DAFTAR HARGA SATUAN UPAH DAN BAHAN

NO UPAH SATUAN HARGA SATUAN

1 Pekerja Oh Rp. 85,000.00


2 Tukang Oh Rp. 120,000.00
3 Tukang Las Oh Rp. 120,000.00
4 Pembantu operator Oh Rp. 85,000.00
5 Operator Oh Rp. 140,000.00
6 Kepala Tukang Oh Rp. 150,000.00
7 Mandor Oh Rp. 134,000.00
8 Juru Ukur Oh Rp. 120,000.00
9 Mekanik Oh Rp. 150,000.00

B. ALAT

NO ALAT SATUAN HARGA SATUAN

Alat Bantu Las dan Pemotongan Jam Rp. 10,000.00


Crawel Crane + Operasional Jam Rp. 288,000.00
Concrete Mixer Hari Rp. 150,000.00
Concrete Vibrator Hari Rp. 25,000.00
Diesel Hammer Jam Rp. 220,000.00
Dump Truk Jam Rp. 253,000.00
Generator Set Jam Rp. 216,000.00
Ponton Pancang Jam Rp. 1,200,000.00
Kontruksi Penyangga Bekisting Ls Rp. 1,750,000.00
Mesin Las 40 Amp Jam Rp. 250,000.00
Theodolite Jam Rp. 35,000.00
Waterpass Jam Rp. 22,000.00
Echosonder Jam Rp. 75,000.00
Sewa Trailer Jam Rp. 850,000.00
Sewa Tronton Jam Rp. 850,000.00
Welding set Jam Rp. 135,000.00
Sewa Matras Pancang M' Rp. 7,000,000.00

C. BAHAN

NO BAHAN SATUAN HARGA SATUAN

Amplas Lembar Rp. 15,000.00


Agregat Batu Pecah 2/3 M³ Rp. 300,000.00
Angkur Plat Landasan Catwalk Buah Rp. 260,000.00
Angker Dudukan Catwalk Buah Rp. 325,000.00
Angkur Diameter 25 mm Buah Rp. 55,000.00
Angkur Diameter 16 mm Buah Rp. 25,000.00
Alat Bantu Pengelasan Ls Rp. 37,500.00
Acetelin @ 15 kg Tabung Rp. 150,000.00
Atap Spandek t = 3 mm Lembar Rp. 180,000.00
Baut dia 16 mm Buah Rp. 8,000.00
Batu Temple Hitam M2 Rp. 210,000.00
Bata Merah Press Mesin Buah Rp. 720.00
Besi Plat Kg Rp. 14,500.00
Besi Tiang Baja Ø 508 t = 12 mm kg Rp. 14,500.00
Besi Pipa Kg Rp. 14,500.00
Besi beton Polos/ Ulir kg Rp. 14,500.00
Besi Siku L.100.100.10 Kg Rp. 14,500.00
Besi Hollow Siap Pasang M2 Rp. 450,000.00
Baja Profil Kg Rp. 14,500.00
Engsel Movable Bridge Unit Rp. 38,750,000.00
Bolard 25 ton Buah Rp. 26,900,000.00
Cat Tembok Kg Rp. 44,000.00
Cat Dasar tembok Kg Rp. 45,000.00
Cat Dasar kayu Kg Rp. 38,000.00
Cat Kayu Kg Rp. 50,000.00
Cat menie kayu Kg Rp. 44,000.00
Dolken Kayu Dia. 8 cm Batang Rp. 25,000.00
Engsel Pintu Buah Rp. 25,000.00
Engsel Jendela Buah Rp. 20,000.00
Fender V 500 L 2000 Buah Rp. 36,400,000.00
Grase Kg Rp. 70,000.00
Grendel Pintu Buah Rp. 20,000.00
Grendel Jendela Buah Rp. 15,000.00
Hidraulik Silinder Rod dia. 120 mm, stroke 2500 mm Buah Rp. 800,000,000.00
Hidraulik Power Unit, Elektrik Motor 7.5 KW, Emergensi Engine 10 Hp Buah Rp. 400,000,000.00
Instalasi Titik Nyala Titik Rp. 250,000.00
Isolator M' Rp. 500.00
Jalusi Almunium Batang Rp. 90,000.00
Kayu Kelas I M3 Rp. 9,000,000.00
Kayu Kelas II M3 Rp. 5,324,000.00
Kayu Kelas III M3 Rp. 5,000,000.00
Kaca Polos tebal 10 mm M2 Rp. 350,000.00
Karbit Kg Rp. 27,000.00
Kawat Beton Kg Rp. 39,000.00
Kawat Las Kg Rp. 31,000.00
Kabel NYA 2.5 mm M' Rp. 4,000.00
Kabel Power NYY 2.5 mm M' Rp. 25,000.00
Kabel NYA 4.0 mm M' Rp. 5,000.00
Kuas Buah Rp. 35,000.00
Kunci Tanam Buah Rp. 150,000.00
Lampu Solar Cell Unit Rp. 34,000,000.00
Lampu TL Komplit 40 watt Buah Rp. 150,000.00
Later Box, Simbol dan Logo (Komplet) + Asesoris Unit Rp. 90,500,000.00
Las doof Buah Rp. 350.00
Lem kayu Kg Rp. 30,000.00
Lisplank GRC M' Rp. 50,000.00
List Gypsum M' Rp. 14,500.00
Minyak Bekisting Liter Rp. 2,000.00
Nok Spandek M' Rp. 75,000.00
Oksigen Tabung Rp. 600,000.00
Oli Liter Rp. 45,000.00
Pasir Beton M³ Rp. 266,000.00
Pasir Urug M³ Rp. 199,000.00
Paku Kg Rp. 29,000.00
Pengencer Kg Rp. 28,000.00
Plamur Kg Rp. 9,000.00
Paku Sekrup Kg Rp. 15,000.00
Pipa Galvanish dia 2.5'' M' Rp. 165,000.00
Pipa Galvanish dia 2'' M' Rp. 140,000.00
Pipa PVC 5/8 (6m) M' Rp. 8,000.00
Pipa oli hidraulik silinder secara lengkap dia. 3/4" dan dia. 1/2"
stainless steel schedule 40, joint flange, elbow, flexible joint, support M' Rp. 300,000,000.00
dan material lainnya (termasuk test pressure dan oil flushing)
Plat Baja Kg Rp. 14,000.00
Rangka Furing Plafond M2 Rp. 100,000.00
T dos PVC Buah Rp. 500.00
Stop Kontak Buah Rp. 25,000.00
Sklar Ganda Buah Rp. 27,000.00
Saklar Broco Buah Rp. 20,000.00
Semen Pc Kg Rp. 1,400.00
Sekerup Segala Ukuran Buah Rp. 1,500.00
Solar Liter Rp. 12,000.00
Sackle dan Shaftnya Komplit Unit Rp. 45,000,000.00
Soft Board Lembar Rp. 120,000.00
Tangga Portable Ls Rp. 18,500,000.00
Zekering Kast Lokal 2 Group Buah Rp. 120,000.00
Triplek 9 mm Lembar Rp. 180,000.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Anl. BP 2/3 1 M3 BATU PECAH 2/3 (Taksir)


Angkutan dari Dolok Sanggul Ke Simanindo
- Tronton Jam 1.00 Rp 850,000.00
- Jarak quari ke lokasi Km/ Jam 75.00
- Kecepatan Rata-rata Km/ Jam 25.00
- Waktu Tempuh Jam 3.00
- Total Biaya Sewa + Operasional Tronton Jam Rp 2,550,000.00
- Kubikasi satu Tronton M3 9.38
Ongkos Angkut Perm3 9.38 : Rp 2,550,000.00 Rp 272,000.00
Harga Dasar Batu Pecah per m3 Rp 300,000.00
- Harga Batu Pecah Di Lokasi per m3 Rp 572,000.00

