Approval sheet on site area before
installation
Date:……………………/………………………/………………….
Cause: Delivery of Hollow core slab
Project Name: ……………………………………………….……………. Installation with Mobile Crane of PPPC
By Phnom Penh Precast Construction produced for your project already and ready to do transportation and
installation. PPPC’s Site Operation Officer inform the plan of delivery Hollow Core Slab in daily for you by detailing
below.
Data:
1. Building: ………………………………………………………………………………………………………………………….
2. Floor: ………………………………………………………………………………………………………………………….
3. Zone: ………………………………………………………………………………………………………………………….
4. Line: ………………………………………………………………………………………………………………………….
5. Thickness, LL, Wire: ………………………………………………………………………………………………………………………….
6. Code of HCS: ………………………………………………………………………………………………………………………….
7. Area (m2): ………………………………………………………………………………………………………………………….
8. Beam Condition: ………………………………………………………………………………………………………………………….
9. Area for Crane: ………………………………………………………………………………………………………………………….
10. Access Road: ………………………………………………………………………………………………………………………….
11. Number of Truck: ………………………………………………………………………………………………………………………….
12. Date of Installation: ………………………………………………………………………………………………………………………….
13. Time: ………………………………………………………………………………………………………………………….