DIVISION OF WORK
TITLE: Sea Water Intake Pipe and Head EPC Work for Track 4A CCGT
Power Plant PAGE: 1 OF 2
REQUISITION NO. : 16C2660C-SM6A.01
RESPONSIBILITY DIVISION
ITEM DESCRIPTION SUBCON-
CTCI REMARK
TRACTOR
8.0 OTHERS
8.1 Safety devices (Safety helmet, safety boot, V
safety net, safety belt, safety rope, and so on.)
8.2 The sanitation, safety and environment V
protection measures
8.3 Quality control of the work V
8.4 The fire-fighting devices during construction V