MILITARY TECHNOLOGICAL COLLEGE  

MTCC3006 Introduction to Civil Engineering 

Week 14: Resource Planning  

Vocabulary 

Planning: Construction project planning is a method of determining “What” is going to be done, “How” 
things are going to be done, “Who” will be doing activities and “How much” activities will cost.  
 
Plant: Mechanical equipment and services. Can be mobile such as cranes, dumpers, and excavators, or 
can be stationary. 
 
Scope of Works: A description of the extent and nature of work to be undertaken. The specification that 
give the details of the work. 
 
Scope of Work: The work that needs to be accomplished to deliver a product, service, or result with the 
specified features and functions. 
 
Work Breakdown Structure (WBS):  In project management, is a deliverable‐oriented breakdown of a 
project into smaller components.  
 
Project Cost Management (PCM): Is an activity for estimating costs, developing project budget and 
controlling spending. 
 
Budget: Is a financial plan for a defined period of time. Estimate of the cost of work, and is considered to 
cover the cost of all the contractors’ work.  
 
 
Aggregate: Granular material used in concrete, road construction, mortars, and plaster. Aggregates can 
originate from natural rocks, gravel and sands. 
 
 
 

Aggregate Cement Ratio: Weight of aggregate divided by the weight of cement. 
 
Adhesive:  
A substance used to bond two objects or materials together. 
 
Adjacent: 
Adjoining, next to, near, or close to.