2 UBICACIÓN
DEPARTAMENTO : Junin
PROVINCIA : Huancayo
DISTRITO : Chilca
3 ENTIDAD CONTRATANTE : Municipalidad Distrital de Chilca
4 ENTIDAD QUE FINANCIA : Municipalidad Distrital de Chilca
CONVENIO : 75%
FECHA DE FIRMA DEL CONVENIO : 21 de Junio de 2017
5 CÓDIGO DE PROYECTO : 15-036-0074-0108-2235679-4000034-0127
6 DEL PERFIL
6.01 CÓDIGO ÚNICO : 277195
6.02 CODIGO DE PROYECTO : 15-036-0074-0108-2235679-4000034-0127
6.03 CONTRATO DE SERVICIOS :
6.04 CONSULTOR :
6.05 MONTO DEL CONTRATO :
6.06 NIVEL DE CALIFICACION :
6.07 PLAZO PARA LA ELABORACION :
6.08 FECHA DE DECLARATORIA DE LA VIABILIDAD :
6.09 COMPONENTES DEL PROYECTO DE INVERSION PUBLICA
EXPEDIENTE TECNICO : S/. 30,000.00
COSTO DIRECTO : S/. 927,863.77
GASTOS GENERALES : S/. 138,066.13
SUPERVISION : S/. 35,708.65
IGV ( 18 % ) : S/. 0.00
UTILIDAD : S/. 0.00
COSTO TOTAL : ###
PLAZO DE EJECUCION DEL PROYECTO : 180 d.c.
6.10 METAS DEL PROYECTO DE INVERSION PUBLICA
MEJORAMIENTO DE CALZADA PARA EL TRANSITO VEHICULAR CON ESTRUCTURA DE PAVIMENTO FLEXIBLE DE 2”, BASE
GRANULAR DE 0.20 MTS , SUB BASE GRANULAR DE 0.20 MTS; MEJORAMIENTO DE LA CAPA DE SUB RASANTE EN UN ESPESOR
DE 0.15 MTS, CONSTRUCCIÓN DE ESTACIONAMIENTOS DE CONCRETO, BOCACALLES, SARDINELES, BADENES Y RAMPAS DE
ACCESO ESPECIAL, REPOSICIÓN DE CUERPOS DE BUZÓN.
NIVEL DE CALIFICACION :
8 DEL CONTRATISTA
8.1 LICITACION PUBLICA :
8.2 CONTRATISTA :
8.3 RESIDENTE DE OBRA : ING. IRVIN RONY CARDENAS POMA
8.4 CONTRATO DE EJECUCION DE OBRA : 21-May-18
8.5 SISTEMA DE LICITACION :
8.6 MODALIDAD DE EJECUCION : Administración Directa
8.7 TOTAL PRESUPUESTO : S/. 556,960.08
8.8 PRESUPUESTO REFERENCIAL : S/. 556,960.08
8.9 PRESUPUESTO CONTRACTUAL : S/. 556,960.08
8.13 PLAZO DEL CONTRATISTA : 120 DC
8.14 ENTREGA DE TERRENO : 21-May-18
8.15 INICIO DEL PLAZO CONTRACTUAL : 21-May-18
8.16 TERMINO DEL PLAZO CONTRACTUAL : 17-Sep-18
8.17 PARALIZACION DE OBRA :
FECHA DE INICIO DE PARALIZACION :
DIAS PARALIZADOS - DC :
TERMINO DE LA PARALIZACION :
REINICIO DE EJECUCION DE OBRA :
9 DE LA SUPERVISION
9.1 CONTRATO DE SERVICIOS :
SUPERVISOR DE OBRA : ING. YESSENIA HUAROC PEREZ
MONTO DEL CONTRATO :
ENTREGA DE TERRENO : 21-May-18
PLAZO DE EJECUCION DE LA PRESTACION : 120
VENCIMIENTO DEL CONTRATO : 17-Sep-18
% % % % %
N° MES S/. S/. S/. S/. ESTADO OBS
1 Jul-17 S/. 84,302.85 7.10% S/. 84,302.85 7.10% S/. 78,305.29 6.59% S/. 78,305.29 6.59% 93% NORMAL
2 Aug-17 S/. 215,269.11 18.13% S/. 299,571.96 25.23% S/. 60,804.67 5.12% S/. 139,109.96 11.72% 46% ATRASADA
3 Sep-17 S/. 215,862.80 18.18% S/. 515,434.76 43.41% S/. 29,709.35 2.50% S/. 168,819.31 14.22% 33% ATRASADA Paralizado 29 días calendarios
4 Oct-17 S/. 183,803.97 15.48% S/. 699,238.73 58.89% S/. 95,982.36 8.08% S/. 264,801.67 22.30% 38% ATRASADA Condiciones climáticas
5 Nov-17 S/. 246,734.26 20.78% S/. 945,972.99 79.67% S/. 63,249.33 5.33% S/. 328,051.00 27.63% 35% ATRASADA Condiciones climáticas
6 Dec-17 S/. 218,475.00 18.40% S/. 1,164,447.99 98.07% S/. 120,826.23 21.69% S/. 448,877.23 49.32% 50% ATRASADA Condiciones climáticas
7 Jan-18 S/. 22,916.13 1.93% S/. 1,187,364.12 100.00%
TOTAL S/. 1,187,364.12 100.00% 100.00% S/. 448,877.23
RESUMEN DE VALORIZACION FINAL DE OBRAA - DESDE EL 01 DE SETIEMBRE HASTA EL 05 DE OCTUBRE DEL 2018
MONTO VALORIZACION
AVANCE %
CONTRATO (EN NUEVOS SOLES) DEL MES ACUMULAD
DESCRIPCION SALDOS
AL COSTO O AL COSTO
(S/IGV) ANTERIOR ACTUAL ACUMULADO DIRECTO DIRECTO
A: VALORIZACION CONTRACTUAL
ADECUADA CALZADA PARA EL TRÁNSITO VEHICULAR/PEATONAL 457,543.16 345,606.52 102,813.33 448,419.85 9,123.31
COSTO DIRECTO 457,543.16 345,606.52 102,813.33 448,419.85 9,123.31 22.47% 98.01%
GASTOS GENERALES 13.00% 59,480.61 44,928.85 13,365.73 58,294.58 1,186.03
SUB TOTAL 517,023.77 390,535.37 116,179.06 506,714.43 10,309.34
SUPERVISIÓN 4.00% 20,680.95 15,621.41 4,647.16 20,268.58 412.37
EXPEDIENTE TÉCNICO 11,500.00 11,500.00 0.00 11,500.00 0.00
LIQUIDACIÓN 1.50% 7,755.36 0.00 0.00 0.00 7,755.36
TOTAL 556,960.08 417,656.78 120,826.23 538,483.01 18,477.07
AVANCE FISICO DE OBRA 100.00% 74.99% 21.69% 96.68% 3.32%
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
01.04.07.01 ENCOFRADO Y DESENCOFRADO BOCACALLES m2 29.15 S/. 26.00 S/. 757.90 0.00 S/. - S/. - 0.00 S/. - 29.15 S/. 757.90
01.04.07.02 CONCRETO EN BOCACALLES f'c=210 kg/cm2 Incluye Acabado m3 26.71 S/. 370.44 S/. 9,894.45 0.00 S/. - S/. - 0.00 S/. - 26.71 S/. 9,894.45
01.04.07.03 CURADO TIPO ARROCERA m2 133.60 S/. 0.82 S/. 109.55 0.00 S/. - S/. - 0.00 S/. - 133.60 S/. 109.55
01.04.07.04 RELLENO DE JUNTAS CON ASFALTO m 56.60 S/. 6.56 S/. 371.30 0.00 S/. - S/. - 0.00 S/. - 56.60 S/. 371.30
01.04.08 CUNETAS
01.04.08.01 ENCOFRADO Y DESENCOFRADO PARA CUNETAS m2 88.39 S/. 25.84 S/. 2,284.00 0.00 S/. - S/. - 0.00 S/. - 88.39 S/. 2,284.00
01.04.08.02 CONCRETO EN CUNETAS f'c=210 kg/cm2 Incluye Acabado m3 31.52 S/. 370.44 S/. 11,676.27 0.00 S/. - S/. - 0.00 S/. - 31.52 S/. 11,676.27
01.04.08.03 CURADO TIPO ARROCERA m2 155.67 S/. 0.82 S/. 127.65 0.00 S/. - S/. - 0.00 S/. - 155.67 S/. 127.65
01.04.08.04 RELLENO DE JUNTAS CON ASFALTO m 19.56 S/. 6.56 S/. 128.31 0.00 S/. - S/. - 0.00 S/. - 19.56 S/. 128.31
01.05 OBRAS DE CONCRETO SIMPLE
01.05.01 SARDINEL PERALTADO
01.05.01.01 ENCOFRADO Y DESENCOFRADO DE SARDINELES m2 241.58 S/. 33.35 S/. 8,056.69 0.00 S/. - S/. - 0.00 S/. - 241.58 S/. 8,056.69
01.05.01.02 CONCRETO EN SARDINEL PERALTADO f'c=175 kg/cm2 m3 34.48 S/. 321.81 S/. 11,096.01 0.00 S/. - S/. - 0.00 S/. - 34.48 S/. 11,096.01
01.05.01.03 ACABADO EN SARDINEL PERALTADO m2 210.64 S/. 11.91 S/. 2,508.72 0.00 S/. - S/. - 0.00 S/. - 210.64 S/. 2,508.72
01.05.01.04 RELLENO DE JUNTAS CON ASFALTO m 25.30 S/. 6.56 S/. 165.97 0.00 S/. - S/. - 0.00 S/. - 25.30 S/. 165.97
01.06 REPOSICION DE ESTRUCTURAS DESAGUE PLUVIAL
01.06.01 TRABAJOS PRELIMINARES
01.06.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 168.77 S/. 1.91 S/. 322.35 0.00 S/. - S/. - 0.00 S/. - 168.77 S/. 322.35
01.06.02 MOVIMIENTO DE TIERRAS
01.06.02.01 EXCAVACION DE ZANJA C/MAQUINA m 240.71 S/. 6.78 S/. 1,632.01 0.00 S/. - S/. - 0.00 S/. - 240.71 S/. 1,632.01
01.06.02.02 EXCAVACION MANUAL DE ZANJA PARA SUMIDERO H<1.50 m3 7.32 S/. 20.71 S/. 151.60 0.00 S/. - S/. - 0.00 S/. - 7.32 S/. 151.60
