INFORME MENSUAL DE ALMACEN

MES JUNIO ANALITICO: N° 01


OBRA
MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR, JORGE BASADRE TRAMO: AV GENERAL CÓRDOVA - JR SUCRE Y PASAJE SANTA MARÍA DEL
DISTRITO DE CHILCA - HUNACAYO - JUNIN
SUPERVISOR DE OBRA : ARQ.YESSENIA HUAROC PEREZ
RESIDENTE DE OBRA : ING. IRVIN RONY CARDENAS POMA
ALMACENERO : MARIBEL BRICEÑO EULOGIO
RUBRO : 07

INGRESADO GASTO EJECUTADOS


ESPEC (a) SALDO TOTAL
UNIDAD DE
IFICA DESCRIPCION PROGRAMADO C/CHICA ABA.-O/C NEA TOTAL MES ANT. ACTUAL ACUMULADO
MEDIDA PRECIO
S S/ANALITICO Mon TOT.
Cant. Cant. Monto Cant. Monto Cant. Monto UNIT. Cant. Monto Cant. Monto TOTAL GASTO Cant. Monto
to UTIL.
2 GASTOS PRESUPUESTARIOS
2.6 ADQUISICION DE ACTIVOS NO FINANCIEROS
2.6.2 CONSTRUCCION DE EDIFICIOS Y ESTRUCTURAS
2.6.2.3 OTRAS ESTRUCTURAS
2.6.2.3.2 INFRAESTRUCTURA VIAL
2.6.2.3.2 COSTO DE CONST. POR ADM. DIRECTA - PERSONAL 133,830.43 0.00 130,464.67 0.00 130,464.67 3,365.76
PLANILLA DE PAGO MES DE JUN 46,807.87 0.00 46,807.87
PLANILLA DE PAGO MES DE JUL 55,678.75 0.00 55,678.75
GRATIFICACION 27,978.05 0.00 27,978.05 60,502.77
2.6.2.3.2 COSTO DE CONST POR ADM. DIRECTA - BIENES 152,744.57 0.00 140,218.1204 0.00 140,218.1204 60,502.77 70,933.30 131,686.07 8,532.05
Vestuario 0.00 3352.20 0.00 3352.20 3118.00 128.00 3246.00 106.20
GUANTES DE CUERO REFORZADO PAR 0 0.00 12.00 108.00 0 0.00 12 108.00 9.00 12 108.00 0.00 12 108.00 0 0.00
BOTAS DE JEBE PAR 0 0.00 12.00 228.00 0 0.00 12 228.00 19.00 12 228.00 0.00 12 228.00 0 0.00
CASACA SEGÚN DISEÑO UND 0 0.00 4.00 400.00 0 0.00 4 400.00 100.00 4 400.00 0.00 4 400.00 0 0.00
ZAPATOS DE SEGURIDAD TALLAS (38, 40, Y 43) PAR 0 0.00 12.00 720.00 0 0.00 12 720.00 60.00 12 720.00 0.00 12 720.00 0 0.00
ZAPATOS DE SEGURIDAD TALLAS (36, 37, Y 40) PAR 0 0.00 3.00 270.00 0 0.00 3 270.00 90.00 3 270.00 0.00 3 270.00 0 0.00
MAMELUCO SEGÚN DISEÑO UND 0 0.00 12.00 780.00 0 0.00 12 780.00 65.00 12 780.00 0.00 12 780.00 0 0.00
PROTECTOR VISUAL UND 0 0.00 12.00 60.00 0 0.00 12 60.00 5.00 12 60.00 0.00 12 60.00 0 0.00
GUANTES DE JEBE UND 0 0.00 18.00 144.00 0 0.00 18 144.00 8.00 12 96.00 0.00 12 96.00 6 48.00
PROTECTOR DE OIDO UND 0 0.00 6.00 13.20 0 0.00 6 13.20 2.20 0 0.00 0.00 0 0.00 6 13.20
CINTA DE SEGURIDAD ROLL 0 0.00 8.00 304.00 0 0.00 8 304.00 38.00 4 152.00 3 114.00 7 266.00 1 38.00
PROTECTOR DE CABEZA COLOR AMARILLO 8, AZUL 2, VEREDE 2 UND 0 0.00 12.00 96.00 0 0.00 12 96.00 8.00 12 96.00 0.00 12 96.00 0 0.00
BARBIQUEJO UND 0 0.00 12.00 24.00 0 0.00 12 24.00 2.00 12 24.00 0.00 12 24.00 0 0.00
RESPIRADOR CON FILTRO UND 0 0.00 3.00 21.00 0 0.00 3 21.00 7.00 0 0.00 2 14.00 2 14.00 1 7.00
CORTA VIENTO UND 0 0.00 12.00 120.00 0 0.00 12 120.00 10.00 12 120.00 0.00 12 120.00 0 0.00
PROTECTOR COLOR BLANCO UND 0 0.00 2.00 64.00 0 0.00 2 64.00 32.00 2 64.00 0.00 2 64.00 0 0.00
Materiales de Construccion 0.00 93,050.00 0.00 93,050.00 26,903.50 64,103.90 91,007.40 2,042.60
ARENA GRUESA (PUESTO EN OBRA) M3 0 0.00 200.00 13,000.00 0 0.00 200 13000.00 65.00 49 3161.60 125.190 8,137.35 174 11,298.95 26 1,701.05
PIEDRA CHANCADA DE 1/2" - 3/4" M3 0 0.00 230.00 14,950.00 0 0.00 230 14950.00 65.00 58 3740.10 168.670 10,963.55 226 14,703.65 4 246.35
MATERIAL GRANULAR PARA SUB BASE PUESTO EN OBRA M3 0 0.00 560.00 19,600.00 0 0.00 560 19600.00 35.00 309 10810.80 251.000 8,785.00 560 19,595.80 0 4.20
CEMENTO PORTLAND TIPO I BOLSAS 0 0.00 2,500.00 45,500.00 0 0.00 2500 45500.00 18.20 505 9191.00 1990.000 36,218.00 2,495 45,409.00 5 91.00
OTROS MATERIALES DE CONSTRUCCION 0.00 18909.00 0.00 18909.00 13242.50 2315.00 15557.50 3351.50
ACERO CORRUGADO 1/2" VAR 0 0.00 30.00 870.00 0 0.00 30 870.00 29.00 20 580.00 10.000 290.00 30 870.00 0 0.00
ACERO LISO DE 5/8" VAR 0 0.00 85.00 3,825.00 0 0.00 85 3825.00 45.00 40 1800.00 45.000 2,025.00 85 3,825.00 0 0.00
ACERO LISO DE 1/2" VAR 0 0.00 10.00 250.00 0 0.00 10 250.00 25.00 10 250.00 0.00 10 250.00 0 0.00
ALAMBRE NEGRO N°8 KG 0 0.00 150.00 675.00 0 0.00 150 675.00 4.50 25 112.50 0.00 25 112.50 125 562.50
CLAVOS PARA MADERA CON CABEZA DE 2 1/2" KG 0 0.00 60.00 270.00 0 0.00 60 270.00 4.50 15 67.50 0.00 15 67.50 45 202.50
CLAVOS PARA MADERA CON CABEZA DE 3" KG 0 0.00 60.00 270.00 0 0.00 60 270.00 4.50 25 112.50 0.00 25 112.50 35 157.50
TUBO DE 3/4 PVC 3 MT UND 0 0.00 25.00 125.00 0 0.00 25 125.00 5.00 0 0.00 0.00 0 0.00 25 125.00
TUBERIA PVC UF S-25 DN 200 MM NTP ISO 4435 I/ ANILLO DE JEBE UND 0 0.00 12.00 2,304.00 0 0.00 12 2304.00 192.00 0 0.00 0.00 0 0.00 12 2,304.00
TUBERIA PVC UF S-25 DN 250 MM NTP ISO 4435 I/ ANILLO DE JEBE UND 0 0.00 38.00 10,222.00 0 0.00 38 10222.00 269.00 38 10222.00 0.00 38 10,222.00 0 0.00
PEGAMENTO PVC GAL 0 0.00 1.00 98.00 0 0.00 1 98.00 98.00 1 98.00 0.00 1 98.00 0 0.00
MADERAS 0.00 10,820.00 0.00 10,820.00 9,405.00 712.00 10,117.00 703.00
TABLA DE 1" X 8" X 10" TORNILLO CEPILLADO UNA CARA UND 0 0.00 140.00 6,300.00 0 0.00 140 6300.00 45.00 140 6300.00 0.00 140 6,300.00 0 0.00
TABLA 1/2" X 8" X 10" TORNILLO CEPILLADO UNA CARA UND 0 0.00 70.00 1,610.00 0 0.00 70 1610.00 23.00 30 690.00 29.000 667.00 59 1,357.00 11 253.00
CUARTON 2" X 2" X 10" MONTAÑA UND 0 0.00 180.00 1,800.00 0 0.00 180 1800.00 10.00 180 1800.00 0.00 180 1,800.00 0 0.00
CUARTON 2" X 2" X 10" EUCALIPTO UND 0 0.00 100.00 750.00 0 0.00 100 750.00 7.50 82 615.00 6.000 45.00 88 660.00 12 90.00
PLANCHA DE TRIPLEY DE 8MM UND 0 0.00 6.00 360.00 0 0.00 6 360.00 60.00 0 0.00 0.00 0 0.00 6 360.00
Herramientas 0.00 3648.00 0.00 3648.00 2592.00 0.00 2592.00 1056.00
INFORME MENSUAL DE ALMACEN
MES JUNIO ANALITICO: N° 01
OBRA
MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR, JORGE BASADRE TRAMO: AV GENERAL CÓRDOVA - JR SUCRE Y PASAJE SANTA MARÍA DEL
DISTRITO DE CHILCA - HUNACAYO - JUNIN
SUPERVISOR DE OBRA : ARQ.YESSENIA HUAROC PEREZ
RESIDENTE DE OBRA : ING. IRVIN RONY CARDENAS POMA
ALMACENERO : MARIBEL BRICEÑO EULOGIO
RUBRO : 07

