Race Course
Study Phase Two
Final Report - December 2018
Pimlico — RACE COURSE STUDY PHASE TWO DECEMBER 2018
Table of
Contents
A - INTRODUCTION / 1 C - THE VISION / 19 D - NON-RACING LAND USE ANALYSIS / 54
STUDY PURPOSE / 3 PLANNING PROCESS / 20 LAND USE CONCEPT / 55
STUDY PROCESS / 6 THE SITE / 23 NON-RACING LAND USE ANALYSIS / 56
STUDY OUTCOME / 8 EXISTING CONDITIONS / 24 LAND USE SUMMARY / 57
THE PALIO INSPIRATION / 25 GATEWAY DISTRICT / 58
B - PREAKNESS PROGRAM / 12 TRACK ROTATION / 26 DISTRICT ONE / 61
PREAKNESS FACILITIES PROGRAM / 13 CONNECTIVITY / 27 DISTRICT TWO / 64
PRODUCT MATRIX / 14 INFRASTRUCTURE, TRAFFIC, & UTILITIES / 28 DISTRICT THREE / 67
SEATING PRODUCT TYPES / 15 EXISITING SYSTEMS / 29 INFIELD LAND USE POTENTIAL / 70
ECONOMIC AND FISCAL IMPACT ANALYSIS / 16 PROPOSED SYSTEMS / 31 CONCEPTUAL PLAN / 71
CONCEPT PLAN / 35 CONCEPT RENDERINGS / 72
CONCEPT RENDERINGS / 36
PERMANENT RACING COMPONTENTS / 37 E - APPENDICES / 74
PREAKNESS EVENT OVERLAY / 46 INFRASTRUCTURE ASSESSMENT / 75
ORDER OF MAGNITUDE COST SUMMARY / 49 COST ESTIMATE / 105
PRELIMINARY CONSTRUCTION SCHEDULE / 50 NON-RACING LAND USE ANALYSIS / 164
ALTERNATIVE CONSTRUCTION SCHEDULE / 51
ALTERNATE COMPONENT PRICING / 53
Study Purpose
Phase One of the Pimlico Race outlined in the Phase One considering year-round venue
Course Study was issued in situational analysis were activity, and redevelopment of
February, 2017. The purpose of focused on safety, security and the Pimlico site to better engage
the Phase One Study was to building code related issues, the the surrounding communities
provide information and analysis facility also lacks modern day and neighboring land uses
to guide the City of Baltimore seating products, amenities and such as Sinai Hospital. In an
(the City) and State of Maryland technology found in comparable effort to achieve these planning
(the State) in determining the sports venues and, due to its goals, this study explores a
extent of their potential support age and condition, is expensive combination of permanent and
to renovate or rebuild Pimlico to operate and maintain. Its overlay (temporary) facilities
Race Course to remain the long capacity and potential revenue to host the Preakness Stakes,
term home for the Preakness are constrained by the type and evaluates the ability of the site
Stakes. amount of seating products, to accommodate various non-
as well as infrastructure and racing functions on a year-round
Key questions addressed in the support. The situational analysis basis, and identifies potential
Phase One Study were: suggested that these, and other, commercial, residential, and
1. Could Pimlico remain the long limitations restrict Pimlico Race entertainment development
term home of the Preakness Course's ability to generate options or opportunities on
Stakes? operating margins comparable portions of the site.
2. If yes, what improvements to more modern venues. The
would be required? Phase One Study estimated that Conceptual planning and design
3. If no, what situational factors substantial renovation of Pimlico scenarios, real estate market
could not be overcome? Race Course to overcome these evaluation, construction cost
Renovation concept from Phase One Report
challenges could cost between estimates and economic and
The Phase One Report did not $248 million and $321 million. fiscal impact analysis were
find situational factors that conducted as part of this study. It
could not be overcome to As a result of the Phase One is intended that this information
maintain Pimlico Race Course Study and the potential high be utilized by the stakeholders to
as the host of the Preakness cost of renovation, the State consider potential public/private
Stakes. However, as host venue requested that the consultant partnerships with the possibility
for such a large and prominent team proceed with the Phase of redeveloping the Pimlico site
public event, Pimlico Race Two Study. The Phase Two to better engage the surrounding
Course is antiquated and in Study focuses on visioning communities and land uses,
need of substantial renovations and concept development of havepositive economic value, and
or complete redevelopment. an ideal venue for hosting the serve as an ideal venue for the
While many of the concerns Preakness Stakes, while also Preakness Stakes in perpetuity.
This analysis is preliminary in Course. Due to quick changes The American Horse Council participate in horse activities but
nature and does not constitute in the external factors, actual (AHC) Foundation commissioned do not own a horse (16.0%) or
a comprehensive master plan of results may vary significantly from a study in 2016 to estimate the attend horse events as a spectator
Pimlico Race Course. Although estimates presented in this report. economic impact of the horse but do not own or participate
the report includes high level industry. Approximately 20,000 (13.2%). While ownership tends
design concepts, it does not The consultant team does horse owner/industry suppliers to be skewed toward older age
include detailed architectural not express an opinion or any participated in the survey process groups, 38% of horse participants
or engineering services, other form of assurance on the with 8,400 individuals providing are minors.
environmental assessments, noise information presented in this complete and usable surveys. Within Maryland, the horse
analysis, or transportation/traffic report. As with all estimates Additional surveys were received industry was estimated to directly
impact studies. In addition, this of this type, results cannot be from horse show organizers contribute over $747 million
study does not include detailed guaranteed, nor is any warranty and racetrack representatives and 15,700 jobs to the State’s
geotechnical engineering, intended that they can be including the four largest economy. When including indirect
hazardous materials testing, achieved. operators – Churchill Downs, New and induced effects, the horse
and other specialty engineering York Racing Association, Penn industry’s total added value to the
services. The analysis is intended to be National, and The Stronach Group Maryland economy was estimated
read and used in its entirety. (TSG). at $1.3 billion and 21,500 total jobs.
The findings and assumptions Separation of any portion from Total output (or the total value
contained in the report reflect the main body of the report The AHC reports that despite the of industry production including
analysis of primary and secondary is prohibited and negates the decline in the horse population value-added) associated with the
sources. The consultant team analysis. This report is restricted due to the recession of 2008- horse industry in Maryland was
utilized sources that are deemed to internal use by the MSA and 2009, the horse industry remains estimated at nearly $2.1 billion.
to be accurate but cannot may not be relied upon by any a stable and vibrant force in the
guarantee their accuracy. No party for any purpose including U.S. economy. The economic As noted in the recent AHC study,
information provided by others any matter pertaining to financing. activity generated by the horse racehorses require significant
was audited or verified and was Reproduction or publication industry contributed over $50 expenditures on breeding,
assumed to be correct. by other parties are strictly billion in direct value to the U.S. maintenance and training such
prohibited. Gross Domestic Product (GDP), a as costs associated with jockeys,
Multiple external factors total contribution of $122 billion to trainers, grooms, veterinarians,
influence current and anticipated Economic Importance of the the U.S. economy, and 1.7 million farriers, insurance, specialized
market conditions. Although Horse Industry total jobs. feed for horses, specialized
the consultant team has not equipment to maintain, train,
knowingly withheld any pertinent Any development project is The AHC study estimated there and transport equine athletes,
facts, it cannot be guaranteed somewhat dependent on the were more than 7.2 million horses entry fees and stalling, and
that the consultant team has attributes of the industry(s) in the U.S. in 2016. Approximately travel expenses. Various other
knowledge of all factors which that it is anticipated to serve. 31% of U.S. households (or 38 specialized service costs related
might influence the future Multiple studies demonstrate million) contain horse enthusiasts to wagering, broadcasting, track
operating potential of the that the horse industry generates which are defined as people maintenance, security, etc. are also
Preakness Stakes at Pimlico Race significant economic activity. who either own horses (1.3%), necessary. The AHC study states
that the racing sector of the horse being the Maryland Income Tax to attract extensive viewership
industry was estimated to add ($18.2 million), Sales Tax ($16.5 and maintain their popularity.
$218 million in direct value to the million) and Property Tax ($15.5 These races equate in caliber
State economy which increases to million). to sporting events like the
$365 million and 5,200 jobs when Super Bowl, World Series, The
including indirect and induced Racing is a key component Masters, and NCAA Final Four
effects. Total output associated of the overall success of the Men’s Basketball Championship.
with the racing sector was horse industry in Maryland. Secondary sources report that
estimated to be $572 million. Unlike professional sports that in aggregate Triple Crown races
generate significant revenues drew a total of nearly 383,000
As mentioned in the Phase from television, horse racing is people in 2018. In addition, Triple
One report, Sage Policy Group extremely dependent on the Crown race day handles (inclusive
conducted a study for various handle (i.e., the total amount of the entire race day program)
Maryland horse industry partners wagered on races) which is reliant were estimated to total more than
that was released in 2016. The on consumer income levels. $459 million in 2018. National
study measured the economic and international exposure from
and fiscal impacts of Maryland’s According to the report by hosting these events is substantial.
horse industry. While the study Sage Policy Group, since 2010 Although down from previous
did not specifically evaluate Maryland’s horse industry has years, total viewership for the race
the impact of horse racing been stabilizing due in large part segments of three Triple Crown
in the State, it did recognize to augmented purses for races. races combined was 35.5 million
the impact of horse racing on In the State of Maryland, 7% of people in 2018 according to
the overall horse industry. The slot machine proceeds are used Nielsen.
study concluded that the horse toward the Purse Dedication
industry in Maryland generates Account which is used to increase The Preakness Stakes is in an
approximately $1.15 billion in total race purses. An additional 2.5% enviable position as it is the
economic activity each year is dedicated to the Racetrack middle race of theTriple Crown – if
which supports 9,100 full-time Facilities Renewal Account. These the winner of the Kentucky Derby
equivalent (FTE) positions with funds have helped to support not does not win this race, there is
approximately $482 million in only horse racing, but rather the no potential for a Triple Crown
combined wages and salary entire horse industry in Maryland. winner. The Preakness Stakes is
income. Direct spending in the The growth in the racing sector a significant economic generator
horse industry was approximately has led to an improved industry for the State and local economies.
