Você está na página 1de 6

BID PACKAGE NO.

BP # 1

AIR SUPPORTED STRUCTURE

JUNE 29, 2009

SECTION V

BID PROPOSAL FORM


Eastern Michigan University
Air Supported Practice Structure
Ypsilanti, MI

BID FORM FOR:


Bid Package No. BP # 1
Air Supported Structure

BIDS ARE TO BE SUBMITTED TO:


Turner Construction Company
535 Griswold, Suite 200
Detroit, Michigan 48226
Attn: Grant Mendeljian

Bids will be time and date stamped

Submitted By:
Arizon Companies
(Company Name)

11880 Dorsett Road (Street Address)

Maryland Heights, MO (City, State, Zip))


Tom Soehngen (Contact Name)
314-739-0037 (Contact Phone #)
314-739-1556 (Contact Fax #)
tsoehngen@arizoncompanies.com
(Contact Email)

A. EEO PARTICIPATION:

I/We, the undersigned, certify that all Equal Opportunity Requirements, Labor Standards
and Non-Discriminatory provisions will be complied with as defined within the Contract
Documents.

B. DOCUMENTS:

I/We, the undersigned, acknowledge receipt of the Contract Documents identified in the BP
#1 “Air Supported Structures” and the following Turner Bid Information Letters:

# dated , # dated

# dated , # dated

# dated , # dated

Bid Package No. BP #1 Turner Construction Company


Air Supported Structure Air Supported Practice Structure Project
June 29, 2009 Ypsilanti, MI
Page 1 of 5
C. CHECKLIST (THE FOLLOWING QUESTIONS MUST BE ANSWERED):

1. General Liability & Auto Insurance as required by the documents? Y


2. Providing all guarantees, certifications, and/or warranties as required? Y
3. Sales Tax included? Y
4. Agree to sign Turner’s subcontract agreement unmodified? N
5. Submit for and obtain all required permits for this work? N
6. All labor included in proposal is Prevailing Wage or Union Labor? Y
7. Completed Prequalification Statement attached or previously submitted? Y
8. Company EMR (Experience Modification Ratio) is equal to or below 1.0? N
9. Have reviewed and will comply with Turner’s Site Specific Safety Plan? Y
10. Bid submission includes all data required per bid documents Y
11. Follow up data and/or samples will be forwarded next business day Y

D. BASE BID PRICE:

The Lump Sum Amount for the Bid Package excluding bond as defined by the contract
documents is:

Lump Sum
$790,808 with 6% sales tax included
Amount ($):
Lump Sum
Amount (Written):

Cost for 100% Performance and Payment Bond: Add: $ 12,000


E. LABOR BREAKDOWN

Supervision man-hours

Installation man-hours

Total Labor man-hours

F. PROJECT PARTICIPATION:

Minority Owned Business Enterprise (MBE) % of contract value

Women-Owned Business Enterprise (WBE) % of contract value


Service-Disabled Veteran-Owned Business
Enterprise (SDVBE) % of contract value

Bid Package No. BP #1 Turner Construction Company


Air Supported Structure Air Supported Practice Structure Project
June 29, 2009 Ypsilanti, MI
Page 2 of 5
G. ALTERNATES (ADD / DEDUCT):

Furnish all labor and materials, including equipment, hoisting, layout, supervision, overhead and
profit, and bond for the following:

1. Provide pricing to increase air structure size to 410 ft x 210 ft x 75 ft in height. Include all
necessary modifications to lighting, heating and inflation systems, structure, egress, etc.