INGRESADO GASTO EJECUTADOS


ESPEC (a) SALDO TOTAL
UNIDAD DE
IFICA DESCRIPCION PROGRAMADO C/CHICA ABA.-O/C NEA TOTAL MES ANT. ACTUAL ACUMULADO
MEDIDA PRECIO
S S/ANALITICO Mon TOT.
Cant. Cant. Monto Cant. Monto Cant. Monto UNIT. Cant. Monto Cant. Monto TOTAL GASTO Cant. Monto
to UTIL.
CARRETILLA BUGGI CON RODAJE INCLUYE LLANTA UND 0 0.00 6.00 990.00 0 0.00 6 990.00 165.00 3 495.00 0.00 3 495.00 3 495.00
INFORME MENSUAL DE ALMACEN
MES JUNIO ANALITICO: N° 01
OBRA
MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR, JORGE BASADRE TRAMO: AV GENERAL CÓRDOVA - JR SUCRE Y PASAJE SANTA MARÍA DEL
DISTRITO DE CHILCA - HUNACAYO - JUNIN
SUPERVISOR DE OBRA : ARQ.YESSENIA HUAROC PEREZ
RESIDENTE DE OBRA : ING. IRVIN RONY CARDENAS POMA
ALMACENERO : MARIBEL BRICEÑO EULOGIO
RUBRO : 07

INGRESADO GASTO EJECUTADOS


ESPEC (a) SALDO TOTAL
UNIDAD DE
IFICA DESCRIPCION PROGRAMADO C/CHICA ABA.-O/C NEA TOTAL MES ANT. ACTUAL ACUMULADO
MEDIDA PRECIO
S S/ANALITICO Mon TOT.
Cant. Cant. Monto Cant. Monto Cant. Monto UNIT. Cant. Monto Cant. Monto TOTAL GASTO Cant. Monto
to UTIL.
LLANTA CON CAMARA RODAJE Y ARO UND 0 0.00 6.00 270.00 0 0.00 6 270.00 45.00 0 0.00 0.00 0 0.00 6 270.00
LAMPA CON MANGO UND 0 0.00 10.00 255.00 0 0.00 10 255.00 25.50 10 255.00 0.00 10 255.00 0 0.00
PICO CON MANGO UND 0 0.00 10.00 300.00 0 0.00 10 300.00 30.00 10 300.00 0.00 10 300.00 0 0.00
COMBO DE 16 LIBRAS C/MANGO UND 0 0.00 2.00 110.00 0 0.00 2 110.00 55.00 2 110.00 0.00 2 110.00 0 0.00
COMBO DE 08 LIBRAS C/MANGO UND 0 0.00 2.00 58.00 0 0.00 2 58.00 29.00 2 58.00 0.00 2 58.00 0 0.00
FLEXOMETRO DE 5 MTS UND 0 0.00 4.00 80.00 0 0.00 4 80.00 20.00 4 80.00 0.00 4 80.00 0 0.00
TIRALINEA UND 0 0.00 4.00 48.00 0 0.00 4 48.00 12.00 4 48.00 0.00 4 48.00 0 0.00
PLANCHA PULIR UND 0 0.00 4.00 42.00 0 0.00 4 42.00 10.50 4 42.00 0.00 4 42.00 0 0.00
PLANCHA DE BATIR UND 0 0.00 4.00 38.00 0 0.00 4 38.00 9.50 4 38.00 0.00 4 38.00 0 0.00
BRUNÑA DE CENTRO UND 0 0.00 4.00 18.00 0 0.00 4 18.00 4.50 4 18.00 0.00 4 18.00 0 0.00
BRUNÑA DE CANTO UND 0 0.00 4.00 18.00 0 0.00 4 18.00 4.50 4 18.00 0.00 4 18.00 0 0.00
NIVEL DE MANO UND 0 0.00 4.00 96.00 0 0.00 4 96.00 24.00 4 96.00 0.00 4 96.00 0 0.00
CORDEL DE CANÑA DE PESCAR 0.9 MM UND 0 0.00 4.00 44.00 0 0.00 4 44.00 11.00 4 44.00 0.00 4 44.00 0 0.00
CORDEL NYLON N° 16 UND 0 0.00 2.00 38.00 0 0.00 2 38.00 19.00 2 38.00 0.00 2 38.00 0 0.00
HOJAS DE SIERRA UND 0 0.00 12.00 54.00 0 0.00 12 54.00 4.50 6 27.00 0.00 6 27.00 6 27.00
DISCO DE CONCRETO DE 7.5" M UND 0 0.00 6.00 264.00 0 0.00 6 264.00 44.00 0 0.00 0.00 0 0.00 6 264.00
PLASTICO DE 1.5 M REFORZADO DOBLE ANCHO-K MTS 0 0.00 200.00 700.00 0 0.00 200 700.00 3.50 200 700.00 0.00 200 700.00 0 0.00
MANGUERA DE 3/4 MTS 0 0.00 100.00 150.00 0 0.00 100 150.00 1.50 100 150.00 0.00 100 150.00 0 0.00
MANGUERA DE 2" MTS 0 0.00 10.00 50.00 0 0.00 10 50.00 5.00 10 50.00 0.00 10 50.00 0 0.00
AZUELA UND 0 0.00 1.00 25.00 0 0.00 1 25.00 25.00 1 25.00 0.00 1 25.00 0 0.00
COMBUSTIBLE 0.00 5180.00 5180.00 762.40 3203.20 3965.60 1214.40
GASOHOL DE 90 PLUS GAL 0 0.00 150.00 1980.00 0 0.00 150 1980.00 13.20 18 237.60 40.000 528.00 58 765.60 92 1214.40
DIESEL B5 S-50 GAL 0 0.00 250.00 3200.00 0 0.00 250 3200.00 12.80 41 524.80 209.000 2675.20 250 3200.00 0 0.00
ACEITES 0.00 4,150.00 4150.00 3,900.00 0.00 4,150.00 -
FILTRO DE COMBUSTIBLE PRIMARIO UND 0 0.00 1.00 148.00 0 0.00 1 148.00 148.00 1 148.00 0.00 1 148.00 0 0.00
FILTRO DE COMBUSTIBLE SECUNDARIO UND 0 0.00 2.00 136.00 0 0.00 2 136.00 68.00 2 136.00 0.00 2 136.00 0 0.00
FILTRO DE ACEITE DE MOTOR UND 0 0.00 1.00 48.00 0 0.00 1 48.00 48.00 1 48.00 0.00 1 48.00 0 0.00
FILTRO DE AIRE PRIMARIO UND 0 0.00 1.00 228.00 0 0.00 1 228.00 228.00 1 228.00 0.00 1 228.00 0 0.00
FILTRO DE ACEITE HIDRAULICO UND 0 0.00 1.00 250.00 0 0.00 1 250.00 250.00 1 0.00 1 250.00 0 0.00
FILTRO DE AIRE SECUNDARIO UND 0 0.00 1.00 210.00 0 0.00 1 210.00 210.00 1 210.00 0.00 1 210.00 0 0.00
FILTRO DE ACEITE DE TRANSMISION UND 0 0.00 1.00 109.00 0 0.00 1 109.00 109.00 1 109.00 0.00 1 109.00 0 0.00
FILTRO DE SEPARADOR DE AGUA UND 0 0.00 1.00 79.00 0 0.00 1 79.00 79.00 1 79.00 0.00 1 79.00 0 0.00
ACEITE DE MOTOR SAE 15W40 X 5GL BALDE 0 0.00 1.00 260.00 0 0.00 1 260.00 260.00 1 260.00 0.00 1 260.00 0 0.00
ACEITE DE TRANSMISION SAE 30 X 5GL BALDE 0 0.00 7.00 2086.00 0 0.00 7 2086.00 298.00 7 2086.00 0.00 7 2,086.00 0 0.00
ACEITE HIDRAULICO SAE 10W GULF BALDE 0 0.00 2.00 596.00 0 0.00 2 596.00 298.00 2 596.00 0.00 2 596.00 0 0.00
Utiles de Escritorio 0.00 1108.92 0.00 1108.92 579.37 471.20 1050.57 58.35
CINTA ADHESIVA TRANSPARENTE DE ¾”X72 YARDAS SHURTAPE UND 0 0.00 4.00 8.35 0 0.00 4 8.35 2.09 4 8.35 0.00 4 8.35 0 0.00
CORRECTOR LIQUIDO T/LAPICERO UND 0 0.00 3.00 3.68 0 0.00 3 3.68 1.23 3 3.68 0.00 3 3.68 0 0.00
TAMPON CON COBERTURA PLASTICA COLOR AZUL T:12.5x 9.5 cm. UND 0 0.00 2.00 4.63 0 0.00 2 4.63 2.31 2 4.63 0.00 2 4.63 0 0.00
TINTA PARA TAMPON COLOR AZUL Y NEGRO UND 0 0.00 2.00 2.08 0 0.00 2 2.08 1.04 2 2.08 0.00 2 2.08 0 0.00
PLUMON RESALTADOR F/ RECTANGULAR COLOR AMARILLO UND 0 0.00 4.00 4.86 0 0.00 4 4.86 1.22 4 4.86 0.00 4 4.86 0 0.00
PORTAMINA ANCHO D/TRAZADO 0.5MM- FABER CASTELL ECON 0.5 UND 0 0.00 3.00 12.07 0 0.00 3 12.07 4.02 3 12.07 0.00 3 12.07 0 0.00
CUADERNO ENGRANPADO CUADRICULADO DE56 GR T.A -5X92 HOJAS LORO UND 0 0.00 3.00 6.23 0 0.00 3 6.23 2.08 3 6.23 0.00 3 6.23 0 0.00
PAPEL BOND FOTOCOPIA D/75 GR T: A4 – ULTRA COPY X 500 UNIDADES PAQUETE 0 0.00 12.00 140.04 0 0.00 12 140.04 11.67 4 46.68 3.000 35.01 7 81.69 5 58.35
BOLIGRAFO DE TINTA SECA COLOR ROJO, AZUL D/ PUNTA FINA UND 0 0.00 12.00 8.36 0 0.00 12 8.36 0.70 12 8.36 0.00 12 8.36 0 0.00
ARCHIVADOR D/CARTON PLATIFICADO C/PALANCA , OFICIO UND 0 0.00 8.00 29.36 0 0.00 8 29.36 3.67 8 29.36 0.00 8 29.36 0 0.00
ARCHIVADOR D/CARTON PLATIFICADO C/PALANCA , 1/2 OFICIO UND 0 0.00 2.00 7.22 0 0.00 2 7.22 3.61 2 7.22 0.00 2 7.22 0 0.00
PAPEL LUSTRE COLORES VARIADOS T: 50 CM X65 CM PLIEGO APOLO UND 0 0.00 6.00 3.19 0 0.00 6 3.19 0.53 6 3.19 0.00 6 3.19 0 0.00
INFORME MENSUAL DE ALMACEN
MES JUNIO ANALITICO: N° 01
OBRA
MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR, JORGE BASADRE TRAMO: AV GENERAL CÓRDOVA - JR SUCRE Y PASAJE SANTA MARÍA DEL
DISTRITO DE CHILCA - HUNACAYO - JUNIN
SUPERVISOR DE OBRA : ARQ.YESSENIA HUAROC PEREZ
RESIDENTE DE OBRA : ING. IRVIN RONY CARDENAS POMA
ALMACENERO : MARIBEL BRICEÑO EULOGIO
RUBRO : 07

