Você está na página 1de 1

B

560 705 705


4000
705 705 620
1750
275

A A

300
2000
1450
275

B
Ø16mm @ 200 C/C Ø16mm @ 200 C/C
Rebar Anchoring by drill Rebar Anchoring by drill 300
(L=150mm) 1750 (L=150mm)

1200

1200
Ø16 @ 200 c/c
Ø16 @ 200 c/c
Rebar Anchoring by drill Rebar Anchoring by drill
(L=150mm) (L=150mm)
Section A-A Section B-B
Section C-C
Section D-D Pipe Support-1 & Rebar Detail
Pump Foundation & Rebar Detail
B
1000
B
1500 A A

200
A A
300
B
B Ø16mm @ 200 C/C Ø16mm @ 200 C/C
Rebar Anchoring by drill Rebar Anchoring by drill 200
Ø16mm @ 200 C/C
(L=150mm) 1000 (L=150mm)
Rebar Anchoring by drill Ø16mm @ 200 C/C

900

900
(L=150mm)
1500 Rebar Anchoring by drill 300
(L=150mm)
550

550
Section A-A Section B-B
Pipe Support-3 & Rebar Detail
Section A-A Section B-B
Pipe Support-2 & Rebar Detail
PROJECT: TITLE: SCALE
KARNAPHULI WATER SUPPLY PROJECT - PHASE 2 (KWSP2) NASHIRABAD PUMPING STATION - FOUNDATION DETAILS 1:150
CLIENT: CONSULTANTS: CONTRACTORS: REV. DESCRIPTION DATE SIGN. DRAWN: DESIGNED: CHECKED Ref DWG No.: K2P1-22-M-29
CHITTAGONG WATER SUPPLY s.y.won Simon lee
NJS CONSULTANTS CO., LTD. JAHANGIR ALAM Sht No.:
& SEWERAGE AUTHORITY In association with
DWG No.: K2P1-22-MP-01-06
(CWASA) CWASA APPROVAL
BETS, AQUA, ACE, SMEC KOLON - KUBOTA JV DATE: 08.JULY. 2018

Você também pode gostar