$662 million in 2015. The report supply chain with more service Without the Preakness Stakes, a
estimates that if the current pace providers able to serve Maryland significant amount of spending
of industry expansion continues horse farms across all segments. that currently exists in the state
through 2020, the industry will would no longer occur. In addition,
have a $1.5 billion yearly economic Despite negative trends in the one could surmise that without
impact on Maryland and support broader horse racing industry, the Preakness Stakes, both
more than 11,000 jobs with $620 major events such as the annual the racing and broader horse
million in employee income. In Triple Crown of Thoroughbred industries in Maryland would
addition to economic impacts, Racing, which includes the decline substantially.
Sage Policy Group reported 2015 Kentucky Derby, Preakness
fiscal impacts of $68.7 million with Stakes in Maryland, and Belmont
the largest revenue generators Stakes in New York, continue
Study Process
The Maryland Stadium Authority an ideal Preakness venue conducted a series of visioning to as "The Vision," which is
(MSA) is administering this also has specific race-related and planning workshops which described in detail in Section C.
study on behalf of the State requirements including dirt and included key stakeholders.
of Maryland, The Maryland turf tracks, a saddling paddock, The initial workshop resulted Once a conceptual planning
Department of Labor, Licensing horse accommodations and in three potential planning approach was determined, RK&K
and Regulation (DLLR), the jockey quarters. These combined scenarios ranging from began an assessment of on
Maryland Racing Commission program elements established partial redevelopment of the and off-site infrastructure and
(MRC), and the Maryland the minimum requirements site which provided minimal recommended improvements to
Jockey Club (MJC). The project which drove the visioning and opportunity for non-racing land support the proposed concept
consultant team includes conceptual planning process. use and community benefit, to plan. This included assessing
Crossroads Consulting, Populous, The program requirements are comprehensive redevelopment demand of the proposed
RK&K Engineering (RK&K), detailed in Section B of this which maximized the use of the concept elements and working
Entreken Associates, Inc. and report. site while also creating an ideal with public utility and other
Turner Construction. venue for the Preakness Stakes. service providers to ensure
Concurrently, the consultant that the proposed land use
The initial task of the Phase team conducted market Through a series of follow-up concept can be serviced. RK&K
Two Study process entailed due diligence related to workshops, the consultant team also looked at associated utility
the development of a detailed potential non-racing land continued to focus on creating improvement costs. In addition,
program of seating and uses. This study included a concept plan that maximized RK&K conducted preliminary
hospitality products considered analysis of demographic and opportunity for non-racing land stormwater management and
to be ideal for hosting the socioeconomic data, the use, had positive community traffic assessments related to the
Preakness Stakes. This product residential market, commuting impact, complemented proposed concept plan.
program was developed in close patterns, residential and neighboring land uses, and
collaboration between the MJC commercial space inventories, could have a significant potential Turner Construction was
and the consultant team. The vacancy rates, development return on investment, while not engaged to generate cost of
program includes quantities, tax incentives and other supply losing sight of the primary goal construction estimates for the
square footage requirements, and demand factors which of serving as an ideal venue demolition, site development
and identifies which products influence demand potential and for the Preakness Stakes. The and racing-related project
are best suited as permanent marketability of potential non- collaboration and research components, including required
or overlay (temporary) racing land use. conducted for this study, temporary facilities.
structures. Product price points including multiple non-racing
for the economic study were Based on this programming product mix market tests and Throughout the study process,
determined solely by the MJC. In and market due diligence plan adjustments, culminated in the consultant team conducted
addition to the seating products, data, the consultant team a program and concept, referred interviews and/or work sessions Pimlico Public Meeting June 2018
with a diverse group of of four open-ended questions Question 2: As it stands today, housing, and housing for the improved in terms of physical
stakeholders to obtain their input in order to obtain authentic, what do you believe are the elderly product and customer service.
regarding Pimlico Race Course unbiased feedback and insights negatives associated with the • Supermarket/food store Several respondents expressed
and the Preakness Stakes, future regarding the Pimlico Race Pimlico Race Course property? • Open green spaces such as a desire for more racing days.
development planning in the Course. Nearly 120 responses community gardens and urban Concerns were expressed related
surrounding area and supporting were received; however, not The most common response farms to noise pollution, impact to
infrastructure and amenities. all respondents answered all related to negative attributes • Educational centers property values and the need to
These stakeholders and public questions. Given the open-ended was the overall physical • Multi-use special event space/ decrease crime in surrounding
officials included, but were not nature of the survey, a qualitative condition and disrepair of the community center area.
limited to, representatives from data analysis was performed. facility and general lack of • Horse racing museum
the following: Responses were reviewed and modern amenities. The location • Casino/sports betting facility The consultant team also
grouped into general categories in an unsafe neighborhood reviewed available operating
- Baltimore City (e.g., planning, based on recurring themes. was the next most common Question 4: Please provide us data provided by the MJC for
public works, economic The following summarizes response. with any additional comments both racing and non-racing
development, etc.) feedback obtained from the that you have regarding the event activity held at Pimlico
- Baltimore Development questionnaires received as part Question 3: In addition to future vision of the Pimlico Race Race Course. Additional data
Corporation of the community outreach horse racing, what type of Course property. was garnered from previous
- Downtown Partnership of effort: development components studies prepared by the
Baltimore do you believe would be The majority (nearly 70%) of Maryland Department of
- Greater Baltimore Committee Question 1: As it stands today, compatible with the surrounding respondents indicated that Commerce and Sage Policy
- LifeBridge Health what do you believe are the community? Pimlico Race Course should Group, Inc. that quantified the
- Maryland Department of positives associated with the remain open, and of these economic and fiscal benefits
Commerce Pimlico Race Course property? The following lists development respondents, most commented associated with hosting the
- Maryland Jockey Club components that respondents that the Preakness Stakes should Preakness Stakes as well as for
- Maryland Racing Commission The most common response listed as compatible with the stay at Pimlico Race Course. the broader Maryland horse
- Maryland Sports related to positive attributes surrounding community: Although many respondents industry.
- Park Heights Renaissance was the history and tradition • Events such as concerts, were geared toward keeping
- State of Maryland of the site. Location and easy fairs, festivals, and other live Pimlico Race Course open and
- The Stronach Group accessibility to the site ranked entertainment the tradition and history of horse
- Visit Baltimore as the next highest positive • Family entertainment such as racing alive in Maryland, they
attribute. Other positive movie screenings and farmers also indicated that significant
Public input was solicited attributes included: the size markets investment would be needed
through questionnaires that and amenities offered on the • Horse shows in the surrounding community
were distributed electronically property; other events held at • Hotel, retail, restaurants, bars, while simultaneously restoring
and on-site at a public session the property; and the revenue, office space the grandeur of Pimlico Race
that was held in June 2018. The economic value, creation of jobs, • Recreational facilities including Course. Multiple respondents
questionnaire developed by and tourism generated from sports fields commented that the overall
the consultant team consisted hosting the Preakness Stakes. • Affordable housing, mixed experience needs to be
Study Outcome
Based on the study purpose and includes a new permanent the temporary infrastructure the running of the Preakness
study process previously outlined, Multi-Use Clubhouse and plaza required to support a particular Stakes at Pimlico Race Course
the Phase Two report culminated area referred to as the Palio. facility or venue, including but not are estimated to be $5 million
in a concept plan that includes Approximately 40% of the limited to tents, power, utilities, annually: $2.3 million at the State
both racing and non-racing premium seating product will be fencing, flooring, lighting, signage level and $2.7 million at the City
uses. It is important to note that accommodated in this permanent and Field of Play equipment. level.
Pimlico Race Course is owned by facility. Throughout four levels, the The proposed Preakness overlay
MJC/TSG and, as such, this is a Multi-Use Clubhouse is proposed program requires approximately Based on multiple visioning
hypothetical, conceptual analysis to consist of track view dining, 390,000 gross square feet of and planning workshops with
of potential uses that could occur, clubs, lounges, suites, rooftop and space based on the product types the consultant team and key
not a feasibility study of what will balcony spaces, administrative and includes reserved and box stakeholders, the following
occur. offices, racing history center/ seating, suites, bleacher seating, illustrates the concept plan with
museum, café, off-track betting, track view dining and hospitality. the minimum racing components
The Preakness program has a total and required service and support required to host the Preakness
venue capacity of 75,000 which functions. The Palio measures Build-out of the recommended Stakes including both the
consists of 30,400 premium seats 500’x300’ and is the proposed overlay program is estimated to minimum permanent racing
and 44,600 general admission location for the temporary range from $4.5 million to $5.5 components and the temporary
seats. This program was approved saddling paddock and paddock million annually which includes the overlay.
by MJC/TSG. The concept plan stalls for the Preakness Stakes. construction and removal costs of
includes demolition and removal temporary facilities but does not
of all existing structures on the The concept plan also include operational costs.
property including the tracks, includes site and infrastructure
infield, grandstand, clubhouse, improvements including roadways Based on the previously described
equestrian barns and associated and on and off-site utilities, vehicle Preakness program as well as
infrastructure and is described in and pedestrian tunnels, pedestrian price points provided by MJC,
detail in Section B. bridges at track crossings and the economic and fiscal impacts
hardscaped plazas. associated with the running of the
The tracks and infield would be Preakness Stakes were estimated.