01.06.02.03 REFINE Y NIVELACION DE ZANJAS P/TUB. 8"-10" m 240.71 S/. 4.12 S/. 991.73 0.00 S/. - S/. - 0.00 S/. - 240.71 S/. 991.73
01.06.02.04 PREPARACION DE CAMAS DE APOYO P/TUB. 8"-10" m 240.71 S/. 7.42 S/. 1,786.07 0.00 S/. - S/. - 0.00 S/. - 240.71 S/. 1,786.07
01.06.02.05 RELLENO COMP. ZANJA TUB. 8"-10" H=0.30 M m 240.71 S/. 30.06 S/. 7,235.74 0.00 S/. - S/. - 0.00 S/. - 240.71 S/. 7,235.74
01.06.02.06 SEGUNDO RELLENO Y COMPACTACION DE ZANJA MATERIAL DE m 240.71 S/. 29.90 S/. 7,197.23 0.00 S/. - S/. - 0.00 S/. - 240.71 S/. 7,197.23
01.06.02.07 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO. m3 316.46 S/. 21.07 S/. 6,667.81 0.00 S/. - S/. - 0.00 S/. - 316.46 S/. 6,667.81
01.06.03 OBRAS DE CONCRETO
01.06.03.01 CONSTRUCCION DE SUMIDEROS und 6.00 S/. 469.10 S/. 2,814.60 0.00 S/. - S/. - 0.00 S/. - 6.00 S/. 2,814.60
01.06.03.02 TAPA DE INSPECCION PARA REJILLA DE SUMIDERO und 6.00 S/. 94.98 S/. 569.88 0.00 S/. - S/. - 0.00 S/. - 6.00 S/. 569.88
01.06.04 SUMINISTRO E INSTALACION DE TUBERIA
01.06.04.01 SUMINISTRO E INSTALACION DE TUBERIA PVC UF DN 200 MM S-2 m 45.80 S/. 34.13 S/. 1,563.15 0.00 S/. - S/. - 0.00 S/. - 45.80 S/. 1,563.15
01.06.04.02 SUMINISTRO E INSTALACION DE TUBERIA PVC UF DN 250 MM S-2 m 194.91 S/. 51.82 S/. 10,100.24 0.00 S/. - S/. - 0.00 S/. - 194.91 S/. 10,100.24
01.06.05 PRUEBA HIDRAULICA
01.06.05.01 PRUEBA HIDRÁULICA DE ALCANTARILLADO m 240.71 S/. 1.70 S/. 409.21 0.00 S/. - S/. - 0.00 S/. - 240.71 S/. 409.21
01.06.06 INSTALACIONES METALICAS
01.06.06.01 VENTANA SUMIDERO 0.60X0.30 m und 6.00 S/. 64.48 S/. 386.88 0.00 S/. - S/. - 0.00 S/. - 6.00 S/. 386.88
ENTIDAD: MUNICIPALIDAD DISTRITAL DE CHILCA
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
02.06.01 ENCOFRADO Y DESENCOFRADO EN RAMPAS m2 4.75 S/. 24.92 S/. 118.37 0.00 S/. - S/. - 0.00 S/. - 4.75 S/. 118.37
02.06.02 CONCRETO f'c=175 kg/cm2 PARA RAMPAS m3 1.16 S/. 332.71 S/. 385.94 0.00 S/. - S/. - 0.00 S/. - 1.16 S/. 385.94
02.06.03 ACABADO EN RAMPA m2 11.58 S/. 11.91 S/. 137.92 0.00 S/. - S/. - 0.00 S/. - 11.58 S/. 137.92
02.07 AREAS VERDES
02.07.01 SEMBRADO DE GRASS m2 301.82 S/. 25.93 S/. 7,826.19 0.00 S/. - S/. - 0.00 S/. - 301.82 S/. 7,826.19
02.07.02 SEMBRADO DE PLANTONES und 115.00 S/. 17.48 S/. 2,010.20 0.00 S/. - S/. - 0.00 S/. - 115.00 S/. 2,010.20
02.08 VARIOS
02.08.01 PLACA RECORDATORIA und 1.00 S/. 733.69 S/. 733.69 0.00 S/. - S/. - 0.00 S/. - 1.00 S/. 733.69
02.08.02 SEÑALIZACION VERTICAL und 4.00 S/. 251.41 S/. 1,005.64 0.00 S/. - S/. - 0.00 S/. - 4.00 S/. 1,005.64
02.08.03 REJILLA PARA VEREDAS PLATINA 1 1/4"X1/4" @ 1" Y MARCO "L" 1 1/4 m2 1.18 S/. 477.11 S/. 562.99 0.00 S/. - S/. - 0.00 S/. - 1.18 S/. 562.99
02.08.04 REPOSICION DE CAJAS DE AGUA Y DESAGUE und 35.00 S/. 98.15 S/. 3,435.25 0.00 S/. - S/. - 0.00 S/. - 35.00 S/. 3,435.25
02.08.05 LIMPIEZA FINAL DE LA OBRA m2 855.08 S/. 0.33 S/. 282.18 0.00 S/. - S/. - 0.00 S/. - 855.08 S/. 282.18
COSTO DIRECTO S/. 457,543.16 S/. - S/. 69,459.61 S/. 69,459.61 S/. 388,083.56
Porcentaje de avance (%) 100.00% 0.00% 15.18% 15.18% 84.82%
GASTOS GENERALES (13.00%) S/. 59,480.61 S/. - S/. 9,029.75 S/. 9,029.75 S/. 50,450.86
SUB TOTAL S/. 517,023.78 S/. - S/. 78,489.36 S/. 78,489.36 S/. 438,534.42
SUPERVISION (4.00%) S/. 20,680.95 S/. - S/. 3,139.57 S/. 3,139.57 S/. 17,541.38
EXPEDIENTE TÉCNICO S/. 11,500.00 S/. 11,500.00 S/. - S/. 11,500.00 S/. -
LIQUIDACIÓN (1.50%) S/. 7,755.36 S/. - S/. - S/. - S/. 7,755.36
TOTAL GENERAL S/. 556,960.08 S/. 11,500.00 S/. 81,628.93 S/. 93,128.93 S/. 463,831.15
Porcentaje de Avance Total (%) 100.00% 2.06% 14.66% 16.72% 83.28%
IZACIÓN DE OBRA N° 01
EL 21 AL 31 DE MAYO - 2018
SALDO
0%
91%
50%
0%
0%
14%
0%
100%
0%
1%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
IZACIÓN DE OBRA N° 01
EL 21 AL 31 DE MAYO - 2018
SALDO
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
IZACIÓN DE OBRA N° 01
EL 21 AL 31 DE MAYO - 2018
SALDO
100%
100%
100%
100%
100%
100%
100%
0%
0%
100%
42%
81%
81%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
IZACIÓN DE OBRA N° 01
EL 21 AL 31 DE MAYO - 2018
SALDO
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
84.82%
84.82%
84.82%
84.82%
0.00%
0.00%
83.28%
ENTIDAD: MUNICIPALIDAD DISTRITAL DE CHILCA
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
01.04.07.01 ENCOFRADO Y DESENCOFRADO BOCACALLES m2 29.15 S/. 26.00 S/. 757.90 0.00 S/. - S/. - 0.00 S/. - 29.15 S/. 757.90
01.04.07.02 CONCRETO EN BOCACALLES f'c=210 kg/cm2 Incluye Acabado m3 26.71 S/. 370.44 S/. 9,894.45 0.00 S/. - S/. - 0.00 S/. - 26.71 S/. 9,894.45
01.04.07.03 CURADO TIPO ARROCERA m2 133.60 S/. 0.82 S/. 109.55 0.00 S/. - S/. - 0.00 S/. - 133.60 S/. 109.55
01.04.07.04 RELLENO DE JUNTAS CON ASFALTO m 56.60 S/. 6.56 S/. 371.30 0.00 S/. - S/. - 0.00 S/. - 56.60 S/. 371.30
01.04.08 CUNETAS
01.04.08.01 ENCOFRADO Y DESENCOFRADO PARA CUNETAS m2 88.39 S/. 25.84 S/. 2,284.00 0.00 S/. - S/. - 0.00 S/. - 88.39 S/. 2,284.00
01.04.08.02 CONCRETO EN CUNETAS f'c=210 kg/cm2 Incluye Acabado m3 31.52 S/. 370.44 S/. 11,676.27 0.00 S/. - S/. - 0.00 S/. - 31.52 S/. 11,676.27
01.04.08.03 CURADO TIPO ARROCERA m2 155.67 S/. 0.82 S/. 127.65 0.00 S/. - S/. - 0.00 S/. - 155.67 S/. 127.65
01.04.08.04 RELLENO DE JUNTAS CON ASFALTO m 19.56 S/. 6.56 S/. 128.31 0.00 S/. - S/. - 0.00 S/. - 19.56 S/. 128.31
01.05 OBRAS DE CONCRETO SIMPLE
01.05.01 SARDINEL PERALTADO
01.05.01.01 ENCOFRADO Y DESENCOFRADO DE SARDINELES m2 241.58 S/. 33.35 S/. 8,056.69 0.00 S/. - S/. - 0.00 S/. - 241.58 S/. 8,056.69
01.05.01.02 CONCRETO EN SARDINEL PERALTADO f'c=175 kg/cm2 m3 34.48 S/. 321.81 S/. 11,096.01 0.00 S/. - S/. - 0.00 S/. - 34.48 S/. 11,096.01
01.05.01.03 ACABADO EN SARDINEL PERALTADO m2 210.64 S/. 11.91 S/. 2,508.72 0.00 S/. - S/. - 0.00 S/. - 210.64 S/. 2,508.72
01.05.01.04 RELLENO DE JUNTAS CON ASFALTO m 25.30 S/. 6.56 S/. 165.97 0.00 S/. - S/. - 0.00 S/. - 25.30 S/. 165.97
01.06 REPOSICION DE ESTRUCTURAS DESAGUE PLUVIAL
01.06.01 TRABAJOS PRELIMINARES
01.06.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 168.77 S/. 1.91 S/. 322.35 0.00 S/. - 136.45 S/. 260.62 136.45 S/. 260.62 32.32 S/. 61.73
01.06.02 MOVIMIENTO DE TIERRAS
01.06.02.01 EXCAVACION DE ZANJA C/MAQUINA m 240.71 S/. 6.78 S/. 1,632.01 0.00 S/. - 194.91 S/. 1,321.49 194.91 S/. 1,321.49 45.80 S/. 310.52
