2.5 0 CN-55D
2.5 0 CN-56I
2.5 0 CN-57I
5 0 CN-FIND
14.5
81240 223.412 PENDIENTE PENDIENTE
81400 225.244 1.145 1.15 160.000 DIM HOR 40620,147.5 40700,147.5 81320,147.5 1.15% en 160 m
81730 233.572 2.524 2.52 330.000 DIM HOR 40700,147.5 40865,147.5 81565,147.5 2.52% en 330 m
81940 233.572 0.000 0.00 210.000 DIM HOR 40865,147.5 40970,147.5 81835,147.5 0% en 210 m
82190 242.45 3.551 3.55 250.000 DIM HOR 40970,147.5 41095,147.5 82065,147.5 3.55% en 250 m
82350 242.45 0.000 0.00 160.000 DIM HOR 41095,147.5 41175,147.5 82270,147.5 0% en 160 m
83030 268.988 3.903 3.90 680.000 DIM HOR 41175,147.5 41515,147.5 82690,147.5 3.9% en 680 m
84110 333.75 5.996 6.00 1080.000 DIM HOR 41515,147.5 42055,147.5 83570,147.5 6% en 1080 m
84894.559 290.445 -5.520 -5.52 784.560 DIM HOR 42055,147.5 42447.2795,147.5 84502.2795,147.5 -5.52% en 784.56 m
Código de Proyecto :
ELEMENTOS DE CURVAS HORIZONTALES
Página : 01 de 01
PROYECTO DE INGENIERIA DE DETALLE (PID) PARA LA AMPLIACION DE DOS CALZADAS TRAMO DV.
Proyecto : Especialidad :
SULLANA – PAITA
Etapa : Estudio DISEÑO VIAL
Hecho por : APG N° Plano : Fecha :julio. 2014 Revisión : A