.18 0.20 23
8 Kebutuhan Air
- Rata-rata Lt/det 0.81 0.96 1.10 1.22 24
- Harian Puncak Faktor 1.1 1.1 1.1 1.1 25
Lt/det 0.89 1.06 1.21 1.34 26
m3/hr 77.30 91.67 104.70 115.60 26a
- Jam Puncak Faktor 1.5 1.5 1.5 1.5 27
Lt/det 1.22 1.45 1.65 1.82 28
9 Kebutuhan Air Baku Faktor 3.0 3.0 3.0 3.0 29
Lt/det 2.68 3.18 3.64 4.01 30

10 Kapasitas Minimum
Bak Penampung (Rese
m3 15.46 18.33 20.94 23.12 31
Sumber : TIPP dan TAPP, tahun 2014
13.2 Resv Eksist 4 lebar
3 panjang
2.5 tinggi
30 volume
UTUHAN AIR BERSIH
PONG JABOI

ANALISA PERHITUNGAN

KETERANGAN
CARA HITUNG

Rata2 kenaikan 2% pertahun


Juklak 100% pelayanan

Juklak / survei
(5)= ((4)*(3))/100
Juklak
(7)= (5) / (6)
Juklak
(9)= (8) x (6)
(10)=(5)x(8)/86400
(11)= 100 - (4)
(12)=(11)/100*(3)
Jjuklak
(14)=(12)/(13)
Juklak
(16)=(13)*(15)
(17)=(12)*(15)/86400
(18)=(10)+(17)

(21)=(18) + (20)
Juklak
(23)=(21)*(22)/100

(24)=(21)+ 23) Disain SPL


Juklak
(26)=(24)* 25) Disain pipa transmisi & reservoir
(26a)=(26)*86.40
Juklak (minimum)
(28)=(24)*(27) Disain pipa distribusi
Musim Kemarau Faktor keamanan
(30)=(26)*(29) Besarnya debit perencanaan
2 X kebutuhan air baku
(31)=(26a)*20%
0.5
PENGOLAHAN DATA PENGUKURAN B

Lokasi : KOTO MUDIAK Hari


Jorong : KOTO MUDIAK Tanggal

Nagari : SOLOK AMBAH Jam


Kecamatan : SIJUNJUNG Alat
Kabupaten : SIJUNJUNG

JARAK ∆H
JARAK a ∆H
NO PATOK KUMULATIF Kumulatif Elevasi
( Meter ) (derajat) ( Meter ) (Meter) (Meter)

1 P0 0.00 0.00 13.81


O
50.00 1.60 1.40
2 P1 50.00 1.40 12.41
O
50.00 -2.20 -1.92
3 P2 100.00 -0.52 14.33
O
50.00 4.60 4.01
4 P3 150.00 3.49 10.32
O
50.00 4.50 3.92
5 P4 200.00 7.41 6.40
O
48.00 5.50 4.60
6 P5 248.00 12.01 1.80
O
50.00 -3.30 -2.88
7 P6 298.00 9.13 4.68
O
50.00 -1.20 -1.05
8 P7 348.00 8.08 5.73
O
37.00 1.20 0.77
9 P8 385.00 8.86 4.95
50.00 -1.60 -1.40
7 P6 435.00 9.13 6.35
O
50.00 5.10 4.44
8 P7 485.00 13.58 1.90
O
50.00 3.40 2.97
9 P8 535.00 16.54 -1.06

13.81
50.00 -4.20 ### -3.66
10 P9 585.00 12.88 17.47
50.00 -4.60 ### -4.01
11 P 10 635.00 8.87 21.48
50.00 2.20 ### 1.92
12 P 11 685.00 10.79 19.56
50.00 2.60 ### 2.27
13 P 12 735.00 13.06 17.29
50.00 1.60 ### 1.40
14 P 13 785.00 14.45 15.90
50.00 4.40 ### 3.84
15 P 14 835.00 18.29 12.06
25.00 2.40 ### 1.05
16 P 15 860.00 19.34 11.02
50.00 -3.30 ### -2.88
17 P 16 910.00 16.46 13.89
50.00 3.30 ### 2.88
18 P 17 960.00 19.34 11.02
50.00 -2.60 ### -2.27
19 P 18 1,010.00 17.07 13.28
50.00 3.60 ### 3.14
20 P 19 1,060.00 20.21 10.14
50.00 -4.60 ### -4.01
21 P 20 1,110.00 16.20 14.15
50.00 -1.60 ### -1.40
22 P 21 1,160.00 14.80 15.55
50.00 3.40 ### 2.97
23 P 22 1,210.00 17.77 12.58
50.00 1.10 ### 0.96
24 P 23 1,260.00 18.73 11.62
50.00 1.60 ### 1.40
25 P 24 1,310.00 20.12 10.23
50.00 2.30 ### 2.01
26 P 25 1,360.00 22.13 8.22
50.00 -4.10 ### -3.57
27 P 26 1,410.00 18.55 11.80
50.00 -3.20 ### -2.79
28 P 27 1,460.00 15.76 14.59
50.00 -1.20 ### -1.05
29 P 28 1,510.00 14.72 15.64
28.00 -2.30 ### -1.12
30 P 29 1,538.00 13.59 16.76
Diperiksa Oleh ; Diajukan
FASILITATOR TEKNIK LKM SIKAYAN TALANG