01.06.02.02 EXCAVACION MANUAL DE ZANJA PARA SUMIDERO H<1.50 m3 7.32 S/. 20.71 S/. 151.60 0.00 S/. - S/. - 0.00 S/. - 7.32 S/. 151.60
01.06.02.03 REFINE Y NIVELACION DE ZANJAS P/TUB. 8"-10" m 240.71 S/. 4.12 S/. 991.73 0.00 S/. - 194.91 S/. 803.03 194.91 S/. 803.03 45.80 S/. 188.70
01.06.02.04 PREPARACION DE CAMAS DE APOYO P/TUB. 8"-10" m 240.71 S/. 7.42 S/. 1,786.07 0.00 S/. - 194.91 S/. 1,446.23 194.91 S/. 1,446.23 45.80 S/. 339.84
01.06.02.05 RELLENO COMP. ZANJA TUB. 8"-10" H=0.30 M m 240.71 S/. 30.06 S/. 7,235.74 0.00 S/. - 194.91 S/. 5,858.99 194.91 S/. 5,858.99 45.80 S/. 1,376.75
01.06.02.06 SEGUNDO RELLENO Y COMPACTACION DE ZANJA MATERIAL DE m 240.71 S/. 29.90 S/. 7,197.23 0.00 S/. - 194.91 S/. 5,827.81 194.91 S/. 5,827.81 45.80 S/. 1,369.42
01.06.02.07 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO. m3 316.46 S/. 21.07 S/. 6,667.81 0.00 S/. - 255.82 S/. 5,390.13 255.82 S/. 5,390.13 60.64 S/. 1,277.68
01.06.03 OBRAS DE CONCRETO
01.06.03.01 CONSTRUCCION DE SUMIDEROS und 6.00 S/. 469.10 S/. 2,814.60 0.00 S/. - S/. - 0.00 S/. - 6.00 S/. 2,814.60
01.06.03.02 TAPA DE INSPECCION PARA REJILLA DE SUMIDERO und 6.00 S/. 94.98 S/. 569.88 0.00 S/. - S/. - 0.00 S/. - 6.00 S/. 569.88
01.06.04 SUMINISTRO E INSTALACION DE TUBERIA
01.06.04.01 SUMINISTRO E INSTALACION DE TUBERIA PVC UF DN 200 MM S-2 m 45.80 S/. 34.13 S/. 1,563.15 0.00 S/. - S/. - 0.00 S/. - 45.80 S/. 1,563.15
01.06.04.02 SUMINISTRO E INSTALACION DE TUBERIA PVC UF DN 250 MM S-2 m 194.91 S/. 51.82 S/. 10,100.24 0.00 S/. - 194.91 S/. 10,100.24 194.91 S/. 10,100.24 0.00 S/. -
01.06.05 PRUEBA HIDRAULICA
01.06.05.01 PRUEBA HIDRÁULICA DE ALCANTARILLADO m 240.71 S/. 1.70 S/. 409.21 0.00 S/. - 194.91 S/. 331.35 194.91 S/. 331.35 45.80 S/. 77.86
01.06.06 INSTALACIONES METALICAS
01.06.06.01 VENTANA SUMIDERO 0.60X0.30 m und 6.00 S/. 64.48 S/. 386.88 0.00 S/. - S/. - 0.00 S/. - 6.00 S/. 386.88
ENTIDAD: MUNICIPALIDAD DISTRITAL DE CHILCA
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
02.06.01 ENCOFRADO Y DESENCOFRADO EN RAMPAS m2 4.75 S/. 24.92 S/. 118.37 0.00 S/. - S/. - 0.00 S/. - 4.75 S/. 118.37
02.06.02 CONCRETO f'c=175 kg/cm2 PARA RAMPAS m3 1.16 S/. 332.71 S/. 385.94 0.00 S/. - S/. - 0.00 S/. - 1.16 S/. 385.94
02.06.03 ACABADO EN RAMPA m2 11.58 S/. 11.91 S/. 137.92 0.00 S/. - S/. - 0.00 S/. - 11.58 S/. 137.92
02.07 AREAS VERDES
02.07.01 SEMBRADO DE GRASS m2 301.82 S/. 25.93 S/. 7,826.19 0.00 S/. - S/. - 0.00 S/. - 301.82 S/. 7,826.19
02.07.02 SEMBRADO DE PLANTONES und 115.00 S/. 17.48 S/. 2,010.20 0.00 S/. - S/. - 0.00 S/. - 115.00 S/. 2,010.20
02.08 VARIOS
02.08.01 PLACA RECORDATORIA und 1.00 S/. 733.69 S/. 733.69 0.00 S/. - S/. - 0.00 S/. - 1.00 S/. 733.69
02.08.02 SEÑALIZACION VERTICAL und 4.00 S/. 251.41 S/. 1,005.64 0.00 S/. - S/. - 0.00 S/. - 4.00 S/. 1,005.64
02.08.03 REJILLA PARA VEREDAS PLATINA 1 1/4"X1/4" @ 1" Y MARCO "L" 1 1/4 m2 1.18 S/. 477.11 S/. 562.99 0.00 S/. - S/. - 0.00 S/. - 1.18 S/. 562.99
02.08.04 REPOSICION DE CAJAS DE AGUA Y DESAGUE und 35.00 S/. 98.15 S/. 3,435.25 0.00 S/. - 24.00 S/. 2,355.60 24.00 S/. 2,355.60 11.00 S/. 1,079.65
02.08.05 LIMPIEZA FINAL DE LA OBRA m2 855.08 S/. 0.33 S/. 282.18 0.00 S/. - S/. - 0.00 S/. - 855.08 S/. 282.18
COSTO DIRECTO S/. 457,543.16 S/. 69,459.61 S/. 63,885.25 S/. 133,344.85 S/. 324,198.31
Porcentaje de avance (%) 100.00% 15.18% 13.96% 29.14% 70.86%
GASTOS GENERALES (13.00%) S/. 59,480.61 S/. 9,029.75 S/. 8,305.08 S/. 17,334.83 S/. 42,145.78
SUB TOTAL S/. 517,023.78 S/. 78,489.36 S/. 72,190.33 S/. 150,679.68 S/. 366,344.09
SUPERVISION (4.00%) S/. 20,680.95 S/. 3,139.57 S/. 2,887.61 S/. 6,027.19 S/. 14,653.76
EXPEDIENTE TÉCNICO S/. 11,500.00 S/. 11,500.00 S/. - S/. 11,500.00 S/. -
LIQUIDACIÓN (1.50%) S/. 7,755.36 S/. - S/. - S/. - S/. 7,755.36
TOTAL GENERAL S/. 556,960.08 S/. 93,128.93 S/. 75,077.94 S/. 168,206.87 S/. 388,753.21
Porcentaje de Avance Total (%) 100.00% 16.72% 13.48% 30.20% 69.80%
IZACIÓN DE OBRA N° 02
EL 01 AL 30 DE JUNIO - 2018
SALDO
0%
66%
35%
0%
0%
14%
0%
100%
0%
1%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
IZACIÓN DE OBRA N° 02
EL 01 AL 30 DE JUNIO - 2018
SALDO
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
19%
19%
100%
19%
19%
19%
19%
19%
100%
100%
100%
0%
19%
100%
IZACIÓN DE OBRA N° 02
EL 01 AL 30 DE JUNIO - 2018
SALDO
100%
100%
100%
100%
50%
100%
100%
0%
0%
43%
13%
33%
33%
36%
35%
92%
93%
93%
100%
92%
100%
94%
97%
97%
100%
IZACIÓN DE OBRA N° 02
EL 01 AL 30 DE JUNIO - 2018
SALDO
100%
100%
100%
100%
100%
100%
100%
100%
31%
100%
70.86%
70.86%
70.86%
70.86%
0.00%
100.00%
69.80%
OBRA: “MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA - JR. SUCRE Y PSJE. SANTA MARIA DEL, DISTRITO DE CHILCA - HUANCAYO - JUNIN”
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
01.04.08.01 ENCOFRADO Y DESENCOFRADO PARA CUNETAS m2 88.39 S/. 25.84 S/. 2,284.00 0.00 S/. - S/. - 0.00 S/. - 88.39 S/. 2,284.00
01.04.08.02 CONCRETO EN CUNETAS f'c=210 kg/cm2 Incluye Acabado m3 31.52 S/. 370.44 S/. 11,676.27 0.00 S/. - S/. - 0.00 S/. - 31.52 S/. 11,676.27
01.04.08.03 CURADO TIPO ARROCERA m2 155.67 S/. 0.82 S/. 127.65 0.00 S/. - S/. - 0.00 S/. - 155.67 S/. 127.65
01.04.08.04 RELLENO DE JUNTAS CON ASFALTO m 19.56 S/. 6.56 S/. 128.31 0.00 S/. - S/. - 0.00 S/. - 19.56 S/. 128.31
01.05 OBRAS DE CONCRETO SIMPLE
01.05.01 SARDINEL PERALTADO
01.05.01.01 ENCOFRADO Y DESENCOFRADO DE SARDINELES m2 241.58 S/. 33.35 S/. 8,056.69 0.00 S/. - 28.35 S/. 945.47 28.35 S/. 945.47 213.23 S/. 7,111.22
01.05.01.02 CONCRETO EN SARDINEL PERALTADO f'c=175 kg/cm2 m3 34.48 S/. 321.81 S/. 11,096.01 0.00 S/. - 4.05 S/. 1,303.33 4.05 S/. 1,303.33 30.43 S/. 9,792.68
01.05.01.03 ACABADO EN SARDINEL PERALTADO m2 210.64 S/. 11.91 S/. 2,508.72 0.00 S/. - 24.75 S/. 294.77 24.75 S/. 294.77 185.89 S/. 2,213.95
01.05.01.04 RELLENO DE JUNTAS CON ASFALTO m 25.30 S/. 6.56 S/. 165.97 0.00 S/. - S/. - 0.00 S/. - 25.30 S/. 165.97
01.06 REPOSICION DE ESTRUCTURAS DESAGUE PLUVIAL
01.06.01 TRABAJOS PRELIMINARES
01.06.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 168.77 S/. 1.91 S/. 322.35 136.45 S/. 260.62 32.32 S/. 61.73 168.77 S/. 322.35 0.00 S/. -
01.06.02 MOVIMIENTO DE TIERRAS
01.06.02.01 EXCAVACION DE ZANJA C/MAQUINA m 240.71 S/. 6.78 S/. 1,632.01 194.91 S/. 1,321.49 45.80 S/. 310.52 240.71 S/. 1,632.01 0.00 S/. -
