Você está na página 1de 4

On Scene Commander

Development Program
Day One (1)

- Building the Foundation -


TIME SUBJECT

8.30 - 9.00 am Participant Registration


(30 min)
9.00 - 9.45 am Understanding Emergency Response Team (ERT) Function
(30 min) ▪ Hierarchy of Command
▪ Incident Command and Control
▪ Building Evacuation Procedure

9.45 - 10.15 am ERT Crisis Critical Task and Activation Standard Operative Procedure (S.O.P)
(30 min) ▪ Announce Command
▪ Establish Communication
▪ Appreciation of Situation
▪ Establish Perimeter
▪ Call for Help
▪ Incident Command Post
▪ Staging Area and Equipment Set Up

10.15 - 10.45 am ERT Response Strategy Selection


(30 min) ▪ Rescue, Exposure, Confinement, Eliminate, Overhaul, Ventilation, Salvage

10.45 - 11.15 am Break


(30 min)
11.15 - 1.00 pm Search and Rescue Team Tactical Operation
(1 hour 45 min) ▪ Operation in Dark and Smoky Environment
▪ Primary Search and Secondary Search Procedure
▪ Large Area SAR
▪ Compartmentalized SAR
▪ Escape Route Set Up
▪ Breathing Apparatus Familiarization

1.00 - 2.00 pm Lunch


(1 hour)
2.00 - 3.45 pm ERT PPE Familiarization
(1 hour 45 min)
Fire and Rescue Personal Protective Equipment (PPE)
▪ Component of Fire and Rescue PPE
▪ Donning and Doffing of Fire Fighting Suit
▪ Fire Fighter Accessory

Hazmat PPE Familiarization


▪ Level of Chemical Protective Clothing
- Level A, B, C, D
▪ Respiratory Protection
- Type of Breathing Apparatus
- Donning and Doffing Breathing Apparatus (BA) , Self Contained

Copyright © 2018 Academy of Safety and Emergency Care Sdn Bhd 1|Page
[105139-D]
Breathing Apparatus (SCBA)

3.45 - 4.15 pm Break


(30 min)
4.15 - 6.00 pm Emergency Response Guide for Hazmat Incident Response
(1 hour 45 min) ▪ Setting up Perimeter
▪ Evacuation / Shelter in Place
▪ Basic Response Tactic

Copyright © 2018 Academy of Safety and Emergency Care Sdn Bhd 2|Page
[105139-D]
On Scene Commander
Development Program
Day Two (2)
- Fire and Rescue Tactical
Strategies -
TIME SUBJECT

8.30 - 9.00 am Door Opens


(30 min)
9.00 - 10.45 am Fire Fighting Equipment Familiarization
(1 hour 45 min)
Hose Formation, Selection and Operation
▪ Hose Roll and Nozzle Selection
▪ Hose Team Commands
▪ Nozzle Pattern Selection

Fire Extinguisher Selection and Operation


▪ 6 Classes of Fire
▪ ABC, CO2, Class D, Foam, Wet Chemical Fire Extinguisher

Hose Reel Operation

10.45 - 11.15 pm Break


(30 min)
11.15 - 1.00 pm Flammable Gas Fire Operation - LPG, LNG, Acetylene etc Operation
(1 hour 45 min) ▪ Hose Team Equipment, Formation, Command
▪ Gas Fire Tactical
▪ Fighting a Gas Fire

1.00 - 2.00 pm Lunch


(1 hour)
2.00 - 3.45 pm High Rise Fire Fighting Operation
(1 hour 45 min) ▪ Hose Lay for High Rise
▪ Moving up or Down and Entrance Procedure
▪ Hose Team Formation for High Rise
▪ High Rise Fire Fighting Tactic

3.45 - 4.15 pm Break


(30 min)
4.15 - 6.00 pm Tactical Strategies - Compartment Fire Operation
(1 hour 45 min) ▪ Smoke Reading
▪ Compartment Fire Behavior and Movement
▪ Long Pulse, Short Pulse, Penciling and Painting Tactic
▪ Operation with SAR Team

Copyright © 2018 Academy of Safety and Emergency Care Sdn Bhd 3|Page
[105139-D]
On Scene Commander
Development Program
Day Three (3)
- Hazardous Material
Tactical Strategy -
TIME SUBJECT

8.30 - 9.00 am Door Opens


(30 min)
9.00 - 10.45 am Tactical Strategies - Handling Leaking and Spillage
(1 hour 45 min) ▪ Confinement & Containment
▪ Patching
▪ Use of Spillage Kit
▪ Leaking into Waterway Management
▪ Release to Atmosphere Management
▪ Neutralization and Clean Up Procedure
▪ Decontamination
▪ Victim and Emergency Decontamination

10.45 - 11.15 am Break


(30 min)
11.15 - 1.00 pm Tactical Strategies - Liquid Chemical Spillage
(1 hour 45 min) ▪ Recognizing Hazmat Incident
▪ Hazmat Team Activation Mechanism
▪ Chemical Spillage Team Org Chart
▪ Hazmat Team Operation Checklist
▪ Zoning - Hot, Warn, Cold
▪ Approach Procedure and Tactical Consideration

1.00 - 2.00 pm Lunch


(1 hour)
2.00 - 3.45 pm Tactical Strategies - Gaseous Chemical Leakage
(1 hour 45 min) ▪ Atmospheric Monitoring
▪ Phases of Liquefied Gas
▪ Suppression of Gases
▪ Perimeter Handling

3.45 - 4.15 pm Break


(30 min)
4.15 - 5..45 pm ERT Automation Blueprint
(1 hour 30 min) ▪ Crisis Risk Assessment
▪ ERT Gap Analysis and Recommendation
▪ ERT Automation Action Plan

5.45 - 6..00 pm Evaluation and Closing


(15 min)

Copyright © 2018 Academy of Safety and Emergency Care Sdn Bhd 4|Page
[105139-D]

Você também pode gostar