reconstructed and realigned. The order-of-magnitude Direct spending is estimated to
Realignment is necessary to cost to construct permanent generate $33.4 million which
accommodate/encourage improvements is $424 million produces $58.9 million in total
potential private development and the estimated construction output (i.e., the sum of direct,
around the perimeter of the duration is approximately three indirect and induced spending)
site. A new 15/16-mile dirt track years. and supports 620 total jobs
and 7/8-mile turf track would be (full and part time) in the State
constructed. The geometry and As described in Section C, nearly annually. Total earnings (labor
distances of the tracks shown every major event requires the income) generated from the
in this report were reviewed/ need for overlay to support the Preakness Stakes are estimated
approved by TSG and MRC. permanent venue and event to be $24.2 million annually. Total
In addition, the concept plan spaces. Overlay includes all of tax revenues generated from
G
G
Seating Product Type Proposed % of Total Approximate NSF/ Approximate NSF Permanent NSF Temporary NSF
Quantity Premium Seat Required Planned Planned
1. Bleacher Seating 4,550 13.56% 7.5 34,125 - 35,100
Similar to Churchill Downs 1st Floor Grandstand
2. Reserved/Box Seating 14,000 41.73% 8.5 119,000 - 115,515
Similar to existing Pimlico apron boxes
3. Track View Dining - Permanent 2,377 7.08% 30 71,310 71,363 -
Similar to existing Pimlico Terrace Dining Room
4. Track View Dining - Temporary 1,623 4.84% 38 61,674 - 64,885
Similar to existing Preakness Turfside Terrace
5. Suites - Permanent 1,000 2.98% 32 32,000 32,047 -
Similar to Churchill Downs Jockey Club Suites
6. Suites - Temporary 2,450 7.30% 30 73,500 - 72,800
Similar to Pimlico Preakness Skye Suites
7. Seating with Hospitality 3,000 8.94% 15 45,000 - 43,850
Similar to Vineyard Vines Club at Churchill Downs
8. Club/Lounge with Track View - Permanent 700 2.09% 38 26,600 27,638 -
Similar to 100-to-1 Club at Santa Anita Park
9. Club/Lounge with Track View - Temporary 700 2.09% 38 26,600 - 28,740
Similar to Starting Gate Lounge at Churchill Downs
TOTAL PREMIUM SEATING 30,400 90.46% 131,048 360,890
Seating Products
Bleacher seating could occur next Temporary track view dining Permanent club and lounge
to the track in areas where higher could occur in the infield along spaces within the clubhouse can
value seating is not appropriate, the home stretch, level with the serve a variety of uses both on
such as the final turn or turf adjacent track surface. racing and non-racing days.
course chute.
Reserved seating could occur in Permanent suites provide an Temporary clubs around the
any area adjacent to the track elevated track view within the venue can provide unique, less-
where elevated seating tiers can clubhouse building that captures formal hospitality experiences
be constructed, like the home the full extent of both the turf that appeal to a broader range of
stretch or starting gate area. and dirt tracks. guests.
Box seating would be appropriate Multi-level temporary suites along Permanent add-on dining
for high-value areas near the the home stretch or at the first makes use of spaces within the
track such as the finish line. turn. Single level suites and villas clubhouse that do not have track
placed in the infield near the finish views. This product provides
line where their low height would elevated hospitality when paired
not impact sightlines to the back with reserved or box seating.
stretch.
4. Permanent Track View Dining 8. Covered Seating with 12. Temporary Add-On Dining
Hospitality
Permanent track view dining Like permanent add-on dining,
provides an elevated track view Covered seating with hospitality temporary facilities can be used
of both the front and back could be placed along the first to a add hospitality package
stretches. and second turns in a location to reserved, box, or bleacher
that does not impact the seating.
sightlines of the clubhouse and
other temporary products.
This section focuses on • Maintaining and generating General Methodology well as spending by attendees changes in local spending on are that it is sensitive to both
estimating the economic and additional fiscal revenues for including spectators, media goods and services that result location and type of spending
Regional input-output models
fiscal benefits associated with local and State governments personnel, jockeys, trainers, staff from income changes in the and can provide indirect and
are typically used by economists
operation of the Preakness and family/friends outside the directly and indirectly affected induced spending, employment
Each of these benefits are as a tool to understand the
Stakes. As previously discussed, race course on items such as industry sectors. The model and earnings information by
important in assessing the flow of goods and services
the overall impact of the horse lodging, restaurants, retail, and generates estimates of these specific industry category while
overall impact of the Preakness among regions and measure
industry, and specifically the transportation. An attendee impacts through a series of taking into account the leakages
Stakes to the State. While the the complex interactions
horse racing industry, to the State buying tickets to the race, relationships using local-level associated with the purchase
value of most of these benefits among them given an initial
is significant and the Preakness staying in a hotel or eating in a average wages, prices and of certain goods and services
is difficult to measure, the spending estimate. Once the
Stakes is a key driving force. restaurant would be examples transportation data, considering outside the economy under
estimated economic activity direct spending amounts are
of direct spending. No direct commute patterns and the consideration.
Local and State economies generated can be quantified. It estimated and assigned to a
market surveys were conducted relative interdependence of the
would continue to benefit from should be noted that this section logical category, an economic The calculated multiplier effect
as part of this analysis. This economy on outside regions for
the running of the Preakness of the report focuses on the model estimates the economic is then added to the direct
initial measure of economic goods and services.
Stakes at an improved Pimlico Preakness Stakes race only and multiplier effects for each type impact to quantify the total
activity reflects analysis of
Race Course in a number of quantifies the direct, indirect, and of direct spending attracted The estimation of multipliers economic impact in terms
data provided by secondary
ways, including such tangible and induced benefits associated with to or retained in the State relies on input-output models, of output, employment and
sources including TSG/MJC that
intangible benefits as: Preakness race day operations resulting from operations of a technique for quantifying earnings which are defined
are deemed to be reliable, but
including the associated tax the Preakness Stakes. The sum interactions between firms, below:
• Enhancing the racetrack’s accuracy cannot be guaranteed.
revenues. This analysis does not of direct, indirect, and induced industries and social institutions
image as a sports/ • Output represents the
quantify any non-racing land use effects equals total economic Once the amount for direct within a specific economy.
entertainment destination total direct, indirect and
such as impacts from additional impact which is expressed in spending is quantified, a This analysis uses IMPLAN
induced spending effects
• Providing a first-class venue commercial and residential terms of output, employment calculated multiplier is applied software and databases which
generated from operations
for area residents and out-of- projects and other non-racing (jobs), and earnings (labor to generate the indirect and are developed under exclusive
of the Preakness Stakes. This
town visitors events that the facility may income). This analysis also induced effects. Indirect effects rights by the Minnesota IMPLAN
calculation measures the total
accommodate. Although not estimates the annual tax reflect the re-spending of the Group, Inc. The IMPLAN (which
• Enhancing the overall quality dollar change in spending
quantified, these developments revenues generated from the initial or direct expenditures stands for Impact Analysis for
of life and livability of the area (output) that occurs in the
would create additional economic Preakness Stakes at Pimlico or the business-to-business Planning) software package
State economy for each dollar
• Generating significant national value. Race Course. transactions required to satisfy allows the estimation of the
of output delivered to final
and international media the direct effect. For example, multiplier effects of changes in
Direct spending represents demand.
exposure businesses impacted by the final demand for one industry
the initial change in spending
Preakness Stakes purchase on all other industries within • Employment (Jobs) represents
• Providing a catalyst for that occurs as a direct result
various goods and services a defined economic area. Its the number of full and part-
further ancillary development of operations of the Preakness
from local and State vendors. A proprietary methodology time jobs supported from
initiatives Stakes. Direct spending
portion of these expenditures includes a matrix of production operations of the Preakness
including expenditures on
occurs in the local economy and distribution data among Stakes. The employment
• Maintaining and generating race day operations such as
and a portion leaves through all counties in the U.S. As such, multiplier measures the total
additional economic activity admission and wagering as
leakage. Induced effects reflect the advantages of this model change in the number of
jobs supported in the State admissions and amusement tax, Summary of Economic Impacts Summary of Tax Revenues Estimated Tax Revenues Generated From Annual Operations of
economy for each additional corporate income tax, hotel/ the Ideal Preakness Stakes at Pimlico Race Course
The table below summarizes the State tax revenues generated
$1.0 million of output delivered motel tax, personal income Entity Amount
estimated economic impacts from the running of the
to final demand. tax and sales and use tax. This
generated from the Preakness Preakness Stakes are estimated State of Maryland $2,319,000
analysis assumes that current
• Earnings (Labor Income) Stakes program as presented in to be $2.3 million annually. City of Baltimore $2,683,000
tax rates remain constant.
represent the wages and this document. Running the Preakness Stakes GRAND TOTAL $5,002,000
salaries earned by employees Factors such as building at Pimlico Race Course
Direct spending related to the
of businesses associated program, attendance, origin of is estimated to generate
Preakness Stakes is estimated of this analysis and based on spending at the State level
with or impacted from attendees, financial operations, $2.7 million in tax revenues
to generate $33.4 million which information provided by the generated from operations of
operations of the Preakness industry trends, economic annually at the City level which
produces $58.9 million in total Comptroller of Maryland, an the Preakness Stakes which
Stakes. In other words, the conditions, direct spending is primarily driven by the
output (i.e., sum of direct, effective tax rate was used. represents a conservative
multiplier measures the total categories used, per person admissions and amusement tax.