01.06.02.02 EXCAVACION MANUAL DE ZANJA PARA SUMIDERO H<1.50 m3 7.32 S/. 20.71 S/. 151.60 0.00 S/. - 7.32 S/. 151.60 7.32 S/. 151.60 0.00 S/. -
01.06.02.03 REFINE Y NIVELACION DE ZANJAS P/TUB. 8"-10" m 240.71 S/. 4.12 S/. 991.73 194.91 S/. 803.03 45.80 S/. 188.70 240.71 S/. 991.73 0.00 S/. -
01.06.02.04 PREPARACION DE CAMAS DE APOYO P/TUB. 8"-10" m 240.71 S/. 7.42 S/. 1,786.07 194.91 S/. 1,446.23 45.80 S/. 339.84 240.71 S/. 1,786.07 0.00 S/. -
01.06.02.05 RELLENO COMP. ZANJA TUB. 8"-10" H=0.30 M m 240.71 S/. 30.06 S/. 7,235.74 194.91 S/. 5,858.99 45.80 S/. 1,376.75 240.71 S/. 7,235.74 0.00 S/. -
01.06.02.06 SEGUNDO RELLENO Y COMPACTACION DE ZANJA MATERIAL DE m 240.71 S/. 29.90 S/. 7,197.23 194.91 S/. 5,827.81 45.80 S/. 1,369.42 240.71 S/. 7,197.23 0.00 S/. -
01.06.02.07 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO. m3 316.46 S/. 21.07 S/. 6,667.81 255.82 S/. 5,390.13 60.64 S/. 1,277.68 316.46 S/. 6,667.81 0.00 S/. -
01.06.03 OBRAS DE CONCRETO
01.06.03.01 CONSTRUCCION DE SUMIDEROS und 6.00 S/. 469.10 S/. 2,814.60 0.00 S/. - 1.00 S/. 469.10 1.00 S/. 469.10 5.00 S/. 2,345.50
01.06.03.02 TAPA DE INSPECCION PARA REJILLA DE SUMIDERO und 6.00 S/. 94.98 S/. 569.88 0.00 S/. - S/. - 0.00 S/. - 6.00 S/. 569.88
01.06.04 SUMINISTRO E INSTALACION DE TUBERIA
01.06.04.01 SUMINISTRO E INSTALACION DE TUBERIA PVC UF DN 200 MM S-2 m 45.80 S/. 34.13 S/. 1,563.15 0.00 S/. - 45.80 S/. 1,563.15 45.80 S/. 1,563.15 0.00 S/. -
01.06.04.02 SUMINISTRO E INSTALACION DE TUBERIA PVC UF DN 250 MM S-2 m 194.91 S/. 51.82 S/. 10,100.24 194.91 S/. 10,100.24 S/. - 194.91 S/. 10,100.24 0.00 S/. -
01.06.05 PRUEBA HIDRAULICA
01.06.05.01 PRUEBA HIDRÁULICA DE ALCANTARILLADO m 240.71 S/. 1.70 S/. 409.21 194.91 S/. 331.35 4.97 S/. 8.45 199.88 S/. 339.80 40.83 S/. 69.41
01.06.06 INSTALACIONES METALICAS
01.06.06.01 VENTANA SUMIDERO 0.60X0.30 m und 6.00 S/. 64.48 S/. 386.88 0.00 S/. - 1.00 S/. 64.48 1.00 S/. 64.48 5.00 S/. 322.40
01.07 SEÑALIZACION HORIZONTAL
01.07.01 PINTURA EN SARDINELES m2 143.63 S/. 20.77 S/. 2,983.20 0.00 S/. - S/. - 0.00 S/. - 143.63 S/. 2,983.20
01.07.02 PINTURA EN PAVIMENTO LINEA DISCONTINUA. m 187.02 S/. 3.12 S/. 583.50 0.00 S/. - S/. - 0.00 S/. - 187.02 S/. 583.50
01.07.03 PINTURA ZONAL EN CRUCE PEATONAL. m2 151.20 S/. 24.39 S/. 3,687.77 0.00 S/. - S/. - 0.00 S/. - 151.20 S/. 3,687.77
01.07.04 PINTURA EN PAVIMENTO LETRAS Y SIMBOLOS. m2 7.96 S/. 26.09 S/. 207.68 0.00 S/. - S/. - 0.00 S/. - 7.96 S/. 207.68
01.08 IMPACTO AMBIENTAL
01.08.01 MITIGACION DE IMPACTO AMBIENTAL glb 1.00 S/. 1,500.00 S/. 1,500.00 0.50 S/. 750.00 0.20 S/. 300.00 0.70 S/. 1,050.00 0.30 S/. 450.00
01.09 VARIOS
01.09.01 NIVELACION DE TAPAS DE BUZON A NIVEL DE BASE und 6.00 S/. 821.22 S/. 4,927.32 0.00 S/. - S/. - 0.00 S/. - 6.00 S/. 4,927.32
01.09.02 LIMPIEZA FINAL DE LA OBRA m2 1,743.75 S/. 0.33 S/. 575.44 0.00 S/. - S/. - 0.00 S/. - 1743.75 S/. 575.44
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
S/. 457,543.16
COSTO DIRECTO S/. 133,344.85 S/. 71,185.75 S/. 204,530.60 S/. 253,012.56
Porcentaje de avance (%) 100.00% 29.14% 15.56% 44.70% 55.30%
GASTOS GENERALES (13.00%) S/. 59,480.61 S/. 17,334.83 S/. 9,254.15 S/. 26,588.98 S/. 32,891.63
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
ZACIÓN DE OBRA N° 03
EL 01 AL 31 DE JULIO - 2018
SALDO
0%
41%
20%
0%
0%
11%
0%
60%
0%
1%
0%
0%
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
ZACIÓN DE OBRA N° 03
EL 01 AL 31 DE JULIO - 2018
SALDO
100%
100%
100%
100%
88%
88%
88%
100%
0%
0%
0%
0%
0%
0%
0%
0%
83%
100%
0%
0%
17%
83%
100%
100%
100%
100%
30%
100%
100%
ZACIÓN DE OBRA N° 03
EL 01 AL 31 DE JULIO - 2018
SALDO
0%
0%
28%
10%
25%
25%
28%
27%
32%
34%
33%
100%
30%
100%
18%
38%
38%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
100%
55.30%
55.30%
ZACIÓN DE OBRA N° 03
EL 01 AL 31 DE JULIO - 2018
SALDO
55.30%
55.30%
0.00%
100.00%
54.78%
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
01.04.08.01 ENCOFRADO Y DESENCOFRADO PARA CUNETAS m2 88.39 S/. 25.84 S/. 2,284.00 0.00 S/. - S/. - 0.00 S/. - 88.39 S/. 2,284.00
01.04.08.02 CONCRETO EN CUNETAS f'c=210 kg/cm2 Incluye Acabado m3 31.52 S/. 370.44 S/. 11,676.27 0.00 S/. - S/. - 0.00 S/. - 31.52 S/. 11,676.27
01.04.08.03 CURADO TIPO ARROCERA m2 155.67 S/. 0.82 S/. 127.65 0.00 S/. - S/. - 0.00 S/. - 155.67 S/. 127.65
01.04.08.04 RELLENO DE JUNTAS CON ASFALTO m 19.56 S/. 6.56 S/. 128.31 0.00 S/. - S/. - 0.00 S/. - 19.56 S/. 128.31
01.05 OBRAS DE CONCRETO SIMPLE
01.05.01 SARDINEL PERALTADO
01.05.01.01 ENCOFRADO Y DESENCOFRADO DE SARDINELES m2 241.58 S/. 33.35 S/. 8,056.69 28.35 S/. 945.47 213.23 S/. 7,111.22 241.58 S/. 8,056.69 0.00 S/. -
01.05.01.02 CONCRETO EN SARDINEL PERALTADO f'c=175 kg/cm2 m3 34.48 S/. 321.81 S/. 11,096.01 4.05 S/. 1,303.33 30.43 S/. 9,792.68 34.48 S/. 11,096.01 0.00 S/. -
01.05.01.03 ACABADO EN SARDINEL PERALTADO m2 210.64 S/. 11.91 S/. 2,508.72 24.75 S/. 294.77 185.89 S/. 2,213.95 210.64 S/. 2,508.72 0.00 S/. -
01.05.01.04 RELLENO DE JUNTAS CON ASFALTO m 25.30 S/. 6.56 S/. 165.97 0.00 S/. - 25.30 S/. 165.97 25.30 S/. 165.97 0.00 S/. -
01.06 REPOSICION DE ESTRUCTURAS DESAGUE PLUVIAL
01.06.01 TRABAJOS PRELIMINARES
01.06.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 168.77 S/. 1.91 S/. 322.35 168.77 S/. 322.35 S/. - 168.77 S/. 322.35 0.00 S/. -
01.06.02 MOVIMIENTO DE TIERRAS
01.06.02.01 EXCAVACION DE ZANJA C/MAQUINA m 240.71 S/. 6.78 S/. 1,632.01 240.71 S/. 1,632.01 S/. - 240.71 S/. 1,632.01 0.00 S/. -
01.06.02.02 EXCAVACION MANUAL DE ZANJA PARA SUMIDERO H<1.50 m3 7.32 S/. 20.71 S/. 151.60 7.32 S/. 151.60 S/. - 7.32 S/. 151.60 0.00 S/. -
01.06.02.03 REFINE Y NIVELACION DE ZANJAS P/TUB. 8"-10" m 240.71 S/. 4.12 S/. 991.73 240.71 S/. 991.73 S/. - 240.71 S/. 991.73 0.00 S/. -
01.06.02.04 PREPARACION DE CAMAS DE APOYO P/TUB. 8"-10" m 240.71 S/. 7.42 S/. 1,786.07 240.71 S/. 1,786.07 S/. - 240.71 S/. 1,786.07 0.00 S/. -
01.06.02.05 RELLENO COMP. ZANJA TUB. 8"-10" H=0.30 M m 240.71 S/. 30.06 S/. 7,235.74 240.71 S/. 7,235.74 S/. - 240.71 S/. 7,235.74 0.00 S/. -
01.06.02.06 SEGUNDO RELLENO Y COMPACTACION DE ZANJA MATERIAL DE m 240.71 S/. 29.90 S/. 7,197.23 240.71 S/. 7,197.23 S/. - 240.71 S/. 7,197.23 0.00 S/. -