INGRESADO GASTO EJECUTADOS


ESPEC (a) SALDO TOTAL
UNIDAD DE
IFICA DESCRIPCION PROGRAMADO C/CHICA ABA.-O/C NEA TOTAL MES ANT. ACTUAL ACUMULADO
MEDIDA PRECIO
S S/ANALITICO Mon TOT.
Cant. Cant. Monto Cant. Monto Cant. Monto UNIT. Cant. Monto Cant. Monto TOTAL GASTO Cant. Monto
to UTIL.
BORRADOR UND 0 0.00 3.00 1.17 0 0.00 3 1.17 0.39 3 1.17 0.00 3 1.17 0 0.00
GRAPAS CAJA 0 0.00 2.00 3.26 0 0.00 2 3.26 1.63 2 3.26 0.00 2 3.26 0 0.00
PLUMON INDELEBLE COLOR AZUL Y NEGRO UND 0 0.00 2.00 2.05 0 0.00 2 2.05 1.03 2 2.05 0.00 2 2.05 0 0.00
THONER HP NEGRO UND 0 0.00 2.00 872.37 0 0.00 2 872.37 436.19 1 436.19 1.000 436.19 2 872.37 0 0.00
COSTO DE CONST POR ADM. DIRECTA - SERVICIO 17,425.00 0.00 15,170.00 0.00 15,170.00 14,375.00 0.00 14,375.00 970.00
2.6.2.3.2 PORTA MINA CON PUNTA METALICA 0.00 15,170.00 0.00 15170.00 14375.00 0.00 14,375.00 970.00
ALQUILER DE RETROEXCABADORA HM 0 0.00 30.00 4,200.00 0 0.00 30 4,200.00 140.00 30 4200.00 0.00 30 4,200.00 0 0.00
ALQUILER DE CARGADOR FRONTAL HM 0 0.00 30.00 5,400.00 0 0.00 30 5,400.00 180.00 30 5400.00 0.00 30 5,400.00 0 0.00
ALQUILER DE VOLQUETE HM 0 0.00 30.00 4,200.00 0 0.00 30 4,200.00 140.00 30 4200.00 0.00 30 4,200.00 0 0.00
PRUEBA DE CALIDAD- DISEÑOS DE MEZCLA UND 0 0.00 2.00 300.00 0 0.00 2 300.00 150.00 2 300.00 0.00 2 300.00 0 0.00
PRUEBA DE CALIDAD- DENSIDAD DE CAMPO UND 0 0.00 15.00 450.00 0 0.00 15 450.00 30.00 5 150.00 0.00 5 150.00 10 300.00
PRUEBA DE CALIDAD-ROTURA DE PROBETAS UND 0 0.00 30.00 600.00 0 0.00 30 600.00 20.00 0 0.00 0.00 0 0.00 30 600.00
PRUEBA DE CALIDAD- PRUEBA HIDRAULICA UND 0 0.00 1.00 20.00 0 0.00 1 20.00 20.00 0 0.00 0.00 0 0.00 1 20.00
FOTOCOPIAS DE VARIOS DOCUMENTOS UND 0 0.00 3,500.00 175.00 0 0.00 3500 175.00 0.05 2500 125.00 0.00 2,500 125.00 1,000 50.00
S/. 304,000.00 0.00 S/. 155,388.12 S/. 0.00 S/. 155,388.12 0 S/. 205,342.44 S/. 70,933.30 S/. 276,525.74 S/. 12,867.81

--------------------------------
ALMACENERO -------------------------------- ----------------------------------
RESIDENTE SUPERVISOR
INFORME MENSUAL DE ALMACEN
MES JUNIO ANALITICO: N° 01
OBRA
MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR, JORGE BASADRE TRAMO: AV GENERAL CÓRDOVA - JR SUCRE Y PASAJE SANTA MARÍA DEL DISTRITO DE
CHILCA - HUNACAYO - JUNIN
SUPERVISOR DE OBRA : ARQ.YESSENIA HUAROC PEREZ
RESIDENTE DE OBRA : ING. IRVIN RONY CARDENAS POMA
ALMACENERO : MARIBEL BRICEÑO EULOGIO
RUBRO : 18

INGRESADO GASTO EJECUTADOS


ESPEC (a) SALDO TOTAL
UNIDAD DE
IFICA DESCRIPCION PROGRAMADO C/CHICA ABA.-O/C NEA TOTAL MES ANT. ACTUAL ACUMULADO
MEDIDA PRECIO
S S/ANALITICO TOT.
Cant. Monto Cant. Monto Cant. Monto Cant. Monto UNIT. Cant. Monto Cant. Monto
UTIL.
TOTAL GASTO Cant. Monto