indirect, and induced spending) estimate relative to the sale
dollar change in earnings of spending amounts, distribution Personal Income Tax – The State
and supports 620 total jobs (full- The following provides a of alcoholic beverages. Ticket
households employed by the of spending, multipliers, and of Maryland imposes a personal
time and part-time) in the State description of the taxes sales are excluded as they are
affected industries for each specific taxes quantified are income tax assessed against
annually. These jobs are created estimated in this analysis. While reflected in the admissions and
additional dollar of output all variables that influence the personal income earned in the
in many sectors of the economy, other taxes may be positively amusement tax.
delivered to final demand. economic and fiscal impact State. The State income tax is
which both directly and impacted by the Preakness
estimates. a graduated rate ranging from City of Baltimore Taxes
The estimated spending indirectly support the increased Stakes, they are not quantified
2.0% to 5.75% of taxable income.
generated from the running level of business activity in the in this analysis. In addition, Admissions and Amusement
Non-residents are subject to a
of the Preakness Stakes also area. Outputs from the IMPLAN this analysis does not include Tax - The admissions and
special nonresident tax rate of
creates tax revenues for the model indicate that total an estimate of taxes that amusement tax is a local tax
1.75% in addition to the State
State of Maryland. Experience earnings generated from the could be generated from the collected by the Comptroller’s
income tax rate. For purposes
in other markets suggests that Preakness Stakes is estimated to potential non-racing land use Office for Maryland's counties
of this analysis and based on
while a significant portion of the be $24.2 million annually. opportunities discussed later and Baltimore City, and
information provided by the
direct spending likely occurs in this report which could be incorporated cities and towns.
Estimated Economic Impact Generated in the State from Annual Comptroller of Maryland, an
near the host venue, additional significant for both the City of The tax is imposed on the gross
Operations of the Ideal Preakness Stakes at Pimlico Race Course effective tax rate was used.
spending occurs in other Baltimore and the State. receipts from admissions, the
Category Amount
economies. Major tax sources Sales and Use Tax – The State of use or rental of recreational or
Output State of Maryland Taxes
impacted by the Preakness Maryland collects 6% sales and sports equipment and the sale
Stakes were identified and Direct Spending $33,449,000 Corporate Income Tax – A use tax from sales and leases of merchandise, refreshments or
taxable amounts to apply to Indirect/Induced Spending $25,467,000 corporate income tax of 8.25% of tangible personal property services at a nightclub or similar
each respective tax rate were Total Output $58,916,000 of corporate federal taxable and services throughout the place where entertainment
estimated. Although other taxes income adjusted by State State and a 9% tax on alcoholic is provided. Admissions and
may also be positively impacted, Total Jobs 620 modifications is also levied beverages. For purposes of amusement tax rates are set
this analysis estimated the by the State of Maryland on this analysis, the 6% tax rate is by local officials and vary by
revenues generated from Total Earnings $24,225,000 corporations. For purposes applied to estimated taxable locality and by activity with
Planning Process
The Phase Two Study was the vision presented in this could be used on a year-round scenarios ranging from The determination to consider market conditions. These results
initiated with a two-day document: basis? partial redevelopment of the year-round use and activation are presented in Section D.
programming and visioning • What is the intended target • How could these potential uses site which provided minimal of the site also triggered the
workshop at the Populous office market and revenue generation better engage the surrounding opportunity for non-racing land market analysis for potential Through a series of follow-up
in Kansas City in April 2018. goal for the Preakness Stakes communities and neighboring use and community benefit, to non-racing land use components workshops with key stakeholders,
This collaborative workshop (ticket sales, corporate sales, land uses such as Sinai comprehensive redevelopment such as commercial, residential the consultant team continued
included the consultant team sponsors)? Hospital? which maximized the use of the and hospitality/entertainment. to focus efforts on creating a
and representatives from the • What is the best venue product site while also creating the best As the concepts evolved, concept plan that maximized
following stakeholder groups: mix (seats, suites, etc.) to Through the exploration of these possible venue for the Preakness Entreken Associates tested opportunity for non-racing land
achieve racing program success questions, it was collectively Stakes. These three initial various non-racing land use use, had positive community
- Baltimore City in this market? agreed that ongoing planning planning scenarios are presented components to develop impact, complemented
- Baltimore Development • Is there an existing racing venue should examine a combination on a subsequent page. recommendations that align with neighboring land uses, and
Corporation in North America that could of permanent and overlay
- LifeBridge Health serve as a product mix model? (temporary) facilities to host
- Maryland Jockey Club If so, how does it translate to the Preakness Stakes and a
- The Stronach Group Pimlico Race Course and the limited racing meet. Instead of
- The Maryland Stadium Preakness Stakes? focusing purely on the needs of
Authority • Which components of the the Preakness Stakes, the ability
- Park Heights Renaissance recommended product mix are of the site to serve non-racing
best achieved as permanent functions on a year-round basis
The intent of this visioning and which are best achieved as with potential commercial, retail
workshop was to bring this overlay? and residential development on
diverse group of stakeholders • What is the recommended portions of the site in addition
together in a collaborative permanent venue program to activating the site as a hub of
environment to explore including support spaces (food community life were considered.
unconventional ideas and service, media, retail, etc.) During the Phase One Study in
concepts for creating an ideal given the answers to the above 2016, MJC stated it was their intent
Preakness venue and Pimlico questions? to move all stabling and training
redevelopment. • Is the full extent of the existing off-site. Therefore, year-round
Pimlico site required to stabling and training at Pimlico was
During this workshop the group accommodate the program and not a consideration in the Phase
endeavored to answer the host the Preakness Stakes? Two Study.
following questions, which would • What are the potential non-
eventually lead the consultant racing uses of the site and The initial workshop resulted
team and stakeholders to permanent improvements that in three potential planning Programming and Visioning Workshop One
OPTION 1
APRIL 25, 2018
The Site
GLEN MT. WASHINGTON
The 110-acre Pimlico Race Course site is located RESIDENTIAL RESIDENTIAL
primarily within residential neighborhoods, with Mt.
Washington to the north, Glen to the northwest and HEALTHCARE
Park Heights to the south. The site is bordered by
Sinai Hospital on the east. Limited commercial/retail NORTH
ERN PA
RKWAY
is located within the Park Heights neighborhood to
the southwest along Park Heights Avenue.
PARKS /
Park Heights comprises smaller neighborhoods OPEN SPACE
that, in aggregate, have more than 26,000
residents. Park Heights has been decreasing in 20-ACRE
population and has experienced nearly double the LIFEBRIDGE
SCHOOL PARCEL
City’s rate of out-migration since this trend began in
INCLUDED HEALTHCARE
the 1970s. IN PLANNING (SINAI HOSPITAL)
Glen is one of the largest communities in Northern
Park Heights. It is a neighborhood of mixed housing PIMLICO
types that include single family, garden apartments,
condominiums and semi-detached single family 110 Acres
homes. Mt. Washington is mostly residential, though
PARK HEIGHTS
it has two small commercial areas: Mt. Washington
RESIDENTIAL
Village, located off the west side of I-83, containing
the Baltimore Light Rail's Mt. Washington Station
and Mt. Washington Mill, located off the east
side of I-83, commonly referred to as Historic Mt.
Washington.
RE
DE
VE
PAR
K BEL PARK HEIGHTS
In 2016, LifeBridge Health purchased 20 acres from HEI
GH
Existing Conditions
Existing Site Legend
1. Primary Points of Entry 10. Paved VIP Parking
2. Front Stable Area 11. Paved Parking
3. Stable and Trailer Parking 12. Preakness Infield Village
4. Clubhouse 13. Preakness Winner's Circle
5. Paddock & Winner's Circle 14. Infield Service Area
6. Grandstand 15. Infield Tunnel
7. Old Grandstand 16. Preakness InfieldFest Area
8. Maintenance 17. Backstretch Stable Area
9. Grass Parking Outside Fence
Facility Statistics
Total Acreage: 110
Dirt Track Distance: 1-Mile Oval with 1-1/4 Mile & 6-Furlong Chutes
The Palio di Siena, known locally The race itself runs for three laps of the seventeen contrade to by many as a "barrier" in the
simply as Il Palio, is a horse race of the Piazza del Campo, the the piazza. The Campo was and middle of the communities
that is held twice each year on perimeter of which is covered remains the focal point of public that surround it and the
July 2 and August 16 in Siena, with several inches of dirt and life in the City. LifeBridge Health campus. The
Italy. Ten horses and riders, turf (imported and laid for the planning team and stakeholders
bareback and dressed in the occasion at great expense to the The consultant team and key consented that the optimum
colors of their district, represent city) and the corners of which stakeholders found similarities planning solution for Pimlico
ten of the seventeen contrade, or are protected with padded to the planning challenges of the would be one that connects the
city wards. The race is possibly crash barriers for the race. On Pimlico site and inspiration in the communities and neighboring
the oldest in the world, dating the dangerous, steeply canted history, culture and design of the land uses through the Pimlico
from 1590. track, the riders are allowed Palio and Piazza del Campo. site.
to use their whips not only for
The Palio di Siena is more their own horse, but also for History & Culture: The Palio is Mixed-Use Piazza: Outside
than a horse race. It is the disturbing other horses and believed to be the oldest horse of the Palio, the piazza is
culmination of ongoing rivalry riders. The Palio in is won by race in the world and Pimlico is the focal point of public life,
and competition between the the horse who represents his the oldest race track in North surrounded by restaurants and
contrade. The lead-up to and contrada, and not by the jockey. America. Similar to MJC's shops, and the site of markets,
the day of the race are invested The winner is the first horse to future vision for the Preakness entertainment, and social
with passion and pride. Formal cross the finish line—a horse can Stakes, the Palio is a multi-day gatherings. It is the place people
and informal rituals take place win without its rider. public spectacle with formal want to be together. The Pimlico
as the day proceeds, with each and informal rituals, pageantry, plan could also include racing
contrada navigating a strategy The Piazza del Campo is the neighborhood celebrations and and non-racing components
of horsemanship, alliances and principal public space at the other events surrounding the that engage the community Piazza del Campo on race day
animosities. There are the final historic center of Siena and is race. The historic culture of the year-round. As with the Piazza,
clandestine meetings among the regarded as one of Europe's Preakness Stakes is similar, with public spaces could be used
heads of the contrade and then greatest medieval squares. It an annual parade, gala, and for components of the racing
between them and the jockeys. is renowned worldwide for other events being held until program utilizing temporary
There is the two-hour pageant its beauty and architectural recent years. Additionally, the overlay.