01.06.02.07 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO. m3 316.46 S/. 21.07 S/. 6,667.81 316.46 S/. 6,667.81 S/. - 316.46 S/. 6,667.81 0.00 S/. -
01.06.03 OBRAS DE CONCRETO
01.06.03.01 CONSTRUCCION DE SUMIDEROS und 6.00 S/. 469.10 S/. 2,814.60 1.00 S/. 469.10 5.00 S/. 2,345.50 6.00 S/. 2,814.60 0.00 S/. -
01.06.03.02 TAPA DE INSPECCION PARA REJILLA DE SUMIDERO und 6.00 S/. 94.98 S/. 569.88 0.00 S/. - S/. - 0.00 S/. - 6.00 S/. 569.88
01.06.04 SUMINISTRO E INSTALACION DE TUBERIA
01.06.04.01 SUMINISTRO E INSTALACION DE TUBERIA PVC UF DN 200 MM S- m 45.80 S/. 34.13 S/. 1,563.15 45.80 S/. 1,563.15 S/. - 45.80 S/. 1,563.15 0.00 S/. -
01.06.04.02 SUMINISTRO E INSTALACION DE TUBERIA PVC UF DN 250 MM S- m 194.91 S/. 51.82 S/. 10,100.24 194.91 S/. 10,100.24 S/. - 194.91 S/. 10,100.24 0.00 S/. -
01.06.05 PRUEBA HIDRAULICA
01.06.05.01 PRUEBA HIDRÁULICA DE ALCANTARILLADO m 240.71 S/. 1.70 S/. 409.21 199.88 S/. 339.80 S/. - 199.88 S/. 339.80 40.83 S/. 69.41
01.06.06 INSTALACIONES METALICAS
01.06.06.01 VENTANA SUMIDERO 0.60X0.30 m und 6.00 S/. 64.48 S/. 386.88 1.00 S/. 64.48 5.00 S/. 322.40 6.00 S/. 386.88 0.00 S/. -
01.07 SEÑALIZACION HORIZONTAL
01.07.01 PINTURA EN SARDINELES m2 143.63 S/. 20.77 S/. 2,983.20 0.00 S/. - S/. - 0.00 S/. - 143.63 S/. 2,983.20
01.07.02 PINTURA EN PAVIMENTO LINEA DISCONTINUA. m 187.02 S/. 3.12 S/. 583.50 0.00 S/. - S/. - 0.00 S/. - 187.02 S/. 583.50
01.07.03 PINTURA ZONAL EN CRUCE PEATONAL. m2 151.20 S/. 24.39 S/. 3,687.77 0.00 S/. - S/. - 0.00 S/. - 151.20 S/. 3,687.77
01.07.04 PINTURA EN PAVIMENTO LETRAS Y SIMBOLOS. m2 7.96 S/. 26.09 S/. 207.68 0.00 S/. - S/. - 0.00 S/. - 7.96 S/. 207.68
01.08 IMPACTO AMBIENTAL
01.08.01 MITIGACION DE IMPACTO AMBIENTAL glb 1.00 S/. 1,500.00 S/. 1,500.00 0.70 S/. 1,050.00 0.15 S/. 225.00 0.85 S/. 1,275.00 0.15 S/. 225.00
01.09 VARIOS
01.09.01 NIVELACION DE TAPAS DE BUZON A NIVEL DE BASE und 6.00 S/. 821.22 S/. 4,927.32 0.00 S/. - S/. - 0.00 S/. - 6.00 S/. 4,927.32
01.09.02 LIMPIEZA FINAL DE LA OBRA m2 1,743.75 S/. 0.33 S/. 575.44 0.00 S/. - S/. - 0.00 S/. - 1743.75 S/. 575.44
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
S/. 457,543.16
COSTO DIRECTO S/. 204,530.60 S/. 141,075.91 S/. 345,606.52 S/. 111,936.65
Porcentaje de avance (%) 100.00% 44.70% 30.83% 75.54% 24.46%
GASTOS GENERALES (13.00%) S/. 59,480.61 S/. 26,588.98 S/. 18,339.87 S/. 44,928.85 S/. 14,551.76
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
ZACIÓN DE OBRA N° 04
L 01 AL 31 DE AGOSTO - 2018
SALDO
0%
16%
10%
0%
0%
11%
0%
0%
0%
0%
0%
0%
0%
0%
0%
15%
25%
25%
25%
100%
100%
100%
100%
100%
100%
100%
100%
100%
ZACIÓN DE OBRA N° 04
L 01 AL 31 DE AGOSTO - 2018
SALDO
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
0%
0%
17%
0%
100%
100%
100%
100%
15%
100%
100%
ZACIÓN DE OBRA N° 04
L 01 AL 31 DE AGOSTO - 2018
SALDO
0%
0%
14%
10%
13%
13%
15%
13%
32%
32%
33%
100%
28%
17%
5%
10%
10%
0%
43%
43%
43%
100%
100%
100%
100%
100%
0%
100%
24.46%
24.46%
ZACIÓN DE OBRA N° 04
L 01 AL 31 DE AGOSTO - 2018
SALDO
24.46%
24.46%
0.00%
100.00%
25.01%
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
01.04.08.01 ENCOFRADO Y DESENCOFRADO PARA CUNETAS m2 88.39 S/. 25.84 S/. 2,284.00 0.00 S/. - 88.39 S/. 2,284.00 88.39 S/. 2,284.00 0.00 S/. -
01.04.08.02 CONCRETO EN CUNETAS f'c=210 kg/cm2 Incluye Acabado m3 31.52 S/. 370.44 S/. 11,676.27 0.00 S/. - 31.52 S/. 11,676.27 31.52 S/. 11,676.27 0.00 S/. -
01.04.08.03 CURADO TIPO ARROCERA m2 155.67 S/. 0.82 S/. 127.65 0.00 S/. - 155.67 S/. 127.65 155.67 S/. 127.65 0.00 S/. -
01.04.08.04 RELLENO DE JUNTAS CON ASFALTO m 19.56 S/. 6.56 S/. 128.31 0.00 S/. - 19.56 S/. 128.31 19.56 S/. 128.31 0.00 S/. -
01.05 OBRAS DE CONCRETO SIMPLE
01.05.01 SARDINEL PERALTADO
01.05.01.01 ENCOFRADO Y DESENCOFRADO DE SARDINELES m2 241.58 S/. 33.35 S/. 8,056.69 241.58 S/. 8,056.69 S/. - 241.58 S/. 8,056.69 0.00 S/. -
01.05.01.02 CONCRETO EN SARDINEL PERALTADO f'c=175 kg/cm2 m3 34.48 S/. 321.81 S/. 11,096.01 34.48 S/. 11,096.01 S/. - 34.48 S/. 11,096.01 0.00 S/. -
01.05.01.03 ACABADO EN SARDINEL PERALTADO m2 210.64 S/. 11.91 S/. 2,508.72 210.64 S/. 2,508.72 S/. - 210.64 S/. 2,508.72 0.00 S/. -
01.05.01.04 RELLENO DE JUNTAS CON ASFALTO m 25.30 S/. 6.56 S/. 165.97 25.30 S/. 165.97 S/. - 25.30 S/. 165.97 0.00 S/. -
01.06 REPOSICION DE ESTRUCTURAS DESAGUE PLUVIAL
01.06.01 TRABAJOS PRELIMINARES
01.06.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 168.77 S/. 1.91 S/. 322.35 168.77 S/. 322.35 S/. - 168.77 S/. 322.35 0.00 S/. -
01.06.02 MOVIMIENTO DE TIERRAS
01.06.02.01 EXCAVACION DE ZANJA C/MAQUINA m 240.71 S/. 6.78 S/. 1,632.01 240.71 S/. 1,632.01 S/. - 240.71 S/. 1,632.01 0.00 S/. -
01.06.02.02 EXCAVACION MANUAL DE ZANJA PARA SUMIDERO H<1.50 m3 7.32 S/. 20.71 S/. 151.60 7.32 S/. 151.60 S/. - 7.32 S/. 151.60 0.00 S/. -
01.06.02.03 REFINE Y NIVELACION DE ZANJAS P/TUB. 8"-10" m 240.71 S/. 4.12 S/. 991.73 240.71 S/. 991.73 S/. - 240.71 S/. 991.73 0.00 S/. -
01.06.02.04 PREPARACION DE CAMAS DE APOYO P/TUB. 8"-10" m 240.71 S/. 7.42 S/. 1,786.07 240.71 S/. 1,786.07 S/. - 240.71 S/. 1,786.07 0.00 S/. -
01.06.02.05 RELLENO COMP. ZANJA TUB. 8"-10" H=0.30 M m 240.71 S/. 30.06 S/. 7,235.74 240.71 S/. 7,235.74 S/. - 240.71 S/. 7,235.74 0.00 S/. -
01.06.02.06 SEGUNDO RELLENO Y COMPACTACION DE ZANJA MATERIAL DE m 240.71 S/. 29.90 S/. 7,197.23 240.71 S/. 7,197.23 S/. - 240.71 S/. 7,197.23 0.00 S/. -
01.06.02.07 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO. m3 316.46 S/. 21.07 S/. 6,667.81 316.46 S/. 6,667.81 S/. - 316.46 S/. 6,667.81 0.00 S/. -
01.06.03 OBRAS DE CONCRETO
01.06.03.01 CONSTRUCCION DE SUMIDEROS und 6.00 S/. 469.10 S/. 2,814.60 6.00 S/. 2,814.60 S/. - 6.00 S/. 2,814.60 0.00 S/. -
01.06.03.02 TAPA DE INSPECCION PARA REJILLA DE SUMIDERO und 6.00 S/. 94.98 S/. 569.88 0.00 S/. - 6.00 S/. 569.88 6.00 S/. 569.88 0.00 S/. -
01.06.04 SUMINISTRO E INSTALACION DE TUBERIA
01.06.04.01 SUMINISTRO E INSTALACION DE TUBERIA PVC UF DN 200 MM S- m 45.80 S/. 34.13 S/. 1,563.15 45.80 S/. 1,563.15 S/. - 45.80 S/. 1,563.15 0.00 S/. -
01.06.04.02 SUMINISTRO E INSTALACION DE TUBERIA PVC UF DN 250 MM S- m 194.91 S/. 51.82 S/. 10,100.24 194.91 S/. 10,100.24 S/. - 194.91 S/. 10,100.24 0.00 S/. -
01.06.05 PRUEBA HIDRAULICA
