Escolar Documentos
Profissional Documentos
Cultura Documentos
I.
Se tiene el siguiente ensayo de corte directo, las dimensiones de la caja es de 6.33𝑐𝑚 ∗ 6.33𝑐𝑚 ∗ 2.50𝑐𝑚.
TIEMPO TIEMPO TIEMPO FUERZA Def TIEMPO DESPL DIAL FUERZA Def. TIEMPO DESPL DIAL Fuerza /𝜎
HORIZ (mm) Carga Corte (kg) Unitaria HORIZ (mm) Carga Corte (kg) Unitaria HORIZ (mm) carga Corte (kg)
00.00 0.000 0.00 0.00 0.000 00.00 0.000 0.00 0.000 0.000 0.00 0.00 0.00 0.000
15 0. 20 11.80 1 .032 0. 50 15 0. 10 13.50 21.774 0.544 15 0.700 17.90 28.87 0.478
30 1. 30 13. 0 22.0 1.103 30 1. 00 16.80 27.097 0.677 1.710 26.70 43.06 0.713
5 2. 0 1 .30 23.06 1.151 5 2. 00 18.20 29.355 0.733 5 2.690 28.10 45.32 0.751
01 .00 3. 60 1 . 0 2 .032 1.200 3. 0 19.40 31.290 0.781 01. 00 3.690 29.40 47.42 0.786
15 . 20 15.10 2 .355 1.216 15 . 50 20.50 33.064 0.826 4.680 30.00 48.39 0.802
30 5. 0 15. 0 2 .83 1.2 0 30 5. 00 21.10 34.032 0.850 5.740 30.40 49.032 0.812
5 6. 50 15. 0 24.839 1.2 0 5 6. 0 21.40 34.516 0.862 5 6.750 30.40 49.032 0.812
02. 00 . 30 15.30 2 .6 1.232 02. 00 . 60 21.4 34.516 0.862 02 . 00 7.710 30.30 48.871 0.81
15 8.500 15.20 2 .516 1.22 8.500 21.30 34.355 0.858 8.500 30.30 48.871 0.81
30 .000 15.20 1.22 .000 21.30 34.355 0.858 9.000 30.20 48.71 0.807
24.839 𝑘𝑔
𝑡1 = 6.33∗6.33 𝑐𝑚2 = 0.62 𝑘𝑔/𝑐𝑚2
34.516 𝑘𝑔
𝑡2 = = 0.86 𝑘𝑔/𝑐𝑚2
6.33∗6.33 𝑐𝑚2
49.032 𝑘𝑔
𝑡3 = 6.33∗6.33 𝑐𝑚2
= 1.22𝑘𝑔/𝑐𝑚2
𝜎1 = 0.5 𝑘𝑔/𝑐𝑚 2
𝜎2 = 1 𝑘𝑔/𝑐𝑚2
𝜎3 = 1.5 𝑘𝑔/𝑐𝑚2
Tabulamos.
𝜎 (𝑘𝑔 𝑘𝑔
( 2)
/𝑐𝑚2) 𝑐𝑚
0.5 0.62
1 0.86
1.5 1.22
0.86−0.62
tan ∅1 = = 0. 8
1−0.5
1.22 − 0.62
tan ∅2 = = 0.60
1.5 − 0.5
1.22−0.86
tan ∅3 = = 0. 2
1.5−1.0
°
∅1 = 25. 6
∅2 = 30. 6°
∅3 = 35. 5°
∅𝑃 = 30. 8°
𝑛 = 𝜎𝑛 tan ∅𝑃 + 𝑐𝑛
0.62 = 0.5 tan 30. 8 + 𝑐1
0.86 = 0.5 tan 30. 8 + 𝑐2
0.22 = 0.5 tan 30. 8 + 𝑐3
𝑐1 = −0.322 𝑘𝑔/𝑐𝑚2
𝑐2 = 0.26 𝑘𝑔/𝑐𝑚2
𝑐3 = 0.32 𝑘𝑔/𝑐𝑚2
Cohesión promedio.
𝐶𝑃 = 0.30 𝑘𝑔/𝑐𝑚2
GRAFICA.