CF-WSS Ketua LKM

Disetujui Oleh ;
DPMU
HAN DATA PENGUKURAN BEDA TINGGI

Rabu & Senin


08 April 2011
02 Mei 2011
09.30 - 14.30 WIB
1. Abney Level
2. Meteran 50 m
Papan, Kayu, Gergaji, dll.

Keterangan ACC PIPA

T1 -DOP A

T2 - SEKOLAH

T2 - DOP A

T1 - DOB B
Akhir Pemukiman

...................................., Mei 2012


Diajukan Oleh :
SATLAK PAMSIMAS

Satlak

Disetujui Oleh ;
KONSULTAN TEKNIK

DMAC TEKNIK
DATA PENGUKURAN RENCANA JARINGAN PIPA AIR BERSIH
PROGRAM PAMSIMAS KABUPATEN SIJUNJUNG

Daerah Sasaran : Jorong Koto Mudiak. Nagari Solok Ambah


Tanggal : 8 Mei 2012
Oleh : LKM & Masyarakat
Dibantu : TFM

Jarak ( Meter ) Pengukur Bacaan Alat Beda Tinggi ( Meter )


No Patok Arah
Antara Titik Komulatif M M Antara Titik Komulatif
Intake Ke Reservoar
P1 0.00 0.00 0.00 0.00 0.00 0.00
P2 12.00 12.00 1.66 2.6 0.94 0.94
P3 26.00 38.00 1.66 12 10.34 11.28
P3 18.00 56.00 1.66 2.1 0.44 11.72
P4 18.00 74.00 1.66 2.9 1.24 12.96
P5 14.00 88.00 1.66 1.4 -0.26 12.70
P6 18.00 106.00 1.66 3.1 1.44 14.14
P7 9.50 115.50 1.66 1.8 0.14 14.28
P8 19.00 134.50 1.66 2.9 1.24 15.52
P9 23.50 158.00 1.66 2.5 0.84 16.36
P10 25.00 183.00 1.66 2.1 0.44 16.80
P11 19.00 202.00 1.66 2.7 1.04 17.84
P12 23.00 225.00 1.66 4.3 2.64 20.48
P13 15.00 240.00 1.66 3.3 1.64 22.12
P14 12.00 252.00 1.66 1.2 -0.46 21.66
P15 16.00 268.00 1.66 3.5 1.84 23.50
P16 18.00 286.00 1.66 3.7 2.04 25.54
P17 23.00 309.00 1.66 2.1 0.44 25.98
P18 22.00 331.00 1.66 2.2 0.54 26.52
P19 13.00 344.00 1.66 2 0.34 26.86
P20 12.00 356.00 1.66 2.3 0.64 27.50
P21 16.00 372.00 1.66 2.1 0.44 27.94
P22 20.00 392.00 1.66 1.8 0.14 28.08
P23 22.00 414.00 1.66 2.3 0.64 28.72
P24 24.50 438.50 1.66 2.2 0.54 29.26
P25 18.00 456.50 1.66 2.6 0.94 30.20
P26 24.50 481.00 1.66 1.7 0.04 30.24
P27 20.00 501.00 1.66 1.8 0.14 30.38
P28 18.00 519.00 1.66 1.50 -0.16 30.22
P29 20.00 539.00 1.66 2.8 1.14 31.36
P30 21.00 560.00 1.66 0.8 -0.86 30.50
P31 11.00 571.00 1.66 0.85 -0.81 29.69
P32 10.00 581.00 1.66 1.5 -0.16 29.53
P33 6.00 587.00 1.66 0.3 -1.36 28.17
P34 5.00 592.00 1.66 0.4 -1.26 26.91
P35 6.00 598.00 1.66 0.5 -1.16 25.75
P36 7.00 605.00 1.66 0.6 -1.06 24.69
P37 8.00 613.00 1.66 0.5 -1.16 23.53
P38 13.50 626.50 1.66 1.4 -0.26 23.27
P39 10.50 637.00 1.66 0.4 -1.26 22.01
P40 11.00 648.00 1.66 0.3 -1.36 20.65
P41 (Res) 5.00 653.00 1.66 1.5 -0.16 20.49
653.00
Reservoar Ke A 0.00 0.00
P42 18.00 671.00 1.66 2.55 0.89 0.89
P43 14.00 685.00 1.66 3.9 2.24 3.13
P44 19.00 704.00 1.66 2.9 1.24 4.37
P45 12.00 716.00 1.66 2.7 1.04 5.41
P46 12.00 728.00 1.66 3.3 1.64 7.05
P47 11.00 739.00 1.66 3.9 2.24 9.29
P48 21.50 760.50 1.66 3.1 1.44 10.73
P49 15.50 776.00 1.66 2.7 1.04 11.77
P50 15.00 791.00 1.66 3.7 2.04 13.81
138.00
A-B 13.81
P51 50.00 841.00 1.66 0.30 -1.36 12.45
P52 50.00 891.00 1.66 1.50 -0.16 12.29
P53 50.00 941.00 1.66 1.40 -0.26 12.03
P54 50.00 991.00 1.66 1.30 -0.36 11.67
P55 48.00 1,039.00 1.66 0.30 -1.36 10.31
P56 50.00 1,089.00 1.66 1.40 -0.26 10.05
298.00