01.06.05.01 PRUEBA HIDRÁULICA DE ALCANTARILLADO m 240.71 S/. 1.70 S/. 409.21 199.88 S/. 339.80 40.83 S/. 69.41 240.71 S/. 409.21 0.00 S/. -
01.06.06 INSTALACIONES METALICAS
01.06.06.01 VENTANA SUMIDERO 0.60X0.30 m und 6.00 S/. 64.48 S/. 386.88 6.00 S/. 386.88 S/. - 6.00 S/. 386.88 0.00 S/. -
01.07 SEÑALIZACION HORIZONTAL
01.07.01 PINTURA EN SARDINELES m2 143.63 S/. 20.77 S/. 2,983.20 0.00 S/. - 143.63 S/. 2,983.20 143.63 S/. 2,983.20 0.00 S/. -
01.07.02 PINTURA EN PAVIMENTO LINEA DISCONTINUA. m 187.02 S/. 3.12 S/. 583.50 0.00 S/. - 187.02 S/. 583.50 187.02 S/. 583.50 0.00 S/. -
01.07.03 PINTURA ZONAL EN CRUCE PEATONAL. m2 151.20 S/. 24.39 S/. 3,687.77 0.00 S/. - 151.20 S/. 3,687.77 151.20 S/. 3,687.77 0.00 S/. -
01.07.04 PINTURA EN PAVIMENTO LETRAS Y SIMBOLOS. m2 7.96 S/. 26.09 S/. 207.68 0.00 S/. - 7.96 S/. 207.68 7.96 S/. 207.68 0.00 S/. -
01.08 IMPACTO AMBIENTAL
01.08.01 MITIGACION DE IMPACTO AMBIENTAL glb 1.00 S/. 1,500.00 S/. 1,500.00 0.85 S/. 1,275.00 0.15 S/. 225.00 1.00 S/. 1,500.00 0.00 S/. -
01.09 VARIOS
01.09.01 NIVELACION DE TAPAS DE BUZON A NIVEL DE BASE und 6.00 S/. 821.22 S/. 4,927.32 0.00 S/. - 6.00 S/. 4,927.32 6.00 S/. 4,927.32 0.00 S/. -
01.09.02 LIMPIEZA FINAL DE LA OBRA m2 1,743.75 S/. 0.33 S/. 575.44 0.00 S/. - 1743.75 S/. 575.44 1743.75 S/. 575.44 0.00 S/. -
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
S/. 457,543.16
COSTO DIRECTO S/. 345,606.52 S/. 102,813.33 S/. 448,419.85 S/. 9,123.31
Porcentaje de avance (%) 100.00% 75.54% 22.47% 98.01% 1.99%
GASTOS GENERALES (13.00%) S/. 59,480.61 S/. 44,928.85 S/. 13,365.73 S/. 58,294.58 S/. 1,186.03
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
SALDO
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
SALDO
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
SALDO
0%
0%
6%
10%
7%
7%
7%
7%
6%
6%
5%
0%
6%
0%
5%
10%
10%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
1.99%
1.99%
SALDO
1.99%
1.99%
0.00%
100.00%
3.32%
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
ITEM DESCRIPCION UND AVANCE FÍSICO MES DE MAYO AVANCE FÍSICO MES DE JUNIO AVANCE FÍSICO MES DE JULIO
METRADO P. UNITARIO PARCIAL S/.
METRADO VALORIZADO % AVANCE METRADO VALORIZADO % AVANCE METRADO VALORIZADO
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
ITEM DESCRIPCION UND AVANCE FÍSICO MES DE MAYO AVANCE FÍSICO MES DE JUNIO AVANCE FÍSICO MES DE JULIO
METRADO P. UNITARIO PARCIAL S/.
METRADO VALORIZADO % AVANCE METRADO VALORIZADO % AVANCE METRADO VALORIZADO
01.04.08.01 ENCOFRADO Y DESENCOFRADO PARA CUNETAS m2 88.39 S/. 25.84 S/. 2,284.00 S/. - S/. - S/. -
01.04.08.02 CONCRETO EN CUNETAS f'c=210 kg/cm2 Incluye Acabado m3 31.52 S/. 370.44 S/. 11,676.27 S/. - S/. - S/. -
01.04.08.03 CURADO TIPO ARROCERA m2 155.67 S/. 0.82 S/. 127.65 S/. - S/. - S/. -
01.04.08.04 RELLENO DE JUNTAS CON ASFALTO m 19.56 S/. 6.56 S/. 128.31 S/. - S/. - S/. -
01.05 OBRAS DE CONCRETO SIMPLE
01.05.01 SARDINEL PERALTADO
01.05.01.01 ENCOFRADO Y DESENCOFRADO DE SARDINELES m2 241.58 S/. 33.35 S/. 8,056.69 S/. - S/. - 28.35 S/. 945.47
01.05.01.02 CONCRETO EN SARDINEL PERALTADO f'c=175 kg/cm2 m3 34.48 S/. 321.81 S/. 11,096.01 S/. - S/. - 4.05 S/. 1,303.33
01.05.01.03 ACABADO EN SARDINEL PERALTADO m2 210.64 S/. 11.91 S/. 2,508.72 S/. - S/. - 24.75 S/. 294.77
01.05.01.04 RELLENO DE JUNTAS CON ASFALTO m 25.30 S/. 6.56 S/. 165.97 S/. - S/. - S/. -
01.06 REPOSICION DE ESTRUCTURAS DESAGUE PLUVIAL
01.06.01 TRABAJOS PRELIMINARES
01.06.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 168.77 S/. 1.91 S/. 322.35 S/. - 136.45 S/. 260.62 81% 32.32 S/. 61.73
01.06.02 MOVIMIENTO DE TIERRAS
01.06.02.01 EXCAVACION DE ZANJA C/MAQUINA m 240.71 S/. 6.78 S/. 1,632.01 S/. - 194.91 S/. 1,321.49 81% 45.80 S/. 310.52
01.06.02.02 EXCAVACION MANUAL DE ZANJA PARA SUMIDERO H<1.50 m3 7.32 S/. 20.71 S/. 151.60 S/. - S/. - 7.32 S/. 151.60
01.06.02.03 REFINE Y NIVELACION DE ZANJAS P/TUB. 8"-10" m 240.71 S/. 4.12 S/. 991.73 S/. - 194.91 S/. 803.03 81% 45.80 S/. 188.70
01.06.02.04 PREPARACION DE CAMAS DE APOYO P/TUB. 8"-10" m 240.71 S/. 7.42 S/. 1,786.07 S/. - 194.91 S/. 1,446.23 81% 45.80 S/. 339.84
01.06.02.05 RELLENO COMP. ZANJA TUB. 8"-10" H=0.30 M m 240.71 S/. 30.06 S/. 7,235.74 S/. - 194.91 S/. 5,858.99 81% 45.80 S/. 1,376.75
01.06.02.06 SEGUNDO RELLENO Y COMPACTACION DE ZANJA MATERIAL DE m 240.71 S/. 29.90 S/. 7,197.23 S/. - 194.91 S/. 5,827.81 81% 45.80 S/. 1,369.42
01.06.02.07 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO. m3 316.46 S/. 21.07 S/. 6,667.81 S/. - 255.82 S/. 5,390.13 81% 60.64 S/. 1,277.68
01.06.03 OBRAS DE CONCRETO
01.06.03.01 CONSTRUCCION DE SUMIDEROS und 6.00 S/. 469.10 S/. 2,814.60 S/. - S/. - 1.00 S/. 469.10
01.06.03.02 TAPA DE INSPECCION PARA REJILLA DE SUMIDERO und 6.00 S/. 94.98 S/. 569.88 S/. - S/. - S/. -
01.06.04 SUMINISTRO E INSTALACION DE TUBERIA
01.06.04.01 SUMINISTRO E INSTALACION DE TUBERIA PVC UF DN 200 MM S- m 45.80 S/. 34.13 S/. 1,563.15 S/. - S/. - 45.80 S/. 1,563.15
01.06.04.02 SUMINISTRO E INSTALACION DE TUBERIA PVC UF DN 250 MM S- m 194.91 S/. 51.82 S/. 10,100.24 S/. - 194.91 S/. 10,100.24 100% S/. -
01.06.05 PRUEBA HIDRAULICA
01.06.05.01 PRUEBA HIDRÁULICA DE ALCANTARILLADO m 240.71 S/. 1.70 S/. 409.21 S/. - 194.91 S/. 331.35 81% 4.97 S/. 8.45
01.06.06 INSTALACIONES METALICAS
01.06.06.01 VENTANA SUMIDERO 0.60X0.30 m und 6.00 S/. 64.48 S/. 386.88 S/. - S/. - 1.00 S/. 64.48
01.07 SEÑALIZACION HORIZONTAL
01.07.01 PINTURA EN SARDINELES m2 143.63 S/. 20.77 S/. 2,983.20 S/. - S/. - S/. -
01.07.02 PINTURA EN PAVIMENTO LINEA DISCONTINUA. m 187.02 S/. 3.12 S/. 583.50 S/. - S/. - S/. -
01.07.03 PINTURA ZONAL EN CRUCE PEATONAL. m2 151.20 S/. 24.39 S/. 3,687.77 S/. - S/. - S/. -
01.07.04 PINTURA EN PAVIMENTO LETRAS Y SIMBOLOS. m2 7.96 S/. 26.09 S/. 207.68 S/. - S/. - S/. -
01.08 IMPACTO AMBIENTAL
01.08.01 MITIGACION DE IMPACTO AMBIENTAL glb 1.00 S/. 1,500.00 S/. 1,500.00 S/. - 0.50 S/. 750.00 50% 0.20 S/. 300.00
01.09 VARIOS
01.09.01 NIVELACION DE TAPAS DE BUZON A NIVEL DE BASE und 6.00 S/. 821.22 S/. 4,927.32 S/. - S/. - S/. -
01.09.02 LIMPIEZA FINAL DE LA OBRA m2 1,743.75 S/. 0.33 S/. 575.44 S/. - S/. - S/. -
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
ITEM DESCRIPCION UND AVANCE FÍSICO MES DE MAYO AVANCE FÍSICO MES DE JUNIO AVANCE FÍSICO MES DE JULIO
METRADO P. UNITARIO PARCIAL S/.