𝑡 = 𝜎𝑡𝑔30. 8 + 0.30
=
Peso especifico humedo (gr/cm) 2.16
1+
Peso especifico seco (gr) 1.96
Curva de compactacion.
Densidad máxima seca=1.96
Capacidad portante.
𝜎𝑝 = 12.38
Carga neta.
𝜎𝑛𝑒𝑡𝑎 = 12.38 − 0.50 − 0.2(2. ) − 1.05(1. 6) − 0.6(2. )
𝜎𝑛𝑒𝑡𝑎 = . 0 𝑡𝑜𝑛/𝑚2
III.
Realizar el diseño de la zapata centrada, si dicha zapata se va a cimentar a 𝐷𝑓 = 3.20m, las cargas de servicios son, 𝑓𝑐 = 210 𝑘𝑔/𝑐𝑚2 , 𝑓𝑦 =
𝑠
200𝑘𝑔/𝑐𝑚2 , 𝑑𝑏𝑧 𝑝 𝑡 = 5/8", 𝑑𝑏𝑐𝑜𝑙 = 1" , 𝑝 = 0.20 (la losa de piso es de concreto armado), 𝑐 = 500 𝑘𝑔/𝑐𝑚2 .
Área de la zapata.
1 0
𝐴= = 21.51 𝑚2
. 0
Zapata cuadrada 60*60.
(0.60 + 2𝑥)2 = 21.51
𝑥 = 2.018 = 2.05 𝑚
𝐵 = 𝐿 = 0.60 + 2.05 ∗ 2 = . 0𝑚
2.35
𝜇=𝜇= 5
= 0. 𝑚
7.70 2(0.47)(0.47)(0.472 +0.472 +1)1/2 0.472 +0.472 +2 2(0.47)(0.47)(0.472 +0.472 +1)1/2
∆ = 4𝜋
[ 0.472 +0.472 +1+0.472 ∗0.472 ∗ 0.472 +0.472 +1 + 𝑐𝑡𝑔 [ 0.472 +0.472 +1−0.472 ∗0.472
]]
. 0.53 2. 0.53
∆ = [ ∗ + 𝑐𝑡 ( )]
𝜋 1. 1. 1.3
.
∆ = [0.60 + 0.36]
𝜋
∆ = 0.5 𝑡𝑜𝑛/𝑚2
Estrato I.
𝜎𝑜 = 3.8(1. 0) = .22 𝑡𝑜𝑛/𝑚2
Estrato II.
𝜎𝑜 𝐼𝐼 = ∗ 𝐻2 = 0. 3(1.50) = 1. 0 𝑡𝑜𝑛/𝑚2
𝑘𝑛 𝑘𝑛 .0 𝑘𝑛
𝜎 = 18. 3
− .81 3 = = 0. 3 𝑡𝑜𝑛/𝑚3
𝑚 𝑚 𝑚3
Estrato III.
𝐻3 3
𝜎𝑜 𝐼𝐼𝐼 = 𝜎3 ∗ = 0. 6 ( ) = 1.1 𝑡𝑜𝑛/𝑚2
2 2
𝑘𝑛
𝜎3 = 1 .3 − .81 = . = 0. 6 𝑡𝑜𝑛/𝑚3
𝑚3
𝜎3 = .22 + 1. 0 + 1.1
𝜎3 = . 0𝑡𝑜𝑛/𝑚2
IV.
Calcular el asentamiento que se da en el punto A, si para el ensayo de la arcilla se tiene lo siguientes resultados.
ALTURA 2.00 cm
DIAMETRO 5.047 cm
CONTENIDO DE HUMEDAD
S= 0.055887292 cm
Cc1 0.23
Cc2 0.218
Cc3 0.246
Cc4 0.221
Cc5 0.189
Cc6 0.253
Ccp 0.226
Cs1 0.0128
Cs2 0.0096
Cs3 0.0192
Cs4 0.0096
Cs5 0.01919
Csp 0.0141
eo 0.9260
S1 0.471 cm
S2 -6.656 cm
S= 0.055887292 cm