Você está na página 1de 1

www.Inspection-for-Industry.

com
ITP No.:
Inspection Gr.
FIELD INSPECTION REPORT Report No.
Quality Control Form Date
BOLTING TORQUE INSPECTION REPORT OF STRUCTURE

FIN NO. SUBCON.

LINE NO. ITEM NO.

DESCRIPTION DWG NO.

MIN Bolt Torque Actual


No. Column No. Bolt Size Remarks
Kgf-m/N-m Kgf-m/N-m
M20
1 M22
M24
M20
2 M22
M24
M20
3 M22
M24
M20
4 M22
M24
M20
5 M22
M24
CONTRACTOR/TPI COMPANY
SUBCON. QC

DATE:
DATE: DATE:

Legend ACC:ACCEPT NA.: Not Applicable REJ: REJECT

Você também pode gostar