METRADO VALORIZADO % AVANCE METRADO VALORIZADO % AVANCE METRADO VALORIZADO
S/. 457,543.16
COSTO DIRECTO S/. 69,459.61 S/. 63,885.25 S/. 71,185.75
Porcentaje de avance al Costo Directo (%) 100.00% 15.18% 13.96% 15.56%
GASTOS GENERALES (13.00%) S/. 59,480.61 S/. 9,029.75 S/. 8,305.08 S/. 9,254.15
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
ITEM DESCRIPCION UND AVANCE FÍSICO MES DE MAYO AVANCE FÍSICO MES DE JUNIO AVANCE FÍSICO MES DE JULIO
METRADO P. UNITARIO PARCIAL S/.
METRADO VALORIZADO % AVANCE METRADO VALORIZADO % AVANCE METRADO VALORIZADO
SUB TOTAL S/. 517,023.78 S/. 78,489.36 S/. 72,190.33 S/. 80,439.90
SUPERVISION (4.00%) S/. 20,680.95 S/. 3,139.57 S/. 2,887.61 S/. 3,217.60
EXPEDIENTE TÉCNICO S/. 11,500.00 S/. - S/. -
LIQUIDACIÓN (1.50%) S/. 7,755.36 S/. - S/. - S/. -
TOTAL GENERAL S/. 556,960.08 S/. 81,628.93 S/. 75,077.94 S/. 83,657.50
Porcentaje de Avance Total (%) 100.00% 14.66% 13.48% 15.02%
VALORIZACIÓNES MENSUALES
SALDO
AVANCE FÍSICO MES DE JULIO AVANCE FÍSICO MES DE AGOSTO AVANCE FÍSICO MES DE AGOSTO ACUMULADO
% AVANCE METRADO VALORIZADO % AVANCE METRADO VALORIZADO % AVANCE METRADO VALORIZADO % AVANCE METRADO VALORIZADO %
3% S/. - 184.08 S/. 351.59 11% 1743.75 S/. 3,330.56 0.00 S/. - 0%
404.70 S/. 15,378.60 100% S/. - 404.70 S/. 15,378.60 0.00 S/. - 0%
1686.29 S/. 8,195.37 100% S/. - 1686.29 S/. 8,195.37 0.00 S/. - 0%
109.20 S/. 4,235.87 85% 18.92 S/. 733.91 15% 128.12 S/. 4,969.77 0.00 S/. - 0%
786.78 S/. 6,852.85 75% 267.84 S/. 2,332.89 25% 1054.62 S/. 9,185.74 0.00 S/. - 0%
201.60 S/. 74,680.70 75% 67.71 S/. 25,082.49 25% 269.31 S/. 99,763.20 0.00 S/. - 0%
1008.00 S/. 826.56 75% 338.54 S/. 277.60 25% 1346.54 S/. 1,104.16 0.00 S/. - 0%
S/. - 345.42 S/. 2,265.96 100% 345.42 S/. 2,265.96 0.00 S/. - 0%
S/. - 26.82 S/. 697.32 100% 26.82 S/. 697.32 0.00 S/. - 0%
S/. - 10.09 S/. 3,737.74 100% 10.09 S/. 3,737.74 0.00 S/. - 0%
S/. - 50.48 S/. 41.39 100% 50.48 S/. 41.39 0.00 S/. - 0%
S/. - 19.20 S/. 125.95 100% 19.20 S/. 125.95 0.00 S/. - 0%
S/. - 29.15 S/. 757.90 100% 29.15 S/. 757.90 0.00 S/. - 0%
S/. - 26.71 S/. 9,894.45 100% 26.71 S/. 9,894.45 0.00 S/. - 0%
S/. - 133.60 S/. 109.55 100% 133.60 S/. 109.55 0.00 S/. - 0%
S/. - 56.60 S/. 371.30 100% 56.60 S/. 371.30 0.00 S/. - 0%
VALORIZACIÓNES MENSUALES
SALDO
AVANCE FÍSICO MES DE JULIO AVANCE FÍSICO MES DE AGOSTO AVANCE FÍSICO MES DE AGOSTO ACUMULADO
% AVANCE METRADO VALORIZADO % AVANCE METRADO VALORIZADO % AVANCE METRADO VALORIZADO % AVANCE METRADO VALORIZADO %
S/. - 88.39 S/. 2,284.00 100% 88.39 S/. 2,284.00 0.00 S/. - 0%
S/. - 31.52 S/. 11,676.27 100% 31.52 S/. 11,676.27 0.00 S/. - 0%
S/. - 155.67 S/. 127.65 100% 155.67 S/. 127.65 0.00 S/. - 0%
S/. - 19.56 S/. 128.31 100% 19.56 S/. 128.31 0.00 S/. - 0%
12% 213.23 S/. 7,111.22 88% S/. - 241.58 S/. 8,056.69 0.00 S/. - 0%
12% 30.43 S/. 9,792.68 88% S/. - 34.48 S/. 11,096.01 0.00 S/. - 0%
12% 185.89 S/. 2,213.95 88% S/. - 210.64 S/. 2,508.72 0.00 S/. - 0%
25.30 S/. 165.97 100% S/. - 25.30 S/. 165.97 0.00 S/. - 0%
17% 5.00 S/. 2,345.50 83% S/. - 6.00 S/. 2,814.60 0.00 S/. - 0%
S/. - 6.00 S/. 569.88 100% 6.00 S/. 569.88 0.00 S/. - 0%
2% S/. - 40.83 S/. 69.41 17% 240.71 S/. 409.21 0.00 S/. - 0%
17% 5.00 S/. 322.40 83% S/. - 6.00 S/. 386.88 0.00 S/. - 0%
S/. - 143.63 S/. 2,983.20 100% 143.63 S/. 2,983.20 0.00 S/. - 0%
S/. - 187.02 S/. 583.50 100% 187.02 S/. 583.50 0.00 S/. - 0%
S/. - 151.20 S/. 3,687.77 100% 151.20 S/. 3,687.77 0.00 S/. - 0%
S/. - 7.96 S/. 207.68 100% 7.96 S/. 207.68 0.00 S/. - 0%
20% 0.15 S/. 225.00 15% 0.15 S/. 225.00 15% 1.00 S/. 1,500.00 0.00 S/. - 0%
S/. - 6.00 S/. 4,927.32 100% 6.00 S/. 4,927.32 0.00 S/. - 0%
S/. - 1743.75 S/. 575.44 100% 1743.75 S/. 575.44 0.00 S/. - 0%
VALORIZACIÓNES MENSUALES
SALDO
AVANCE FÍSICO MES DE JULIO AVANCE FÍSICO MES DE AGOSTO AVANCE FÍSICO MES DE AGOSTO ACUMULADO
% AVANCE METRADO VALORIZADO % AVANCE METRADO VALORIZADO % AVANCE METRADO VALORIZADO % AVANCE METRADO VALORIZADO %
15% 27.21 S/. 563.52 14% 14.79 S/. 306.30 8% 180.80 S/. 3,744.37 11.36 S/. 235.27 6%
3% S/. - S/. - 553.75 S/. 32,549.43 63.79 S/. 3,749.58 10%
8% 43.87 S/. 543.55 12% 18.49 S/. 229.09 5% 329.85 S/. 4,086.84 26.14 S/. 323.87 7%
8% 43.87 S/. 791.41 12% 18.49 S/. 333.56 5% 329.85 S/. 5,950.49 26.14 S/. 471.57 7%
8% 108.78 S/. 528.67 14% 60.74 S/. 295.20 8% 741.33 S/. 3,602.86 56.80 S/. 276.05 7%
8% 108.78 S/. 1,030.15 14% 47.64 S/. 451.15 6% 728.23 S/. 6,896.34 56.80 S/. 537.90 7%
59% S/. - 66.94 S/. 1,687.56 27% 236.43 S/. 5,960.40 14.13 S/. 356.22 6%
59% 13.17 S/. 688.40 2% 178.08 S/. 9,308.24 26% 635.86 S/. 33,236.40 38.55 S/. 2,015.01 6%
60% S/. - 4.95 S/. 1,597.66 28% 16.83 S/. 5,432.05 0.90 S/. 290.48 5%
S/. - 1.83 S/. 588.91 100% 1.83 S/. 588.91 0.00 S/. - 0%
62% 13.17 S/. 10.80 2% 154.43 S/. 126.63 22% 651.82 S/. 534.49 41.54 S/. 34.06 6%
72.70 S/. 476.91 83% 15.00 S/. 98.40 17% 87.70 S/. 575.31 0.00 S/. - 0%
75% 3.19 S/. 80.42 13% S/. - 23.55 S/. 593.70 1.34 S/. 33.78 5%
58% 42.59 S/. 2,226.18 28% S/. - 135.08 S/. 7,060.63 15.06 S/. 787.19 10%
58% 42.59 S/. 34.92 28% S/. - 135.08 S/. 110.77 15.06 S/. 12.35 10%
100.32 S/. 658.10 100% S/. - 100.32 S/. 658.10 0.00 S/. - 0%
2.73 S/. 68.03 57% 2.02 S/. 50.34 43% 4.75 S/. 118.37 0.00 S/. - 0%
0.66 S/. 219.59 57% 0.50 S/. 166.36 43% 1.16 S/. 385.94 0.00 S/. - 0%
6.58 S/. 78.37 57% 5.00 S/. 59.55 43% 11.58 S/. 137.92 0.00 S/. - 0%
S/. - 301.82 S/. 7,826.19 100% 301.82 S/. 7,826.19 0.00 S/. - 0%
S/. - 115.00 S/. 2,010.20 100% 115.00 S/. 2,010.20 0.00 S/. - 0%
S/. - 1.00 S/. 733.69 100% 1.00 S/. 733.69 0.00 S/. - 0%
S/. - 4.00 S/. 1,005.64 100% 4.00 S/. 1,005.64 0.00 S/. - 0%
S/. - 1.18 S/. 562.99 100% 1.18 S/. 562.99 0.00 S/. - 0%
31% S/. - S/. - 35.00 S/. 3,435.25 0.00 S/. - 0%
S/. - 855.08 S/. 282.18 100% 855.08 S/. 282.18 0.00 S/. - 0%
VALORIZACIÓNES MENSUALES
SALDO
AVANCE FÍSICO MES DE JULIO AVANCE FÍSICO MES DE AGOSTO AVANCE FÍSICO MES DE AGOSTO ACUMULADO
% AVANCE METRADO VALORIZADO % AVANCE METRADO VALORIZADO % AVANCE METRADO VALORIZADO % AVANCE METRADO VALORIZADO %
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
01.04.08.01 ENCOFRADO Y DESENCOFRADO PARA CUNETAS m2 0.00 S/. 25.84 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.04.08.02 CONCRETO EN CUNETAS f'c=210 kg/cm2 Incluye Acabado m3 0.00 S/. 370.44 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.04.08.03 CURADO TIPO ARROCERA m2 0.00 S/. 0.82 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.04.08.04 RELLENO DE JUNTAS CON ASFALTO m 0.00 S/. 6.56 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.05 OBRAS DE CONCRETO SIMPLE
