10 Kapasitas Minimum
Bak Penampung (Rese
m3 15.46 18.33 20.94 23.12 31
Sumber : TIPP dan TAPP, tahun 2014
13.2 Resv Eksist 4 lebar
3 panjang
2.5 tinggi
30 volume
UTUHAN AIR BERSIH
PONG JABOI
ANALISA PERHITUNGAN
KETERANGAN
CARA HITUNG
Juklak / survei
(5)= ((4)*(3))/100
Juklak
(7)= (5) / (6)
Juklak
(9)= (8) x (6)
(10)=(5)x(8)/86400
(11)= 100 - (4)
(12)=(11)/100*(3)
Jjuklak
(14)=(12)/(13)
Juklak
(16)=(13)*(15)
(17)=(12)*(15)/86400
(18)=(10)+(17)
(21)=(18) + (20)
Juklak
(23)=(21)*(22)/100
JARAK ∆H
JARAK a ∆H
NO PATOK KUMULATIF Kumulatif Elevasi
( Meter ) (derajat) ( Meter ) (Meter) (Meter)
13.81
50.00 -4.20 ### -3.66
10 P9 585.00 12.88 17.47
50.00 -4.60 ### -4.01
11 P 10 635.00 8.87 21.48
50.00 2.20 ### 1.92
12 P 11 685.00 10.79 19.56
50.00 2.60 ### 2.27
13 P 12 735.00 13.06 17.29
50.00 1.60 ### 1.40
14 P 13 785.00 14.45 15.90
50.00 4.40 ### 3.84
15 P 14 835.00 18.29 12.06
25.00 2.40 ### 1.05
16 P 15 860.00 19.34 11.02
50.00 -3.30 ### -2.88
17 P 16 910.00 16.46 13.89
50.00 3.30 ### 2.88
18 P 17 960.00 19.34 11.02
50.00 -2.60 ### -2.27
19 P 18 1,010.00 17.07 13.28
50.00 3.60 ### 3.14
20 P 19 1,060.00 20.21 10.14
50.00 -4.60 ### -4.01
21 P 20 1,110.00 16.20 14.15
50.00 -1.60 ### -1.40
22 P 21 1,160.00 14.80 15.55
50.00 3.40 ### 2.97
23 P 22 1,210.00 17.77 12.58
50.00 1.10 ### 0.96
24 P 23 1,260.00 18.73 11.62
50.00 1.60 ### 1.40
25 P 24 1,310.00 20.12 10.23
50.00 2.30 ### 2.01
26 P 25 1,360.00 22.13 8.22
50.00 -4.10 ### -3.57
27 P 26 1,410.00 18.55 11.80
50.00 -3.20 ### -2.79
28 P 27 1,460.00 15.76 14.59
50.00 -1.20 ### -1.05
29 P 28 1,510.00 14.72 15.64
28.00 -2.30 ### -1.12
30 P 29 1,538.00 13.59 16.76
Diperiksa Oleh ; Diajukan
FASILITATOR TEKNIK LKM SIKAYAN TALANG
Disetujui Oleh ;
DPMU
HAN DATA PENGUKURAN BEDA TINGGI
T1 -DOP A
T2 - SEKOLAH
T2 - DOP A
T1 - DOB B
Akhir Pemukiman
Satlak
Disetujui Oleh ;
KONSULTAN TEKNIK
DMAC TEKNIK
DATA PENGUKURAN RENCANA JARINGAN PIPA AIR BERSIH
PROGRAM PAMSIMAS KABUPATEN SIJUNJUNG
B - SD 10.05
P57 50.00 1,139.00 1.66 2.70 1.04 11.09
P58 37.00 1,176.00 1.66 0.80 -0.86 10.23