of the Corteo Storico followed integrity. The open site was a Preakness Infield Fest has been
by crowning moment of the marketplace established before considered "a right of passage" These remarkable similarities
day - the race - which takes only the thirteenth century on a for generations of young helped the consultant team
about 75 seconds to complete. sloping site near the meeting Baltimoreans. and key stakeholders establish
Although there is great public point of the three hillside the Palio vision and influenced
spectacle, the passions displayed communities that coalesced Connectivity: The Piazza del the planning concept that is
are very real. to form Siena. Today, eleven Campo connects seventeen city presented in the following pages.
narrow shaded streets radiate wards and is the focal point of
into the city connecting each public life. Pimlico is regarded Piazza del Campo every day
Track Rotation
In an effort to explore
planning options that could
achieve optimum land use
and community connectivity,
the track geometry shown
adjacent was presented to and
approved by MJC and MRC. This
critical approval allows for the
Connectivity
Pimlico Race Course is regarded through to Park Heights Avenue.
by many as a "barrier" in the The north section of this street
middle of the communities may be temporarily closed during
that surround it, including the the race meet to serve as seating
Pe
LifeBridge Health campus. overlay along the homestretch.
mb
rid
Pimlic
The consultant team and key
ge
stakeholders agreed that an Queensberry Avenue and
o
optimum planning solution Pembridge Avenue to the south
Qu
for Pimlico would be one that could be pulled through the site,
ee
connected the communities and including the infield, to connect to
ns
be
neighboring land uses through Northern Parkway. The sections
rry
the Pimlico site. As previously of these streets that cross the
explained, the 35-degree track and infield would need to
clockwise rotation aligns the track be temporarily closed during the ad
Ro
op
with the city street grid allowing race meet. The Pembridge Avenue Lo
for potential connectivity through design incorporates a tunnel under
W
the site and providing opportunity the homestretch for uninterrupted
in
ne
for contiguous, complimentary heavy vehicle access to the infield
rA
ve
development connected to the during the closure. The track
n
ue
surrounding land uses. crossings could be accomplished AT GRADE
TRACK
by pulling back and damming the BRIDGES
Existing Systems
Roadways water service lines with 6” FM toward Cross Country Blvd, At the intersection of Winner In Belvedere Avenue, a 12” The point of gas service is
The study of the condition of the water meters. The first meter is while SMs south of West Rogers Avenue and Hayward Avenue, service drain extends north terminated with a meter/
existing roadway systems is not located at the southwest corner Avenue transport sewage an 8” sanitary service line to the site from the City’s 24” regulator operating at standard
part of this study. of Northern Parkway and Pimlico south. The largest diameter SM extends northeast and a 6” storm drain. This 12” service drain delivery pressure by Baltimore
Road and the second meter is bordering the project site is a sanitary line extends southeast, is about 200’ west of Palmer Gas and Electric. See Exhibit 13
Water Systems located west of Hayward Avenue 12”-15” SM originating at the both upstream to the site. Both Avenue. in Appendix E.1.
The water mains surrounding and Winner Avenue. The two (2) intersection of Hayward Avenue sanitary service lines connect to
the site are located in the City's 6” FM meters are connected by a and Maple Avenue, extending the City’s sanitary Manhole 90. At Queensberry Avenue and Conduit (Baltimore City)
Western Third Pressure Zone 8” water line that provides both west along Hayward Avenue, and Belvedere Avenue, a 36” service In West Rogers Avenue, the
with overflow elevation of EL fire and domestic water services then extending south along Park At the intersection of Winner drain extends northeast to the City has a 12-way concrete
567.4, causing existing typical to the course facilities. The first Heights Avenue. There are 8”- Avenue and Ingleside Avenue, an site and then runs along the encased duct bank with conduit
water pressures to be near 49 water meter extends off a 12” 10” SMs in West Rogers Avenue 8” sanitary service line connects east side of the race course. See manholes. The duct bank is
psi. The major transmission water main in Northern Parkway and its intersecting streets, and to City sanitary Manhole 82 and Exhibits 07 and 08 in Appendix composed of clay tile and
mains around the site are a 12” and the second meter extends in West Belvedere Avenue, Park extends northeast (upstream) to E.1. fiber conduits that provides a
water main in Northern Parkway, off an 8” water main in Winner Heights Avenue, Winner Avenue, the stables. See Exhibits 04 and pathway for Baltimore Gas and
a 24” water main in Belvedere Avenue. Hayward Avenue, and in the 05 in Appendix E.1. Gas System (Baltimore Gas and Electric’s feeders and various
Avenue, and a 12” water main southern parking lot along Maple Electric) cable systems. See Exhibits 10
in Park Heights Avenue, not On the southeast side of the Avenue and former Washington Storm Drainage Systems From the intersection of Winner and 11 in Appendix E.1.
including distribution mains course, there are two (2) 6” Avenue. From the intersection of Winner Avenue and Hayward Avenue,
that also surround the site. water service lines in Belvedere Avenue and Hayward Avenue, a 6” low pressure gas service Electrical Systems (Baltimore
Within the project limits, the Avenue. The first water service At Queensberry Avenue and a 20” service drain extends line extends northeast and then Gas and Electric)
infrastructure includes a 10” extends off a 12” main in the Belvedere Avenue, an 8” sanitary northeast from the City 27” north to the north side of the From the intersection of Maple
water main in West Rogers vicinity of Woolverton Avenue service line connects and then storm drain and then north in clubhouse. Avenue and Hayward Avenue,
Avenue, 6”-8” water mains at the with a 4” domestic meter. The extends northeast (upstream) vicinity of the clubhouse. overhead single phase 13 KV
intersecting roads between West second water service extends along the east side of the course From West Rogers Avenue, conductors extend into the
Rogers Avenue and Northern off a 10” main west of Preakness and then crosses Pimlico Road In Belvedere Avenue, a 12” south of Key Avenue, a 6” southern parking lot. The
Parkway, an 8” water main in Way with a 6” FM meter / 4” to a serve lot owned by the service drain extends into the medium pressure gas service overhead conductors serve
Winner Avenue and Hayward domestic meter. See Exhibits 01 Binah Institute. race course property from a line extends southeast to a a pole mounted 10 KVA
Avenue, and a 6” water main and 02 in Appendix E.1. city 24” storm drain. From the service building west of the transformer that provides 120
loop (serving a City fire hydrant) In Belvedere Avenue, a 6” intersection of Park Heights grandstands. V secondary service to pole
in the southern parking lot Sanitary Systems sanitary service line connects to and Paton Avenue, a 24” service mounted fixtures.
along Maple Avenue and former Pimlico Race Course is at a the 8” SM approximately 400’ drain extends northeast to the North of the Pimlico Road and
Washington Avenue. modest high point such that east of Park Heights Avenue and site from the City’s 54” storm Belvedere Avenue intersection, West of the grandstands,
collector sewer mains (SM) extends north (upstream) to the drain. a 4” low pressure gas service Baltimore Gas and Electric
On the northwest side of the on and north of West Rogers site. line extends west to the stable has two (2) pad mounted
course, there are two (2) 6” Avenue transport sewage north facility. switchgears. Two (2) sets of
Existing Systems
three phase 13-KV conductors overhead conductors serve Existing soils are an urban
extend from the switchgears a pole mounted 75 KVA complex; Hydrological Soil
northwest overhead to West transformer that provides 120 V Group D.
Rogers Avenue and southwest secondary service.
underground to Winner Avenue. North of the Pimlico Road and Traffic
Baltimore Gas and Electric’s Belvedere Avenue intersection, See Proposed Systems, Traffic.
conductors are overhead in overhead single phase 13 KV
West Rogers Avenue and conductors extend west to the
Winner Avenue. Baltimore stable facility. The overhead
Gas and Electric has three (3) conductors’ serve a pole
transformers spaced along the mounted 300 KVA, 13.8/4.4 V
west side of the grandstands transformer for the stable facility.
and clubhouse that are fed by an See Exhibits 10 and 11 in
underground 13 KV loop system Appendix E.1.
from the switchgears. A 1000
KVA, 277/480V transformer Telecom Systems
is located at the south end of From field observation, the
clubhouse. The second 2500 Verizon and Comcast telecom
KVA, 277/480V transformer cable systems are attached to
is located near the two the Baltimore Gas and Electric’s
switchgears. The third 500 KVA, overhead pole system within the
240V transformer is located Pimlico Race Course site.
about 200’ north of the two See Exhibits 10 and 11 in
switchgears. Appendix E.1.