01.05.01 SARDINEL PERALTADO
01.05.01.01 ENCOFRADO Y DESENCOFRADO DE SARDINELES m2 0.00 S/. 33.35 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.05.01.02 CONCRETO EN SARDINEL PERALTADO f'c=175 kg/cm2 m3 0.00 S/. 321.81 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.05.01.03 ACABADO EN SARDINEL PERALTADO m2 0.00 S/. 11.91 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.05.01.04 RELLENO DE JUNTAS CON ASFALTO m 0.00 S/. 6.56 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.06 REPOSICION DE ESTRUCTURAS DESAGUE PLUVIAL
01.06.01 TRABAJOS PRELIMINARES
01.06.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 0.00 S/. 1.91 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.06.02 MOVIMIENTO DE TIERRAS
01.06.02.01 EXCAVACION DE ZANJA C/MAQUINA m 0.00 S/. 6.78 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.06.02.02 EXCAVACION MANUAL DE ZANJA PARA SUMIDERO H<1.50 m3 0.00 S/. 20.71 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.06.02.03 REFINE Y NIVELACION DE ZANJAS P/TUB. 8"-10" m 0.00 S/. 4.12 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.06.02.04 PREPARACION DE CAMAS DE APOYO P/TUB. 8"-10" m 0.00 S/. 7.42 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.06.02.05 RELLENO COMP. ZANJA TUB. 8"-10" H=0.30 M m 0.00 S/. 30.06 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.06.02.06 SEGUNDO RELLENO Y COMPACTACION DE ZANJA MATERIAL DE m 0.00 S/. 29.90 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.06.02.07 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO. m3 0.00 S/. 21.07 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.06.03 OBRAS DE CONCRETO
01.06.03.01 CONSTRUCCION DE SUMIDEROS und 0.00 S/. 469.10 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.06.03.02 TAPA DE INSPECCION PARA REJILLA DE SUMIDERO und 0.00 S/. 94.98 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.06.04 SUMINISTRO E INSTALACION DE TUBERIA
01.06.04.01 SUMINISTRO E INSTALACION DE TUBERIA PVC UF DN 200 MM S- m 0.00 S/. 34.13 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.06.04.02 SUMINISTRO E INSTALACION DE TUBERIA PVC UF DN 250 MM S- m 0.00 S/. 51.82 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.06.05 PRUEBA HIDRAULICA
01.06.05.01 PRUEBA HIDRÁULICA DE ALCANTARILLADO m 0.00 S/. 1.70 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.06.06 INSTALACIONES METALICAS
01.06.06.01 VENTANA SUMIDERO 0.60X0.30 m und 0.00 S/. 64.48 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.07 SEÑALIZACION HORIZONTAL
01.07.01 PINTURA EN SARDINELES m2 0.00 S/. 20.77 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.07.02 PINTURA EN PAVIMENTO LINEA DISCONTINUA. m 0.00 S/. 3.12 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.07.03 PINTURA ZONAL EN CRUCE PEATONAL. m2 0.00 S/. 24.39 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.07.04 PINTURA EN PAVIMENTO LETRAS Y SIMBOLOS. m2 0.00 S/. 26.09 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.08 IMPACTO AMBIENTAL
01.08.01 MITIGACION DE IMPACTO AMBIENTAL glb 0.00 S/. 1,500.00 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.09 VARIOS
01.09.01 NIVELACION DE TAPAS DE BUZON A NIVEL DE BASE und 0.00 S/. 821.22 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
01.09.02 LIMPIEZA FINAL DE LA OBRA m2 0.00 S/. 0.33 S/. - S/. - S/. - 0.00 S/. - 0.00 S/. -
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
S/. 9,123.31
COSTO DIRECTO S/. - S/. 9,123.32 S/. 9,123.32 S/. -
Porcentaje de avance (%) 100.00% 0.00% 100.00% 100.00% 0.00%
GASTOS GENERALES (13.00%) S/. 1,186.03 S/. - S/. 1,186.03 S/. 1,186.03 S/. -
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
SALDO
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
SALDO
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
SALDO
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0.00%
0.00%
SALDO
0.00%
0.00%
0.00%
0.00%
0.00%
OBRA: "MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
COSTO DIRECTO S/. 8,235.80 S/. - S/. 8,235.80 S/. 8,235.80 S/. -
Porcentaje de avance (%) 100.00% 0.00% 100.00% 100.00% 0.00%
GASTOS GENERALES (13.00%) S/. 1,070.65 S/. - S/. 1,070.65 S/. 1,070.65 S/. -
SUB TOTAL S/. 9,306.46 S/. - S/. 9,306.46 S/. 9,306.46 S/. -
SUPERVISION (4.00%) S/. 372.26 S/. - S/. 372.26 S/. 372.26 S/. -
LIQUIDACIÓN (1.50%) S/. 139.60 S/. - S/. - S/. - S/. 139.60
TOTAL GENERAL S/. 9,818.31 S/. - S/. 9,678.72 S/. 9,678.72 S/. 139.60
Porcentaje de Avance Total (%) 100.00% 0.00% 98.58% 98.58% 1.42%
SALDO
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0.00%
0.00%
0.00%
0.00%
100.00%
1.42%
PRESUPUESTO BASE S/. 536,661.73 S/. 525,940.01 98.00% S/. 10,721.71 2.00%
"MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DEL JR. JORGE BASADRE TRAMO: AV. GENERAL CORDOVA – JR. SUCRE Y PSJE. SANTA MARIA DEL
OBRA:
DISTRITO DE CHILCA - HUANCAYO - JUNÍN"
SUPERVISOR: ING. YESSENIA HUAROC PEREZ
RESIDENTE: ING. IRVIN RONY CARDENAS POMA
MES: sep-oct 2018
MAYO Nº 01 S/. 21,545.61 S/. 21,545.61 4.71% S/. 69,459.61 S/. 69,459.61 15.18% 322.38%
JUNIO Nº 02 S/. 138,109.04 S/. 159,654.65 34.89% S/. 63,885.25 S/. 133,344.85 29.14% 83.52%
JULIO Nº 03 S/. 143,537.38 S/. 303,192.03 66.27% S/. 71,185.75 S/. 204,530.60 44.70% 67.46%
AGOSTO Nº 04 S/. 128,435.37 S/. 431,627.40 94.34% S/. 141,075.91 S/. 345,606.52 75.54% 80.07%
SETIEMBRE Nº 05 S/. 18,545.41 S/. 450,172.81 98.39% S/. 94,918.94 S/. 440,525.46 96.28% 97.86%
OCTUBRE Nº 06 S/. 7,370.35 S/. 457,543.16 100.00% S/. 7,894.39 S/. 448,419.85 98.01% 98.01%
### ###
0.9
0.8
0.7553528235
0.7
0.6626523059
0.6
0.5
0.4470192574
0.4
0.3489389941
0.3 0.291436664
0.2
0.1518099549
0.1
0 0.0470897871
0 0
INICIO MAYO JUNIO JULIO AGOSTO SETIEMBRE OCTUBRE
COSTO DIRECTO S/. 457,543.16 S/. 102,813.33 S/. - S/. - S/. - S/. - S/. -
GASTOS GENERALES 13.00% S/. 59,480.61 S/. 13,365.73 S/. - S/. - S/. - S/. - S/. -
SUPERVISIÓN 4.00% S/. 20,680.95 S/. 4,647.16 S/. - S/. - S/. - S/. - S/. -
LIQUIDACIÓN 1.50% S/. 7,755.36 S/. - S/. - S/. - S/. - S/. - S/. -
EXPEDIENTE TÉCNICO S/. 11,500.00 S/. 11,500.00 S/. - S/. - S/. - S/. - S/. -
PORCENTAJE DE AVANCE VALORIZADO 23.76% 23.76% 0.00% 0.00% 0.00% 0.00% 0.00%