2 GASTOS PRESUPUESTARIOS
2.6 ADQUISICION DE ACTIVOS NO FINANCIEROS
2.6.2 CONSTRUCCION DE EDIFICIOS Y ESTRUCTURAS
2.6.2.3 OTRAS ESTRUCTURAS
2.6.2.3.2 INFRAESTRUCTURA VIAL
2.6.2.3.2 COSTO DE CONST. POR ADM. DIRECTA - PERSONAL 64,185.00 0.00 0.00 57,696.86 57,696.86 6,488.14
PLANILLA DE PAGO MES DE AGOSTO 0.00 57,696.86 57,696.86
2.6.2.3.2 COSTO DE CONST POR ADM. DIRECTA - BIENES 52,643.00 0.00 16,819.70 0.00 16,819.7000 0.0000 330.0000 330.0000 16,039.7000
MATERIALES DE CONSTRUCCIÓN 0.00 8,750.00 0.00 8,750.00 0.00 0.00 0.00 8,750.00
MATERIAL GRANULAR PARA SUB BASE PUESTO EN OBRA M3 0 0.00 250.00 8,750.00 0 0.00 250 8750.00 35.00 0 0.00 0.00 0 0.00 250 8,750.00
CEMENTO BOLS 870.00 20,010.00 23.00
OTROS MATERIALES DE CONSTRUCCION 0.00 8069.70 0.00 8069.70 0.00 330.00 330.00 7289.70
ASFALTO RC-250 GAL 0 0.00 50.00 550.00 0 0.00 50 550.00 11.00 0 0.00 30.000 330.00 30 330.00 20 220.00
TIERRA NEGRA M3 0 0.00 12.00 1,080.00 0 0.00 12 1080.00 90.00 0 0.00 0.000 0.00 0 0.00 12 1,080.00
SEMILLA GRASS AMERICANO PARA JARDINERÍA KG 0 0.00 20.00 700.00 0 0.00 20 700.00 35.00 0 0.00 0.000 0.00 0 0.00 20 700.00
PLANTONES (FRESNOS, ALAMOS, QUINUAL) UND 0 0.00 115.00 1,552.50 0 0.00 115 1552.50 13.50 0 0.00 0.000 0.00 0 0.00 115 1,552.50
MARCO Y TAPA DE FF° BUZÓN 0.60M X 125 KG YARMA UND 0 0.00 6.00 2,100.00 0 0.00 6 2100.00 350.00 0 0.00 0.000 0.00 0 0.00 6 2,100.00
PINTURA DE TRÁFICO DE 1 GALON MARCA JET (9 AMARILLOS, 5 NEGROS, 5 BLANCOS) GAL 0 0.00 19.00 1,273.00 0 0.00 19 1273.00 67.00 0 0.00 0.000 0.00 0 0.00 19 1,273.00
DISOLVENTE PARA TRAFICO M/ANYPSA GAL 0 0.00 10.00 269.00 0 0.00 10 269.00 26.90 0 0.00 0.000 0.00 0 0.00 10 269.00
BROCHA DE 4"/AGUILA UND 0 0.00 4.00 47.20 0 0.00 4 47.20 11.80 0 0.00 0.000 0.00 0 0.00 4 47.20
RODILLO DE 4" MARCA TORO UND 0 0.00 6.00 48.00 0 0.00 6 48.00 8.00 0 0.00 0.000 0.00 0 0.00 6 48.00
PLACA RECORDATORIA DE MARMOL IMPORTADOS CARRARA UND 0 0.00 1.00 450.00 0 0.00 1 450.00 450.00
COSTO DE CONST POR ADM. DIRECTA - SERVICIO 23,172.00 0.00 12,500.00 0.00 12,500.00 0.00 11,100.00 11,100.00 1,400.00
2.6.2.3.2 PORTA MINA CON PUNTA METALICA 0.00 12,500.00 0.00 12500.00 0.00 11100.00 11,100.00 1,400.00
MANTENIMIENTO CORRECTIVO DEL TRACTOR ORUGA CAT D6MXL HM 0 0.00 1.00 4,800.00 0 0.00 1 4,800.00 4800.00 0 0.00 1.000 4,800.00 1 4,800.00 0 0.00
CONSTRUCCIÓN E INSTALACIÓN DE 04 UNIDADES DE SEÑALIZACIÓN INFORMATIVA HM 0 0.00 1.00 850.00 0 0.00 1 850.00 850.00 0 0.00 0.00 0 0.00 1 850.00
MANTENIMIENTO PREVENTIVO Y CORRECTIVO DE LA MAQUINARIA DEL VOLQUETE IVECO TRAKKER 380T42H HM 0 0.00 1.00 3,000.00 0 0.00 1 3,000.00 3000.00 0 0.00 1.000 3,000.00 1 3,000.00 0 0.00
MANTENIMIENTO PREVENTIVO Y CORRECTIVO DE LA MAQUINARIA MOTONIVELADORA KOMATSU GD511A-1 HM 0 0.00 1.00 3,300.00 0 0.00 1 3,300.00 3300.00 0 0.00 1.000 3,300.00 1 3,300.00 0 0.00
CONSTRUCCIÓN E INSTALACIÓN DE REJILLA METÁLICA PARA TAPA DE DRENAJE PLUVIAL CON MEDIDAS 2M X 0.36M HM 0 0.00 1.00 550.00 0 0.00 1 550.00 550.00 0 0.00 0.00 0 0.00 1 550.00
S/. 140,000.00 0.00 S/. 29,319.70 S/. 0.00 S/. 29,319.70 0 S/. 0.00 S/. 69,126.86 S/. 69,126.86 S/. 23,927.84

--------------------------------
ALMACENERO -------------------------------- ----------------------------------
RESIDENTE SUPERVISOR
RESUMEN DEL ESTADO FINANCIERO
APORTE MUNICIPALIDAD DISTRITAL DE CHILCA

PROYECTO: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA - JR. SUCRE Y PSJE. SANTA MARIA DEL,
OBRA
DISTRITO DE CHILCA - HUANCAYO - JUNIN”
RUBRO
SUPERVISOR DE OBRA : ING. YESENIA GLORIA HUAROC PEREZ
RESIDENTE DE OBRA : ING.IRVIN RONY CARDENAS POMA
ALMACENERO : MARIBEL BRICEÑO EULOGIO
FECHA Jul-18

RUBRO 07
PROGRAMADO GASTOS FINANCIEROS SALDO
ITEM CLASIFICADOR DESCRIPCION S/ANALITICO
% PRESUPUESTAL
%
MES ANT. % PTE. MES % ACUMULADO %
01 2.6.2.3.2. 4 PERSONAL 133,830.43 100% 130,464.67 42.92% 0.00 0.00% 130,464.67 42.92% 3,365.76 1.11%
02 2.6.2.3.2. 5 BIENES 152,744.57 100% 60,502.77 19.90% 70,933.30 23.33% 131,436.07 43.24% 21,308.50 7.01%
03 2.6.2.3.2. 6 SERVICIOS 17,425.00 100% 14,375.00 4.73% 0.00 0.00% 14,375.00 4.73% 3,050.00 1.00%
TOTAL 304,000.00 100% 205,342.44 67.5% 70,933.30 23.33% 276,275.74 90.88% 27,724.26 9%

RUBRO 18
01 2.6.2.3.2. 4 PERSONAL 64,185.00 100% 0.00 0.00% 57,696.86 18.98% 57,696.86 41.21% 6,488.14 4.63%
02 2.6.2.3.2. 5 BIENES 52,643.00 100% 0.00 0.00% 330.00 0.11% 330.00 0.24% 52,313.00 37.37%
03 2.6.2.3.2. 6 SERVICIOS 23,172.00 100% 0.00 0.00% 11,100.00 3.65% 11,100.00 7.93% 12,072.00 8.62%
TOTAL 140,000.00 100% 0.00 0.0% 69,126.86 49.38% 69,126.86 49.38% 70,873.14 51%

RESUMEN TOTAL DEL MES DE AGOSTO


PROGRAMADO GASTOS FINANCIEROS SALDO
ITEM CLASIFICADOR DESCRIPCION S/ANALITICO
% PRESUPUESTAL
%
MES ANT. % PTE. MES % ACUMULADO %
01 PERSONAL 198,015.43 100% 130,464.67 29.38% 57,696.86 331.12% 188,161.53 42.38% 9,853.90 2.22%
02 BIENES 205,387.57 100% 60,502.77 13.63% 71,263.30 408.97% 131,766.07 29.68% 73,621.50 16.58%
03 SERVICIOS 40,597.00 100% 14,375.00 3.24% 11,100.00 63.70% 25,475.00 5.74% 15,122.00 3.41%
TOTAL 444,000.00 100% 205,342.44 46.2% 140,060.16 31.55% 345,402.60 77.79% 98,597.40 22%

-------------------------------- -------------------------------- ----------------------------------


ALMACENERO RESIDENTE SUPERVISOR
INFORME MENSUAL DE ALMACEN
MES JUNIO ANALITICO: N° 01
OBRA
MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR, JORGE BASADRE TRAMO: AV GENERAL CÓRDOVA - JR SUCRE Y PASAJE SANTA MARÍA DEL DISTRITO
DE CHILCA - HUNACAYO - JUNIN
SUPERVISOR DE OBRA : ARQ.YESSENIA HUAROC PEREZ
RESIDENTE DE OBRA : ING. IRVIN RONY CARDENAS POMA
ALMACENERO : MARIBEL BRICEÑO EULOGIO
RUBRO : 07