Proposed Systems
Roadways gpm, and the total peak hour preliminary check that must be the north. However, it is possible The unit quantities (square sewer systems were unavailable
The study of proposed roadway flow will be 3,300 gpm, or, more confirmed with an actual fire that a more detailed hydraulic footage of buildings, etc) used to due to limited capacity and
systems was limited to that conservatively, say 3,500 gpm. flow test. Note, at the time of model analysis conducted in a derive estimated demands were cannot be used to accept the
included in the Architectural this study, fire flow testing was future study will indicate that provided by Populous. Under proposed flows. However,
narrative and as needed to This project is a large not possible as the City was the southern connections be proposed conditions, the total there is a proposed sewer
capture costs of new roadways development with new buildings performing a comprehensive tied to the existing 24” water peak hour flow rate is 1,500 gpm. improvements project, SC 940:
and restoration of existing and streets. Multiple new water cleaning and lining of area water main in Belvedere Avenue Hydraulic Improvements to the
roadways disturbed for utility mains are proposed to connected mains. instead of the 12” water main. RK&K sent a request to the City High Level Sewershed Collection
improvements. See Exhibit 00.1 to existing water mains around All proposed work outside of on 08/27/2018 to evaluate the System, which will have sufficient
in Appendix E.1 for additional the perimeter of the project Since all existing facilities within the project limits only include sanitary sewer system capacity capacity once completed to
information. limits. This “looping” of the the project limits will be removed tie-in connections at adjacent downstream from the project accept all proposed flows. SC
system is designed to provide and replaced with a completely street intersections. Therefore, site to determine if and where 940 is expected to be completed
Water Systems improved hydraulic performance. different site layout, the following no significant improvements are the sewage flows could be by January 2021. The Pimlico
RK&K estimated water demands RK&K conducted a preliminary existing water mains will be noted beyond the project limits, discharged. The City used their development tie-in connection
under proposed conditions analysis simulating a fire flow test removed or abandoned within pending confirmation by fire flow hydraulic model to evaluate point to this project would be at
within the project limits, using the City’s water hydraulic the project limits: the 10” water tests recommended for a future system capacity. Although RK&K the intersection of Queensberry
excluding the future LifeBridge model in WaterCad, where the main in West Rogers Avenue, phase of study. See Exhibit 03 in did not estimate existing sewage Avenue and West Garrison
Health campus. See Exhibit peak demand of 3,500 gpm was the 6”- 8” water mains at the Appendix E.1 for greater detail. flows, RK&K requested that the Avenue. This would require a
02.1 Water & Wastewater Flow applied to one point on the 24” intersecting roads between West City zero-out any existing flows sewer main be constructed
Estimates in Appendix E.1 for the water main while the rest of the Rogers Avenue and Northern Sanitary Systems in the model because existing outside of the development
assumptions and calculations. system was on maximum day Parkway, and the 6” water main RK&K estimated sewage flow facilities will be removed. The limits. The SC 940 sewer will have
The maximum day conditions conditions. According to this loop in the southern parking lot generation under proposed City’s model currently assumed a total capacity of 3.5 MGD (2,431
are assumed to occur on the analysis, the residual pressure along Maple Avenue and former conditions within the project, that the existing peak flow was gpm). The City stated that they
day of the Preakness Stakes on the 24” water main during Washington Avenue. excluding the future LifeBridge 0.25 MGD (174 gpm), which will allow a Pimlico developer to
with 75,000 spectators within peak flow was 41 psi, which is Health campus. See Exhibit was removed during analysis discharge up to 2.66 MGD (1,847
the official event limits and greater than the lower limit of See Exhibit 03 in Appendix 02.1 Water & Wastewater Flow per RK&K’s request. There are gpm) to this future sewer. Given
with open public access for all 20 psi. Moreover, other areas E.1 for the Proposed Water Estimates in Appendix E.1 for the several candidate sewer systems that the proposed development
facilities outside the event limits. within the pressure zone, but Infrastructure Improvements assumptions and calculations. located north, south, east, and peak flow is 2.16 MGD (1,500
The unit quantities (square farther away from the project consisting of 8” – 12” water The maximum day conditions west which were considered for gpm), the current estimated
footage of buildings, etc) used to site, still had residual pressures mains. The proposed water are assumed to occur on on the accepting the proposed sewage peak flow is 81% of the maximum
derive estimated demands were above 20 psi. This indicates that mains would connect to the day of the Preakness Stakes flows. allowed to be sent to the SC 940
provided by Populous. Under the surrounding infrastructure existing 12” water main along with 75,000 spectators within system. As the development plan
proposed conditions, maximum outside of the project site should Belvedere Avenue in the south the official event limits and Based on the City’s hydraulic is refined, this sewage generation
day demand will be 800 gpm, be able to handle the proposed and to the existing 12” water with open public access for all model analysis, the City limit should not be exceeded.
the needed fire flow will be 2,500 flows. However, this is only a main in Northern Parkway in facilities outside the event limits. responded that all of the existing
Proposed Systems
Since all existing facilities within connection at the intersection site will require further study for feeders and third party telecom Telecom Systems (Verizon) be paid by the user. Commercial
the project limits will be removed of Queensberry Avenue and possible impacts to the existing cable systems. The lighting Verizon telecommunication has needs likely can be addressed
and replaced with a completely West Garrison Avenue. This will City’s drainage system. See conduit system are PVC concrete a conduit system within Pimlico with their existing infrastructure.
different site layout, the 8” – 10” likely be a dedicated main such Exhibit 09 in Appendix E.1. encased with 18” to 30” of cover. Road between Northern Parkway Residential users would not.
existing sewer mains will be that the existing 8” sewer main Lighting handboxes are placed and Belvedere Avenue. Verizon
removed or abandoned in the in Queensberry Avenue would Gas System (Baltimore Gas and at each light pole location and also has their overhead cable Historically for Preakness Stakes
following roads within the project remain to serve the other existing Electric) where the conduit runs require system attached to the utility event day they were able to
limits: West Rogers Avenue, the residents along that road. Baltimore Gas and Electric directional change and roadway poles north and west of the Race boost their copper services at
intersecting streets between (BGE) will design and install crossings. See Exhibit 12 in Course. The conduit system and the request of the Broadcasting
West Rogers Avenue and There are two areas in the project their gas distribution system Appendix E.1. the overhead cable system will Network(s) covering the event.
Northern Parkway, and in Maple limits where existing grades to accommodate service be impacted by the Race Course Verizon provides temporary at-
Avenue and former Washington indicate that gravity alone likely requirements. They have a Electrical Systems (Baltimore improvements. To maintain grade cable to provide a feed to
Avenue in the existing southern will not suffice in transporting medium pressure system in Gas and Electric) Verizon's cable distribution the existing grandstand.
parking lot area. sewage to the final discharge West Rogers Avenue that Baltimore Gas and Electric would system running through the
location. For these two areas, would accommodate the be responsible for the installation Race Course site, a new conduit The City ductbanks can provide
See Exhibit 06 in Appendix the buildings will use gravity project’s demand. However, of its electrical feeders that system constructed to Verizon’s a pathway to accommodate new
E.1 for the Proposed Sewer collectors in a sub-sewershed as the proposed development supply primary circuit runs to standards will be required. The third-party telecommunication
Infrastructure Improvements. This which discharges to a pump eliminates West Rogers Avenue, the customers. Secondary rated new conduit system will consist systems within the Race Course
study assumes that all proposed station and is subsequently it is recommended the main be cables would be installed for 120 of PVC, sand encased, ductbanks site.
flows (1,500 gpm) will discharge pumped through a force main moved to Northern Parkway. V lighting circuits. BGE has an with 3' nominal depth of cover.
to the SC 940 connection south into a nearby gravity manhole. Alternatively, it could be placed existing electric main traversing See Exhibit 12 in Appendix E.1.
of the site, but more detailed See Exhibit 06 in Appendix E.1. in an easement free of proposed the site within the existing West Verizon’s existing service to the
future studies may indicate structures and designed around. Rogers Avenue road right-of- project area is limited to voice Stormwater Management
that a small portion of this flow Storm Drainage Systems BGE also has a low pressure main way. The main provides service and enterprise level ethernet The site area, limit of disturbance,
from a few individual buildings For this study, the storm water to the south of the site that may to properties east and west of service transmitted with copper is approximately 115 acres.
may be able to discharge to flow would be collected and be able to assist with meeting the the property and must remain in wire. They do not have a video The proposed improvements
other sewer systems, including diverted to Northern Parkway project demand, but not cover it. service. BGE suggests the main service sister company in the area. consist of the demolition and
those which flow north. The then directed east to the north See Exhibit 12 in Appendix E.1. be moved to Northern Parkway Their top services, fiber optic reconstruction of the Race
proposed gravity sewers are side of Greenspring Avenue. and placed underground. FIOS and Optical Wave, do not Course to a new modernized
8” – 15” in diameter. The only The collected storm water flow Conduit (Baltimore City) Alternatively, an easement could currently extend to the project facility, and demolition of the
proposed sewer infrastructure would then be deposited into an The new conduit system will be set up over its current location area. Verizon is uncertain of the surrounding buildings and
improvement required outside existing drainage ditch on the consist of PVC concrete encased with the service remaining feasibility of bringing it in. Verizon construction of mixed-use
of the development limits is north side of Northern Parkway duct banks with 4.5’ nominal above ground or relocated mentioned they have brought developments. See Exhibit
an 885’ long, 15” gravity sewer which continues easterly to the depth of cover. These duct underground. See Exhibit 12 in FIOS to areas at their cost in cases 16 in Appendix E.1 for more
which connects the development Jones Falls. The added storm banks will provide a pathway Appendix E.1. where it strategically made sense. information. Part of the proposed
site to the future SC 940 tie-in water run-off from the Pimlico for Baltimore Gas and Electric’s Otherwise, the cost would need to improvements are the associated
Proposed Systems
utilities including water, sanitary, Environmental Site Design over 39 ac of impervious and shows stormwater from the may be possible to demonstrate to the Jones Falls stream. See
storm drain, electric and gas Analysis: The proposed 157,000 cf of runoff volume. As proposed impervious areas of a runoff decrease using more Exhibits 15-18 in Appendix E.1 for
improvements, and three stormwater management mentioned above, Baltimore City the Race Course and mixed-use detailed TR20 modeling additional information.