87.00
B - DOP 1 10.05
P59 50.00 1,226.00 1.66 2.10 0.44 10.49
P60 50.00 1,276.00 1.66 2.80 1.14 11.63
P61 50.00 1,326.00 1.66 1.30 -0.36 11.27
150.00
A-D 13.81
P62 50.00 1,376.00 3.66 17.47
P63 50.00 1,426.00 4.01 21.48
P64 50.00 1,476.00 -1.92 19.56
P65 50.00 1,526.00 -2.27 17.29
P66 50.00 1,576.00 -1.40 15.90
P67 50.00 1,626.00 -3.84 12.06
P68 25.00 1,651.00 -1.05 11.01
P69 50.00 1,701.00 2.88 13.89
375.00
D-DOP 2 13.89
P61.A 50.00 1,751.00 1.66 0.50 -1.16 12.73
P61.B 50.00 1,801.00 1.66 0.50 -1.16 11.57
P61.C 50.00 1,851.00 1.66 3.00 1.34 12.91
P61.D 50.00 1,901.00 1.66 3.00 1.34 14.25
P61.E 50.00 1,951.00 1.66 3.00 1.34 15.59
P61.F 50.00 2,001.00 1.66 0.50 -1.16 14.43
P61.G 50.00 2,051.00 1.66 2.60 0.94 15.37
P61.H 50.00 2,101.00 1.66 2.60 0.94 16.31
400.00
D-E 13.89
P70 50.00 2,151.00 -2.88 11.01
P71 50.00 2,201.00 2.27 13.28
P72 50.00 2,251.00 -3.14 10.14
P73 50.00 2,301.00 4.01 14.15
P74 50.00 2,351.00 1.40 15.55
P75 50.00 2,401.00 -2.97 12.58
P76 50.00 2,451.00 -0.95 11.63
350.00
D1 - D2 32.00 2,483.00 -0.67 11.91
32.00
E - DOP 3 11.63
P77 50.00 2,533.00 -1.39 10.24
P78 50.00 2,583.00 -2.01 8.23
P79 50.00 2,633.00 3.57 11.81
P80 50.00 2,683.00 2.79 14.60
P81 50.00 2,733.00 1.05 15.65
P82 28.00 2,761.00 1.12 16.77
278.00
RAN RENCANA JARINGAN PIPA AIR BERSIH
PAMSIMAS KABUPATEN SIJUNJUNG
Keterangan
Pipa GI "
Pipa GI + Elbow 45°
Pipa GI + Elbow 45°
Pipa GI
Pipa GI
Pipa GI
Pipa GI
Pipa GI
Pipa GI
Pipa GI + Menyebrang Sungai
Pipa GI
Pipa GI + Menyebrang Sungai
Pipa PVC
Pipa PVC
Pipa PVC
Pipa GI
Pipa GI + Menyebrang Sungai
Pipa GI
Pipa GI + Elbow 45°
Pipa GI + Elbow 45°
Pipa GI
Pipa PVC
Pipa PVC
Pipa PVC
Pipa GI + Elbow 45°
Pipa GI + Elbow 45°
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC + Elbow 45°
Pipa PVC + Elbow 45°
Pipa PVC 3"
Pipa PVC + Elbow 45°
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC + Elbow 45°
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa GI + Menyeberang Sungai
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Tabel 5 - 2.