Anl. P 1 M3 PASIR BETON (Taksir)


Angkutan dari Dolok Sanggul Ke Simanindo
- Dump Truck Jam 1.00 Rp 253,000.00
- Jarak quari ke lokasi Km/ Jam 75.00
- Kecepatan Rata-rata Km/ Jam 25.00
- Waktu Tempuh Jam 3.00
- Total Biaya Sewa + Operasional Tronton Jam Rp 759,000.00
- Kubikasi satu Tronton M3 10.00
Ongkos Angkut Per m3 10.00 : Rp 759,000.00 Rp 75,900.00
Harga Dasar Pasir per m3 Rp 266,000.00
- Harga Pasir Sampai Ke Lokasi per m3 Rp 341,900.00

Anl. PU 1 M3 PASIR URUG (Taksir)


Angkutan dari Dolok Sanggul Ke Simanindo
- Dump Truck Jam 1.00 Rp 253,000.00
- Jarak quari ke lokasi Km/ Jam 75.00
- Kecepatan Rata-rata Km/ Jam 25.00
- Waktu Tempuh Jam 3.00
- Total Biaya Sewa + Operasional Tronton Jam Rp 759,000.00
- Kubikasi satu Tronton M3 10.00
Ongkos Angkut Perm3 10.00 : Rp 759,000.00 Rp 75,900.00
Harga Dasar Pasir Urug per m3 Rp 199,000.00
- Harga Pasir Urug Di Lokasi per m 3 Rp 274,900.00

Anl. S 1 KG SEMEN PC (Taksir)


Angkutan dari Dolok Sanggul Ke Simanindo
- Dump truck /Jam 1.00 Rp 253,000.00
- Jarak Panglong ke Lokasi Km/ Jam 75.00
- Kecepatan Rata-rata Km/ Jam 25.00
- Waktu Tempuh Jam 3.00
- Total Ongkos 1 Tronton Semen 300 Zak (50 Kg) Rp 759,000.00
- Upah Muat Bongkar dari Truck (2 Kali) 300.00 x Rp 2,000.00 Rp 600,000.00
Jumlah 1,359,000.00
- 1 Dump truck = 300 Zak Semen (50 kg) Zak 300.00
- Jadi Ongkos Angkut Semen per zak (50 kg) 300.00 : Rp 1,359,000.00 Rp 4,530.00
- Harga Dasar Semen per zak (50 kg) Rp 70,000.00
- Harga Semen 1 Zak (50 Kg) Sampai Ke Lokasi Rp 74,530.00
- Jadi Harga Semen per kg 50.00 : Rp 74,530.00 Rp 1,490.60

Anl. BU 1 KG BESI ULIR/ POLOS (Taksir)


Angkutan darat dari Medan Simanindo (1 trailer mampu mengangkut 12.000 kg Besi Beton) /Jam Rp 850,000.00
1.0000 Jam - Sewa Trailer Km 226.00
- Jarak Medan - Simanindo Km/ Jam 25.00
- Kecepatan Rata-rata Jam 9.04
- Waktu Tempuh + Loading Rp 7,684,000.00
- Total Biaya Sewa Trailer Kg 12,000.00
- Berat Total Besi Beton diangkut /Kg Rp 640.33

1.0000 Jam - Sewa Crane Rp 288,000.00


- Pekerjaan Pengangkutan Jam/ Trailer 1.00
- Berat Total Besi Beton diangkut Kg 12,000.00
- Total Biaya Sewa Crane Rp 288,000.00
- Loading - Unloading Rp 576,000.00
- Biaya Loading - Unloading /Kg Rp 48.00
1.0000 Kg - Pengadaan Besi Beton Ulir /kg /Kg Rp 14,500.00
Total Biaya Pengangkutan Darat Rp 15,188.33

Anl. PTPB PENGADAAN DAN PENGANGKUTAN PIPA PANCANG BAJA Dia. 508 mm ; Tbl. 12 mm (Kg) (Taksir)
Angkutan darat dari Jakarta ke Simanindo ( 1 trailer mampu mengangkut 9 batang pipa @ 12 m)
1.0000 jam - Sewa Trailer /Jam Rp 850,000.00
- Jarak Jakarta - Pelabuhan Ajibata Km 1,800.00
- Kecepatan Rata-rata Km/ Jam 30.00
- Waktu Tempuh + Loading Jam 60.00
- Total Biaya Sewa Trailer ###
- Panjang Total Tiang diangkut M' 108.00
Kg 15,876.00
/Kg Rp 3,212.40

1.0000 jam - Carter Ferry Penyeberangan (Ajibata-Tomok) /Trip (PP) ###


- Panjang Total Tiang diangkut M' 108.00
Kg 15876.00
- Total Biaya Carter /Kg Rp 755.86

1.0000 jam - Sewa Trailer /Jam Rp 850,000.00


- Jarak Pelabuhan Tomok - Simanindo Km 25.00
- Kecepatan Rata-rata Km/ Jam 30.00
- Waktu Tempuh + Loading Jam 0.83
- Total Biaya Sewa Trailer Rp 708,333.33
- Panjang Total Tiang diangkut M' 108.00
Kg 15876.00
/Kg Rp 44.62

1.0000 jam - Sewa Crane Rp 288,000.00


- Pekerjaan Pengangkutan Jam/ Trailer 1.00
- Panjang Total Tiang diangkut M' 108.00
- Total Biaya Sewa Crane Rp 288,000.00
- Loading - Unloading Rp 576,000.00
- Biaya Loading - Unloading /Kg Rp 36.28

1.0000 kg - Pengadaan Tiang Pancang /kg /Kg Rp 14,500.00


- Total Biaya Pengangkutan Darat Rp 18,549.15
- Overhead + Profit 10% Rp -
Harga Satuan Pekerjaan (D+E) Rp 18,549.15

Anl. PP PEKERJAAN PENGUKURAN (PM.78 2014)


HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 30.000 85,000.00 2,550,000.00
2. Juru Ukur OH 30.000 120,000.00 3,600,000.00
Jumlah Harga Tenaga Kerja 6,150,000.00
B. Bahan
Jumlah Harga Bahan -
C. Peralatan
1. Waterpass Unit 30.000 22,000.00 660,000.00
2. Theodolite Unit 30.000 35,000.00 1,050,000.00
3. Echosonder Unit 7.000 75,000.00 525,000.00
Jumlah Harga Peralatan 2,235,000.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 8,385,000.00
E. Overhead + Profit 0% 8,385,000.00 -
F. Harga Satuan Pekerjaan (D+E) 8,385,000.00

Anl MD - II MOBILISASI DAN DEMOBILISASI TAHAP - II (PM.78 2014)


HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
Jumlah Harga Tenaga Kerja -
B. Bahan
Jumlah Harga Bahan -
C. Peralatan
1. Theodolite Unit 1.0000 500,000.00 500,000.00
2. Waterpass Unit 1.0000 500,000.00 500,000.00
3. Crawal Crane Unit 1.0000 19,500,000.00 19,500,000.00
4. Diesel Hammer Unit 1.0000 14,500,000.00 14,500,000.00
5. Mesin Las Unit 2.0000 600,000.00 1,200,000.00
6. Generator Set Unit 1.0000 600,000.00 600,000.00
7. Mesin Las Unit 2.0000 600,000.00 1,200,000.00
8. Concrete Vibrator Unit 1.0000 500,000.00 500,000.00
9. Concrete Mixer Unit 2.0000 500,000.00 1,000,000.00
10. Ponton Pancang Rakitan Unit 1.0000 19,500,000.00 19,500,000.00
11. Generator Set Unit 1.0000 600,000.00 600,000.00
Jumlah Harga Peralatan 59,600,000.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 59,600,000.00
E. Jumlah Harga Tenaga, Bahan dan Peralatan (2x) 119,200,000.00
F. Overhead + Profit 0% 59,600,000.00 -
G. Harga Satuan Pekerjaan 119,200,000.00
Anl. OCC OPERATIONAL CRAWEL CRANE (HARI) (PM.78 2014)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Operator OH 1.000 140,000.00 140,000.000
2. Pembantu Operator OH 2.000 85,000.00 170,000.000
Jumlah Harga Tenaga Kerja 310,000.00
B. Bahan
1. Grease Kg 2.000 70,000.00 140,000.00
2. Oli Kg 5.000 45,000.00 225,000.00
3. Solar Liter 200.000 12,000.00 2,400,000.00
Jumlah Harga Bahan 2,765,000.00
C. Peralatan
1. Crawel Crane Jam 8.000 288,000.00 2,304,000.00
Jumlah Harga Peralatan 2,304,000.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 5,379,000.00
E. Overhead + Profit 0% 5,379,000.00 -
F. Harga Satuan Pekerjaan Per - Hari (D+E) 5,379,000.00

