Electrical
Power conductors and cables including cable joints,
glands,terminations, cable ties, including all necessary
1
accessories complete as per specification and as shown on
Tray & Trunking Installation
drawing
Supply and fixing of the Cable Tray and Trunking (thickness -
2
1.5mm)with all accessories including threaded rod, channels for
Sub Main,Power
Lighting Distribution
& LowBoard & Final
Current Distribution Board
System
Supply, install, of Submain Distribution Board & Final
3
Distribution Board (DB) with MCCB incomer complete as
Light Fixtures
specified and shown on drawing.
Wiring of following light points, including Circuit wiring using
4
PVC insulated stranded copper conductors, with all accessories,
PVC conduits, Labour etc (Supermarket)
5 Installation, of following Light fixtures
7 Sundries
HVAC WORKS
PLUMBING WORKS
Sundries
S.No Description Unit Claimed Expenses
117.15
1,988.34
68.46
201.55
118.84
109.21
1,937.85
483.11
30.00
85.28
171.74
689.66
71.97
10.42
1,930.93
1,005.00
120.79
318.91
4.00
50.00
(134.08)
104.37
197.50
(667.74)
(727.71)
1,616.11
226.44
1,195.89
752.10
1,301.72
(552.00)
(479.62)