underground sand filters for design has been developed in Department of Public Works developments, 41.31 ac., as piped methods, which routes the
stormwater management. accordance with the current MDE supports the idea of treating this to and treated by 18 underground runoff through the stormwater Traffic
Stormwater Design Manual. The development using centralized sand filters, exceeding the management facilities. The peak A preliminary traffic assessment
Stormwater Management existing impervious area within stormwater management 39.11 ac requirement by 2.2 ac flow rates are summarized in the was completed for the
Approach: The stormwater the project limit of disturbance facilities. The community has of impervious area treatment. table. proposed Pimlico site. The
management approach proposes is greater than 40%; therefore, expressed the desire to have Calculations show the facility traffic assessment included a
three underground facilities, the project is considered part an active year-round park in will provide approximately Stormwater Management System: preliminary review of traffic
each containing six underground re-development and part new the course infield. To maximize 159,000 cf of water quality Proposed impervious areas were and transit operations for daily
sand filters, to treat and development. The stormwater active green space in a relatively volume, exceeding the 157,000 calculated for the development and Preakness Stakes event
manage the stormwater for the management approach utilizes small area, the use of non- cf water quality volume parcels, the roads, the courses, day scenarios, an evaluation
proposed site. Baltimore City techniques from the new Chapter structural environmental site estimate. Groundwater recharge and walks. The runoff from the of the proposed site road
Department of Public Works 3: Performance Criteria for design practices is infeasible. is not typically required for proposed impervious areas will network and preliminary
was given the opportunity to Urban BMP Design of the MDE Underground sand filters offer redevelopment projects and is be piped to and treated by the recommendations and cost
review the concept approach Stormwater Design Manual. The a possible solution to meet not provided. three underground facilities, each estimates for intersection
and was supportive of providing limit of disturbance primarily stormwater management needs; containing 6 sand filters, located improvements (traffic signals and
stormwater management in includes the proposed Race free up the site for active uses; Stormwater Management under the proposed Race Course minor geometric improvements),
centralized facilities. From Course, mixed use building and accommodate possible Quantity Control: Basic infield. Each underground sand coordination with Baltimore City
a cost perspective, this is a developments, new and restored operations for race day events. hydrologic modeling (TR-55) filter consists of three parts: Department of Transportation
more conservative approach sidewalks and roads, utilities and Water quality control performed for the overall site as Pretreatment Chamber (length and the Maryland Department of
than using multiple smaller, water management structures. requirements can be met via one drainage area suggests that 82 ft, width 12 ft, and depth Transportation Maryland Transit
more localized, stormwater treatment by the proposed the post-development Q10 and 3 ft), Filter Bed (length 60 ft, Administration, and a preliminary
management facilities at this Stormwater Management Quality underground sand filters. At Q100 are greater than the pre- width 12 ft, and depth 1 ft), and estimate of trips generated
phase of study. This approach Control: this level of study, just a single development peak flow rates, Clearwell Chamber (length 3 ft by the site based on the latest
also provides some flexibility This project is considered point of study was assumed see Table 1 below. However, even and width 12 ft). Once treated, proposed land uses.
with how each individual parcel redevelopment from a to simplify the stormwater though TR-55 shows a slight the system will collect the runoff
will be developed. Traditional stormwater management estimate. The concept provided increase in quantity control, it from smaller 18” pipes to a new The proposed site includes
low impact development devices perspective. As proposed 48” pipe running on the east side a horse racing course with
could be incorporated in the impervious exceeds existing Table 1: Peak Flow TR-55 Rates of the proposed development equestrian, civic, residential
future, thereby providing surplus impervious, quality control under West Northern Parkway. and commercial mixed-use
treatment as minimizing the requirements are generated for Storm Q10 (cfs) Q100 (cfs) This pipe will outfall east of West development as well as a hotel
extent of centralized facilities both redevelopment and net Existing Conditions 586.88 1045.21 Northern Parkway discharging along Northern Parkway, and
repaired. new development. Calculations Proposed Conditions 596.31 1053.24 to the closest existing drainage residential and neighborhood
show the project must treat NET CHANGE 9.31 8.03 ditch, and eventually outfalling commercial land uses to the
Proposed Systems
south along Belvedere Avenue. Transportation Transit Authority. be willing to work with event Table 2: Proposed Pimlico Development
Preliminary trip generation Both agencies indicated there organizers to modify and/or
estimates were developed for were no major traffic or transit augment transit service for future AM Peak Hour of PM Peak Hour of Daily
the proposed development to issues with the proposed events at Pimlico Race Course. Adjacent Street Traffic Adjacent Street Traffic
estimate the total number of preliminary design and would Civic/Entertainment 209 603 6,611
vehicles that would be added be willing to review the site as A parking study was not Commercial Mixed-Use/Hotel 305 853 9,550
to the surrounding roads. The additional details are finalized. performed for this preliminary Neighborhood Commercial 413 1,163 12,315
estimates, summarized in the Maryland Department of study. It is assumed that the Residential 146 174 2,457
adjacent Table 2, are based on Transportation Maryland Transit development project will Residential/Mixed-Use 68 81 774
the latest available potential land Administration operates a local provide sufficient parking Equestrian/Racing N/A N/A
use assumptions as well as on on transit “center” at the nearby to accommodate the daily Subtotal 1,141 2,874 31,707
the ITE Trip Generation Manual, Sinai Hospital with bus stops and parking needs of the proposed - 15% Trip Reduction -171 -431 -4,756
10th Edition. No trips were layover spaces. The Agencies development, either with on-site
TOTAL 970 2,443 26,951
estimated for the equestrian/ indicated that they routinely facilities (garages and parking
racing land uses based on their make minor transit service lots), or on-street parking.
expected low levels of activity on changes approximately three For Preakness Stakes event
a daily basis. All site generated to four times per year. Maryland day, parking could continue Avenue.
trips were reduced by 15%, as Department of Transportation to be provided via a on-street • Northern Parkway at Key
a planning-level estimate, to Maryland Transit Administration parking and off-site parking Avenue.
account for internal capture (trips indicated that if the Pimlico site lots connected by multi-modal • Northern Parkway at Merville
occurring entirely within the development were to occur, transportation. Avenue.
site and, therefore, not adding they would likely make minor • Northern Parkway at Rusk
new trips to the surrounding transit service adjustments to Based on the proposed internal Avenue.
roads), pass-by trips (trips to/ provide service to the site via road network, the volume of • Park Heights Avenue at Paton
from the proposed sites by one or more of their routes that vehicles generated by the Avenue.
vehicles that were already on the already pass near the site. Neither site, both on a recurring daily
surrounding roads), transit, and Baltimore City Department of basis and during large events See Exhibit 00.1 in Appendix E.1.
non-motorized travel (walk, bike, Transportation nor Maryland at Pimlico Race Course, it is
scooter) as shown on in the table Department of Transportation anticipated that minor geometric
to the right. Maryland Transit Administration improvements and possibly new
expressed concerns regarding traffic signals would be required
Coordination meetings were the Preakness Stakes event at one or more of the following
conducted with Baltimore City day. Maryland Department of intersections:
Department of Transportation Transportation Maryland Transit
and Maryland Department of Administration said they would • Northern Parkway at Winner
Commercial Mixed Use, Hotel: focus on Demographic & Income Pimlico Race Course Saratoga Race Course
Potential hotel property with Profiles, Household Income and Baltimore, MD Saratoga Springs, NY
restaurants and storefront retail. Poverty Levels, Housing Profiles
and Retail Market Place Profiles. 1 mile dirt oval, 7/8 mile turf oval 1 1/8 mile dirt oval, 1 mile turf oval
Residential Mixed Use: Low-rise The peer race track comparison Opened 1870 Opened 1863
residential with ground level represents a snapshot Notable Races: Notable Races:
retail and restaurants. comparison of race track facilities Black Eyed Susan Stakes Travers Stakes
and their surrounding environs Preakness Stakes Whitney Handicap
Residential: Potential mix of compared to Pimlico Race
single/multi-family and age- Course. There was no attempt
Laurel Park Racetrack Aqueduct Racetrack
restricted low rise residential. to make comparisons whereby a
Laurel, MD South Ozone Park, NY
definitive conclusion for a certain
Neighborhood Commercial: residential and/or commercial
1 1/8 mile dirt oval, 1 mile turf oval 1 1/8 mile dirt oval, 1 mile turf oval
Grocery store anchor with product type is determined.
Opened 1911 Opened 1894
storefront retail and services.
Notable Races: Notable Races:
Predicated on the foregoing
Defrancis Memorial Dash Stakes Wood Memorial Stakes
LifeBridge Health Campus: information, the focus on
Barbara Fritche Handicap Carter Handicap
Planned expansion of LifeBridge potential alternative land use
Medical Campus at Sinai development options were
Hospital. analyzed and presented in Gulfstream Park Racing & Casino Surfside Track at Del Mar
a matrix format ranking the Hallandale Beach, FL Del Mar, CA
It is important to understand that probability of use as High,
this is a hypothetical, conceptual Moderate, or Low. Research 1 1/8 mile dirt oval, 1 mile turf oval 1 1/8 mile dirt oval, 1 mile turf oval
analysis of potential uses that culminated in a summary Opened 1939 Opened 1937
could occur – not a feasibility of future development Notable Races: Notable Races:
study of what will occur – which opportunities that could occur Florida Derby Pacific Classic
is particularly relevant since within the Near Term (1-3 Years) Pegasus World Cup Del Mar Oaks
Pimlico Race Course is owned by or Long Term.
the MJC/TSG.