INGRESADO GASTO EJECUTADOS


ESPEC (a) SALDO TOTAL
UNIDAD DE
IFICA DESCRIPCION PROGRAMADO C/CHICA ABA.-O/C NEA TOTAL MES ANT. ACTUAL ACUMULADO
MEDIDA PRECIO
S S/ANALITICO TOT.
Cant. Monto Cant. Monto Cant. Monto Cant. Monto UNIT. Cant. Monto Cant. Monto TOTAL GASTO Cant. Monto
UTIL.
2 GASTOS PRESUPUESTARIOS
2.6 ADQUISICION DE ACTIVOS NO FINANCIEROS
2.6.2 CONSTRUCCION DE EDIFICIOS Y ESTRUCTURAS
2.6.2.3 OTRAS ESTRUCTURAS
2.6.2.3.2 INFRAESTRUCTURA VIAL
2.6.2.3.2 COSTO DE CONST. POR ADM. DIRECTA - PERSONAL 133,830.00 0.00 130,464.67 0.00 130,464.67 3,365.33
PLANILLA DE PAGO MES DE JUN 46,807.87 0.00 46,807.87
PLANILLA DE PAGO MES DE JUL 55,678.75 0.00 55,678.75
GRATIFICACION 27,978.05 0.00 27,978.05
2.6.2.3.2 COSTO DE CONST POR ADM. DIRECTA - BIENES 153,245.00 0.00 140,218.1300 0.00 140,218.1300 130,239.58 5,471.75 135,711.33 4,506.80
Vestuario 0.00 3352.20 0.00 3352.20 3227.00 67.20 3294.20 58.00
GUANTES DE CUERO REFORZADO PAR 0 0.00 12.00 108.00 0 0.00 12 108.00 9.00 12 108.00 0.00 12 108.00 0 0.00
BOTAS DE JEBE PAR 0 0.00 12.00 228.00 0 0.00 12 228.00 19.00 11 209.00 0.00 11 209.00 1 19.00
CASACA SEGÚN DISEÑO UND 0 0.00 4.00 400.00 0 0.00 4 400.00 100.00 4 400.00 0.00 4 400.00 0 0.00
ZAPATOS DE SEGURIDAD TALLAS (38, 40, Y 43) PAR 0 0.00 12.00 720.00 0 0.00 12 720.00 60.00 12 720.00 0.00 12 720.00 0 0.00
ZAPATOS DE SEGURIDAD TALLAS (36, 37, Y 40) PAR 0 0.00 3.00 270.00 0 0.00 3 270.00 90.00 3 270.00 0.00 3 270.00 0 0.00
MAMELUCO SEGÚN DISEÑO UND 0 0.00 12.00 780.00 0 0.00 12 780.00 65.00 12 780.00 0.00 12 780.00 0 0.00
PROTECTOR VISUAL UND 0 0.00 12.00 60.00 0 0.00 12 60.00 5.00 12 60.00 0.00 12 60.00 0 0.00
GUANTES DE JEBE UND 0 0.00 18.00 144.00 0 0.00 18 144.00 8.00 12 96.00 2 16.00 14 112.00 4 32.00
PROTECTOR DE OIDO UND 0 0.00 6.00 13.20 0 0.00 6 13.20 2.20 0 0.00 6 13.20 6 13.20 0 0.00
CINTA DE SEGURIDAD ROLL 0 0.00 8.00 304.00 0 0.00 8 304.00 38.00 7 266.00 1 38.00 8 304.00 0 0.00
PROTECTOR DE CABEZA COLOR AMARILLO 8, AZUL 2, VEREDE 2 UND 0 0.00 12.00 96.00 0 0.00 12 96.00 8.00 12 96.00 0.00 12 96.00 0 0.00
BARBIQUEJO UND 0 0.00 12.00 24.00 0 0.00 12 24.00 2.00 12 24.00 0.00 12 24.00 0 0.00
RESPIRADOR CON FILTRO UND 0 0.00 3.00 21.00 0 0.00 3 21.00 7.00 2 14.00 0.00 2 14.00 1 7.00
CORTA VIENTO UND 0 0.00 12.00 120.00 0 0.00 12 120.00 10.00 12 120.00 0.00 12 120.00 0 0.00
PROTECTOR COLOR BLANCO UND 0 0.00 2.00 64.00 0 0.00 2 64.00 32.00 2 64.00 0.00 2 64.00 0 0.00
Materiales de Construccion 0.00 93,050.00 0.00 93,050.00 91,007.40 2,038.40 93,045.80 4.20
ARENA GRUESA (PUESTO EN OBRA) M3 0 0.00 200.00 13,000.00 0 0.00 200 13000.00 65.00 174 11298.95 26 1,701.05 200 13,000.00 0 0.00
PIEDRA CHANCADA DE 1/2" - 3/4" M3 0 0.00 230.00 14,950.00 0 0.00 230 14950.00 65.00 226 14703.65 4 246.35 230 14,950.00 0 0.00
MATERIAL GRANULAR PARA SUB BASE PUESTO EN OBRA M3 0 0.00 560.00 19,600.00 0 0.00 560 19600.00 35.00 560 19595.80 0.00 560 19,595.80 0 4.20
CEMENTO PORTLAND TIPO I BOLSAS 0 0.00 2,500.00 45,500.00 0 0.00 2500 45500.00 18.20 2,495 45409.00 5 91.00 2,500 45,500.00 0 0.00
OTROS MATERIALES DE CONSTRUCCION 0.00 18909.00 0.00 18909.00 14613.00 1661.00 16274.00 2635.00
ACERO CORRUGADO 1/2" VAR 0 0.00 30.00 870.00 0 0.00 30 870.00 29.00 30 870.00 0.00 30 870.00 0 0.00
ACERO LISO DE 5/8" VAR 0 0.00 85.00 3,825.00 0 0.00 85 3825.00 45.00 85 3825.00 0.00 85 3,825.00 0 0.00
ACERO LISO DE 1/2" VAR 0 0.00 10.00 250.00 0 0.00 10 250.00 25.00 10 250.00 0.00 10 250.00 0 0.00
ALAMBRE NEGRO N°8 KG 0 0.00 150.00 675.00 0 0.00 150 675.00 4.50 50 225.00 0.00 50 225.00 100 450.00
CLAVOS PARA MADERA CON CABEZA DE 2 1/2" KG 0 0.00 60.00 270.00 0 0.00 60 270.00 4.50 15 67.50 0.00 15 67.50 45 202.50
CLAVOS PARA MADERA CON CABEZA DE 3" KG 0 0.00 60.00 270.00 0 0.00 60 270.00 4.50 51 229.50 0.00 51 229.50 9 40.50
TUBO DE 3/4 PVC 3 MT UND 0 0.00 25.00 125.00 0 0.00 25 125.00 5.00 0 0.00 25.000 125.00 25 125.00 0 0.00
TUBERIA PVC UF S-25 DN 200 MM NTP ISO 4435 I/ ANILLO DE JEBE UND 0 0.00 12.00 2,304.00 0 0.00 12 2304.00 192.00 0 0.00 8.000 1,536.00 8 1,536.00 4 768.00
TUBERIA PVC UF S-25 DN 250 MM NTP ISO 4435 I/ ANILLO DE JEBE UND 0 0.00 38.00 10,222.00 0 0.00 38 10222.00 269.00 34 9146.00 0.00 34 9,146.00 4 1,076.00
PEGAMENTO PVC GAL 0 0.00 1.00 98.00 0 0.00 1 98.00 98.00 0 0.00 0.00 0 0.00 1 98.00
MADERAS 0.00 10,820.00 0.00 10,820.00 9,872.00 643.00 10,515.00 305.00
TABLA DE 1" X 8" X 10" TORNILLO CEPILLADO UNA CARA UND 0 0.00 140.00 6,300.00 0 0.00 140 6300.00 45.00 139 6255.00 0.00 139 6,255.00 1 45.00
TABLA 1/2" X 8" X 10" TORNILLO CEPILLADO UNA CARA UND 0 0.00 70.00 1,610.00 0 0.00 70 1610.00 23.00 59 1357.00 11.000 253.00 70 1,610.00 0 0.00
CUARTON 2" X 2" X 10" MONTAÑA UND 0 0.00 180.00 1,800.00 0 0.00 180 1800.00 10.00 160 1600.00 0.00 160 1,600.00 20 200.00
CUARTON 2" X 2" X 10" EUCALIPTO UND 0 0.00 100.00 750.00 0 0.00 100 750.00 7.50 88 660.00 12.000 90.00 100 750.00 0 0.00
PLANCHA DE TRIPLEY DE 8MM UND 0 0.00 6.00 360.00 0 0.00 6 360.00 60.00 0 0.00 5.000 300.00 5 300.00 1 60.00
Herramientas 0.00 3648.00 0.00 3648.00 2354.00 456.00 2810.00 838.00
INFORME MENSUAL DE ALMACEN
MES JUNIO ANALITICO: N° 01
OBRA
MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR, JORGE BASADRE TRAMO: AV GENERAL CÓRDOVA - JR SUCRE Y PASAJE SANTA MARÍA DEL DISTRITO
DE CHILCA - HUNACAYO - JUNIN
SUPERVISOR DE OBRA : ARQ.YESSENIA HUAROC PEREZ
RESIDENTE DE OBRA : ING. IRVIN RONY CARDENAS POMA
ALMACENERO : MARIBEL BRICEÑO EULOGIO
RUBRO : 07

INGRESADO GASTO EJECUTADOS


ESPEC (a) SALDO TOTAL
UNIDAD DE
IFICA DESCRIPCION PROGRAMADO C/CHICA ABA.-O/C NEA TOTAL MES ANT. ACTUAL ACUMULADO
MEDIDA PRECIO
S S/ANALITICO TOT.
Cant. Monto Cant. Monto Cant. Monto Cant. Monto UNIT. Cant. Monto Cant. Monto TOTAL GASTO Cant. Monto
UTIL.
CARRETILLA BUGGI CON RODAJE INCLUYE LLANTA UND 0 0.00 6.00 990.00 0 0.00 6 990.00 165.00 3 495.00 1.000 165.00 4 660.00 2 330.00
INFORME MENSUAL DE ALMACEN
MES JUNIO ANALITICO: N° 01
OBRA
MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR, JORGE BASADRE TRAMO: AV GENERAL CÓRDOVA - JR SUCRE Y PASAJE SANTA MARÍA DEL DISTRITO
DE CHILCA - HUNACAYO - JUNIN
SUPERVISOR DE OBRA : ARQ.YESSENIA HUAROC PEREZ
RESIDENTE DE OBRA : ING. IRVIN RONY CARDENAS POMA
ALMACENERO : MARIBEL BRICEÑO EULOGIO
RUBRO : 07