Anl. ODH OPERATIONAL DIESEL HAMMER (HARI) (PM.78 2014)


HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 3.000 85,000.00 255,000.000
2. Operator OH 1.000 140,000.00 140,000.000
3. Pembantu Operator OH 2.000 85,000.00 170,000.000
Jumlah Harga Tenaga Kerja 565,000.00
B. Bahan
1. Oli Kg 4.000 45,000.00 180,000.00
2. Solar Liter 250.000 12,000.00 3,000,000.00
Jumlah Harga Bahan 3,180,000.00
C. Peralatan
1. Diesel Hammer Jam 8.000 220,000.00 1,760,000.00
Jumlah Harga Peralatan 1,760,000.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 5,505,000.00
E. Overhead + Profit 0% 5,505,000.00 -
F. Harga Satuan Pekerjaan Per - Hari (D+E) 5,505,000.00

Anl. OPP OPERATIONAL PONTON PANCANG RAKITAN (HARI) (PM.78 2014)


HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Tukang OH 1.000 120,000.00 120,000.000
2. Operator OH 2.000 140,000.00 280,000.000
3. Pembantu Operator OH 10.000 85,000.00 850,000.000
Jumlah Harga Tenaga Kerja 1,250,000.00
B. Bahan
1. Karbit Kg 2.000 27,000.00 54,000.00
2. Oli Liter 4.000 45,000.00 180,000.00
3. Solar Liter 100.000 12,000.00 1,200,000.00
Jumlah Harga Bahan 1,434,000.00
C. Peralatan
1. Ponton Rakitan Jam 5.000 1,200,000.00 6,000,000.00
Jumlah Harga Peralatan 6,000,000.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 8,684,000.00
E. Overhead + Profit 0% 8,684,000.00 -
F. Harga Satuan Pekerjaan Per - Hari (D+E) 8,684,000.00

Anl. PTPKTTP PENGANGKUTAN TIANG PANCANG KE TITIK PANCANG (M') (PM.78 2014)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
Jumlah Harga Tenaga Kerja -
B. Bahan
Jumlah Harga Bahan -
C. Peralatan
1. Operational Crawel Crane (Hari) Hari 0.008 5,379,000.00 43,032.00
Jumlah Harga Peralatan 43,032.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 43,032.00
E. Overhead + Profit 0% 43,032.00 -
F. Harga Satuan Pekerjaan Per - Hari (D+E) 43,032.00
Anl. PTTP - 1A PEMANCANGAN TIANG TEGAK DENGAN PONTON (M') DARI TANAH DASAR KE TANAH KERAS (PM.78 2014)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
Jumlah Harga Tenaga Kerja -
B. Bahan
Jumlah Harga Bahan -
C. Peralatan
1. Pengangkutan Tiang Pancang Ketitik Pancang (M') M' 1.000 43,032.00 43,032.00
2. Operational Diesel Hammer (Hari) Hari 0.033 5,505,000.00 181,665.00
3. Operational Ponton Pancang Rakitan (Hari) Hari 0.033 8,684,000.00 286,572.00
Jumlah Harga Peralatan 511,269.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 511,269.00
E. Overhead + Profit 0% 511,269.00 -
F. Harga Satuan Pekerjaan Per - M' (D+E) 511,269.00

Anl. PTMP - 1A PEMANCANGAN TIANG MIRING DENGAN PONTON (M') DARI TANAH DASAR KE TANAH KERAS (PM.78 2014)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
Jumlah Harga Tenaga Kerja -
B. Bahan
Jumlah Harga Bahan -
C. Peralatan
1. Pengangkutan Tiang Pancang Ketitik Pancang (M') M' 1.000 43,032.00 43,032.00
2. Operational Diesel Hammer (Hari) Hari 0.042 5,505,000.00 229,558.50
3. Operational Ponton Pancang Rakitan (Hari) Hari 0.042 8,684,000.00 362,122.80
Jumlah Harga Peralatan 634,713.30
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 634,713.30
E. Overhead + Profit 0% 634,713.30 -
F. Harga Satuan Pekerjaan Per - M' (D+E) 634,713.30

Anl. PTTP - 1B PEMANCANGAN TIANG TEGAK DENGAN PONTON (M') SEABED (PM.78 2014)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
Jumlah Harga Tenaga Kerja -
B. Bahan
Jumlah Harga Bahan -
C. Peralatan
1. Pengangkutan Tiang Pancang Ketitik Pancang (M') M' 1.000 43,032.00 43,032.00
2. Operational Ponton Pancang Rakitan (Hari) Hari 0.033 8,684,000.00 286,572.00
Jumlah Harga Peralatan 329,604.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 329,604.00
E. Overhead + Profit 0% 329,604.00 -
F. Harga Satuan Pekerjaan Per - M' (D+E) 329,604.00

Anl. PTMP - 1B PEMANCANGAN TIANG MIRING DENGAN PONTON (M') SEABED (PM.78 2014)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
Jumlah Harga Tenaga Kerja -
B. Bahan
Jumlah Harga Bahan -
C. Peralatan
1. Pengangkutan Tiang Pancang Ketitik Pancang (M') M' 1.000 43,032.00 43,032.00
2. Operational Ponton Pancang Rakitan (Hari) Hari 0.042 8,684,000.00 362,122.80
Jumlah Harga Peralatan 405,154.80
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 405,154.80
E. Overhead + Profit 0% 405,154.80 -
F. Harga Satuan Pekerjaan Per - M' (D+E) 405,154.80

Anl. PTTP - 2 PEMANCANGAN TIANG TEGAK DENGAN MATRAS PANCANG (M') DARI TANAH DASAR KE TANAH KERAS (PM.78 2014)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
Jumlah Harga Tenaga Kerja -
B. Bahan
Jumlah Harga Bahan -
C. Peralatan
1. Pengangkutan Tiang Pancang Ketitik Pancang (M') M' 1.0000 43,032.00 43,032.00
2. Operational Diesel Hammer (Hari) Hari 0.0330 5,505,000.00 181,665.00
Jumlah Harga Peralatan 224,697.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 224,697.00
E. Overhead + Profit 0% 224,697.00 -
F. Harga Satuan Pekerjaan Per - M' (D+E) 224,697.00
Anl. PTTP - 1 PEMANCANGAN TIANG TEGAK DENGAN MATRAS PANCANG (M') SEABED (PM.78 2014)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
Jumlah Harga Tenaga Kerja -
B. Bahan
Jumlah Harga Bahan -
C. Peralatan
1. Pengangkutan Tiang Pancang Ketitik Pancang (M') M' 1.0000 43,032.00 43,032.00

Jumlah Harga Peralatan 43,032.00


D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 43,032.00
E. Overhead + Profit 0% 43,032.00 -
F. Harga Satuan Pekerjaan Per - M' (D+E) 43,032.00