PROYEKSI KEBUTUHAN AIR BERSIH PROGRAM PAMSIMAS
Jorong Bonai Koto Tinggi
Tahun Proyeksi Ke 15
No Uraian Satuan Tahun KOTO MUDIAK
Rumus
Perenc. Int- Res Res-A A-B B-SD B-DOP 1 A-D D-DOP 2 D-E D1-D2 E-DOP 3 TOTAL
4 Pelayanan KU / HU % 80 20 - - - - - - - - - - 11
Jiwa 598 - - - - - - - - - - - 12
Jiwa/HU 75 100 100 100 100 100 100 100 100 100 100 100 13
Jmlh. HU 8 - - - - - - - - - - - 14
Pemakaian Air Lt/org/hr 60 60 60 60 60 60 60 60 60 60 60 60 15
Lt/HU/hr 4,500 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 16
Lt/det 0.41 - - - - - - - - - - - 17
5 Total Domestik Lt/det 0.57 - 0.02 0.11 0.04 0.04 0.06 0.11 0.16 0.09 0.14 0.78 18
8 Kehilangan Air % 20 20 20 20 20 20 20 20 20 20 20 20 22
Lt/det 0.11 - 0.00 0.02 0.01 0.01 0.01 0.02 0.03 0.02 0.03 0.16 23
9 Kebutuhan Air
- Rata-rata Lt/det 0.68 - 0.03 0.13 0.05 0.05 0.07 0.13 0.19 0.11 0.17 0.93 24
- Harian Puncak Faktor 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 25
Lt/det 0.75 - 0.03 0.15 0.06 0.06 0.07 0.15 0.21 0.12 0.19 1.03 26
- Jam Puncak Faktor 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 27
Lt/det 1.03 - 0.04 0.20 0.08 0.08 0.10 0.20 0.29 0.16 0.25 1.40 28
10 Kebutuhan Air Baku Faktor 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 29
Lt/det 2.26 - 0.08 0.44 0.17 0.17 0.22 0.44 0.64 0.36 0.56 3.08 30
11 Kapasitas Reservoir M3 11.83 - 0.44 2.33 0.87 0.87 1.16 2.33 3.34 1.89 2.91 24.20
Dimensi Reservoir M 3.00
M 4.00
M 2.50
M 0.30
12 Kapasitas SPL M2 8.22 - 0.30 1.62 0.61 0.61 0.81 1.62 2.32 1.31 2.02 36.97
M 5.00
M 3.00
M 3.00
M 0.30
ANALISA PERHITUNGAN
KET
KODE CARA HITUNG
23
265 Rata2 kenaikan 2% pertahun
255 Juklak 100% pelayanan
120
Juklak / survei
(5)= ((4)*(3))/100
Juklak
(7)= (5) / (6)
Juklak
(9)= (8) x (17)
(10)=(5)x(8)/86400
(21)=(18) + (20)
Juklak
(23)=(21)*(22)/100
(24)=(21)+ 23)
Juklak
(26)=(24)* 25)
Juklak (minimum)
(28)=(24)*(27)
Faktor keamanan
(30)=(26)*(29) Besarnya Debit Perenc.
3X kebutuhan air baku
Panjang
Lebar
Tinggi
Freeboard
Panjang
Lebar
Tinggi
Freeboard
RENCANA JARINGAN PIPA KOTO MUDIAK
Jalur Pipa Q(m3/dt) L (m) D(m) f g(m/dt2) hf(m) H(m) hf total (M) P/g
Int-Res 1.40 0.00140 653.00 2.00 0.05082 0.02655 9.80 8.3062 20.4900 8.3062 12.1838
Res - A 0.04 0.00004 138.00 2.00 0.05082 0.02655 9.80 0.0013 13.8100 0.0013 13.8087
A-B 0.20 0.00020 298.00 2.00 0.05082 0.02655 9.80 0.0788 10.0500 0.0800 9.9700
B-SD 0.08 0.00008 87.00 1.50 0.03812 0.02700 9.80 0.0139 10.2300 0.0939 10.1361
B-DOP 1 0.10 0.00010 150.00 1.50 0.03812 0.02700 9.80 0.0425 11.2700 0.1225 11.1475
A-D 0.25 0.00025 375.00 2.00 0.05082 0.02655 9.80 0.1549 13.8915 0.1561 13.7354
D-DOP 2 0.20 0.00020 400.00 1.50 0.03812 0.02700 9.80 0.4530 16.3115 0.6092 15.7023
D-E 0.29 0.00029 350.00 2.00 0.05082 0.02655 9.80 0.1911 11.6305 0.3460 11.2845
D1-D2 0.16 0.00016 32.00 1.50 0.03812 0.02700 9.80 0.0239 11.9105 0.3699 11.5406
E-DOP 3 0.25 0.00025 278.00 1.50 0.03812 0.02700 9.80 0.4920 16.7726 0.8619 15.9107
KEHILANGAN
SISA -
KEHILANGAN BEDA - TENAGA
JALUR PIPA DEBIT (Q) PANJANG (L) DIA.PIPA KOEF. ( f ) TEKANAN JENIS PIPA KET.
TENAGA ( hf ) -TINGGI (H) TOTAL ( hf
( P/g )
Total )
INT - RES 1.03 653.00 3 0.0250 0.5544 20.49 0.5544 19.9356 GI -PVC