INGRESADO GASTO EJECUTADOS


ESPEC (a) SALDO TOTAL
UNIDAD DE
IFICA DESCRIPCION PROGRAMADO C/CHICA ABA.-O/C NEA TOTAL MES ANT. ACTUAL ACUMULADO
MEDIDA PRECIO
S S/ANALITICO TOT.
Cant. Monto Cant. Monto Cant. Monto Cant. Monto UNIT. Cant. Monto Cant. Monto TOTAL GASTO Cant. Monto
UTIL.
LLANTA CON CAMARA RODAJE Y ARO UND 0 0.00 6.00 270.00 0 0.00 6 270.00 45.00 0 0.00 0.00 0 0.00 6 270.00
LAMPA CON MANGO UND 0 0.00 10.00 255.00 0 0.00 10 255.00 25.50 6 153.00 0.00 6 153.00 4 102.00
PICO CON MANGO UND 0 0.00 10.00 300.00 0 0.00 10 300.00 30.00 10 300.00 0.00 10 300.00 0 0.00
COMBO DE 16 LIBRAS C/MANGO UND 0 0.00 2.00 110.00 0 0.00 2 110.00 55.00 2 110.00 0.00 2 110.00 0 0.00
COMBO DE 08 LIBRAS C/MANGO UND 0 0.00 2.00 58.00 0 0.00 2 58.00 29.00 2 58.00 0.00 2 58.00 0 0.00
FLEXOMETRO DE 5 MTS UND 0 0.00 4.00 80.00 0 0.00 4 80.00 20.00 4 80.00 0.00 4 80.00 0 0.00
TIRALINEA UND 0 0.00 4.00 48.00 0 0.00 4 48.00 12.00 2 24.00 0.00 2 24.00 2 24.00
PLANCHA PULIR UND 0 0.00 4.00 42.00 0 0.00 4 42.00 10.50 3 31.50 0.00 3 31.50 1 10.50
PLANCHA DE BATIR UND 0 0.00 4.00 38.00 0 0.00 4 38.00 9.50 4 38.00 0.00 4 38.00 0 0.00
BRUNÑA DE CENTRO UND 0 0.00 4.00 18.00 0 0.00 4 18.00 4.50 1 4.50 0.00 1 4.50 3 13.50
BRUNÑA DE CANTO UND 0 0.00 4.00 18.00 0 0.00 4 18.00 4.50 2 9.00 0.00 2 9.00 2 9.00
NIVEL DE MANO UND 0 0.00 4.00 96.00 0 0.00 4 96.00 24.00 3 72.00 0.00 3 72.00 1 24.00
CORDEL DE CANÑA DE PESCAR 0.9 MM UND 0 0.00 4.00 44.00 0 0.00 4 44.00 11.00 3 33.00 0.00 3 33.00 1 11.00
CORDEL NYLON N° 16 UND 0 0.00 2.00 38.00 0 0.00 2 38.00 19.00 1 19.00 0.00 1 19.00 1 19.00
HOJAS DE SIERRA UND 0 0.00 12.00 54.00 0 0.00 12 54.00 4.50 6 27.00 6.000 27.00 12 54.00 0 0.00
DISCO DE CONCRETO DE 7.5" M UND 0 0.00 6.00 264.00 0 0.00 6 264.00 44.00 0 0.00 6.000 264.00 6 264.00 0 0.00
PLASTICO DE 1.5 M REFORZADO DOBLE ANCHO-K MTS 0 0.00 200.00 700.00 0 0.00 200 700.00 3.50 200 700.00 0.00 200 700.00 0 0.00
MANGUERA DE 3/4 MTS 0 0.00 100.00 150.00 0 0.00 100 150.00 1.50 100 150.00 0.00 100 150.00 0 0.00
MANGUERA DE 2" MTS 0 0.00 10.00 50.00 0 0.00 10 50.00 5.00 10 50.00 0.00 10 50.00 0 0.00
AZUELA UND 0 0.00 1.00 25.00 0 0.00 1 25.00 25.00 0 0.00 0.00 0 0.00 1 25.00
COMBUSTIBLE 0.00 5180.00 5180.00 3965.60 547.80 4513.40 666.60
GASOHOL DE 90 PLUS GAL 0 0.00 150.00 1980.00 0 0.00 150 1980.00 13.20 58 765.60 41.500 547.80 100 1313.40 50.5 666.60
DIESEL B5 S-50 GAL 0 0.00 250.00 3200.00 0 0.00 250 3200.00 12.80 250 3200.00 0.00 250 3200.00 0 0.00
ACEITES 0.00 4,150.00 4150.00 4,150.00 0.00 4,150.00 -
FILTRO DE COMBUSTIBLE PRIMARIO UND 0 0.00 1.00 148.00 0 0.00 1 148.00 148.00 1 148.00 0.00 1 148.00 0 0.00
FILTRO DE COMBUSTIBLE SECUNDARIO UND 0 0.00 2.00 136.00 0 0.00 2 136.00 68.00 2 136.00 0.00 2 136.00 0 0.00
FILTRO DE ACEITE DE MOTOR UND 0 0.00 1.00 48.00 0 0.00 1 48.00 48.00 1 48.00 0.00 1 48.00 0 0.00
FILTRO DE AIRE PRIMARIO UND 0 0.00 1.00 228.00 0 0.00 1 228.00 228.00 1 228.00 0.00 1 228.00 0 0.00
FILTRO DE ACEITE HIDRAULICO UND 0 0.00 1.00 250.00 0 0.00 1 250.00 250.00 1 250.00 0.00 1 250.00 0 0.00
FILTRO DE AIRE SECUNDARIO UND 0 0.00 1.00 210.00 0 0.00 1 210.00 210.00 1 210.00 0.00 1 210.00 0 0.00
FILTRO DE ACEITE DE TRANSMISION UND 0 0.00 1.00 109.00 0 0.00 1 109.00 109.00 1 109.00 0.00 1 109.00 0 0.00
FILTRO DE SEPARADOR DE AGUA UND 0 0.00 1.00 79.00 0 0.00 1 79.00 79.00 1 79.00 0.00 1 79.00 0 0.00
ACEITE DE MOTOR SAE 15W40 X 5GL BALDE 0 0.00 1.00 260.00 0 0.00 1 260.00 260.00 1 260.00 0.00 1 260.00 0 0.00
ACEITE DE TRANSMISION SAE 30 X 5GL BALDE 0 0.00 7.00 2086.00 0 0.00 7 2086.00 298.00 7 2086.00 0.00 7 2,086.00 0 0.00
ACEITE HIDRAULICO SAE 10W GULF BALDE 0 0.00 2.00 596.00 0 0.00 2 596.00 298.00 2 596.00 0.00 2 596.00 0 0.00
Utiles de Escritorio 0.00 1108.93 0.00 1108.93 1050.58 58.35 1108.93 0.00
CINTA ADHESIVA TRANSPARENTE DE ¾”X72 YARDAS SHURTAPE UND 0 0.00 4.00 8.35 0 0.00 4 8.35 2.09 4 8.35 0.00 4 8.35 0 0.00
CORRECTOR LIQUIDO T/LAPICERO UND 0 0.00 3.00 3.68 0 0.00 3 3.68 1.23 3 3.68 0.00 3 3.68 0 0.00
TAMPON CON COBERTURA PLASTICA COLOR AZUL T:12.5x 9.5 cm. UND 0 0.00 2.00 4.63 0 0.00 2 4.63 2.31 2 4.63 0.00 2 4.63 0 0.00
TINTA PARA TAMPON COLOR AZUL Y NEGRO UND 0 0.00 2.00 2.08 0 0.00 2 2.08 1.04 2 2.08 0.00 2 2.08 0 0.00
PLUMON RESALTADOR F/ RECTANGULAR COLOR AMARILLO UND 0 0.00 4.00 4.86 0 0.00 4 4.86 1.22 4 4.86 0.00 4 4.86 0 0.00
PORTAMINA ANCHO D/TRAZADO 0.5MM- FABER CASTELL ECON 0.5 UND 0 0.00 3.00 12.07 0 0.00 3 12.07 4.02 3 12.07 0.00 3 12.07 0 0.00
CUADERNO ENGRANPADO CUADRICULADO DE56 GR T.A -5X92 HOJAS LORO UND 0 0.00 3.00 6.24 0 0.00 3 6.24 2.08 3 6.24 0.00 3 6.24 0 0.00
PAPEL BOND FOTOCOPIA D/75 GR T: A4 – ULTRA COPY X 500 UNIDADES PAQUETE 0 0.00 12.00 140.04 0 0.00 12 140.04 11.67 7 81.69 5.000 58.35 12 140.04 0 0.00
BOLIGRAFO DE TINTA SECA COLOR ROJO, AZUL D/ PUNTA FINA UND 0 0.00 12.00 8.36 0 0.00 12 8.36 0.70 12 8.36 0.00 12 8.36 0 0.00
ARCHIVADOR D/CARTON PLATIFICADO C/PALANCA , OFICIO UND 0 0.00 8.00 29.36 0 0.00 8 29.36 3.67 8 29.36 0.00 8 29.36 0 0.00
ARCHIVADOR D/CARTON PLATIFICADO C/PALANCA , 1/2 OFICIO UND 0 0.00 2.00 7.22 0 0.00 2 7.22 3.61 2 7.22 0.00 2 7.22 0 0.00
PAPEL LUSTRE COLORES VARIADOS T: 50 CM X65 CM PLIEGO APOLO UND 0 0.00 6.00 3.19 0 0.00 6 3.19 0.53 6 3.19 0.00 6 3.19 0 0.00
INFORME MENSUAL DE ALMACEN
MES JUNIO ANALITICO: N° 01
OBRA
MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR, JORGE BASADRE TRAMO: AV GENERAL CÓRDOVA - JR SUCRE Y PASAJE SANTA MARÍA DEL DISTRITO
DE CHILCA - HUNACAYO - JUNIN
SUPERVISOR DE OBRA : ARQ.YESSENIA HUAROC PEREZ
RESIDENTE DE OBRA : ING. IRVIN RONY CARDENAS POMA
ALMACENERO : MARIBEL BRICEÑO EULOGIO
RUBRO : 07