B - SD 10.05
P57 50.00 1,139.00 1.66 2.70 1.04 11.09
P58 37.00 1,176.00 1.66 0.80 -0.86 10.23
87.00

B - DOP 1 10.05
P59 50.00 1,226.00 1.66 2.10 0.44 10.49
P60 50.00 1,276.00 1.66 2.80 1.14 11.63
P61 50.00 1,326.00 1.66 1.30 -0.36 11.27
150.00

A-D 13.81
P62 50.00 1,376.00 3.66 17.47
P63 50.00 1,426.00 4.01 21.48
P64 50.00 1,476.00 -1.92 19.56
P65 50.00 1,526.00 -2.27 17.29
P66 50.00 1,576.00 -1.40 15.90
P67 50.00 1,626.00 -3.84 12.06
P68 25.00 1,651.00 -1.05 11.01
P69 50.00 1,701.00 2.88 13.89
375.00
D-DOP 2 13.89
P61.A 50.00 1,751.00 1.66 0.50 -1.16 12.73
P61.B 50.00 1,801.00 1.66 0.50 -1.16 11.57
P61.C 50.00 1,851.00 1.66 3.00 1.34 12.91
P61.D 50.00 1,901.00 1.66 3.00 1.34 14.25
P61.E 50.00 1,951.00 1.66 3.00 1.34 15.59
P61.F 50.00 2,001.00 1.66 0.50 -1.16 14.43
P61.G 50.00 2,051.00 1.66 2.60 0.94 15.37
P61.H 50.00 2,101.00 1.66 2.60 0.94 16.31
400.00
D-E 13.89
P70 50.00 2,151.00 -2.88 11.01
P71 50.00 2,201.00 2.27 13.28
P72 50.00 2,251.00 -3.14 10.14
P73 50.00 2,301.00 4.01 14.15
P74 50.00 2,351.00 1.40 15.55
P75 50.00 2,401.00 -2.97 12.58
P76 50.00 2,451.00 -0.95 11.63
350.00
D1 - D2 32.00 2,483.00 -0.67 11.91
32.00
E - DOP 3 11.63
P77 50.00 2,533.00 -1.39 10.24
P78 50.00 2,583.00 -2.01 8.23
P79 50.00 2,633.00 3.57 11.81
P80 50.00 2,683.00 2.79 14.60
P81 50.00 2,733.00 1.05 15.65
P82 28.00 2,761.00 1.12 16.77
278.00
RAN RENCANA JARINGAN PIPA AIR BERSIH
PAMSIMAS KABUPATEN SIJUNJUNG

Keterangan

Pipa GI "
Pipa GI + Elbow 45°
Pipa GI + Elbow 45°
Pipa GI
Pipa GI
Pipa GI
Pipa GI
Pipa GI
Pipa GI
Pipa GI + Menyebrang Sungai
Pipa GI
Pipa GI + Menyebrang Sungai
Pipa PVC
Pipa PVC
Pipa PVC
Pipa GI
Pipa GI + Menyebrang Sungai
Pipa GI
Pipa GI + Elbow 45°
Pipa GI + Elbow 45°
Pipa GI
Pipa PVC
Pipa PVC
Pipa PVC
Pipa GI + Elbow 45°
Pipa GI + Elbow 45°
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC + Elbow 45°
Pipa PVC + Elbow 45°
Pipa PVC 3"
Pipa PVC + Elbow 45°
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC + Elbow 45°
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC

Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC

Pipa PVC
Pipa PVC

Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC

Pipa PVC
Pipa GI + Menyeberang Sungai
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC

Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC

Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC

Pipa PVC

Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Tabel 5 - 2.
PROYEKSI KEBUTUHAN AIR BERSIH PROGRAM PAMSIMAS
Jorong Bonai Koto Tinggi

Tahun Proyeksi Ke 15
No Uraian Satuan Tahun KOTO MUDIAK
Rumus
Perenc. Int- Res Res-A A-B B-SD B-DOP 1 A-D D-DOP 2 D-E D1-D2 E-DOP 3 TOTAL

1 Jml. Penduduk Sekarang Jiwa 555 - 15 80 30 30 40 80 115 65 100 555 0


2 Jumlah penduduk 15 th Jiwa 747 - 20 108 40 40 54 108 155 87 135 747 1
Pelayanan penduduk % 100 100 100 100 100 100 100 100 100 100 100 100 2
Jiwa 747 - 20 108 40 40 54 108 155 87 135 747 3
3 Pelayanan SR % 20 80 100 100 100 100 100 100 100 100 100 100 4
Jiwa 149 - 20 108 40 40 54 108 155 87 135 747 5
Jiwa/sb 5 5 5 5 5 5 5 5 5 5 5 5 6
Jmlh. Sb 30 - 4 22 8 8 11 22 31 17 27 149 7
Pemakaian Air Lt/org/hr 90 90 90 90 90 90 90 90 90 90 90 90 8
Lt/sb/hr 450 450 450 450 450 450 450 450 450 450 450 450 9
Lt/det 0.16 - 0.02 0.11 0.04 0.04 0.06 0.11 0.16 0.09 0.14 0.78 10

4 Pelayanan KU / HU % 80 20 - - - - - - - - - - 11
Jiwa 598 - - - - - - - - - - - 12
Jiwa/HU 75 100 100 100 100 100 100 100 100 100 100 100 13
Jmlh. HU 8 - - - - - - - - - - - 14
Pemakaian Air Lt/org/hr 60 60 60 60 60 60 60 60 60 60 60 60 15
Lt/HU/hr 4,500 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 16
Lt/det 0.41 - - - - - - - - - - - 17
5 Total Domestik Lt/det 0.57 - 0.02 0.11 0.04 0.04 0.06 0.11 0.16 0.09 0.14 0.78 18

6 Total Non Domestik % 0 0 0 0 0 0 0 0 0 0 0 0 19


Lt/det - - - - - - - 20
7 Total Kebutuhan Air Lt/det 0.57 - 0.02 0.11 0.04 0.04 0.06 0.11 0.16 0.09 0.14 0.78 21

8 Kehilangan Air % 20 20 20 20 20 20 20 20 20 20 20 20 22
Lt/det 0.11 - 0.00 0.02 0.01 0.01 0.01 0.02 0.03 0.02 0.03 0.16 23
9 Kebutuhan Air
- Rata-rata Lt/det 0.68 - 0.03 0.13 0.05 0.05 0.07 0.13 0.19 0.11 0.17 0.93 24
- Harian Puncak Faktor 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 25
Lt/det 0.75 - 0.03 0.15 0.06 0.06 0.07 0.15 0.21 0.12 0.19 1.03 26
- Jam Puncak Faktor 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 27
Lt/det 1.03 - 0.04 0.20 0.08 0.08 0.10 0.20 0.29 0.16 0.25 1.40 28
10 Kebutuhan Air Baku Faktor 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 29
Lt/det 2.26 - 0.08 0.44 0.17 0.17 0.22 0.44 0.64 0.36 0.56 3.08 30

11 Kapasitas Reservoir M3 11.83 - 0.44 2.33 0.87 0.87 1.16 2.33 3.34 1.89 2.91 24.20
Dimensi Reservoir M 3.00
M 4.00
M 2.50
M 0.30

12 Kapasitas SPL M2 8.22 - 0.30 1.62 0.61 0.61 0.81 1.62 2.32 1.31 2.02 36.97
M 5.00
M 3.00
M 3.00
M 0.30

Sumber : Analisa Fasilitator WSS, tahun 2011


Tabel 5 - 2.
AN AIR BERSIH PROGRAM PAMSIMAS
ong Bonai Koto Tinggi

ANALISA PERHITUNGAN
KET
KODE CARA HITUNG

23
265 Rata2 kenaikan 2% pertahun
255 Juklak 100% pelayanan
120
Juklak / survei
(5)= ((4)*(3))/100
Juklak
(7)= (5) / (6)
Juklak
(9)= (8) x (17)
(10)=(5)x(8)/86400