Belmont Park Santa Anita Park
Elmont, NY Arcadia, CA
A peer race track comparison
among seven existing horse
1 1/2 mile dirt oval, 1 5/16 mile turf oval 1 mile dirt oval, 0.9 mile turf oval
racing venues in the U.S. was also
Opened 1905 Opened 1934
prepared. The baseline of the
Notable Races: Notable Races:
comparison comprised a 1-mile
Belmont Stakes Santa Anita Derby
and 5-mile radii surrounding the
Jockey Gold Cup Santa Anita Oaks
respective peer facilities with
Gateway District
Retail Improvements
5k to 9k X
10k to 14k X
15k to 24k X
>25k X
Restaurant Casual Dining
3K to 5k X
>5k X
Concept Restaurant/Craft Brewery
3k to 5k X
>5k X
Fast Food Out Parcel Pad X
Bars/Clubs
3k to 5k X
>5k X
Office Space
Ground Floor X
2-3 Floors X
Medical Office Space
Ground Floor X
2-3 Floors X
Technology & Innovation
Ground Floor X
2-3 Floors X
Hotel
Flag - 125-150 Units X
Independent - 125-150 Units X
Extended Stay <100 Units X
Parking Garage
350-400 Spaces X
District One
This area of potential
redevelopment abuts the west
edge of the Gateway District
and provides the greatest
roadway frontage along
Northern Parkway. At 18.44
acres, District One represents
the largest overall land area
where a blend of residential and
commercial mixed use could
occur. Civic improvements, such
as a community resource center
or STEM center, and permanent
equestrian facilities could also
be programmed in this district.
Retail Improvements
5K to 9K X
10K to 14K X
15K to 24K X
>25K X
Small Box Retail
<10k X
>10k X
Convenience/Gas X
Restaurant Casual Dining
3K to 5k X
>5k X
Concept Restaurant/Craft Brewery
3k to 5k X
>5k X
Fast Food Out Parcel Pad X
Grocery
<25k X
>25k X
Bars/Clubs
3k to 5k X
>5k X
Office Space
Ground Floor X
2-3 Floors X
Medical Office Space
Ground Floor X
2-3 Floors X
Technology & Innovation
Ground Floor X
2-3 Floors X
Hotel
Flag - 125-150 Units X
Independent - 125-150 Units X
Extended Stay <100 Units X
Parking Garage
550-600 Spaces X
Residential
Apartments X
Live/Work X
Row Housing X
District Two
This area of potential
redevelopment is programmed
for Neighborhood Commercial
land uses and considered
instrumental in the inclusion
of the surrounding residential
neighborhood needs.
fruits, vegetables, and other parking in concert with the Years) grocery store and parking Residential Parcel #4 69,163 SF 1.59 Acres X
fresh food items to local area reconfiguration of the race development comprises 175,000
Near Term Development (1 - 3 Years)
residents. Baltimore City is track. The grocery store and SF, additional potential future Grocery Store 50,000 SF
providing tax cut incentives parking could be sited on the development allocation for Surface Parking 125,000 SF
to big box grocery stores to Neighborhood Commercial commercial improvements is Long Term Potential Development
entice development in approved Parcel with orientation to Park estimated at 7,000 SF. Future Neighborhood Commercial 7,000 SF
Heights Avenue. Residential Parcel #4 48,000 SF 40 Units
Baltimore neighborhoods.
The City now offers personal Similarly, a 0.70 FAR is applied
property tax credits to grocery to the residential land allocation
stores locating or making of 69,163 SF indicating an
significant renovations within applied land area of 48,000 SF.
targeted areas in the City. The A 2-story townhouse and/or
lack of access to healthy food row house development may be
choices contributes to disparities appropriate for this site. As such,
in life expectancy, which can total potential improvements
differ up to 18 years. In addition, equate to 40 units or 25 units per
quality supermarkets often acre. The total ground level site
serve as a catalyst for increased coverage allocation for this use is
economic development in the 40,000 SF.
community.
Grocery
<25k X
25k to 50k X
>50k X
Neighborhood Retail Center
<5k X
5k to 10k X
Convenience/Gas X
Neighborhood Personal Services
<5k X
5k to 10k X
Small Box Retail
<10k X
Restaurant Casual Dining
3k to 5k X
>5k X
Bars/Clubs
3k to 5k X
>5k X
Neighborhood Residential
Detached Townhouse X
Row Housing X
Detached Single Family X
Detached 2-Story 4-Plex X
3-4 Story Suburban Apartment Building X
Small Apartment Units <900 SF X
Modern Row House Style Apartments X
Affordable Housing
Small Apartment Units <900 SF X
District Three
Development of Residential One of the key components with the redevelopment efforts District Three Phasing
Parcel #3 appears to be the of the Park Heights Master immediately south within the 268,892 SF Total Land Area (6.17 Acres)
most likely to occur in the near Plan is the redevelopment Park Heights Neighborhood. Land Allocation: Improvement Allocation
term. With the close proximity of the Major Redevelopment In the long term, private 1-3 Years Long Term
to the LifeBridge Health campus, Area in Central Park Heights. development interests could Residential Parcel #1 132,759 SF 3.05Acres X
a range of senior living type The 60 acres centered on construct housing and Residential Parcel #2 70,782 SF 1.62 Acres X
facilities could evolve and align Park Heights and Woodland apartments that meet the need Residential Parcel #3 65,351 SF 1.50 Acres X
with the Park Heights Master Avenues were comprised of of the reinvested community.
Near Term Development (1 - 3 Years)
Plan district. Age Restricted, nearly 600 properties, of which This is predicated on the success
Residential Parcel #3 65,000 SF 100 Units
Independent Living, and/or approximately 400 were vacant of the Pimlico Race Course Long Term Potential Development
Affordable Senior Housing are buildings and lots, representing reconfiguration and the success Residential Parcel #1 157,500 SF 175 Units
all considered high potential the most blighted and distressed of development interests in the Residential Parcel #2 48,000 SF 40 Units
development. Development area within the 1,500 acre Master other districts surrounding the
potential approximates 100 units Plan. Redevelopment could race track.
based on an allocation of 650 SF accommodate hundreds of new
per unit which assumes 350 SF housing units, along with new Parcel #1 is envisioned as
allocated per room and a 300 SF parks, streetscape improvements multi-family development. It
allocation per room for common and other amenities. is estimated that up to 175
areas, hallways and offices. The units could be developed
total building improvements Based on information supplied contemplating an average of
approximate 65,000 SF (100 by the Pimlico Community 900 SF per unit. Unit inventory
units X 650 SF). Development Authority, 482 could range from 450 SF for
out of 581 properties have studio apartments to 1,200 SF for
been acquired, 125 relocations 2 or 3 bedroom units. The total
have been completed, and developable area approximates
57 properties have been 157,500 SF (175 units X 900 SF
demolished. Approximately $17 per unit).
million has been spent on these
activities, including $8 million Parcel #2 contemplates
in slots revenue, $4.75 million townhouse/row housing up
in City bond revenue funds and to 40 units based on the site
$4.5 million in State funds. In configuration. The typical unit
FY 19, an additional $1.8 million structure averages 1,200 SF. Total
in City bond funds are slated building area would equate to
to be used towards acquisition, 48,000 SF (40 units X 1,200 SF
relocation, and demolition. per unit).
Residential Parcel #1
3-4 Story Suburban Apartment Building X
Market Rate Small Apartment Units <900 SF X
Modern Row House Style Apartments X
Affordable Small Apartment Units <900 SF X
Residential Parcel #2
Detached Townhouse X
Row Housing X
Detached Single Family X
Detached 2-Story 4-Plex X
Residential Parcel #3
Age Restricted X
Independent Living X
Affordable Senior Housing X
Conceptual Plan
The concept plan depicted to the CONCEPT PLAN KEY
right is a composite of the key driving GATEWAY DISTRICT
factors presented on the previous A. Multi-Use Clubhouse
pages. Careful consideration of
B. 15/16 Mile Dirt Track
surrounding land uses, track geometry, L
connectivity and potential alternative C. 7/8 Mile Turf Track
DISTRICT ONE M D. Preakness Winner's Circle
land uses were equally evaluated.
Q
However the objective to create an E. Palio / Saddling Paddock
ideal Preakness Stakes venue was the M F. Infield
M N
single overriding factor that impacted
G. Suite Tower Expansion
all aspects of the plan.
L M Q H. Equestrian Program
R
The Multi-Use Clubhouse (A), G I. Infield Green Space
H
envisioned as a flexible-use building J. Sports Fields
capable of hosting year-round events, K. Potential Civic Buildings
K A
sits at a seven-degree angle to the
L. Parking Structures
track to improve sight lines down the J
home stretch. The Loop Road, which K E B M. Mixed Use Commercial
runs between the track and Multi-Use A C N. Hotel
Clubhouse, will be used for race day O. Residential
overlay. The plaza along the entry side K
P. Neighborhood Retail
of the Multi-Use Clubhouse connects I
D
with the future suite tower and the Q
Palio (E), where the saddling paddock LifeBridge Health Campus
could be temporarily constructed. Q. LifeBridge Health Buildings
Preakness Stakes horses and daily R. LifeBridge Parking Structure
haul-ins will be housed in temporary O
buildings north of the Palio during the
race meet. These key built elements,
J
along with the tracks, established the
framework for the remainder of the O
concept plan.
DISTRICT TWO
To achieve the required geometry, it
should be noted that the tracks and O
adjacent roads push into the LifeBridge DISTRICT THREE
site. LifeBridge has expressed interest
in a real estate exchange which would P
provide their campus with enhanced
Northern Parkway frontage as shown
to the right. O