INGRESADO GASTO EJECUTADOS


ESPEC (a) SALDO TOTAL
UNIDAD DE
IFICA DESCRIPCION PROGRAMADO C/CHICA ABA.-O/C NEA TOTAL MES ANT. ACTUAL ACUMULADO
MEDIDA PRECIO
S S/ANALITICO TOT.
Cant. Monto Cant. Monto Cant. Monto Cant. Monto UNIT. Cant. Monto Cant. Monto TOTAL GASTO Cant. Monto
UTIL.
BORRADOR UND 0 0.00 3.00 1.17 0 0.00 3 1.17 0.39 3 1.17 0.00 3 1.17 0 0.00
GRAPAS CAJA 0 0.00 2.00 3.26 0 0.00 2 3.26 1.63 2 3.26 0.00 2 3.26 0 0.00
PLUMON INDELEBLE COLOR AZUL Y NEGRO UND 0 0.00 2.00 2.05 0 0.00 2 2.05 1.03 2 2.05 0.00 2 2.05 0 0.00
THONER HP NEGRO UND 0 0.00 2.00 872.37 0 0.00 2 872.37 436.19 2 872.37 0.00 2 872.37 0 0.00
COSTO DE CONST POR ADM. DIRECTA - SERVICIO 16,925.00 0.00 15,485.00 0.00 15,310.00 14,375.00 1,110.00 15,485.00 0.00
2.6.2.3.2 PORTA MINA CON PUNTA METALICA 0.00 15,485.00 0.00 15310.00 14375.00 1110.00 15,485.00 0.00
ALQUILER DE RETROEXCABADORA HM 0 0.00 30.00 4,200.00 0 0.00 30 4,200.00 140.00 30 4200.00 0.00 30 4,200.00 0 0.00
ALQUILER DE CARGADOR FRONTAL HM 0 0.00 30.00 5,400.00 0 0.00 30 5,400.00 180.00 30 5400.00 0.00 30 5,400.00 0 0.00
ALQUILER DE VOLQUETE HM 0 0.00 30.00 4,200.00 0 0.00 30 4,200.00 140.00 30 4200.00 0.00 30 4,200.00 0 0.00
PRUEBA DE CALIDAD- DISEÑOS DE MEZCLA UND 0 0.00 2.00 300.00 0 0.00 2 300.00 150.00 2 300.00 0.00 2 300.00 0 0.00
PRUEBA DE CALIDAD- DENSIDAD DE CAMPO UND 0 0.00 15.00 450.00 0 0.00 15 450.00 30.00 5 150.00 10.000 300.00 15 450.00 0 0.00
PRUEBA DE CALIDAD-ROTURA DE PROBETAS UND 0 0.00 30.00 600.00 0 0.00 30 600.00 20.00 0 0.00 30.000 600.00 30 600.00 0 0.00
PRUEBA DE CALIDAD- PRUEBA HIDRAULICA UND 0 0.00 1.00 160.00 0 0.00 1 160.00 160.00 0 0.00 1.000 160.00 1 160.00 0 0.00
FOTOCOPIAS DE VARIOS DOCUMENTOS UND 0 0.00 3,500.00 175.00 0 0.00 3500 175.00 0.05 2500 125.00 1000.000 50.00 3,500 175.00 0 0.00
S/. 304,000.00 0.00 S/. 155,703.13 S/. 0.00 S/. 155,528.13 0 S/. 275,079.25 S/. 6,581.75 S/. 281,661.00 S/. 7,872.13

--------------------------------
ALMACENERO -------------------------------- ----------------------------------
RESIDENTE SUPERVISOR
INFORME MENSUAL DE ALMACEN
MES JUNIO ANALITICO: N° 01
OBRA
MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR, JORGE BASADRE TRAMO: AV GENERAL CÓRDOVA - JR SUCRE Y PASAJE SANTA MARÍA DEL DISTRITO DE
CHILCA - HUNACAYO - JUNIN
SUPERVISOR DE OBRA : ARQ.YESSENIA HUAROC PEREZ
RESIDENTE DE OBRA : ING. IRVIN RONY CARDENAS POMA
ALMACENERO : MARIBEL BRICEÑO EULOGIO
RUBRO : 18

INGRESADO GASTO EJECUTADOS


ESPEC (a) SALDO TOTAL
UNIDAD DE
IFICA DESCRIPCION PROGRAMADO C/CHICA ABA.-O/C NEA TOTAL MES ANT. ACTUAL ACUMULADO
MEDIDA PRECIO
S S/ANALITICO TOT.
Cant. Monto Cant. Monto Cant. Monto Cant. Monto UNIT. Cant. Monto Cant. Monto TOTAL GASTO Cant. Monto
UTIL.
2 GASTOS PRESUPUESTARIOS
2.6 ADQUISICION DE ACTIVOS NO FINANCIEROS
2.6.2 CONSTRUCCION DE EDIFICIOS Y ESTRUCTURAS
2.6.2.3 OTRAS ESTRUCTURAS
2.6.2.3.2 INFRAESTRUCTURA VIAL
2.6.2.3.2 COSTO DE CONST. POR ADM. DIRECTA - PERSONAL 125,670.00 0.00 57,696.86 51,097.42 108,794.28 16,875.72
PLANILLA DE PAGO MES DE AGOSTO 57,696.86 51,097.42 108,794.28
2.6.2.3.2 COSTO DE CONST POR ADM. DIRECTA - BIENES 36,830.00 0.00 36,829.70 0.00 36,829.7000 330.0000 36,149.7000 36,479.7000 350.0000
MATERIALES DE CONSTRUCCIÓN 0.00 28,760.00 0.00 28,760.00 0.00 28,760.00 28,760.00 0.00
MATERIAL GRANULAR PARA SUB BASE PUESTO EN OBRA M3 0 0.00 250.00 8,750.00 0 0.00 250 8750.00 35.00 0 0.00 250.000 8,750.00 250 8,750.00 0 0.00
CEMENTO BOLS 0 0.00 870.00 20,010.00 0 0.00 870 20010.00 23.00 0 0.00 870.000 20,010.00 870 20,010.00 0 0.00
OTROS MATERIALES DE CONSTRUCCION 0.00 8069.70 0.00 8069.70 330.00 7389.70 7719.70 350.00
ASFALTO RC-250 GAL 0 0.00 50.00 550.00 0 0.00 50 550.00 11.00 30 330.00 20.000 220.00 50 550.00 0 0.00
TIERRA NEGRA M3 0 0.00 12.00 1,080.00 0 0.00 12 1080.00 90.00 0 0.00 12.000 1,080.00 12 1,080.00 0 0.00
SEMILLA GRASS AMERICANO PARA JARDINERÍA KG 0 0.00 20.00 700.00 0 0.00 20 700.00 35.00 0 0.00 20.000 700.00 20 700.00 0 0.00
PLANTONES (FRESNOS, ALAMOS, QUINUAL) UND 0 0.00 115.00 1,552.50 0 0.00 115 1552.50 13.50 0 0.00 115.000 1,552.50 115 1,552.50 0 0.00
MARCO Y TAPA DE FF° BUZÓN 0.60M X 125 KG YARMA UND 0 0.00 6.00 2,100.00 0 0.00 6 2100.00 350.00 0 0.00 5.000 1,750.00 5 1,750.00 1 350.00
PINTURA DE TRÁFICO DE 1 GALON MARCA JET (9 AMARILLOS, 5 NEGROS, 5 BLANCOS) GAL 0 0.00 19.00 1,273.00 0 0.00 19 1273.00 67.00 0 0.00 19.000 1,273.00 19 1,273.00 0 0.00
DISOLVENTE PARA TRAFICO M/ANYPSA GAL 0 0.00 10.00 269.00 0 0.00 10 269.00 26.90 0 0.00 10.000 269.00 10 269.00 0 0.00
BROCHA DE 4"/AGUILA UND 0 0.00 4.00 47.20 0 0.00 4 47.20 11.80 0 0.00 4.000 47.20 4 47.20 0 0.00
RODILLO DE 4" MARCA TORO UND 0 0.00 6.00 48.00 0 0.00 6 48.00 8.00 0 0.00 6.000 48.00 6 48.00 0 0.00
PLACA RECORDATORIA DE MARMOL IMPORTADOS CARRARA UND 0 0.00 1.00 450.00 0 0.00 1 450.00 450.00 0 0.00 1.000 450.00 1 450.00 0 0.00
COSTO DE CONST POR ADM. DIRECTA - SERVICIO 12,500.00 0.00 12,500.00 0.00 12,500.00 11,100.00 1,400.00 12,500.00 0.00
2.6.2.3.2 PORTA MINA CON PUNTA METALICA 0.00 12,500.00 0.00 12500.00 11100.00 1400.00 12,500.00 0.00
MANTENIMIENTO CORRECTIVO DEL TRACTOR ORUGA CAT D6MXL HM 0 0.00 1.00 4,800.00 0 0.00 1 4,800.00 4800.00 1 4800.00 0.000 0.00 1 4,800.00 0 0.00
CONSTRUCCIÓN E INSTALACIÓN DE 04 UNIDADES DE SEÑALIZACIÓN INFORMATIVA HM 0 0.00 1.00 850.00 0 0.00 1 850.00 850.00 0 0.00 1.000 850.00 1 850.00 0 0.00
MANTENIMIENTO PREVENTIVO Y CORRECTIVO DE LA MAQUINARIA DEL VOLQUETE IVECO TRAKKE HM 0 0.00 1.00 3,000.00 0 0.00 1 3,000.00 3000.00 1 3000.00 0.000 0.00 1 3,000.00 0 0.00
MANTENIMIENTO PREVENTIVO Y CORRECTIVO DE LA MAQUINARIA MOTONIVELADORA KOMATSU GD51 HM 0 0.00 1.00 3,300.00 0 0.00 1 3,300.00 3300.00 1 3300.00 0.000 0.00 1 3,300.00 0 0.00
CONSTRUCCIÓN E INSTALACIÓN DE REJILLA METÁLICA PARA TAPA DE DRENAJE PLUVIAL CON MEDIDA HM 0 0.00 1.00 550.00 0 0.00 1 550.00 550.00 0 0.00 1.000 550.00 1 550.00 0 0.00
S/. 175,000.00 0.00 S/. 49,329.70 S/. 0.00 S/. 49,329.70 0 S/. 69,126.86 S/. 88,647.12 S/. 157,773.98 S/. 17,225.72