(11)= 100 - (4)


(12)=(11)/100*(3)
Juklak
(14)=(12)/(13)
Juklak
(16)=(13)*(15)
(17)=(12)*(15)/86400
(18)=(10)+(17)

(21)=(18) + (20)

Juklak
(23)=(21)*(22)/100

(24)=(21)+ 23)
Juklak
(26)=(24)* 25)
Juklak (minimum)
(28)=(24)*(27)
Faktor keamanan
(30)=(26)*(29) Besarnya Debit Perenc.
3X kebutuhan air baku

Panjang
Lebar
Tinggi
Freeboard

Panjang
Lebar
Tinggi
Freeboard
RENCANA JARINGAN PIPA KOTO MUDIAK
Jalur Pipa Q(m3/dt) L (m) D(m) f g(m/dt2) hf(m) H(m) hf total (M) P/g

Int-Res 1.40 0.00140 653.00 2.00 0.05082 0.02655 9.80 8.3062 20.4900 8.3062 12.1838

Res - A 0.04 0.00004 138.00 2.00 0.05082 0.02655 9.80 0.0013 13.8100 0.0013 13.8087
A-B 0.20 0.00020 298.00 2.00 0.05082 0.02655 9.80 0.0788 10.0500 0.0800 9.9700
B-SD 0.08 0.00008 87.00 1.50 0.03812 0.02700 9.80 0.0139 10.2300 0.0939 10.1361

B-DOP 1 0.10 0.00010 150.00 1.50 0.03812 0.02700 9.80 0.0425 11.2700 0.1225 11.1475

A-D 0.25 0.00025 375.00 2.00 0.05082 0.02655 9.80 0.1549 13.8915 0.1561 13.7354
D-DOP 2 0.20 0.00020 400.00 1.50 0.03812 0.02700 9.80 0.4530 16.3115 0.6092 15.7023

D-E 0.29 0.00029 350.00 2.00 0.05082 0.02655 9.80 0.1911 11.6305 0.3460 11.2845
D1-D2 0.16 0.00016 32.00 1.50 0.03812 0.02700 9.80 0.0239 11.9105 0.3699 11.5406
E-DOP 3 0.25 0.00025 278.00 1.50 0.03812 0.02700 9.80 0.4920 16.7726 0.8619 15.9107

Diameter & Panjang Pipa


Jenis Diameter Panjang Jenis Pipa Jumlah Batang Total
No
Jaringan ( inch ) PVC GI PVC GI Batang
Transmisi
1 3 - - - - -
2 2 354.00 300.00 59.00 50.00 109.00
-
Distribusi 3 - - - - -
1 2 1,110.00 54.00 185.00 9.00 194.00
2 1.5 948.00 - 158.00 - 158.00

3 Sekolah 3/4 30.00 - 5.00 - 5.00


TOTAL 2,442.00 354.00 407.00 59.00 466.00
PERHITUNGAN HIDROLIS
JARINGAN PIPA JORONG KOTO MUDIAK

KEHILANGAN
SISA -
KEHILANGAN BEDA - TENAGA
JALUR PIPA DEBIT (Q) PANJANG (L) DIA.PIPA KOEF. ( f ) TEKANAN JENIS PIPA KET.
TENAGA ( hf ) -TINGGI (H) TOTAL ( hf
( P/g )
Total )

(lt/det) (m) (inchi) (m) (m) (m) (m)

INT - RES 1.03 653.00 3 0.0250 0.5544 20.49 0.5544 19.9356 GI -PVC

Res - A 0.04 138.00 3 0.0250 0.0002 13.81 0.0002 13.8098 PVC


A-B 0.20 298.00 2 0.0266 0.0788 10.05 0.0790 9.9710 PVC
B-SD 0.08 87.00 1.5 0.0270 0.0139 10.23 0.0929 10.1371 PVC
B-C 0.10 150.00 1.5 0.0270 0.0425 11.27 0.1215 11.1485 PVC
A-D 0.25 375.00 3 0.0250 0.0192 13.89 0.0194 13.8721 PVC- GI
D-E 0.29 350.00 2 0.0266 0.1913 11.63 0.2107 11.4198 PVC
D1-D2 0.16 32.00 1.5 0.0270 0.0239 11.91 0.2347 11.6758 PVC
E-F 0.25 303.00 1.5 0.0270 0.5367 16.77 0.7474 16.0252 PVC