Anl. PTMP PEMANCANGAN TIANG MIRING DENGAN MATRAS (M') (PM.78 2014)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
Jumlah Harga Tenaga Kerja -
B. Bahan
Jumlah Harga Bahan -
C. Peralatan
1. Pengangkutan Tiang Pancang Ketitik Pancang (M') M' 1.0000 43,032.00 43,032.00
2. Operational Diesel Hammer (Hari) Hari 0.0417 5,505,000.00 229,558.50
Jumlah Harga Peralatan 272,590.50
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 272,590.50
E. Overhead + Profit 0% 272,590.50 -
F. Harga Satuan Pekerjaan Per - M' (D+E) 272,590.50

Anl. PTP-1 PENYAMBUNGAN TIANG PANCANG (BH) (PM.78 2014)


HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.200 85,000.00 17,000.000
2. Tukang OH 0.200 120,000.00 24,000.000
3. Mandor OH 0.020 134,000.00 2,680.000
Jumlah Harga Tenaga Kerja 43,680.00
B. Bahan
1. Plat Baja Kg 1.000 14,000.00 14,000.00
Jumlah Harga Bahan 14,000.00
C. Peralatan
1. Generator Set Jam 1.000 216,000.00 216,000.00
2. Mesin Las 40 Amp Jam 1.000 250,000.00 250,000.00
Jumlah Harga Peralatan 466,000.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 523,680.00
E. Overhead + Profit 0% 523,680.00 -
F. Harga Satuan Pekerjaan Per - Buah (D+E) 523,680.00

Anl. PTP-2 PEMOTONGAN TIANG PANCANG (BH) (PM.78 2014)


HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.400 85,000.00 34,000.000
2. Tukang OH 0.400 120,000.00 48,000.000
3. Mandor OH 0.040 134,000.00 5,360.000
Jumlah Harga Tenaga Kerja 87,360.00
B. Bahan
1. Acetelin @ 15 kg Tabung 0.300 150,000.00 45,000.00
2. Oksigen (tabung) Tabung 0.500 600,000.00 300,000.00
Jumlah Harga Bahan 345,000.00
C. Peralatan
1. Welding Set Jam 0.500 135,000.00 67,500.00
Jumlah Harga Peralatan 67,500.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 499,860.00
E. Overhead + Profit 0% 499,860.00 -
F. Harga Satuan Pekerjaan Per - Buah (D+E) 499,860.00
Anl. PTP-3 PENUTUP TIANG PANCANG (BH) (PM.78 2014)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.500 85,000.00 42,500.000
2. Tukang OH 0.250 120,000.00 30,000.000
3. Mandor OH 0.030 134,000.00 4,020.000
Jumlah Harga Tenaga Kerja 76,520.00
B. Bahan
1. Besi Plat Kg 16.450 14,500.00 238,520.29
2. Kawat Las Kg 1.000 31,000.00 31,000.00
3. Oksigen (tabung) Tabung 0.200 150,000.00 30,000.00
Jumlah Harga Bahan 299,520.29
C. Peralatan
1. Mesin Las 40 Amp Jam 0.313 250,000.00 78,125.00
2. Generator Set Jam 0.313 216,000.00 67,500.00
Jumlah Harga Peralatan 145,625.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 521,665.29
E. Overhead + Profit 0% 521,665.29 -
F. Harga Satuan Pekerjaan Per - Buah (D+E) 521,665.29

Anl. PBUP PEMBESIAN 10 Kg DENGAN BESI POLOS ATAU BESI ULIR (AHSP 2016)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.070 85,000.00 5,950.00
2. Tukang Besi OH 0.070 120,000.00 8,400.00
3. Kepala Tukang OH 0.007 150,000.00 1,050.00
4. Mandor OH 0.004 134,000.00 536.00
Jumlah Harga Tenaga Kerja 15,936.00
B. Bahan
1. Besi Beton (Polos/ Ulir) Kg 10.500 15,188.33 159,477.50
2. Kawat Beton Kg 0.150 39,000.00 5,850.00
Jumlah Harga Bahan 165,327.50
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 181,263.50
E. Overhead + Profit 0% 181,263.50 -
F. Harga Satuan Pekerjaan Per - 10 Kg (D+E) 181,263.50
G. Harga Satuan Pekerjaan Per - 1 Kg (F/10) 18,126.35

Anl. PBP PABRIKASI 1 Kg BESI PROFIL (MB) (AHSP 2016)


HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.060 85,000.00 5,100.00
2. Tukang Besi OH 0.060 120,000.00 7,200.00
3. Kepala Tukang OH 0.006 150,000.00 900.00
4. Mandor OH 0.003 134,000.00 402.00
Jumlah Harga Tenaga Kerja 13,602.00
B. Bahan
1. Besi Profil Kg 1.150 14,500.00 16,675.00
2. Cotting Kg 1.000 6,000.00 6,000.00
Jumlah Harga Bahan 22,675.00
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 36,277.00
E. Overhead + Profit 0% 36,277.00 -
F. Harga Satuan Pekerjaan Per - Kg (D+E) 36,277.00
Anl. B BEKISTING (M2) (PM.78 2014)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.600 85,000.00 51,000.00
2. Tukang Kayu OH 0.500 120,000.00 60,000.00
3. Kepala Tukang OH 0.050 150,000.00 7,500.00
4. Mandor OH 0.010 134,000.00 1,340.00
Jumlah Harga Tenaga Kerja 119,840.00
B. Bahan
1. Paku Kg 0.400 29,000.00 11,600.00
2. Angkur Plat Landasan Bh 0.040 260,000.00 10,400.00
3. Kayu Kelas II M3 0.028 5,324,000.00 150,136.80
4. Triplek 9 mm Lembar 0.350 180,000.00 63,000.00
Jumlah Harga Bahan 235,136.80
C. Peralatan
1. Kontruksi Penyangga Bekisting Ls 0.100 1,750,000.00 175,000.00
Jumlah Harga Peralatan 175,000.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 529,976.80
E. Overhead + Profit 0% 529,976.80 -
F. Harga Satuan Pekerjaan Per - M2 (D+E) 529,976.80

Anl. BKB BEKISTING KERB BETON (M2) (PM.78 2014)


HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.600 85,000.00 51,000.00
2. Tukang Kayu OH 0.500 120,000.00 60,000.00
3. Kepala Tukang OH 0.050 150,000.00 7,500.00
4. Mandor OH 0.010 134,000.00 1,340.00
Jumlah Harga Tenaga Kerja 119,840.00
B. Bahan
1. Paku Kg 0.400 29,000.00 11,600.00
2. Angkur Plat Landasan Bh 0.040 260,000.00 10,400.00
3. Kayu Kelas II M3 0.028 5,324,000.00 150,136.80
4. Triplek 9 mm Lembar 0.400 180,000.00 72,000.00
Jumlah Harga Bahan 244,136.80
C. Peralatan
1. Kontruksi Penyangga Bekisting Ls 0.100 1,717,000.00 171,700.00
Jumlah Harga Peralatan 171,700.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 535,676.80
E. Overhead + Profit 0% 535,676.80 -
F. Harga Satuan Pekerjaan Per - M2 (D+E) 535,676.80
G. Harga Satuan Pekerjaan Per - M2 (D+E) 0.250 x 535,676.80 133,919.20

