Você está na página 1de 3

CALCULO DE RED DE DISTRIBUCION ABIERTA

PROYECTO: “MEJORAMIENTO DEL SERVICIO DE SANEAMIENTO BASICO EN LAS AVENIDAS PANAMERICANA Y GRAU, DISTRITO DE ZORRITOS, PROVINCIA DE CONTRALMIRANTE VILLAR - TUMBES”

19.949 L/S

0.006992 L/S/M

GASTO (LT/S) COTA PIEZOMETRICA COTA TERRENO PRESIONES


LONGITUD CLASE
TRAMO (m) D(Pulg) V (m/s) hf (°/°°) HF (m)
(m) INICIAL MARCHA FICTICIO INICIAL INICIAL FINAL TUBERIA
FINAL (QF) INICIAL (i) FINAL (f) FINAL (f)
(QI) (QM) (Qfic.) (i) (i) (f)

TRAMO 01 ( EMPALME DE LA RED AGUA ) 272.40 19.9490 1.9045326 18.0445 18.9967 4 3.63 0.008202 2.2341273568 2360.00 2357.77 2360.00 2321.31 0.00 36.46 C - 7.5

TRAMO 02 481.25 18.0445 3.3647 14.6797 16.3621 4 3.13 0.006222 2.9945 2360.00 2357.01 2360.00 2332.29 0.00 24.7 C - 7.5
TRAMO 03 152.70 14.6797 1.0676 13.6121 14.1459 4 2.70 0.004753 0.7259 2357.77 2357.04 2321.31 2328.96 36.46 28.1 C - 7.5
TRAMO 04 153.70 13.6121 1.0746 12.5375 13.0748 4 2.50 0.004109 0.6316 2357.04 2356.41 2321.31 2318.28 35.74 38.1 C - 7.5
TRAMO 05 134.50 12.5375 0.9404 11.5971 12.0673 4 2.31 0.003543 0.4765 2356.41 2355.93 2318.28 2317.93 38.13 38.0 C - 7.5
TRAMO 06 232.50 11.5971 1.6256 9.9715 10.7843 4 2.06 0.002877 0.6690 2355.93 2355.26 2317.93 2314.89 38.01 40.4 C - 7.5
TRAMO 07 136.40 9.9715 0.9537 9.0179 9.4947 4 1.82 0.002273 0.3101 2355.26 2354.95 2332.29 2314.96 22.97 40.0 C - 7.5
TRAMO 08 417.10 9.0179 2.9162 6.1016 7.5597 4 1.45 0.001491 0.6220 2354.78 2354.16 2314.96 2314.32 39.82 39.8 C - 7.5
TRAMO 09 213.55 6.1016 1.4931 4.6086 5.3551 4 1.02 0.000788 0.1683 2354.95 2354.78 2332.29 2326.56 22.66 28.2 C - 7.5
TRAMO 10 514.15 4.6086 3.5948 1.0138 2.8112 4 0.54 0.000239 0.1230 2354.16 2354.04 2326.56 2316.86 27.61 37.2 C - 7.5
TRAMO 11 28.90 1.0138 0.2021 0.8117 0.9128 4 0.17 0.000030 0.0009 2354.78 2354.78 2329.75 2306.00 25.03 48.8 C - 7.5
TRAMO 12 26.70 0.8117 0.1867 0.6251 0.7184 4 0.14 0.000019 0.0005 2354.04 2354.04 2329.75 2308.06 24.29 46.0 C - 7.5
TRAMO 13 89.40 1.0138 0.6251 0.3887 0.7013 4 0.13 0.000018 0.0016 2354.04 2354.04 2326.56 2329.75 27.48 24.3 C - 7.5
L. TOTAL = 2,853.25

RED DE DISTRIBUCION

CANTIDAD ML
METRADOS
CLASE 7.5 CLASE 7.5
TUBERIA PVC UF 4" 2,853.25

2,853.25 0.00

TOTAL 2,853.25 ML

Página 1 CALCULO RED LA PAMPA


PUNTO COTA
1 2321.305 4' 2314.323
2 2328.963 5' 2314.888
3 2318.281 11' 2317.634
3' 2317.925 12' 2314.419
4 2314.963 46' 2289.584
5 2332.290 49' 2304.74
6 2326.555 51' 2309.585
7 2329.750 70' 2315.621
8 2329.750 44' 2286.354
9 2333.167
10 2319.592
11 2320.000
12 2317.540
13 2316.860
14 2306.000
15 2308.058
16 2311.859
17 2300.000
18 2277.311
19 2299.380
20 2309.376
21 2304.778
22 2296.331
23 2289.835
24 2288.532
25 2288.458
26 2285.394
27 2274.864
28 2285.922
29 2288.000
30 2287.129
31 2286.938
32 2293.936
33 2307.143
34 2273.520
35 2263.659
36 2264.786
37 2256.086
38 2269.222
39 2272.179
40 2292.755
41 2276.936
42 2278.000
43 2289.352
44 2289.774
45 2293.889
46 2296.347
47 2299.513
48 2301.513
49 2308.493
50 2312.981
51 2311.658
52 2311.000
53 2301.000
54 2304.349
55 2293.763
56 2293.331
57 2297.672
58 2291.841
59 2299.055
60 2306.093
61 2304.216
62 2306.298
63 2294.729
64 2297.137
65 2297.288
66 2297.012
67 2301.949
68 2303.571
69 2304.393
70 2316.117
71 2316.748
72 2317.359
73 2313.962