Nama Proyek : Nama operator : Lokasi Proyek : Nama Engineer : Deskripsi Tanah : Tanggal : No. Uji I No. Container 1 2 3 Berat container, W1 (g) 6.94 5.7 6 Berat tanah basah + container, W2 (g) 24.94 25.32 24.55 Berat tanah kering + container, W3 (g) 20.06 20.1 17.68 Berat tanah basah, W = W2-W1 (g) 18.00 19.62 18.55 Berat tanah kering, Ws = W3-W1 (g) 13.12 14.40 11.68 Berat air, Ww = W-Ws 4.88 5.22 6.87 Kadar air, w = (Ww/Ws) X 100% 37.20 36.25 58.82 Kadar air rata-rata, w (%) 44,09 44.09 No. Uji II No. Container 1 2 3 Berat container, W1 (g) 6.28 7.72 4.18 Berat tanah basah + container, W2 (g) 22.66 34.52 22.75 Berat tanah kering + container, W3 (g) 17.5 27.83 16.92 Berat tanah basah, W = W2-W1 (g) 16.38 26.80 18.57 Berat tanah kering, Ws = W3-W1 (g) 11.22 20.11 12.74 Berat air, Ww = W-Ws 5.16 6.69 5.83 Kadar air, w = (Ww/Ws) X 100% 45.99 33.27 45.76 Kadar air rata-rata, w (%) 41.67 No. Uji III No. Container 1 2 3 Berat container, W1 (g) 8.86 7.52 8.36 Berat tanah basah + container, W2 (g) 24.86 23.67 21.66 Berat tanah kering + container, W3 (g) 18.1 19.2 18.58 Berat tanah basah, W = W2-W1 (g) 16.00 16.15 13.30 Berat tanah kering, Ws = W3-W1 (g) 9.24 11.68 10.22 Berat air, Ww = W-Ws 6.76 4.47 3.08 Kadar air, w = (Ww/Ws) X 100% 73.16 38.27 30.14 Kadar air rata-rata, w (%) 47.19