Anl. BUK PEMASANGAN 1 M2 BEKISTING UNTUK KOLOM (Asumsi 2 x Pakai) (AHSP 2016)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.660 85,000.00 56,100.00
2. Tukang Kayu OH 0.330 120,000.00 39,600.00
3. Kepala Tukang OH 0.033 150,000.00 4,950.00
4. Mandor OH 0.033 134,000.00 4,422.00
Jumlah Harga Tenaga Kerja 105,072.00
B. Bahan
1. Kayu Kelas III M3 0.040 5,000,000.00 200,000.00
2. Paku 5 cm - 12 cm Kg 0.400 29,000.00 11,600.00
3. Minyak Bekisting Liter 0.200 2,000.00 400.00
4. Balok Kayu Kelas II M3 0.015 5,324,000.00 79,860.00
5. Plywood, t = 9 mm Lembar 0.350 180,000.00 63,000.00
6. Dolken Kayu Ø 8 - 10 cm, Pjg = 4 m' Batang 2.000 25,000.00 50,000.00
Jumlah Harga Bahan 404,860.00
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 509,932.00
E. Overhead + Profit 0% 509,932.00 -
F. Harga Satuan Pekerjaan Per - M2 (D+E) (1 x Pakai) 509,932.00
G. Harga Satuan Pekerjaan 2 x Pakai 254,966.00
Anl. BUB PEMASANGAN 1 M2 BEKISTING UNTUK BALOK (Asumsi 2 x Pakai) (AHSP 2016)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.660 85,000.00 56,100.00
2. Tukang Kayu OH 0.330 120,000.00 39,600.00
3. Kepala Tukang OH 0.033 150,000.00 4,950.00
4. Mandor OH 0.033 134,000.00 4,422.00
Jumlah Harga Tenaga Kerja 105,072.00
B. Bahan
1. Kayu Kelas III M3 0.040 5,000,000.00 200,000.00
2. Paku 5 cm - 12 cm Kg 0.400 29,000.00 11,600.00
3. Minyak Bekisting Liter 0.200 2,000.00 400.00
4. Balok Kayu Kelas II M3 0.018 5,000,000.00 90,000.00
5. Plywood, t = 9 mm Lembar 0.350 180,000.00 63,000.00
6. Dolken Kayu Ø 8 - 10 cm, Pjg = 4 m' Batang 2.000 25,000.00 50,000.00
Jumlah Harga Bahan 415,000.00
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 520,072.00
E. Overhead + Profit 0% 520,072.00 -
F. Harga Satuan Pekerjaan Per - M2 (D+E) (1 x Pakai) 520,072.00
G. Harga Satuan Pekerjaan 2 x Pakai 260,036.00

Anl. BUL PEMASANGAN 1 M2 BEKISTING UNTUK LANTAI (Asumsi 2 x Pakai) (AHSP 2016)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.660 85,000.00 56,100.00
2. Tukang Kayu OH 0.330 120,000.00 39,600.00
3. Kepala Tukang OH 0.033 150,000.00 4,950.00
4. Mandor OH 0.033 134,000.00 4,422.00
Jumlah Harga Tenaga Kerja 105,072.00
B. Bahan
1. Kayu Kelas III M3 0.040 5,000,000.00 200,000.00
2. Paku 5 cm - 12 cm Kg 0.400 29,000.00 11,600.00
3. Minyak Bekisting Liter 0.200 2,000.00 400.00
4. Balok Kayu Kelas II M3 0.015 5,324,000.00 79,860.00
5. Plywood, t = 9 mm Lembar 0.350 180,000.00 63,000.00
6. Dolken Kayu Ø 8 - 10 cm, Pjg = 4 m' Batang 6.000 25,000.00 150,000.00
Jumlah Harga Bahan 504,860.00
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 609,932.00
E. Overhead + Profit 0% 609,932.00 -
F. Harga Satuan Pekerjaan Per - M2 (D+E) 609,932.00
G. Harga Satuan Pekerjaan 2 x Pakai 304,966.00

Anl. BUD PEMASANGAN 1 M2 BEKISTING UNTUK DINDING (AHSP 2016)


HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.660 85,000.00 56,100.00
2. Tukang Kayu OH 0.330 120,000.00 39,600.00
3. Kepala Tukang OH 0.033 150,000.00 4,950.00
4. Mandor OH 0.033 134,000.00 4,422.00
Jumlah Harga Tenaga Kerja 105,072.00
B. Bahan
1. Kayu Kelas III M3 0.030 5,000,000.00 150,000.00
2. Paku 5 cm - 12 cm Kg 0.400 29,000.00 11,600.00
3. Minyak Bekisting Liter 0.200 2,000.00 400.00
4. Balok Kayu Kelas II M3 0.020 5,324,000.00 106,480.00
5. Plywood, t = 9 mm Lembar 0.350 180,000.00 63,000.00
6. Dolken Kayu Ø 8 - 10 cm, Pjg = 4 m' Batang 3.000 25,000.00 75,000.00
7. Penjaga Jarak Bekisting (Spacer) Buah 4.000 50,000.00 200,000.00
Jumlah Harga Bahan 606,480.00
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 711,552.00
E. Overhead + Profit 0% 711,552.00 -
F. Harga Satuan Pekerjaan Per - M2 (D+E) 711,552.00
Anl. K.175 PASANG KACA POLOS Tebal 10 mm (m2) (AHSP 2016)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 1.650 85,000.00 140,250.00
2. Tukang Batu OH 0.275 120,000.00 33,000.00
3. Kepala Tukang OH 0.028 150,000.00 4,200.00
4. Mandor OH 0.083 134,000.00 11,122.00
Jumlah Harga Tenaga Kerja 188,572.00
B. Bahan
1. Semen Portland M3 326.000 1,490.60 485,935.60
2. Pasir Beton M3 0.543 341,900.00 185,602.86
3. Agregat Pecah 2/3 M3 0.572 572,000.00 326,993.33

Jumlah Harga Bahan 998,531.79


C. Peralatan
1. Molen Kapasitas 0,3 M3 Hari 0.250 150,000.00 37,500.00
Jumlah Harga Peralatan 37,500.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 1,224,603.79
E. Overhead + Profit 0% 1,224,603.79 -
F. Harga Satuan Pekerjaan Per - M3 (D+E) 1,224,603.79

Anl. K.250 MEMBUAT 1 M3 BETON MUTU f'c = 21,7 Mpa, Slump (120+20) MM (K.250) (AHSP 2016)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 1.650 85,000.00 140,250.00
2. Tukang Batu OH 0.275 120,000.00 33,000.00
3. Kepala Tukang OH 0.028 150,000.00 4,200.00
4. Mandor OH 0.083 134,000.00 11,122.00
Jumlah Harga Tenaga Kerja 188,572.00
B. Bahan
1. Semen Portland M3 384.000 1,490.60 572,390.40
2. Pasir Beton M3 0.494 341,900.00 168,996.29
3. Agregat Pecah 2/3 M3 0.577 572,000.00 330,171.11

Jumlah Harga Bahan 1,071,557.80


C. Peralatan
1. Molen Kapasitas 0,3 M3 Hari 0.250 252,500.00 63,125.00
Jumlah Harga Peralatan 63,125.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 1,323,254.80
E. Overhead + Profit 0% 1,323,254.80 -
F. Harga Satuan Pekerjaan Per - M3 (D+E) 1,323,254.80

Anl. D DELETASI (M') (PM.78 2014)


HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 1.000 85,000.00 85,000.00
2. Tukang OH 0.010 120,000.00 1,200.00
3. Mandor OH 0.100 134,000.00 13,400.00
Jumlah Harga Tenaga Kerja 99,600.00
B. Bahan
1. Besi Beton Kg 4.000 15,188.33 60,753.33
2. Besi Siku L.100.100.10 Kg 7.380 14,500.00 107,010.00
3. Kawat Las Kg 0.250 31,000.00 7,750.00
Jumlah Harga Bahan 175,513.33
C. Peralatan
1. Mesin Las 40 Amp Jam 0.350 250,000.00 87,500.00
Jumlah Harga Peralatan 87,500.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 362,613.33
E. Overhead + Profit 0% 362,613.33 -
F. Harga Satuan Pekerjaan Per - M' (D+E) 362,613.33
Anl. FD - I PEMASANGAN FENDER DERMAGA (PM.78 2014)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 2.000 85,000.00 170,000.00
2. Tukang OH 0.500 120,000.00 60,000.00
3. Mandor OH 0.100 134,000.00 13,400.00
Jumlah Harga Tenaga Kerja 243,400.00
B. Bahan
1. Angkur Diameter 25 mm Buah 4.000 55,000.00 220,000.00
2. Fender Tipe V-500H.2000L Buah 1.000 36,400,000.00 36,400,000.00
Jumlah Harga Bahan 36,620,000.00
C. Peralatan
1. Alat Bantu Pengelasan/Pemotongan Jam 1.000 10,000.00 10,000.00
2. Mesin Las 40 Amp Jam 0.400 250,000.00 100,000.00
Jumlah Harga Peralatan 110,000.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 36,973,400.00
E. Overhead + Profit 0% 36,973,400.00 -
F. Harga Satuan Pekerjaan Per - Buah (D+E) 36,973,400.00

Anl. BD - I PEMASANGAN BOLLARD (PM.78 2014)


HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 2.000 85,000.00 170,000.00
2. Tukang OH 0.500 120,000.00 60,000.00
3. Mandor OH 0.100 134,000.00 13,400.00
Jumlah Harga Tenaga Kerja 243,400.00
B. Bahan
1. Angkur Diameter 25 mm Buah 6.000 55,000.00 330,000.00
2. Bollard 25 Ton Buah 1.000 26,900,000.00 26,900,000.00
Jumlah Harga Bahan 27,230,000.00
C. Peralatan
1. Alat Bantu Pengelasan/Pemotongan Jam 1.000 10,000.00 10,000.00
2. Mesin Las 40 Amp Jam 0.400 250,000.00 100,000.00
Jumlah Harga Peralatan 110,000.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 27,583,400.00
E. Overhead + Profit 0% 27,583,400.00 -
F. Harga Satuan Pekerjaan Per - Buah (D+E) 27,583,400.00

Anl. PU PENGURUGAN 1 M3 DENGAN PASIR URUG (AHSP 2016)


HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.300 85,000.00 25,500.00
2. Mandor OH 0.010 134,000.00 1,340.00
Jumlah Harga Tenaga Kerja 26,840.00
B. Bahan
1. Pasir Urug M3 1.200 274,900.00 329,880.00
Jumlah Harga Bahan 329,880.00
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 356,720.00
E. Overhead + Profit 0% 356,720.00 -
F. Harga Satuan Pekerjaan Per - M3 (D+E) 356,720.00
Anl. BM PEMASANGAN 1 M2 DINDING BATA MERAH CAMP. 1SP : 4PP (AHSP 2016)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.300 85,000.00 25,500.00
2. Tukang Batu OH 0.100 120,000.00 12,000.00
3. Kepala Tukang OH 0.010 150,000.00 1,500.00
4. Mandor OH 0.015 134,000.00 2,010.00
Jumlah Harga Tenaga Kerja 41,010.00
B. Bahan
1. Bata Merah Buah 70.000 720.00 50,400.00
2. Semen Portland Kg 11.500 1,490.60 17,141.90
3. Pasir Pasang M3 0.043 341,900.00 14,701.70
Jumlah Harga Bahan 82,243.60
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 123,253.60
E. Overhead + Profit 0% 123,253.60 -
F. Harga Satuan Pekerjaan Per - M2 (D+E) 123,253.60

Anl. PL PEMASANGAN 1 M2 PLESTERAN 1SP : 4 PP MM (AHSP 2016)


HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.300 85,000.00 25,500.00
2. Tukang Batu OH 0.150 120,000.00 18,000.00
3. Kepala Tukang OH 0.015 150,000.00 2,250.00
4. Mandor OH 0.015 134,000.00 2,010.00
Jumlah Harga Tenaga Kerja 47,760.00
B. Bahan
1. Semen Portland Kg 6.240 1,490.60 9,301.34
2. Pasir Pasang M3 0.024 341,900.00 8,205.60
Jumlah Harga Bahan 17,506.94
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 65,266.94
E. Overhead + Profit 0% 65,266.94 -
F. Harga Satuan Pekerjaan Per - M2 (D+E) 65,266.94

Anl. KPKZ PEMBUATAN DAN PEMASANGAN 1 M3 KUZEN PINTU DAN KUZEN JENDELA, KAYU KELAS II ATAU III (AHSP 2016)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 6.000 85,000.00 510,000.00
2. Tukang Kayu OH 18.000 120,000.00 2,160,000.00
3. Kepala Tukang OH 1.800 150,000.00 270,000.00
4. Mandor OH 0.300 134,000.00 40,200.00
Jumlah Harga Tenaga Kerja 2,980,200.00
B. Bahan
1. Balok Kayu II M3 1.200 5,324,000.00 6,388,800.00
2. Paku 10 cm Kg 1.250 29,000.00 36,250.00
3. Lem Kayu Kg 1.000 30,000.00 30,000.00
Jumlah Harga Bahan 6,455,050.00
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 9,435,250.00
E. Overhead + Profit 0% 9,435,250.00 -
F. Harga Satuan Pekerjaan Per - M3 (D+E) 9,435,250.00
Anl. DPP PEMBUATAN DAN PEMASANGAN 1 M2 DAUN PINTU PANEL, KAYU KELAS I ATAU II (AHSP 2016)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 1.000 85,000.00 85,000.00
2. Tukang Kayu OH 3.000 120,000.00 360,000.00
3. Kepala Tukang OH 0.300 150,000.00 45,000.00
4. Mandor OH 0.050 134,000.00 6,700.00
Jumlah Harga Tenaga Kerja 496,700.00
B. Bahan
1. Balok Kayu II M3 0.040 5,324,000.00 212,960.00
2. Lem Kayu Kg 0.500 30,000.00 15,000.00
Jumlah Harga Bahan 227,960.00
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 724,660.00
E. Overhead + Profit 0% 724,660.00 -
F. Harga Satuan Pekerjaan Per - M2 (D+E) 724,660.00

Anl. PJK PEMBUATAN DAN PEMASANGAN 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS I ATAU II (AHSP 2016)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.800 85,000.00 68,000.00
2. Tukang Kayu OH 2.400 120,000.00 288,000.00
3. Kepala Tukang OH 0.240 150,000.00 36,000.00
4. Mandor OH 0.040 134,000.00 5,360.00
Jumlah Harga Tenaga Kerja 397,360.00
B. Bahan
1. Balok Kayu II M3 0.024 5,324,000.00 127,776.00
2. Lem Kayu Kg 0.300 30,000.00 9,000.00
Jumlah Harga Bahan 136,776.00
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 534,136.00
E. Overhead + Profit 0% 534,136.00 -
F. Harga Satuan Pekerjaan Per - M2 (D+E) 534,136.00

Anl. KTB PEMASANGAN 1 BUAH KUNCI TANAM BIASA (AHSP 2016)


HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.010 85,000.00 850.00
2. Tukang Kayu OH 0.500 120,000.00 60,000.00
3. Kepala Tukang OH 0.050 150,000.00 7,500.00
4. Mandor OH 0.005 134,000.00 670.00
Jumlah Harga Tenaga Kerja 69,020.00
B. Bahan
1. Kunci Tanam Biasa Buah 1.000 150,000.00 150,000.00
Jumlah Harga Bahan 150,000.00
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 219,020.00
E. Overhead + Profit 0% 219,020.00 -
F. Harga Satuan Pekerjaan Per - Buah (D+E) 219,020.00

Anl. EP PEMASANGAN 1 BUAH ENGSEL PINTU (AHSP 2016)


HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.015 85,000.00 1,275.00
2. Tukang Kayu OH 0.150 120,000.00 18,000.00
3. Kepala Tukang OH 0.015 150,000.00 2,250.00
4. Mandor OH 0.001 134,000.00 107.20
Jumlah Harga Tenaga Kerja 21,632.20
B. Bahan
1. Engsel Pintu Buah 1.000 25,000.00 25,000.00
Jumlah Harga Bahan 25,000.00
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 46,632.20
E. Overhead + Profit 0% 46,632.20 -
F. Harga Satuan Pekerjaan Per - Buah (D+E) 46,632.20

Anl. EJ PEMASANGAN 1 BUAH ENGSEL JENDELA (AHSP 2016)


HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.010 85,000.00 850.00
2. Tukang Kayu OH 0.100 120,000.00 12,000.00
3. Kepala Tukang OH 0.010 150,000.00 1,500.00
4. Mandor OH 0.001 134,000.00 67.00
Jumlah Harga Tenaga Kerja 14,417.00
B. Bahan
1. Engsel Jendela Buah 1.000 20,000.00 20,000.00
Jumlah Harga Bahan 20,000.00
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 34,417.00
E. Overhead + Profit 0% 34,417.00 -
F. Harga Satuan Pekerjaan Per - Buah (D+E) 34,417.00

Anl. PGP PASANG GRENDEL PINTU (BH) (PM.78 2014)


HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.015 85,000.00 1,275.00
2. Tukang Kayu OH 0.150 120,000.00 18,000.00
3. Kepala Tukang OH 0.015 150,000.00 2,250.00
4. Mandor OH 0.001 134,000.00 107.20
Jumlah Harga Tenaga Kerja 21,632.20
B. Bahan
1. Grendel Pintu Buah 1.000 20,000.00 20,000.00
Jumlah Harga Bahan 20,000.00
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 41,632.20
E. Overhead + Profit 0% 41,632.20 -
F. Harga Satuan Pekerjaan Per - Buah (D+E) 41,632.20

Anl. PGJ PASANG GRENDEL JENDELA (BH) (PM.78 2014)


HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.010 85,000.00 850.00
2. Tukang Kayu OH 0.100 120,000.00 12,000.00
3. Kepala Tukang OH 0.010 150,000.00 1,500.00
4. Mandor OH 0.001 134,000.00 67.00
Jumlah Harga Tenaga Kerja 14,417.00
B. Bahan
1. Grendel Jendela Buah 1.000 15,000.00 15,000.00
Jumlah Harga Bahan 15,000.00
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 29,417.00
E. Overhead + Profit 0% 29,417.00 -
F. Harga Satuan Pekerjaan Per - Buah (D+E) 29,417.00
Anl. LGB PEMASANGAN 1 M2 LANGIT - LANGIT GYPSUM BOARD, t = 9 mm (AHSP 2016)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.100 85,000.00 8,500.00
2. Tukang Kayu OH 0.050 120,000.00 6,000.00
3. Kepala Tukang OH 0.005 150,000.00 750.00
4. Mandor OH 0.005 134,000.00 670.00
Jumlah Harga Tenaga Kerja 15,920.00
B. Bahan
1. Gypsum Board Lembar 0.364 120,000.00 43,680.00
2. Paku Skrup Kg 0.110 15,000.00 1,650.00
Jumlah Harga Bahan 45,330.00
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 61,250.00
E. Overhead + Profit 0% 61,250.00 -
F. Harga Satuan Pekerjaan Per - M2 (D+E) 61,250.00

Anl. LKP PEMASANGAN 1 M' LIST LANGIT - LANGIT KAYU PROFIL (AHSP 2016)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.050 85,000.00 4,250.00
2. Tukang Kayu OH 0.050 120,000.00 6,000.00
3. Kepala Tukang OH 0.005 150,000.00 750.00
4. Mandor OH 0.003 134,000.00 402.00
Jumlah Harga Tenaga Kerja 11,402.00
B. Bahan
1. List Kayu Profil M 1.050 14,500.00 15,225.00
2. Paku Skrup Kg 0.010 15,000.00 150.00
Jumlah Harga Bahan 15,375.00
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 26,777.00
E. Overhead + Profit 0% 26,777.00 -
F. Harga Satuan Pekerjaan Per - M' (D+E) 26,777.00

Anl. PTL-TL40 PEMASANGAN TITIK LAMPU TL 40 WATT (Komplit) + SAKLAR (Titik) (PM.78 2014)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.500 85,000.00 42,500.00
2. Tukang OH 0.500 120,000.00 60,000.00
3. Kepala Tukang OH 0.050 150,000.00 7,500.00
4. Mandor OH 0.050 134,000.00 6,700.00
Jumlah Harga Tenaga Kerja 116,700.00
B. Bahan
1. Pipa PVC 5/8 (6m) Lajur 1.000 8,000.00 8,000.00
2. Isolator M' 15.000 500.00 7,500.00
3. Kabel NYA 2.5 mm M' 20.000 4,000.00 80,000.00
4. Lampu TL Komplit 40 watt Buah 1.000 150,000.00 150,000.00
5. Las Doof Buah 6.000 350.00 2,100.00
6. Saklar Broco Buah 1.000 20,000.00 20,000.00
7. T dos PVC Buah 2.000 500.00 1,000.00
Jumlah Harga Bahan 268,600.00
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 385,300.00
E. Overhead + Profit 0% 385,300.00 -
F. Harga Satuan Pekerjaan Per - Titik (D+E) 385,300.00
Anl. PS PEMASANGAN SEKERING 2 GOUP (Unit) (PM.78 2014)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.950 85,000.00 80,750.00
2. Tukang OH 0.095 120,000.00 11,400.00
3. Kepala Tukang OH 0.010 150,000.00 1,425.00
4. Mandor OH 0.010 134,000.00 1,273.00
Jumlah Harga Tenaga Kerja 94,848.00
B. Bahan
1. Pipa PVC 5/8 (6m) Lajur 2.000 8,000.00 16,000.00
2. Kabel NYA 4.0 mm M' 8.000 5,000.00 40,000.00
3. Zekering Kast Lokal 2 Group Buah 1.000 120,000.00 120,000.00
Jumlah Harga Bahan 176,000.00
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 270,848.00
E. Overhead + Profit 0% 270,848.00 -
F. Harga Satuan Pekerjaan Per - Titik (D+E) 270,848.00

Anl. PSK PEMASANGAN STOP KONTAK (Titik) (PM.78 2014)


HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.028 85,000.00 2,380.00
2. Tukang OH 0.042 120,000.00 5,040.00
3. Kepala Tukang OH 0.004 150,000.00 630.00
4. Mandor OH 0.003 134,000.00 335.00
Jumlah Harga Tenaga Kerja 8,385.00
B. Bahan
1. Pipa PVC 5/8 (6m) Lajur 0.120 8,000.00 960.00
2. Kabel NYA 2.5 mm M' 0.180 4,000.00 720.00
3. Stop Kontak Buah 1.180 25,000.00 29,500.00
4. T Dos PVC Buah 2.180 500.00 1,090.00
Jumlah Harga Bahan 32,270.00
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 40,655.00
E. Overhead + Profit 0% 40,655.00 -
F. Harga Satuan Pekerjaan Per - Titik (D+E) 40,655.00