--------------------------------
ALMACENERO -------------------------------- ----------------------------------
RESIDENTE SUPERVISOR
MANIFIESTO DE GASTO POR RUBROS
PROYECTO: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA - JR. SUCRE Y PSJE. SANTA MARIA DEL, DISTRITO DE CHILCA -
OBRA
HUANCAYO - JUNIN”
META
SUPERVISOR DE OBRA :ING. IRVIN RONY CARDENAS POMA CIP: 181654
RESIDENTE DE OBRA :ING. YESENIA GLORIA HUAROC PEREZ CIP: 94881

APORTE DE MUNICIPALIDAD DISTRITAL DE CHILCA


RUBRO 07
GASTOS FINANCIEROS
PROGRAMADO
ITEM RUBRO CLASIFICADOR DESCRIPCION % COSTOS MAT.
S/ANALITICO % SALDO DEL PIA %
ADQUIRIDOS

01 2.6.2.3.2.4 COSTO DE CONST. POR ADMINIST. DIRECTA-PERSONAL S/. 136,171.00 100% S/. 135,898.96 99.80% S/. 272.04 0.20%
07 REC.
DIRECT.
02 2.6.2.3.2.5 COSTO DE CONST. POR ADMINIST. DIRECTA-BIENES S/. 144,589.00 100% S/. 140,718.13 97.32% S/. 3,870.87 2.68%
RECAUD
.
03 2.6.2.3.2.6 COSTO DE CONST. POR ADMINIST. DIRECTA-SERVICIOS S/. 15,485.00 100% S/. 15,485.00 100.00% S/. - 0.00%

TOTAL EJECUTADO S/. 296,245.00 100% S/. 292,102.09 98.60% S/. 4,142.91 1.40%

RUBRO 18
GASTOS FINANCIEROS
PROGRAMADO
ITEM RUBRO CLASIFICADOR DESCRIPCION % COSTOS MAT.
S/ANALITICO % SALDO DEL PIA %
ADQUIRIDOS

01 2.6.2.3.2.4 COSTO DE CONST. POR ADMINIST. DIRECTA-PERSONAL S/. 128,170.00 100% S/. 128,094.28 99.94% S/. 75.72 0.06%
18 REC.
DIRECT.
02 2.6.2.3.2.5 COSTO DE CONST. POR ADMINIST. DIRECTA-BIENES S/. 36,830.00 100% S/. 36,829.70 100.00% S/. 0.30 0.00%
RECAUD
.
03 2.6.2.3.2.6 COSTO DE CONST. POR ADMINIST. DIRECTA-SERVICIOS S/. 12,500.00 100% S/. 12,500.00 100.00% S/. - 0.00%

TOTAL EJECUTADO S/. 177,500.00 100% S/. 177,423.98 99.96% S/. 76.02 0.04%

TOTAL DE META S/. 473,745.00 100% S/. 469,526.07 99.11% S/. 4,218.93 0.89%
APORTE POR COFINANCIAMIENTO
GASTOS COFINANCIAMIENTO
ITEM DESCRIPCION COSTOS MAT.
% SALDO DEL PIA %
ADQUIRIDOS

01 COSTO DE CONST. POR COFINANCIAMIENTO-BIENES S/. 30,907.68 100.00%

02 COSTO DE CONST. POR COFINANCIAMIENTO-SERVICIOS S/. 8,400.00 100.00%

TOTAL EJECUTADO S/. 39,307.68 100.00%


RESUMEN DEL ESTADO FINANCIERO
APORTE MUNICIPALIDAD DISTRITAL DE CHILCA

PROYECTO: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA - JR. SUCRE Y PSJE. SANTA MARIA DEL, DISTRITO DE CHILCA - HUANCAYO
OBRA
- JUNIN”
RUBRO
SUPERVISOR DE OBRA : ING. YESENIA GLORIA HUAROC PEREZ
RESIDENTE DE OBRA : ING.IRVIN RONY CARDENAS POMA
ALMACENERO : MARIBEL BRICEÑO EULOGIO
FECHA Sep-18

RUBRO 07
GASTOS GASTOS FINANCIEROS
PROGRAMADO SALDO
ITEM CLASIFICADOR DESCRIPCION
S/ANALITICO
EJECUTADOS % PRESUPUESTAL
%
SEGÚN O/C Y O/S MES ANT. % PTE. MES % ACUMULADO %
01 2.6.2.3.2. 4 PERSONAL 133,830.00 133,830.00 100% 130,464.67 45.06% 0.00 0.00% 130,464.67 45.06% 3,365.33 1.16%
02 2.6.2.3.2. 5 BIENES 153,245.00 140,218.13 100% 130,239.58 44.98% 5,471.75 1.89% 135,711.33 46.87% 4,506.80 1.56%
03 2.6.2.3.2. 6 SERVICIOS 16,925.00 15,485.00 100% 14,375.00 4.96% 1,110.00 0.38% 15,485.00 5.35% 0.00 0.00%
TOTAL 304,000.00 289,533.13 100% 275,079.25 95.0% 6,581.75 2.27% 281,661.00 97.28% 7,872.13 3%

RUBRO 18
01 2.6.2.3.2. 4 PERSONAL 125,670.00 125,670.00 100% 57,696.86 32.97% 51,097.42 40.66% 108,794.28 62.17% 16,875.72 9.64%
02 2.6.2.3.2. 5 BIENES 36,830.00 36,829.70 100% 330.00 0.19% 36,149.70 98.15% 36,479.70 20.85% 350.00 0.20%
03 2.6.2.3.2. 6 SERVICIOS 12,500.00 12,500.00 100% 11,100.00 6.34% 1,400.00 11.20% 12,500.00 7.14% 0.00 0.00%
TOTAL 175,000.00 174,999.70 100% 69,126.86 39.5% 88,647.12 50.66% 157,773.98 90.16% 17,225.72 10%

RESUMEN TOTAL DEL MES DE AGOSTO


GASTOS GASTOS FINANCIEROS
PROGRAMADO SALDO
ITEM FUENTE DE FFTO DESCRIPCION S/ANALITICO
EJECUTADOS % PRESUPUESTAL
%
SEGÚN O/C Y O/S MES ANT. % PTE. MES % ACUMULADO %
01 7 FONCOMUN 304,000.00 289,533.13 100% 275,079.25 59.22% 6,581.75 1.42% 281,661.00 60.63% 22,339.00 4.81%
02 18 CANON 175,000.00 174,999.70 100% 69,126.86 14.88% 88,647.12 19.08% 157,773.98 33.96% 17,226.02 3.71%
TOTAL 479,000.00 464,532.83 100% 344,206.11 74.1% 95,228.87 20.50% 439,434.98 94.60% 39,565.02 9%

-------------------------------- -------------------------------- ----------------------------------


ALMACENERO RESIDENTE SUPERVISOR
MANIFIESTO DE GASTO POR RUBROS
PROYECTO: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA - JR. SUCRE Y PSJE. SANTA MARIA DEL,
OBRA
DISTRITO DE CHILCA - HUANCAYO - JUNIN”
META
SUPERVISOR DE OBRA :ING. IRVIN RONY CARDENAS POMA CIP: 181654
RESIDENTE DE OBRA :ING. YESENIA GLORIA HUAROC PEREZ CIP: 94881

APORTE DE MUNICIPALIDAD DISTRITAL DE CHILCA

RUBRO 07
GASTOS FINANCIEROS
PROGRAMADO
ITEM RUBRO CLASIFICADOR DESCRIPCION % COSTOS MAT.
S/ANALITICO % SALDO DEL PIA %
ADQUIRIDOS

01 2.6.2.3.2.4 COSTO DE CONST. POR ADMINIST. DIRECTA-PERSONAL 133,830.00 100% 130,464.67 97.49% 3,365.33 2.51%
07 REC.
DIRECT.
02 2.6.2.3.2.5 COSTO DE CONST. POR ADMINIST. DIRECTA-BIENES 153,245.00 100% 140,218.13 91.50% 13,026.87 8.50%
RECAUD
.
03 2.6.2.3.2.6 COSTO DE CONST. POR ADMINIST. DIRECTA-SERVICIOS 16,925.00 100% 15,310.00 90.46% 1,615.00 9.54%

TOTAL EJECUTADO 304,000.00 100% 285,992.80 94.08% 18,007.20 5.92%

RUBRO 18
GASTOS FINANCIEROS
PROGRAMADO
ITEM RUBRO CLASIFICADOR DESCRIPCION % COSTOS MAT.
S/ANALITICO % SALDO DEL PIA %
ADQUIRIDOS

01 2.6.2.3.2.4 COSTO DE CONST. POR ADMINIST. DIRECTA-PERSONAL 125,670.00 100% 108,794.28 86.57% 16,875.72 13.43%
18 REC.
DIRECT.
02 2.6.2.3.2.5 COSTO DE CONST. POR ADMINIST. DIRECTA-BIENES 36,830.00 100% 36,829.70 100.00% 0.30 0.00%
RECAUD
.
03 2.6.2.3.2.6 COSTO DE CONST. POR ADMINIST. DIRECTA-SERVICIOS 12,500.00 100% 12,500.00 100.00% 0.00 0.00%

TOTAL EJECUTADO 175,000.00 100% 158,123.98 90.36% 16,876.02 9.64%

479,000.00