Development of a Method of Analyzing Behavior of
Cast-in-place Pile Bore Walls Using
the Shear Strength Reduction FEM
When constructing castin-piace piles near tracks or existing structures, work must be limited to within the track closure tine,
and caretul deformation prevention work must be done almost every time construction is performed. Those are needed because
1 method of assessing safety factors such as train running stability and track deformation at ple construction has not yet been
established. Work ime limitation and deformation prevention increase the construction period and costs, resulting in greater overall
time and expenses required forthe project. In ight ofthat, dereguatng work ime and limiting deformation prevention work to only
‘wha erally anata! hy heing abla ta anim safely a ila conection ara urgent iain
To enable quantitative assessment of safety at pile construction, we studied and improved an analysis method by the three-
dimensional elasto-plastic
fine element method that incorporated the shear strength reduction metrod (SSR-FEM). We were
able to confi effectiveness ofthis analysis method, and we completed development of analysis software. This article reports the
overview of those.
l2koyworde: Cac in place pile Stabile bore wall, ine element method (FEM)
When structure ate construced in overtack spaces, new
funda imbiling covinplae piles ae ofe imal
near Foundations of existing tracks, viadues and buildings. But
methods of asssing sail of pile bore walls and their impact,
fon surrounding ground and adjacent foundations have not yee
besa putin place. Iie chus diicule o formulate an appropiate
plan For wot to coneol she impact. Under thee crcumatness,
Foundation construction can only be done at night when the tack
is closed and is chus often accompanied by excess impact contol
work. This leads to an increase ofthe construction period and
costs, Impact control work can even case ground deformation
and other adverse fers
“Teovercome those problems, more appropriate impact contol
work is needed based on more appropriate assessment of dling
effets, Methods of making such assesment, however, have not
boon sufficiently putin place, We ony have experiment results
‘which show thar securing a distance to che existing foundation
approximately equal ro the diameter ofthe new pile can reduce
the impact. Ie is therefore a maver of urgency wo establish an
assesment method that can be applied to actual design and
construction planning,
‘We thus devsloped and confirmed effectiveness of FEM
analysis software that incorporated the shear strength reduction,
method a simplified impact analysis method for planning. An
‘overview and considerations of the devclopment at as fllows,
Study on Analysis Method
2.1 Overvow
‘When constructing cast-in-place ples at sites adjacent to lines in
service, ts necessary to ensure stabiliy of dhe adjacent tacks,
roadbed and the ground underneath them, While drilling,
collapse of bore walls must be prevented by using slurry (muddy
water). However there i ile information on the mechanisms
snd boundary conditions of bore wall cll, 50 caren
se prevent cole by eting the ary eel high ow ern
deg
Ti igh of dau sain, we have develop eo
clasifng the salty and cll Bebavoro bore wal by
apbying the thieedinensonl da-plaicty Gite clement
Inthe tht incoportc the sear steagh edacton meted
(SSR-FEM). Unie omenoral FEM, SRCFEM fan ans
mnthod thar can automat cla the shape ofthe ip
Surfer and the orl sy furor he mn ay Brora
the went wo be conse has aa whol) without pr
sd suming he sip surfce=®. Thi metho has been already
inode inthe mana ofJR Ess fordevgn an contraction
‘of rench wal eailty for cantinnsnndergrnd wal
2.2 Software Overview
“The SSR-FEM analysis software developed alongwith the
rmanal for design and construction of trench wall abilsy for
continuous underground walls uses FEM mesh that models
‘two-dimensional cos section including the tench crose-scton
asthe cross section to analy.
‘SSR-FEM, thar software can automaticaly cleulate dhe assumed
slip surface shape Ghown asa contour diagram) and the sfery
{acer ofthe total stem. However, itcannet be applicd to thee-
simensional mesh such as che cinder ofa pile bore because it
‘has an analysis function jus for ewo-dimensional models,
‘Weethus decided ro develop a new pre-and post-processor that
‘an handle thre-dimensional mesh to enable thre-dimensional
nays ofthe behavior ofthe surrounding natural ground aginst
a ofindrical bore. The computing engine, however, was used for
the most par ais Fig. 1 shows a software acren image and
Fig. 2an example frau diplay using a thind-paty application
(assumed lip sec” added for explanatory purposes
“The model shown isa cutout of a quarter of the analyzed
area (withthe center ange at 90") with the pile center as the
reference point fr symmetry. "The numbers of nodal points and
Thanks to the characteris of
0
‘JREAST Tia Rew Na21
“Fonts Sats Docipoan Laban ad doops Cs oR a Ga