BP # 1
SECTION V
Submitted By:
Arizon Companies
(Company Name)
A. EEO PARTICIPATION:
I/We, the undersigned, certify that all Equal Opportunity Requirements, Labor Standards
and Non-Discriminatory provisions will be complied with as defined within the Contract
Documents.
B. DOCUMENTS:
I/We, the undersigned, acknowledge receipt of the Contract Documents identified in the BP
#1 “Air Supported Structures” and the following Turner Bid Information Letters:
# dated , # dated
# dated , # dated
# dated , # dated
The Lump Sum Amount for the Bid Package excluding bond as defined by the contract
documents is:
Lump Sum
$790,808 with 6% sales tax included
Amount ($):
Lump Sum
Amount (Written):
Supervision man-hours
Installation man-hours
F. PROJECT PARTICIPATION:
Furnish all labor and materials, including equipment, hoisting, layout, supervision, overhead and
profit, and bond for the following:
1. Provide pricing to increase air structure size to 410 ft x 210 ft x 75 ft in height. Include all
necessary modifications to lighting, heating and inflation systems, structure, egress, etc.
Add $99,807
ADD / DEDUCT $__________________________________________________
Add $23,951
ADD / DEDUCT $__________________________________________________
Add $8,984
ADD / DEDUCT $__________________________________________________
No Differential
ADD / DEDUCT $__________________________________________________
Add $8,750
ADD / DEDUCT $__________________________________________________
Add $11,965
ADD / DEDUCT $__________________________________________________
8. Provide pricing to furnish and install inner end walls and divider netting:
Add $9,904
ADD / DEDUCT $__________________________________________________
Add $955
ADD / DEDUCT $__________________________________________________
Add $2,350
ADD / DEDUCT $__________________________________________________
11. Provide pricing to furnish all installation labor and equipment complete:
Add $65,750
ADD / DEDUCT $__________________________________________________
12. Provide pricing to install a translucent top panel that works well with your structures
layout of approximately 40ft x 200ft. Please specify exact panel size proposed:
Add $12,000
ADD / DEDUCT $__________________________________________________
14. Provide pricing to delete fabric repair kit as required in specification section 13120:
Deduct $500
ADD / DEDUCT $__________________________________________________
15. Provide pricing to provide hanging goal posts and associated hardware at each end:
Add $795
ADD / DEDUCT $__________________________________________________
1. Provide labor rate cost for each trade classification per the “Labor Rate Cost Matrix”
below.
Rates as per Michigan Department of Labor, Energy & Economic Growth
I. SCHEDULE:
3. Installation weeks
SIGNED: DATE:
Officer of the Company
PRINT NAME:
COMPANY
TITLE:
BASE WAGE $ $ $ $ $ $
DUES $ $ $ $ $ $
OTHER: $ $ $ $ $ $
FICA $ $ $ $ $ $
FUTA $ $ $ $ $ $
MESC $ $ $ $ $ $
W/C INSURANCE $ $ $ $ $ $
G/L INSURANCE $ $ $ $ $ $
FRINGES
PENSION(S) $ $ $ $ $ $
ANNUITY FUND $ $ $ $ $ $
APPRENTICESHIP FUND $ $ $ $ $ $
OTHER: $ $ $ $ $ $
OTHER: $ $ $ $ $ $
OTHER: $ $ $ $ $ $
OTHER: $ $ $ $ $ $
OTHER: $ $ $ $ $ $
TOTAL FRINGES: $ $ $ $ $ $