Você está na página 1de 1

APPROVAL COLUMN

100

100

100
600

H20
H20
H20 stiffening ring @ 2.0m
07

600
H20 H20

H20
H2O
H20

SEC.O - 0

O O A A X X

400
35000

35000
H20
H20

26000
H20 stiffening ring @ 2.0m
07

400
H20 H20

H20
H2O
H20

SEC.A - A

400

H20
H20
10000

10000

8000
H20 stiffening ring @ 2.0m
07

400
H20 H20

H20
H2O
H20

SEC.X - X

PILE CAPACITY OF 500KN AT PENETRATION DEPTH OF 35M FOR 600MM DIAMETER WAS ADOPTED FOR THE BREASTING DOLPHINS, PILE CAPACITY OF 500KN AT PENETRATION DEPTH OF
35M FOR 400MM DIAMETER WAS ADOPTED FOR THE DESIGN OF JETTY (PLATFORM AND WALKWAY) AND PILE CAPACITY OF 400KN AT PENETRATION DEPTH OF 26M FOR 400MM DIAMETER
WAS ADOPTED FOR THE INTERCONNECTING WALKWAYS AND PILE CAPACITY OF 400KN AT PENETRATION DEPTH OF 35M FOR 400MM DIAMETER WAS ADOPTED FOR THE MOORING DOLPHINS SUPPORTS.

TYPICAL PILES REINFORCEMENT

PROJECT TEAM JETTY SYKES


PROJECT NAME AND LOCATION All measurements are in m except otherwise stated
SYKES ENERGIPROJEKTS LIMITED
STRUCT-D/JTY-09 ENERGIPROJEkTS LTD.
A.A. RANO Bulk Petroleum Handling Facility
Ijegun Egba, Lagos State.
SYKES ENERGIPROJEKTS LIMITED OR THE REGISTERED CRUSTEAM GROUP
OWNER ENGINEER WHO ENDORSED THESE DRAWINGS SHALL NOT BE
A.A. RANO NIG. LTD. LIABLE FOR ANY PART OF THE CONSTRUCTION WORKS NOT JINGMEN HONGTU SPECIAL AIRCRAFT MANUFACTURING CO., LIMITED
OPPOSITE NNPC HOUSE, SUPERVISED
HOTORO, WIZCHINO ENEGINEERING LIMITED
KANO STATE. Tel :