Anl. PBKB 1 M2 PENGECATAN BIDANG KAYU BARU (1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) (AHSP 2016)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.070 85,000.00 5,950.00
2. Tukang Kayu OH 0.009 120,000.00 1,080.00
3. Kepala Tukang OH 0.006 150,000.00 900.00
4. Mandor OH 0.003 134,000.00 402.00
Jumlah Harga Tenaga Kerja 8,332.00
B. Bahan
1. Cat Manie Kg 0.200 44,000.00 8,800.00
2. Plamur Kg 0.150 9,000.00 1,350.00
3. Cat Dasar Kg 0.170 38,000.00 6,460.00
4. Cat Penutup Kg 0.260 50,000.00 13,000.00
5. Kuas Buah 0.010 35,000.00 350.00
6. Pengencer Kg 0.030 28,000.00 840.00
7. Amplas Lembar 0.200 15,000.00 3,000.00
Jumlah Harga Bahan 33,800.00
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 42,132.00
E. Overhead + Profit 0% 42,132.00 -
F. Harga Satuan Pekerjaan Per - M2 (D+E) 42,132.00
Anl. PTB 1 M2 PENGECATAN TEMBOK BARU (1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) (AHSP 2016)
HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.020 85,000.00 1,700.00
2. Tukang Kayu OH 0.063 120,000.00 7,560.00
3. Kepala Tukang OH 0.006 150,000.00 945.00
4. Mandor OH 0.003 134,000.00 402.00
Jumlah Harga Tenaga Kerja 10,607.00
B. Bahan
1. Plamur Kg 0.100 9,000.00 900.00
2. Cat Dasar Kg 0.100 45,000.00 4,500.00
3. Cat Penutup Kg 0.260 44,000.00 11,440.00
Jumlah Harga Bahan 16,840.00
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 27,447.00
E. Overhead + Profit 0% 27,447.00 -
F. Harga Satuan Pekerjaan Per - M2 (D+E) 27,447.00

Anl. PKP PASANG KACA POLOS Tebal 10 mm (m2) (PM.78 2014)


HARGA SATUAN JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp) HARGA (Rp)
A. Tenaga Kerja
1. Pekerja OH 0.015 85,000.00 1,275.00
2. Tukang Kayu OH 0.150 120,000.00 18,000.00
3. Kepala Tukang OH 0.015 150,000.00 2,250.00
4. Mandor OH 0.001 134,000.00 107.20
Jumlah Harga Tenaga Kerja 21,632.20
B. Bahan
1. Kaca Polos tebal 10 mm M2 1.100 350,000.00 385,000.00

Jumlah Harga Bahan 385,000.00


C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 406,632.20
E. Overhead + Profit 0% 406,632.20 -
F. Harga Satuan Pekerjaan Per - M2 (D+E) 406,632.20
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAN

LOKASI
TAHUN ANGGARAN

NO URAIAN PEKERJAAN TOTAL BIAYA


(Rp)
1 2 3

SUB TOTAL -
SUPERVISI (2,5%) -
JUMLAH -
PPn (10%) -
TOTAL -
PEMBULATAN -

Terbilang :

Diperiksa oleh , Dibuat oleh,

Disetujui Oleh
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN
LOKASI
TAHUN ANGGARAN

HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA VOLUME SATUAN SATUAN HARGA SATUAN
(Rp.) (Rp.)
1 2 3 4.00 5 6 7

Ls Ls 1,000,000.00 0.00
Ls Ls 3,000,000.00 0.00
Anl. PP Ls 8,385,000.00 0.00
Ls Ls 13,000,000.00 0.00
Ls Ls 3,000,000.00 0.00
Anl MD - II Ls 119,200,000.00 0.00
Ls Ls 2,014,000.00 0.00
Jumlah I 0.00

Anl. PTPB Kg 18,549.15 0.00


Anl. PTTP - 1B M' 329,604.00 0.00
Anl. PTTP - 1A M' 511,269.00 0.00
Anl. PTMP - 1B M' 405,154.80 0.00
Anl. PTMP - 1A M' 634,713.30 0.00
Anl. PTP-1 Buah 523,680.00 0.00
Anl. PTP-2 Buah 499,860.00 0.00
Anl. PTP-3 Buah 521,665.29 0.00

Anl. PBUP Kg 18,126.35 0.00


Anl. K.250 M3 1,323,254.80 0.00

Anl. PBUP Kg 18,126.35 0.00


Anl. B M2 529,976.80 0.00
Anl. K.250 M3 1,323,254.80 0.00

Anl. PBUP Kg 18,126.35 0.00


Anl. B M2 529,976.80 0.00
Anl. K.250 M3 1,323,254.80 0.00
Anl. BD - I Buah 27,583,400.00 0.00
Jumlah VIII 0.00

Anl. PTPB Kg 18,549.15 0.00


Anl. PTTP - 1B M' 329,604.00 0.00
Anl. PTTP - 1A M' 511,269.00 0.00
Anl. PTMP - 1B M' 405,154.80 0.00
Anl. PTMP - 1A M' 634,713.30 0.00
Anl. PTP-1 Buah 523,680.00 0.00
Anl. PTP-2 Buah 499,860.00 0.00
Anl. PTP-3 Buah 521,665.29 0.00

Anl. PBUP Kg 18,126.35 0.00


Anl. K.250 M3 1,323,254.80 0.00

Anl. PBUP Kg 18,126.35 0.00


Anl. B M2 529,976.80 0.00

Perhitungan RAB Konstruksi - 22


HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA VOLUME SATUAN SATUAN HARGA SATUAN
(Rp.) (Rp.)
1 2 3 4.00 5 6 7
Anl. K.250 M3 1,323,254.80 0.00
Anl. FD - I Buah 36,973,400.00 0.00
Anl. BD - I Buah 27,583,400.00 0.00
Jumlah VIII 0.00

Anl. PTPB Kg 18,549.15 0.00


Anl. PTTP - 1B M' 329,604.00 0.00
Anl. PTTP - 1A M' 511,269.00 0.00
Anl. PTP-1 Buah 523,680.00 0.00
Anl. PTP-2 Buah 499,860.00 0.00
Anl. PTP-3 Buah 521,665.29 0.00

Anl. PBUP Kg 18,126.35 0.00


Anl. K.250 M3 1,323,254.80 0.00

Anl. PBUP Kg 18,126.35 0.00


Anl. B M2 529,976.80 0.00
Anl. K.250 M3 1,323,254.80 0.00

Anl. PBUP Kg 18,126.35 0.00


Anl. B M2 529,976.80 0.00
Anl. K.250 M3 1,323,254.80 0.00
Anl. PBP Kg 36,277.00 0.00
Anl. PBP Kg 36,277.00 0.00
Ls Buah 25,000.00 0.00
Ls M' 165,000.00 0.00
Ls M' 140,000.00 0.00
Jumlah X 0.00

Perhitungan RAB Konstruksi - 23


MATRIK TAHAPAN PEKERJAAN

#REF!
#REF!
#REF!

PEKERJAAN YANG DILAKSANAKAN


APBN MURNI APBN MURNI APBN MURNI
TAHAP - I TAHAP - II TAHAP - III
NO URAIAN PEKERJAAN
TAHUN 2017 TAHUN 2018 TAHUN 2019 RAB SELESAI

DIPA DIPA DIPA


1 2 3 4 8

-
-
-
-
-
-
-
-
-
-
-
-
-
-

JUMLAH - - - -
SUPERVISI 2,5% - - - -
TOTAL - - - -
PPN 10% - - - -
GRAND TOTAL - - - -
DIBULATKAN - - - -
TOTAL ANGGARAN KESELURUHA -

Medan, Januari 2018


Disetujui oleh, Dibuat oleh,
KEMENTERIAN PERHUBUNGAN KURVA S
DIREKTORAT JENDERAL PERHUBUNGAN DARAT
BALAI PENGELOLA TRASPORTASI DARAT WILAYAH II
PROVINSI SUMATERA UTARA

JADUAL PELAKSANAAN PEKERJAAN 120 ( SERTUS DUA PULUH ) HARI KALENDER


No. URAIAN PEKERJAAN VOLUME SATUAN BOBOT DURASI BULAN MARET BULAN APRIL BULAN MEI BULAN JUNI BULAN JULI BULAN AGUSTUS BULAN SEPTEMBER BULAN OKTOBER KETERANGAN
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Chart Title
100.00

0.00
TOTAL BOBOT PEKERJAAN FISIK - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Disetujui oleh, Dibuat oleh,