Add $99,807
ADD / DEDUCT $__________________________________________________

2. Provide pricing to add an additional vehicle air lock:

Add $23,951
ADD / DEDUCT $__________________________________________________

3. Provide pricing to increase the vehicle air lock to 16 ft x 40 ft:

Add $8,984
ADD / DEDUCT $__________________________________________________

4. Provide pricing to add an additional emergency exit:


Add $4,900 each
ADD / DEDUCT $__________________________________________________

5. Provide pricing to add remote ballasts:

No Differential
ADD / DEDUCT $__________________________________________________

6. Provide pricing to add light pole guards:

Add $8,750
ADD / DEDUCT $__________________________________________________

7. Provide pricing to use hanging lights in lieu of pole mounted:

Add $11,965
ADD / DEDUCT $__________________________________________________

8. Provide pricing to furnish and install inner end walls and divider netting:

Add $9,904
ADD / DEDUCT $__________________________________________________

9. Provide EMU logo on air structure, (100 Square Feet):

Add $955
ADD / DEDUCT $__________________________________________________

10. Provide pricing to include a remote system monitor:

Add $2,350
ADD / DEDUCT $__________________________________________________

11. Provide pricing to furnish all installation labor and equipment complete:

Add $65,750
ADD / DEDUCT $__________________________________________________

12. Provide pricing to install a translucent top panel that works well with your structures
layout of approximately 40ft x 200ft. Please specify exact panel size proposed:

Add $12,000
ADD / DEDUCT $__________________________________________________

Bid Package No. BP #1 Turner Construction Company


Air Supported Structure Air Supported Practice Structure Project
June 29, 2009 Ypsilanti, MI
Page 3 of 5
13. Provide pricing to fabricate two camera station blisters located on the West Side
between the two emergency exit doors:
Add $29,750
ADD / DEDUCT $__________________________________________________

14. Provide pricing to delete fabric repair kit as required in specification section 13120:
Deduct $500
ADD / DEDUCT $__________________________________________________

15. Provide pricing to provide hanging goal posts and associated hardware at each end:
Add $795
ADD / DEDUCT $__________________________________________________

H. UNIT PRICES (ADD / DEDUCT):

1. Provide labor rate cost for each trade classification per the “Labor Rate Cost Matrix”
below.
Rates as per Michigan Department of Labor, Energy & Economic Growth

I. SCHEDULE:

1. Submittals / Shop Drawings weeks

2. Fabrication / Delivery weeks

3. Installation weeks

SIGNED: DATE:
Officer of the Company

PRINT NAME:

COMPANY

TITLE:

Bid Package No. BP #1 Turner Construction Company


Air Supported Structure Air Supported Practice Structure Project
June 29, 2009 Ypsilanti, MI
Page 4 of 5
LABOR RATE COST MATRIX
JOURNEYMAN FOREMAN
TRADE: TIME AND DOUBLE TIME AND DOUBLE
STRAIGHT STRAIGHT
ONE HALF TIME ONE HALF TIME
TIME TIME

BASE WAGE $ $ $ $ $ $

VACATION & HOLIDAY $ $ $ $ $ $

DUES $ $ $ $ $ $

OTHER: $ $ $ $ $ $

TOTAL TAXABLE WAGES: $ $ $ $ $ $

TAXES & INSURANCE

FICA $ $ $ $ $ $

FUTA $ $ $ $ $ $

MESC $ $ $ $ $ $

W/C INSURANCE $ $ $ $ $ $

G/L INSURANCE $ $ $ $ $ $

TOTAL TAXES & INSURANCE: $ $ $ $ $ $

FRINGES

PENSION(S) $ $ $ $ $ $

ANNUITY FUND $ $ $ $ $ $

HEALTH & WELFARE $ $ $ $ $ $

APPRENTICESHIP FUND $ $ $ $ $ $

OTHER: $ $ $ $ $ $

OTHER: $ $ $ $ $ $

OTHER: $ $ $ $ $ $

OTHER: $ $ $ $ $ $

OTHER: $ $ $ $ $ $

TOTAL FRINGES: $ $ $ $ $ $

TOTAL HOURLY WAGE: $ $ $ $ $ $

Bid Package No. BP #1 Turner Construction Company


Air Supported Structure Air Supported Practice Structure Project
June 29, 2009 Ypsilanti, MI
Page 5 of 5